Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Managers Handbook for Software Development

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.

Agresti, W.↗

Manager's handbook for software development, revision 1

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.

Source record↗

ECUT (Energy Conversion and Utilization Technologies Program). Biocatalysis Project

Presented are the FY 1985 accomplishments, activities, and planned research efforts of the Biocatalysis Project of the U.S. Department of Energy, Energy Conversion and Utilization Technologies (ECUT) Program. The Project's technical activities were organized as follows: In the Molecular Modeling and Applied Genetics work element, research focused on (1) modeling and simulation studies to establish the physiological basis of high temperature tolerance in a selected enzyme and the catalytic mechanisms of three species of another enzyme, and (2) determining the degree of plasmid amplification and stability of several DNA bacterial strains. In the Bioprocess Engineering work element, research focused on (1) studies of plasmid propagation and the generation of models, (2) developing methods for preparing immobilized biocatalyst beads, and (3) developing an enzyme encapsulation method. In the Process Design and Analysis work element, research focused on (1) further refinement of a test case simulation of the economics and energy efficiency of alternative biocatalyzed production processes, (2) developing a candidate bioprocess to determine the potential for reduced energy consumption and facility/operating costs, and (3) a techno-economic assessment of potential advancements in microbial ammonia production.

Source record↗

Nuclear Energy Model Intercomparison Project

This document summarizes the current status and future plans of the Nuclear Model Intercomparison Project. The objectives of this project are to understand how issues central to nuclear energy are modeled in long-term capacity expansion models, to investigate how model structures and input assumptions impact projections for nuclear’s role, to refine model representations of nuclear energy, and to communicate findings to the research community and decision-makers. High-level goals are discussed for each of the four participating model groups: the U.S. Energy Information Administration (EIA), U.S. Environmental Protection Agency (EPA), Electric Power Research Institute (EPRI), and National Renewable Energy Laboratory (NREL). This document summarizes scenarios and assumptions for the model comparison, outcomes from the first workshop, and next steps.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Planning Optimization for Inductively Charged On-demand Automated Electric Shuttles Project at Greenville, South Carolina

Wireless charging technology presents an ideal fit for autonomous electric vehicles for realizing a fully automated system (vehicle and charger). This paper presents a planning optimization analysis for a pilot project of in-route wireless charging infrastructure serving fixed-route on-demand shared automated electric shuttles (SAESs) at Greenville, South Carolina, USA. A single-objective non-linear mixed integer system planning optimization problem is formulated. A comprehensive cost model representing the overall inductively charged SAESs system is developed, considering road construction, power electronics and materials, traction battery, and installation costs. The optimization problem is solved to determine the best combination of the system key design parameters (number and allocations of wireless chargers, charging power level, track length and on-board battery capacity) that show the most cost-effective solution and allow the SAESs to achieve charge-sustaining operation. The planning platform incorporates representative simulated traffic data (driving speed and routes) for four SAESs in the Greenville using the Simulation of Urban Mobility tool. These data are fed to a vehicle powertrain model and a wireless charger power model to predict the battery power, energy and state-of-charge profiles, which are provided to the search algorithm to assess the design objectives under specific constraints. Finally, the results indicate that implementing high-power (100 kW) wireless charger at a few designated stops for fixed-route SAESs with the proper track length allows the vehicles to realize charge-sustaining operation, infinite range, and zero recharge downtime, with a significant reduction in the on-board battery (36%) and road coverage (69%), at minimum cost.

33 ADVANCED PROPULSION SYSTEMS↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 14: Model Verification/Validation Test Plan (Deliverable D10))

This report summarizes the technical progress and validation plan for each of AGGREGATE project modules, and integrated modules. The overall validation plan can be divided into two major parts. Firstly, it provides offline validation results of each module using the IEEE-123 node distribution system with certain modifications to support individual module results verification. The offline validation plan tentatively validated the usability and practicability of developed AGGREGATE tools. Secondly, the realworld test system - Seattle City Light (SCL) test feeder for verifying each module and the integrated modules using GE advanced distribution management system (ADMS) software.

42 ENGINEERING↗

Wallops Flight Facility Integration and Testing Customer Handbook

The Wallops Integration and Testing Handbook is a guide for planning operations at Wallops testing facilities. It provides a summary of the capabilities and technical specifications of available facilities. This handbook prescribes the information to be provided by the user that will enable the integration and testing team to effectively plan for and support the facility user’s project. Note that each facility plans for availability based on current workloads/ mission schedules. For example, sounding rockets may have between 20 and 35 missions in work at one time. Also note that special training, such as cleanroom certification, electrostatic discharge (ESD) or confined space training may be required for entrance to some facilities.

Adam Hammoudi↗

Potential Impacts of Transportation and Building Electrification on the Grid: A Review of Electrification Projections and their Effects on Grid Infrastructure, Operation, and Planning

This paper highlights the main impacts of transportation and building electrification on electricity grid infrastructure, operations, and planning. We focus on which electric technologies are expected to grow, how electrification will impact electricity demand and grid activities, and which solutions might improve the integration of these technologies. Recent industry reports show increasing projections of electrification technologies in the coming decades. Studies show that increased demand from electrification will likely require grid capacity expansion and make grid operations and planning more challenging; however, multiple non-wires solutions exist to ensure integration is efficient and cost-effective. Electrification of space heating and especially transportation is expected to have the largest impact on electricity demand in the near future. Uncontrolled electric vehicle charging poses a significant challenge to grid operations, but control strategies create an opportunity for improved efficiency. Other insights include a high level of uncertainty in electrification adoption and potential benefits of combining electrification technologies with renewable generation and energy storage.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Manned space flight program management.

Manned space flight program management noting system efficiency, cost factors, reliability and performance reports based on Apollo project

PROGRAM MANAGEMENT↗

Meta-Analysis of Advanced Nuclear Reactor Cost Estimations

Supporting Data can be downloaded at: https://gain.inl.gov/content/uploads/4/2024/06/INL-RPT-24-77048-R1.xlsx Nuclear energy is a critical cornerstone of the current United States clean energy supply and may play a larger role in the future in support of a transition to a net-zero economy. The current fleet of nuclear reactors predominantly consists of large light-water reactors (LWRs), while many of the reactor designs under consideration are smaller and/or different technologies. Because these new designs have not yet been built, there is a high degree of uncertainty associated with their cost. This complicates energy-planning efforts because cost projections are not always standardized, consistent, and centralized in an easily accessible location. To help support energy planning in the US, this report provides advanced nuclear cost ranges using a transparent methodology along with other relevant information that can be used to help support decision making and energy planning. The purpose of this work was to conduct a methodical process for cost evaluation using only public information that was vetted with the end-goal to provide reference cost projections for nuclear energy. To provide a solid basis for these values, the approach and assumptions are explicitly laid out throughout the report allowing any user of the data to challenge or reconsider them. Because future US nuclear-reactor costs are still unknown due to little recent observed data, the report opted to compile a comprehensive list of bottom-up estimates and evaluate averages/trends within the data to identify reference ranges. This was deemed preferable to opining on the robustness or validity of one cost estimation versus another. To that end, the work evaluated thousands of lines of cost subaccounts from several bottom-up cost estimates. A wide variety of different reactor types captured in the data are of various sizes and technologies. Some of these reactors will be representative of advanced reactors under development while others will not. Thus, the results here are dependent on the data that are available and the accuracy of the estimates that are used. Each bottom-up estimate was reviewed to determine whether it was complete. Incomplete data sets were corrected to ensure an adequate basis of cross-comparison. The report is not without limitations and should be interpreted as an initial step to develop cost ranges for nuclear technology. Ultimately, future work can build upon the methodology with refined cost estimates to reduce uncertainty. US-based overnight capital cost (OCC) estimates were compiled from extensive data sets into ranges for both large and small reactor sizes for 2030. To project the cost declines over time, learning rates were sampled from literature sources. No SMRs were previously built; hence, learning rates based on bottom-up approaches (e.g., by quantifying the impact stemming from fabrication of different components, modular work, site construction, commissioning) were prioritized. For larger reactors, actual learning rates from deployments were used to project future costs (adjusted to account for standardization or lack thereof between designs). Other costs included are fixed and variable operations and maintenance costs. The final variables were capacity factors and ramp rates to support energy planning.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimum-AIV: A planning and scheduling system for spacecraft AIV

A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

Arentoft, M. M.↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Odor Control Test Report of the Urine Containment Bag (UCB) for Orion Utilization

The purpose of this report is to summarize the conclusions for the odor control test of the Urine Containment Bag (UCB), P/N SDD46107234-306 in an environment simulating a space craft capsule. JSC 65891, Odor Control Test Plan of the Urine Containment Bag (UCB) for Orion Utilization, documents the test plan. The details of the test set-up and data reduction are detailed in the WSTF test report for this test WSTF #10-44500, Odor Control Test Plan of the Urine Containment Bag (UCB) for Orion Utilization,. This document outlines the project conclusions and forward plans with regard to trash containment for Constellation.

Casper, Stephanie↗

HFE in the design of the socio-technical system of the control room of a new generation reactor: issues faced during multistage validation - 126

This paper deals with the contribution of Human Factors and Ergonomics (HF and E) experts to the design of the control room (CR) of a new generation reactor (NGR), our view of the multistage validation (MSV) process and the issues faced during it. Our approach to MSV was to articulate two points of view: the designers' point of view (test and explore various design options) and the regulatory authorities' point of view (validate the performance of the socio-technical system of the CR). To perform this articulation, both tests and validation shared the same method and goals. The main issues faced during this process were to (1) get a coherent and integrated version of the full-scope simulator when the design of the socio-technical system of the CR was still in progress, (2) determine when to stop MSVs, and (3) define a criterion for the sampling of operational conditions. The first issue led us to the conclusion that specific project milestones synchronising the design of every part of the CR have to be planned early in the project in order to mitigate the risk of delaying WSTs (Whole System Tests). Regarding the second issue, we advocate that no further WSTs are required when the last modifications brought to the CR design have no significant impact on crews' activities. Finally, concerning the last issue, we think that performing WSTs in all classes of situations a crew may face during operating the plant is necessary. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Energy-Storing Cryogenic Carbon Capture™ for Utility and Industrial-scale Processes (Final Report)

This project leverages work completed under funding from previous U.S. Department of Energy (DOE) projects and other sources of funding around the Cryogenic Carbon Capture Process™ (CCC). The purpose of this project is to further develop a perturbation of the CCC process that stores energy called the Cryogenic Carbon Capture™ Energy Storing (CCC-ES) process. The successful completion of the tasks in this project has prepared the CCC-ES process for scaling and developed initial plans and a feasibility analysis for an engineering-scale or small-commercial scale system that can store at least 10 MWh of energy. The specific areas of work in this project are: (1) Develop a conceptual, site-specific integrated process flow diagram: Sustainable Energy Solutions (SES) developed a conceptual, site-specific plan including a process flow diagram for integrating CCC-ES at a specific location. The proposed system was based on a typical engineering-scale CCC system designed to capture 30-50 metric tonnes of CO 2 per day (TPD), with modifications and additional changes and equipment put in place to add the energy storage element to the system. The 30-50 TPD scale corresponds to the required 10 MWh of stored energy. This task includes updating simulation software for transient analysis. SES also coordinated with the Jim Bridger Power Plant in Point of Rocks, Wyoming to get site-specific data. Using these data, SES completed site-specific preliminary process flow diagrams, estimated capital and operating costs for the CCC-ES system, and used the upgraded software package to estimate the primary figures of merit. (2) Complete a technoeconomic analysis (TEA): SES completed a full-scale TEA of the CCC-ES system to meet specific success criteria. This TEA used process information from the host site selected above. (3) Technology and data gap assessment for the CCC-ES process: As part of the technology gap assessment, SES performed an assessment of the best alternative energy storage solutions including figures of merit and operational strengths and weaknesses. SES then compared the proposed system with a discussion of how it addresses the weaknesses of alternative systems, showing for example a cost of stored energy at less than $50/MWh and with a roundtrip efficiency of greater than 95%. This assessment includes technical and other risk analyses and technology gaps with research and development needs to commercialize the process by 2030. Finally, work includes a commercialization roadmap/development pathway outlining the major milestones to move to a commercially operating CCC-ES system. (4) Phase II pre-FEED project plan: SES completed a project plan for the Phase II pre-FEED analysis using the same host site as in the Phase I conceptual study.

03 NATURAL GAS↗

Project risk and appeals in U.S. Forest Service planning

The National Environmental Policy Act (NEPA) requires U.S. Forest Service planning processes to be conducted by interdisciplinary teams of resource specialists to analyze and disclose the likely environmental impacts of proposed natural resource management actions on Forest Service lands. Multiple challenges associated with these processes have been a source of frustration for the agency. One of these challenges involves administrative appeals through which public entities can challenge a Forest Service decision following a NEPA process. These appeals instigate an internal review process and can result in an affirmation of the Forest Service decision, a reversal of that decision, or additional work that re-initiates all or part of the NEPA process. We examine the best predictors of appeals and their outcomes on a representative sample of 489 Forest Service NEPA processes that were decided between 2007 and 2009. While certain factors associated with pre-existing social contexts (such as a history of controversy) or pre-determined elements of a proposed action (such as the extraction of forest products) predispose certain processes to a higher risk of appeals, other practices and process-related strategies within the control of the agency also appear to bear meaningful influence on the occurrence of appeals and their outcomes. Appeals and their outcomes were most strongly related to programmatic, structural (turnover of personnel in particular), and relationship risks (both internal and external) within the processes, suggesting the need for greater focus within the agency on cultivating positive internal and external relationships to manage the risk of appeals. -- Highlights: ► We examined appeals and their outcomes on 489 U.S. Forest Service NEPA processes. ► Project type, context, team turnover, and personal relationships predicted appeals. ► External relationship management and staff turnover best predicted appeal outcomes. ► Positive internal and external relationships appear to reduce appeal risks.

54 ENVIRONMENTAL SCIENCES↗