Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Payload”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Analysis of commercial equipment and instrumentation for Spacelab payloads. Volume 3: Design analysis and trade studies

A detailed analysis is presented of each selected equipment item, and suitability and cost analyses were documented by equipment item. Tradeoffs of alternative specification requirements are presented which include possible relaxation of vibration, material control, fungus and corrosion requirements for experiment equipment. An additional tradeoff was performed to determine whether it is cost effective to modify experiment equipment to be compatible with a 28-volt dc power source rather than the conventional 110-volt ac source. Programmatic analysis data are given which were used as the basis for the extension of results from the analyses of specific equipment items to the entire spacelab experiment program.

Source record↗

Skylab program payload integration. Skylab film environmental effects

The effects of the Skylab environments on the 22 types of film used for data recording on Skylab were evaluated. Environmental histories and sensitometric curves for 114 rolls of film used for this evaluation are presented. Photographic parameters evaluated in detail were film fogging of black and white films, changes in maximum density of color film, latent image fading, and changes in film sensitivity. Other photographic and film physical anomalies such as electrostatic exposure, emulsion cracking, and reciprocity failure were also documented. Results based upon comparison of film sensitometric data for flight film with ground control film and ground test film are presented independently for each film type. The study showed that photographic film fulfilled the requirements of the Skylab applications in which it was used. Environmental film degradation, although present on almost every roll, did not preclude recording sufficient data to meet experiment requirements for all film, except film type SC-5. Specific conclusions are provided in the areas of further analyses, tests, and developments.

Source record↗

Integrated orbital servicing and payloads study. Volume 1: Executive summary

A study is summarized in which a comparison was made of the following modes of maintaining a satellite system: (1) expendable mode in which failed satellites are replaced, (2) on-orbit servicing where a satellite can be fixed by unmanned module exchange in space, and (3) ground refurbishment in which the satellite is brought back to ground for repairs. It was concluded that on-orbit maintenance is the most cost-effective mode and that it is technically feasible. It can be used to repair failed satellites, to improve reliability of operating satellites, and to update equipment. On-orbit servicing can increase program flexibility and satellite reliability, lifetime, and availability. The significant conclusions and results of two studies are summarized.

Source record↗

Integrated orbital servicing study for low-cost payload programs. Volume 2: Technical and cost analysis

Orbital maintenance concepts were examined in an effort to determine a cost effective orbital maintenance system compatible with the space transportation system. An on-orbit servicer maintenance system is recommended as the most cost effective system. A pivoting arm on-orbit servicer was selected and a preliminary design was prepared. It is indicated that orbital maintenance does not have any significant impact on the space transportation system.

Cody, E. R.↗

Evaluation philosophy for shuttle launched payloads

Potential benefits of factory-to-pad testing constitute major cost savings and increase test effectiveness. Overall flight performance will be improved. The factory-to-pad approach is compatible with space shuttle processing and the large space telescope program.

Heuser, R. E.↗

Design of a video system providing optimal visual information for controlling payload and experiment operations with television

A program was conducted which included the design of a set of simplified simulation tasks, design of apparatus and breadboard TV equipment for task performance, and the implementation of a number of simulation tests. Performance measurements were made under controlled conditions and the results analyzed to permit evaluation of the relative merits (effectivity) of various TV systems. Burden factors were subsequently generated for each TV system to permit tradeoff evaluation of system characteristics against performance. For the general remote operation mission, the 2-view system is recommended. This system is characterized and the corresponding equipment specifications were generated.

Source record↗

Vehicle systems and payload requirements evaluation

Techniques developed for identifying launch vehicle system requirements for NASA automated space missions are discussed. Emphasis is placed on development of computer programs and investigation of astrionics for OSS missions and Scout. The Earth Orbit Mission Program - 1 which performs linear error analysis of launch vehicle dispersions for both vehicle and navigation system factors is described along with the Interactive Graphic Orbit Selection program which allows the user to select orbits which satisfy mission requirements and to evaluate the necessary injection accuracy.

Rea, F. G.↗

Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

Source record↗

Methods for Combining Payload Parameter Variations with Input Environment

Methods are presented for calculating design limit loads compatible with probabilistic structural design criteria. The approach is based on the concept that the desired limit load, defined as the largest load occuring in a mission, is a random variable having a specific probability distribution which may be determined from extreme-value theory. The design limit load, defined as a particular value of this random limit load, is the value conventionally used in structural design. Methods are presented for determining the limit load probability distributions from both time-domain and frequency-domain dynamic load simulations. Numerical demonstrations of the methods are also presented.

Merchant, D. H.↗

Phase B - final definition and preliminary design study for the initial Atmospheric Cloud Physics Laboratory (ACPL): A spacelab mission payload. Work breakdown structure for phase C/D DR-MA-06 (preliminary issue)

The Work Breakdown Structure (WBS) and Dictionary (DR-MA-06) for initial and subsequent flights of the Atmospheric Cloud Physics Laboratory (ACPL) is presented. An attempt is made to identify specific equipment and components in each of the eleven subsystems; they are listed under the appropriate subdivisions of the WBS. The reader is cautioned that some of these components are likely to change substantially during the course of the study, and the list provided should only be considered representative.

Source record↗

Shuttle payload interface verification equipment study. Volume 3: Specification data

A complete description is given of the IVE physical and performance design requirements as evolved in this study. The data are presented in a format to facilitate the development of an item specification. Data were used to support the development of the project plan data (schedules, cost, etc.) contained in Volume 4 of this report.

Source record↗

Atmospheric science facility pallet-only mode space transportation system payload (feasibility study), Volume 1

The economic and technical feasibility is assessed of employing a pallet-only mode for conducting Atmospheric Magnetospheric Plasmas-in-Space experiments. A baseline design incorporating the experiment and instrument descriptions is developed. The prime instruments are packaged into four pallets in a physical and functional manner compatible with the Space Transportation System capabilities and/or constraints and an orbiter seven-day mission timeline. Operational compatibility is verified between the orbiter/payload and supporting facilities. The development status and the schedule requirements applicable to the Atmospheric Science Facility mission are identified. Conclusions and recommendations are presented and discussed.

Source record↗

Addendum report to atmospheric science facility pallet-only mode space transportation system payload feasibility study, volume 3, revision A

The feasibility of accomplishing selected atmospheric science mission using a pallet-only mode was studied. Certain unresolved issues were identified. The first issue was that of assuring that the on-board computer facility was adequate to process scientific data, control subsystems such as instrument pointing, provide mission operational program capability, and accomplish display and control. The second issue evolved from an investigation of the availability of existing substitute instruments that could be used instead of the prime instrumentation where the development tests and schedules are incompatible with the realistic budgets and shuttle vehicle schedules. Some effort was expended on identifying candidate substitute instruments, and the performance, cost, and development schedule trade-offs found during that effort were significant enough to warrant a follow-on investigation. This addendum documents the results of that follow-on effort, as it applies to the Atmospheric Sciences Facility.

Source record↗