At least 1,477 records · Page 82

Pumping optimization model for pump and treat systems - 15091

Pump and Treat systems are being utilized to remediate contaminated groundwater in the Hanford 100 Areas adjacent to the Columbia River in Eastern Washington. Design of the systems was supported by a three-dimensional (3D) fate and transport model. This model provided sophisticated simulation capabilities but requires many hours to calculate results for each simulation considered. Many simulations are required to optimize system performance, so a two-dimensional (2D) model was created to reduce run time. The 2D model was developed as a equivalent-property version of the 3D model that derives boundary conditions and aquifer properties from the 3D model. It produces predictions that are very close to the 3D model predictions, allowing it to be used for comparative remedy analyses. Any potential system modifications identified by using the 2D version are verified for use by running the 3D model to confirm performance. The 2D model was incorporated into a comprehensive analysis system (the Pumping Optimization Model, POM) to simplify analysis of multiple simulations. It allows rapid turnaround by utilizing a graphical user interface that: 1 allows operators to create hypothetical scenarios for system operation, 2 feeds the input to the 2D fate and transport model, and 3 displays the scenario results to evaluate performance improvement. All of the above is accomplished within the user interface. Complex analyses can be completed within a few hours and multiple simulations can be compared side-by-side. The POM utilizes standard office computing equipment and established groundwater modeling software. (authors)

54 ENVIRONMENTAL SCIENCES↗

Numerical modeling of groundwater flow in the Navajo sandstone aquifer at the Tuba city, Arizona, disposal site - 15167

A numerical model is being developed to describe groundwater flow in the Navajo Sandstone aquifer that underlies the US DOE Office of Legacy Management Tuba City disposal site that is located near Tuba City, Arizona. The site is a former uranium-ore processing mill that operated from 1956 until 1966. Resulting groundwater contamination extends approximately 457 meters (1,500 feet) off the site. The primary contaminants are nitrate, sulfate, and uranium. Onsite solid waste encapsulation was completed by 1990 and pump-and-treat groundwater remediation was implemented in 2002. A site conceptual model, along with an approach to numerically simulate groundwater flow and advective transport of contaminants at the site, is being developed. Numerical model calibration will address transient periods of active and inactive groundwater withdrawal during the remedial action. The calibrated model will be applied to forecast contaminant capture under the current and hypothetical groundwater extraction scenarios. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of a facility in a historical reactor at SRS: achieving both historical significance preservation and effective in-situ decommissioning - 15275

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions, LLC (SRNS). In 2004, US DOE recognized SRS as a structure within the Cold War Historic District of national, state and local significance because it is composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. US DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. The Disassembly Basin (DB) in C Reactor was evaluated for action under CERCLA. Data indicated there were over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 million (M) liters (L) of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. The need for an action was identified to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. In-situ decommissioning was selected as the remedy. The remedial action proceeded in stages: -Above-grade modifications to the interior of DB building -Relocation of irradiated scrap and reactor components to the deepest segments of the DB - Construction of a metal building to house evaporators - Forced evaporation of the DB's radiologically contaminated water - Grouting with special hybrid grouts - Removal of the evaporators and temporary building. Since the building itself was not demolished and will remain unchanged in appearance with the exception of filling the DB with grout, this ISD removal action/methodology did not adversely impact the historical significance of the 105-C Reactor Building, in accordance with the National Historic Preservation Act, nor did it adversely affect the ability to determine the full extent and details of preservation at some later date. Both special hybrid grout materials met all requirements. Overall average 7-day compressive strength for the dry area mix was 1.54 MPa (223 psi) and for the underwater mix 2.94 MPa (427 psi).Overall 28-day compressive strength for the dry area mix was 2.88 MPa (417 psi) and for the underwater mix 4.99 MPa (724 psi). A limited amount of testing was also performed at 91 days, where the overall compressive strength for the dry area mix was found to be 9.40 MPa (1363 psi) and for the underwater mix 13.98 MPa (2028 psi). All compressive strength values far exceeded the 0.34 MPa (50 psi) minimum requirements. The special, flowable-fill grouts designed and used for P- and R-Reactor ISD and used again for this 105-C ISD removal action resulted in considerable labor, cost, and schedule savings versus conventional materials. As an added bonus/benefit, the CO{sub 2} footprint of the SRS C-Reactor DB ISD was minimized by using a small amount of cement and byproduct material to produce the structural fill materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Of the final end state for decommissioning of reactors at SRS: collaboration between stakeholders, regulators, and the Federal Government - 15279

The Savannah River Site (SRS) is an 802 square-kilometer (310 square-miles) United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina. Nuclear weapons material production began in the early 1950's, utilizing five (5) production reactors. In the early 1990's all SRS production reactor operations were terminated. The first reactor closure end-state declaration was documented in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 29,543 square-meter (318,000 square-feet) 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost-effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U.S. Environmental Protection Agency (USEPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized / immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the up-front planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 321 kilometer (200-mile) radius) with stakeholder and SRS Citizens Advisory Board (CAB) participation. These meetings were conducted over an eight- month period as the end-state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four (4) SRS reactors and other hardened facilities such as the chemical Separation Facilities (canyons). Closure of the SRS P Reactor Area was precedent setting and sets the stage for closure of other reactors and hardened facilities. The DOE, USEPA, and SCDHEC engaged in active, up-front, and timely involvement with the SRS. The SRS CAB, elected officials, and citizens of South Carolina and Georgia met to discuss the P reactor area closure and associated risks. Early public involvement gave SRS and the regulators assurance that the selected decision was valid and would not be overturned. Public input improved the process and ensured that the important decision on the final end-state of the reactor facilities was not made in isolation. ISD of P Reactor will provide adequate protection of human health and the environment and the lowest cost since short-term risk is minimized to remedial workers from exposure to contaminated equipment and facilities by leaving the reactor vessel in place allowing for radiological decay over time. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Systems-based approach to understanding Technetium immobilization in the subsurface - 15326

The purpose of this work is to identify the chemical and biological reactions that occur and potentially influence the mobility of Technetium (Tc-99) in the subsurface. Tc-99 is a by-product of nuclear fission processes and has a relatively long half-life (t{sub 1/2}=212,000 years); additionally, it is highly soluble and mobile in groundwater and is most often remediated through pump and treat systems. The oxidized form of Tc-99 [Pertechnetate, Tc(VII)O{sub 4}-] is highly soluble and very mobile, while the reduced form of Tc-99 [Technetium-oxide, Tc(IV)O{sub 2}·nH{sub 2}O] is insoluble. Historically, complex interactions within the subsurface have made clean-up efforts for Tc-99 challenging. It is thought that environmental bacteria play a role in reducing contaminants to less soluble forms but it is difficult to predict or estimate the interactions and impacts of the complex, mixed microbial communities found in the environment. We have set up controlled batch experiments to examine a selection of organisms (Anaeromyxobacter dehalogenans strain CP-C, Geobacter sulfurreducens strain PAC, Geobacter daltonii strain FRC-32, and Shewanella oneidensis strain MR1) that have known metal reducing capabilities, for their ability to reduce Tc-99 to less soluble forms. An additional organism, Cellulomonas strain ES6 was chosen based on its origin of isolation from the Hanford site. Organisms were evaluated under anaerobic conditions both as isolates and in mixed consortia with and without the presence of iron-bearing mineral substrate. Experiments were monitored using spectroscopy, qPCR, volatile organic acid (VOA) analysis, and inductively coupled plasma-optical emission spectroscopy (ICP-OES) and mass spectrometer techniques (ICP-MS). Initial data collected has shown that the presence and type of substrate may increase the reduction of Tc-99 to less mobile forms. Data collected from these experiments will allow for (a) a better understanding of the mobility of Tc-99 in the subsurface, (b) better predictions of contaminant fate and transport over time, and (c) the development of long term remediation strategies for Tc-99. Additionally, information collected will be used to develop a systems-based metabolic model with predictive capabilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US EPA superfund radiation risk assessment update: new, revised, and upcoming tools - 15350

The U.S. EPA Superfund remedial program is finishing up a significant number of revisions to its guidance for the risk assessment process at radioactively contaminated Superfund sites. The six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet based calculators for risk and dose assessment at Superfund sites are being revised to reflect better science, revisions to existing exposure scenarios and new scenarios, and changes to match up more closely with the EPA chemical regional screening level calculator. A comprehensive set of revisions to the PRG calculator will be finished in November 2014. A revised version of the 1999 guidance document that provides an overview for the Superfund risk assessment process at radioactively contaminated sites, 'Radiation Risk Assessment At CERCLA Sites: Q and A' was issued on June 13, 2014 reflects Superfund recommended guidance and other technical documents issued over the past 15 years. Also on June 13, 2014 EPA issued a new tool-kit comprised of 22 fact sheets that was developed to help the general public understand more about EPA's risk assessment process used at radioactively contaminated Superfund sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3D Sonar for tank waste quantification - 15430

An innovative remote 3D Sonar technology adapted from the oil and gas industry has been successfully applied to the mapping of radioactive sludge deposits during tank, fuel pool and silo remediation operations at the Sellafield site in the UK. The technology can: -Measure the disposition and calculate the volume of settled solids in a waste tank thereby supporting tank closure objectives - Produce accurate 3-D images of solids disposition, structure and tank internals to help identify where sludge deposits and debris are located -Capture real time 'Sonar video' of movement of solids in the tank in real time to aid retrieval - Detect and monitor gas release and bubble generation Aside from direct safety, cost and schedule benefits, improved accuracy and confidence in residual waste volume determinations can lead to increased level of regulator confidence in meeting closure objectives. This technology has potential to bring such benefits to challenges in the DOE estate, such as Savannah River Site (SRS) and Hanford Tank Farms remediation, and operations at the Hanford Waste Treatment Plant. This paper describes the 3D Sonar technology and its applications, and reviews a 3D Sonar demonstration project specifically aimed at enhancing retrieval and closure operations at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory testing options for FUSRAP projects - 15462

Remediation projects within the Formerly Used Sites Remedial Action Program (FUSRAP) have many options to consider when evaluating their analytical testing needs. Factors that should be considered in determination of a project's analytical testing needs include which parameter results are considered time-critical, the potential savings in reduction of construction-related delays when time-critical samples are analyzed onsite (including screening) instead of offsite, control of data quality for onsite versus offsite data, and the value of additional knowledge gained by programs such as FUSRAP by employing onsite laboratories. The most important factor turned out to be reduction in construction-related delays. We considered development of an optimum combination of onsite lab/offsite lab capability. This depends on: i. Time critical parameters and the methods required; ii. Estimated Cost for onsite lab construction or facility rental, maintenance, labor, chemicals (reagents and standards), and certification (if desired and deemed necessary) iii. Ability, flexibility, and cost of offsite lab sample testing using project-desired TATs and methods that will meet project action levels iv. Willingness of stakeholders, in particular regulators, in accepting some combination of onsite and offsite testing (for example, onsite screening followed by offsite confirmatory testing for certain parameters) Due to the significant costs in construction of an onsite lab and development of sample testing capability and all which that entails, the recommendations made in this paper will aid other FUSRAP projects in finding an acceptable combination of onsite and offsite testing that is acceptable to all stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New approach to gamma scans for processed natural uranium at a FUSRAP site - 15470

The Superior Steel Site is part of the FUSRAP because the former facility processed natural uranium metal in support of the Atomic Energy Commission (AEC) fuel-element development program in the 1950's. Previous investigations of the site have identified uranium contamination both inside and outside of the building associated with the uranium work and some limited remediation was performed in the past. As part of the remedial investigation (RI) process for the site, gamma scan surveys were completed in order to define the nature and extent of elevated residual uranium associated with AEC activities. One of the challenges with investigating for processed natural uranium versus unprocessed natural uranium is that the processed uranium is practically devoid of its decay progeny, which produce gamma photon radiation emissions commonly relied upon to detect the presence of uranium. To address this challenge, a sodium iodide (NaI) detector was designed and fabricated to optimize the signal to noise ratio for U-238 low energy gammas (59-127 keV) and to reduce interferences from other radionuclides that may be present from non-FUSRAP sources. Gamma scan surveys were performed with the optimized NaI detector in conjunction with typical, commercially available 0.35 liter NaI detectors. The results of this survey and a comparison between the detectors is presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges in obtaining property access: The FUSRAP Maywood site experience - 15550

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the US government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. Many of these sites are not owned by the federal government and therefore require owner permission to enter. The experience in pursuing such access at the FUSRAP Maywood Superfund Site (the Maywood Site or the Site) in Bergen County, New Jersey, is extensive. Since the US Army Corps of Engineers (the Corps) assumed responsibility for the Maywood Site from the US Department of Energy in 1997, over 200 separate property access agreements (known in FUSRAP as a Real Estate Right-of-Entry or ROE) have been executed between the Corps and approximately 75 different land owners and tenant occupants at the Maywood Site (agreement renewals with the same owners over time account for the difference). Maywood's experience during the Corps' tenure, reflected here in three case studies of representative property access efforts, offers some lessons and best practices that may apply to other remedial programs. While the Site Community Relations Manager (the author of this paper) managed the property access task, multi-disciplinary support from across the project was also critical to success in this endeavor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation and evaluation of a radiological field investigation for real property interests associated with the FUSRAP Maywood Site - 15611

Public streets, easements, and rights-of-way, collectively referred to as Real Property Interests (RPI), pose challenging and complex problems for the FUSRAP Maywood Project Team. RPIs are components of a multi-faceted objective to evaluate all remaining sources of contamination for which the Government is responsible under the Maywood Record of Decision. USACE designed and implemented a MARSSIM-based radiological investigation within sixteen potentially impacted RPIs. These RPIs were not completely addressed on their own or in conjunction with nearby property investigations or remediations. However, these RPIs were investigated based on the potential for or known impact of FMSS contamination as determined through both a historic data review of the transport mechanism (downstream waste deposition) and process knowledge obtained during Final Status Survey of proximal properties. The primary objectives of this investigation were to confirm the presence or absence of FUSRAP contamination within a given RPI, provide sufficient data to release an RPI if contamination was not encountered, and provide sufficient data for either design of an appropriate remedial solution or implementation of Land Use Controls when contamination was encountered. Of additional value, knowledge gained during the RPI investigations will allow the team to share useful radiological data with local officials and utility service providers. This information will support better, more informed decisions by all parties involved in situations such as emergency subsurface utility repairs, roadway improvement planning, or even natural disaster response. Finally, certain unexpected outcomes learned during the final data analysis may lead to refinement of the conceptual site model. Logistical lessons learned and challenges encountered during the Maywood investigation may also be helpful to stakeholders, planners, and managers of similar projects wishing to identify their own potential liability within public streets, easements, rights-of-way, and other types of RPIs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Land-use planning scenarios for contaminated land: comparing EPA, state, and tribal scenarios - 15642

Land-use planning focusing on future disposition of public lands, forests and, former agricultural or industrial land, must take into account demographic and economic factors as well as future needs and availability of recreational open space, arable land, and water for growing populations. Planning requires the balancing of competing interests for 'growth', open space, and preservation of cultural, ecological and natural resources Landscapes with soil, surface water, and groundwater contaminated by former military, industrial, mining or agricultural uses, pose special challenges, many of which have been addressed under the rubric of 'brown-fields'. Land-use decisions or recommendations can be based mainly on economic/social interests taking into account projected demographic changes, or they can be based mainly on environmental issues taking into account contamination levels, remediation costs and technologies, and health risk issues. Future land-use is interwoven with cleanup goals. Where unrestricted future land-use is anticipated or desired, cleanup levels for soil and groundwater must be low enough to allow such uses without unacceptable health risks. Where such cleanup levels are unattainable for fiscal or technological reasons, residual contamination will remain, and future uses, particularly for groundwater, must be restricted, requiring engineered barriers and institutional controls to interdict future exposure pathways from contaminated environmental media to receptors (residents, recreationists, employees). Although contamination and hazard may persist for centuries, planning beyond a generation or two incurs great uncertainties in demographics, policies, economic, and climate-related changes. The Environmental Protection Agency and various states have established categories of clean-up levels corresponding to future industrial, recreational and residential use, with variations on these themes. This paper examines the spectrum of land-uses, and emphasizes a distinctions between -residential- and -unrestricted- as applied to future land-uses, particularly involving groundwater. Land-use determinations can be proposed and evaluated by a myriad of regulatory policies, guidance documents, and processes, including comprehensive land-use planning documents, Baseline Risk Assessments, Remedial Investigation/Feasibility documents and Records of Decision - which are not the focus of this study. This study instead focuses on gradations in different residential, recreational and industrial land-use scenarios and their relation to contamination of soil and groundwater. The Consortium for Risk Evaluation with Stakeholder Participation (CRESP) instituted this study to help understand the varying land-use versus clean-up decisions at the Department of Energy's environmental management sites, particularly Hanford (Washington State). (authors)

54 ENVIRONMENTAL SCIENCES↗

RCRA closure at the Connecticut Yankee atomic power company Haddam neck plant - 15655

From 1968 through 1996 Connecticut Yankee Atomic Power Company (CYAPCO) operated the Haddam Neck Plant (HNP) at 362 Injun Hollow Road, East Hampton, Connecticut. In 1980 CYAPCO applied to be a permitted generator and storage facility for hazardous waste and was issued a Resource Conservation and Recovery Act (RCRA) Part A Treatment, Storage, and Disposal Facility Permit. During the operational period, the HNP produced more than 110 billion kilowatt-hours of energy. In 1996, CYAPCO decided to close and decommission the HNP. Decommissioning activities began in 1998 and were successfully completed in 2007 in accordance with Nuclear Regulatory Commission (NRC) regulations and the CYAPCO License Termination Plan. As part of the closure process for the HNP, closure of the RCRA permit under the RCRA Corrective Action Program (CAP) was required. From 2002 through 2007, under the RCRA CAP, CYAPCO completed investigations and remediation work to address environmental impacts resulting from chemical usage at the HNP. The RCRA CAP was conducted under the regulatory authority of the United States Environmental Protection Agency (USEPA) and the Connecticut Department of Energy and Environmental Protection (CTDEEP). In the fall of 2014, the RCRA closure process was completed, and CYAPCO, with concurrence from USEPA, was issued a Letter of Completion from the CTDEEP signifying completion of the RCRA closure process. The paper discusses the RCRA closure process completed at the HNP, including the investigation, remediation, groundwater monitoring, and closure activities completed to achieve closure of the HNP under the RCRA requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Study of autunite dissolution in the presence of Shewanella oneidensis MR1 and different bicarbonate concentrations - 15736

Remediation of uranium at Hanford Site 300 area via tripolyphosphate injections could sequester uranium (VI) in an insoluble form, creating different types of uranium phosphate minerals like autunite. The factors that influence the dissolution of such minerals come into question. Bacteria can play a significant role in the dissolution of minerals and the formation of secondary minerals. Formed autunite, as a phosphorus-containing mineral, can attract bacteria to liberate phosphorus, meeting their nutrient requirements and causing uranium release back into the environment. Previous studies have been conducted under aerobic conditions. This research was extended to investigate the stability of the autunite mineral under anaerobic conditions pertaining to the Hanford Site, and to study the effect of facultative anaerobic bacteria on the uranium (VI) release from autunite. Objectives: - Evaluate bacterial interactions with uranium (VI) by focusing on facultative anaerobic bacteria, Shewanella Oneidensis MR1. - Study the effect of bacteria on the dissolution of the uranyl phosphate solid phases created as a result of sodium tripolyphosphate injections into the subsurface at the Hanford 300 Area. - Evaluate the role of anaerobic bacteria as one of the factors affecting the outcome of environmental remediation. Experimental Approach: - 16 crimp-sealed bottles were prepared with 50 ml of media solution and 90 mg (4.4 mM of uranium VI) Ca-autunite mineral obtained from Hanford site. Bottles were inoculated with Shewanella Oneidensis MR1 strains when autunite was equilibrated with the media solutions. Bacteria was obtained from Pacific Northwestern National Laboratory (PNNL). - Solution media preparation: 20 mM NaHepes buffer: pH=7, 10 mM Lactate plus bicarbonate in four concentrations (0, 3, 5 and 10 of KHCO{sub 3}) and a bacteria-free control. Samples were taken from the supernatant solutions of the experimental and control bottles. Wet and dry digestion was performed until a white solid residue was acquired. Dilution was made on solid samples for KPA analysis to determine concentration of U (VI) as function of time. The results suggests that in the absence of HCO{sub 3}{sup -} there was a decrease in the of uranium (VI) concentration due to metal reducing bacteria Shewanella Oneidensis MR1, but for higher concentrations of HCO{sub 3}{sup -}, there is no significant difference in uranium (VI) reduction before and after inoculation with bacteria. - Although bottles were sealed, there is an hypothesis that it was oxygen restricted but not strictly performed under anaerobic conditions. For that matter there is a reason to repeat the experiment using the glove box to understand the uranium (VI) reduction mechanism and behavior of bacteria with oxic/anoxic interfaces. Conclusions: - Higher bicarbonate concentrations might interfere with uranium (VI) reduction by anaerobic bacteria. - It is necessary to reduce time of sampling before the inoculation and prolong sampling time after inoculation. - It might be necessary to increase concentration of lactate. Future Work: - Conduct experiment in strictly anaerobic conditions by using the glove box and evaluate if further reduction of uranium (VI) is obtained in the presence of carbonates (HCO{sub 3}{sup -}). - Finalize analysis of calcium and phosphorous via ICP instrument.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efforts to Improve Efficiency of Extraction Well Operation at the Fernald Preserve, Harrison, Ohio - 16177

The Fernald Preserve, a former uranium processing facility that produced high-purity uranium metal products during the Cold War, is located in southwest Ohio. The facility became a US Department of Energy Office of Legacy Management (LM) site in November 2006, following completion of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration (with the exception of groundwater). When the site was turned over to LM, approximately 76.5 ha of the Great Miami Aquifer remained contaminated with uranium above the final remediation level of 30 μg/L. Here, uranium contamination is being removed from groundwater in the Great Miami Aquifer through a pump-and-treat operation, which is predicted to continue until 2033. Twenty extraction wells pump about 30 million liters per day. Operation of the system is impacted by iron in the groundwater that promotes iron fouling of the well pumps, motors, and screens. The design of the well field evolved over 21 years and reflected a conservative system that could respond to a wide range of pumping conditions. For instance, some of the extraction wells were sized with pumps and motors that would allow the well to pump up to 1890 L/min (500 gpm) if warranted. The added flexibility, though, came at the cost of operational efficiency. We describe the efforts that have been taken by LM since the Fernald site was transferred to LM to mitigate the operational impacts from the iron fouling aquifer conditions and improve the efficiency of the well-field operation. Variable-frequency drives were installed at six wells to replace flow control valves. Several wells with oversized pumps and motors were changed from 24-hour per day operation to 8-hour per day operation to allow the pumps to operate closer to their design flow rates. Pumps and motors were 'right-sized' at many wells to improve pumping efficiency. The process used to rehabilitate (or clean) well screens was improved, and a process was developed to clean pumps without having to pull them from the well. To reduce pressure drops, improvements were also made to the configuration of the discharge piping. A new control system was installed for each well to allow local control and local tracking of energy used. The amount of energy used daily compared to number of gallons pumped provides a method to assess pump performance and determine when action is necessary to restore well pump efficiency. Additionally, the metrics being employed to help quantify well-field efficiency improvements are described, and the benefits achieved by proactively managing the pump-and-treat operation are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US EPA Superfund Radiation Risk Assessment Update: New, Revised, and Upcoming Tools - 16308

The U.S. Environmental Protection Agency (EPA) Superfund remedial program is finishing up a significant number of revisions to its guidance for the risk assessment process at radioactively contaminated Superfund sites. The six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet based calculators for risk and dose assessment at Superfund sites are being revised to reflect better science, revisions to existing exposure scenarios and new scenarios, and changes to match up more closely with the EPA chemical regional screening level calculator. A comprehensive set of revisions to the PRG calculator was finished in November 2014. Additional revisions to the other 5 calculators were made in 2015 and are discussed in this paper. Further revisions are expected prior to WM and will be presented if finished or discussed in more general terms if still underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dense Non Aqueous Phase Liquid Source Area Delineation Using Membrane Interface Probe and Hydraulic Profile Tool Technology at Space Launch Complex 16, Cape Canaveral Air Force Station, Florida - 16352

The historical use and disposal of chlorinated solvents throughout Department of Defense and Department of Energy sites has resulted in subsurface contamination by dense non-aqueous phase liquids (DNAPL). The nature and environmental persistence of DNAPLs makes delineation and remediation of these compounds challenging and costly. This paper examines the utilization of data from a membrane interface probe (MIP) and hydraulic profile tool (HPT) to reduce a typical 18 to 24 month field investigation to 3 months; thereby, significantly reducing costs and resulting in a three-dimensional (3D) imagery of a deep DNAPL plume in order to support an aggressive remedial design for Space Launch Complex 16 (SLC16) at Cape Canaveral Air Force Station, Florida. During the early stages of the U.S. space program, chlorinated solvents were routinely used at space complexes. Spent solvents were discharged to surface impoundments where they migrated into the subsurface. Over time, these chlorinated solvents reached concentrations high enough to form a DNAPL plume. Recent investigations near SLC16 identified a previously unknown DNAPL plume co-mingled with dissolved-phase chlorinated compounds. The DNAPL source area (concentrations of trichloroethene [TCE] as high as 1,000,000 micrograms per liter [μg/L]) was discovered approximately 1,200 feet (ft) west of the existing monitoring network area. The U.S. Air Force, along with the U.S. Army Corps of Engineers, developed data quality objectives (DQO) to delineate the extent of the DNAPL and the dissolved-phase contaminant plume. A multi-phase investigation approach was developed by HydroGeoLogic, Inc. (HGL) emphasizing the use of MIP and HPT sampling technologies, conventional direct push technology (DPT), and monitoring well sampling methods. This approach allowed the collection of real-time data that supported the project DQOs and significantly reduced overall project costs and the field implementation schedule. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenge of Moving Science into Practice: Lessons Learned and New Approaches - 16443

Remediation of residual subsurface soil and groundwater contamination remains a significant problem facing the U.S. Department of Energy Office of Environmental Management (EM). EM has completed cleanup activities at many of their sites, however, many of the remaining sites are technically complex, either due to the nature of the contaminants or to the nature of the subsurface environment. Often these complex sites require supporting scientific studies to resolve key technical uncertainties. A key challenge is the difficulty in efficiently moving advancements from basic and applied science research studies to field applications to address key technical needs. The successful transfer of technologies from the laboratory to the field generally benefits from an overt structure that combines the results of scientific studies with professional judgement to translate them into actionable practice. The process requires a 'connecting of the dots', e.g., bringing the best science and technical judgement to real and measurable improvements to baseline remedial activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗