Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TERMINAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Implementing the Mars Science Laboratory Terminal Descent Sensor Field Test Campaign

Overall, the MSL TDS Field Test campaign was very successful. TDS was shown to perform extremely well over the required operational envelope. Early BB TDS field tests uncovered a number of issues, but none that invalidated the TDS design or implementation. EM TDS tests uncovered minor things of interest, but nothing of concern. Value of testing hardware in the field was demonstrated and significantly contributed to the overall TDS V&V effort. Over the 5-plus year field test campaign, numerous lessons were learned that will inform future field test efforts.

Terminal Descent Sensor↗

Evaluation of the Controller-Managed Spacing Tools, Flight-Deck Interval Management and Terminal Area Metering Capabilities for the ATM Technology Demonstration #1

NASA has developed a suite of advanced arrival management technologies combining time-based scheduling with controller- and flight deck-based precision spacing capabilities that allow fuel-efficient arrival operations during periods of high throughput. An operational demonstration of these integrated technologies, i.e., the ATM Technology Demonstration #1 (ATD-1), is slated for 2016. Human-in-the-loop simulations were conducted to evaluate the performance of the ATD-1 system and validate operational feasibility. The ATD-1 system was found to be robust to scenarios with saturated demand levels and high levels of system delay. High throughput, 10 above baseline demand levels, and schedule conformance less than 20 seconds at the 75th percentile were achievable. The flight-deck interval management capabilities also improved the median schedule conformance at the final approach fix from 5 to 3 seconds with less variance.

terminal metering↗