Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Los Alamos National Laboratory Ten-Year Site Plan FY 2016

The Los Alamos National Laboratory will continue to face a significant challenge over the next 25 years in balancing near-term needs while transforming the infrastructure to ensure long-term viability. The 2014 Los Alamos National Laboratory Strategic Plan emphasized that infrastructure must be modernized and maintained to fulfill diverse, complex, and evolving missions in a period of fl at or decreasing budgets. The large number of existing facilities will continue to age while safety, security, sustainability and compliance requirements will likely increase. The Laboratory must also continue to act as an environmental steward, reduce environmental risk, and improve sustainability. This plan identifies strategies that will enable the Laboratory to provide a flexible, responsive infrastructure within available resources. At the end of the 25 year period, the Laboratory will have achieved the following: New facilities construction and enduring facilities reinvestment to support critical capabilities; Improved energy efficiency and long-term sustainability practices; Modernized utility infrastructure to support future programmatic needs; Legacy cleanup and long-term environmental stewardship goals; Footprint reduction and nuclear infrastructure consolidation. Even in the face of new and significant pressures, the Laboratory will continue to take substantial steps to streamline operations, modernize the infrastructure, and fulfill its vision of being the premier national security science laboratory. The fiscal year (FY) 2016 Ten-Year Site Plan (TYSP) is consistent with previous TYSPs and incorporates updated information in accordance with National Nuclear Security Administration (NNSA) guidance. The TYSP is a vital planning component to meet the NNSA commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory’s missions and workforce. Emphasizing the Laboratory’s core capabilities, this TYSP reflects the Laboratory’s role as a prominent contributor to NNSA missions through its programs and campaigns.

99 GENERAL AND MISCELLANEOUS↗

Using Micro-Synchrophasor Data for Advanced Distribution Grid Planning and Operations Analysis

This report reviews the potential for distribution-grid phase-angle data that will be available from new micro-synchrophasors (µPMUs) to be utilized in existing distribution-grid planning and operations analysis. This data could augment the current diagnostic capabilities of grid analysis software, used in both planning and operations for applications such as fault location, and provide data for more accurate modeling of the distribution system. µPMUs are new distribution-grid sensors that will advance measurement and diagnostic capabilities and provide improved visibility of the distribution grid, enabling analysis of the grid’s increasingly complex loads that include features such as large volumes of distributed generation. Large volumes of DG leads to concerns on continued reliable operation of the grid, due to changing power flow characteristics and active generation, with its own protection and control capabilities. Using µPMU data on change in voltage phase angle between two points in conjunction with new and existing distribution-grid planning and operational tools is expected to enable model validation, state estimation, fault location, and renewable resource/load characterization. Our findings include: data measurement is outstripping the processing capabilities of planning and operational tools; not every tool can visualize a voltage phase-angle measurement to the degree of accuracy measured by advanced sensors, and the degree of accuracy in measurement required for the distribution grid is not defined; solving methods cannot handle the high volumes of data generated by modern sensors, so new models and solving methods (such as graph trace analysis) are needed; standardization of sensor-data communications platforms in planning and applications tools would allow integration of different vendors’ sensors and advanced measurement devices. In addition, data from advanced sources such as µPMUs could be used to validate models to improve/ensure accuracy, providing information on normally estimated values such as underground conductor impedance, and characterization of complex loads. Although the input of high-fidelity data to existing tools will be challenging, µPMU data on phase angle (as well as other data from advanced sensors) will be useful for basic operational decisions that are based on a trend of changing data.

25 ENERGY STORAGE↗

Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

99 GENERAL AND MISCELLANEOUS↗

EPRI/DOE High Burnup Fuel Sister Pin Test Plan Simplification and Visualization

The EPRI/DOE High Burnup Confirmatory Data Project (herein called the "Demo") is a multi-year, multi-entity confirmation demonstration test with the purpose of providing quantitative and qualitative data to show how high-burnup fuel ages in dry storage over a ten-year period. The Demo involves obtaining 32 assemblies of high-burnup PWR fuel of four common cladding alloys from the North Anna Nuclear Power Plant, drying them according to standard plant procedures, and then storing them in an NRC-licensed TN-3 2B cask on the North Anna dry storage pad for ten years. After the ten-year storage time, the cask will be opened and the rods will be examined for signs of aging. Twenty-five rods from assemblies of similar claddings, in-reactor placement, and burnup histories (herein called "sister rods") have been shipped from the North Anna Nuclear Power Plant and are currently being nondestructively tested at Oak Ridge National Laboratory. After the non-destructive testing has been completed for each of the twenty-five rods, destructive analysis will be performed at ORNL, PNNL, and ANL to obtain mechanical data. Opinions gathered from the expert interviews, ORNL and PNNL Sister Rod Test Plans, and numerous meetings has resulted in the Simplified Test Plan described in this document. Some of the opinions and discussions leading to the simplified test plan are included here. Detailed descriptions and background are in the ORNL and PNNL plans in the appendices . After the testing described in this simplified test plan h as been completed , the community will review all the collected data and determine if additional testing is needed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2017

Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2017 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2018. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

99 GENERAL AND MISCELLANEOUS↗

Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington

The U.S. Department of Energy (DOE) manuals for radioactive waste management, DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017, require that the Hanford Site maintain site performance assessments and composite analyses (CAs). This document describes the plan for maintaining the CA that supports waste disposal and remedial actions for the Hanford Site. An initial CA of the site was issued in 1998, conditionally approved in 1999, received further analysis to satisfy conditions in an addendum in 2001, and was approved in 2002. This document meets the maintenance plan requirements described in DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017 and implements the requirements of the disposal authorization related to the CA for the U.S. Department of Energy, Richland Operations Office, the responsible field Office, and its contractors. In addition to providing current plans for revisions to the CA, this maintenance plan describes the work expected to be completed for ongoing reviews of new information; data related to residual sources of radioactive material, land use, and monitoring; and research and development related activities being conducted at the Hanford Site and within other U.S. Department of Energy programs. The main emphasis of this maintenance plan is to identify additional data and information to support the next revision of the Hanford Site CA. Improvements are expected regarding the knowledge of waste characterization and inventory, site-specific geotechnical data, and final disposition of major disposal facilities and waste sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EHS Health Assessment & Health Action Plan Report CY 2017

The (EHS) Health Action Plan initiative targets the key health risks identified through the 8-15-80 model by engaging employees to change their own healthcare story. (EHS) identified the most prevalent of the health risks amongst our population through Health Risk Assessment (HRA) and used that data to build Health Action Plans. Our 2017 Health Action Plans addressed inadequate sleep, increasing energy, stress, weight management, physical inactivity, hypertension, dyslipidemia, managing and preventing diabetes, managing low back pain, allergies & asthma, digestive health, tobacco use, and living well or maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connect employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre/post-assessments to encourage building behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months - just one risk reduction or behavior change to make an impact on their Division as well as Sandia's overall risk levels and ultimately healthcare costs.

99 GENERAL AND MISCELLANEOUS↗

EHS Health Assessment & Health Action Plan Report CY 2017

The (EHS) Health Action Plan initiative targets the key health risks identified through the 8-15-80 model by engaging employees to change their own healthcare story. (EHS) identified the most prevalent of the health risks amongst our population through Health Risk Assessment (HRA) and used that data to build Health Action Plans. Our 2017 Health Action Plans addressed inadequate sleep, increasing energy, stress, weight management, physical inactivity, hypertension, dyslipidemia, managing and preventing diabetes, managing low back pain, allergies & asthma, digestive health, tobacco use, and living well or maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connect employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre/post-assessments to encourage building behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months - just one risk reduction or behavior change to make an impact on their Division as well as Sandia's overall risk levels and ultimately healthcare costs.

99 GENERAL AND MISCELLANEOUS↗

KTF Sub-Area Plan: Overview & Summary

The KTF Sub-Area Plan is currently under development. Finalization awaits decisions regarding the long-term future of the site. The sub-area plan will build upon previous master plans, facilities and infrastructure (F&I) revitalization plans, and building studies. Planning concepts under consideration are: (1) Replace facilities with a combination of new permanent and non-permanent space; and (2) Complete deferred maintenance at remaining facilities.

99 GENERAL AND MISCELLANEOUS↗

TTR Sub-Area Plan: Overview & Summary

The TTR Sub-Area Plan is currently under development and is significantly influenced by National Nuclear Security Administration (NNSA) decisions about permitting and environmental regulatory compliance issues. The sub-area plan will build upon previous draft master plans, F&I revitalization plans, and building studies. Planning concepts under consideration are: Continue to use and preserve large tracts of land for large-scale mission-related testing; Identify investments to protect, sustain, and recapitalize infrastructure, facilities, and equipment assets; Identify opportunities to dispose of obsolete facilities and consolidate common functions in order to reduce operating costs.

99 GENERAL AND MISCELLANEOUS↗

Project Plan: Salt in Situ Heater Test

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project planned for the Waste Isolation Pilot Plant (WIPP) site, titled the Brine Availability Test in Salt (BATS). BATS is the first stage in a planned sequence of tests to bolster the technical basis for disposal of heat generating waste in salt. This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The experiment has begun in January 2020 and the first phase will continue for several months with the possibility for follow on testing. BATS comprises a suite of modular tests, which consist of a group of adjacent horizontal boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (12.2 cm [4.81 diameter) containing equipment for water-vapor collection and borehole closure monitoring, surrounded by smaller-diameter (up to 5.3 cm [2.11 diameter) satellite observation boreholes. Observation boreholes contain grouted-in temperature sensors, electrical resistivity tomography (ERT) sensors, and fiber optics; packer-isolated tracer release and sampling intervals; and acoustic emission (AE) piezoelectric sensors. A larger-diameter (12.2 cm [4.81) satellite borehole includes sorel and salt cement plugs, as part of an engineered barrier sealing test. The first two tests, to be implemented in parallel, are heated (target borehole wall temperature of 120 °C) and unheated, with similar arrays of observation borehole monitoring changes. Follow-on tests will be designed using information gathered from the first two tests, and may be conducted at other borehole wall temperatures, use multiple observation boreholes, and may include different measurement types and test designs. This 2020 update of the original 2018 project plan satisfies DOE-NE Spent Fuel and Waste Science and Technology (SFWST) milestone M3SF-205N010303034, as part of the SNL "Salt Disposal R&D" work package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rice Business Plan Competition (Final Report)

During the grant period, Rice University held a total of three regional Clean Energy Business Plan Competitions for graduate level students with a particular focus on attracting student startups in the clean energy space (clean tech, renewable energy, transportation, batteries, sustainability, etc.) Over the three years of the grant, the Rice Business Plan Competition awarded a total of three ${$}$50,000 DOE-sponsored prizes to the winning startups (${$}$150,000 total). The Rice Energy Business Plan Competition’s DOE Clean Tech competition leveraged the resources and infrastructure of the existing annual Rice Business Plan Competition (RBPC), which is the world’s largest and richest intercollegiate graduate-level business plan competition in the world

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technical & Programmatic Solutions for Direct Disposal of DPCs: Draft Outline and Staffing Plan

This is a work planning document that describes technical and programmatic goals for disposition of spent nuclear fuel (SNF) that is currently in dry storage in dual-purpose canisters (DPCs), or will be in the foreseeable future. It then describes how those goals can be promoted by a research and development (R&D) program. The needed R&D is compared to the ongoing work supported by the U.S. Department of Energy in FY18, and planned for FY19 and beyond. Some additional R&D activities are recommended, and plans are presented for technical integration activities that address the efficacy of the Direct Disposal of DPCs program (WBS 1.08.01.03.05), and integration with the overall Disposal Research program (WBS 1.08.01.03). The planned deliverable for this work package in FY19 (M2SF-1951\1010305051-Analysis of Solutions for DPC Disposal; 6/19/19) will be the product of this workplan. The deliverable will evaluate technical options for DPC direct disposal, taking into account the range ofpast and current DPC designs in the existing fleet. It will describe a set of goals for successful disposition of spent fuel in DPCs. It will analyze the scope and timing of needed R&D activities (R&D Plan), and discuss the uses of generic and site-specific analyses. Where appropriate, it will use alternative management cases to represent how DPC direct disposal could be incorporated in the overall geologic disposal program, given uncertainties in program direction and funding.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Emergency Planning Considerations for Advanced Nuclear Power Reactors

The purpose of this scoping study is to develop an approach for establishing emergency planning requirements for advanced nuclear power reactors and other new reactor technologies. The approach considers existing emergency planning requirements and guidance. More specifically the study focuses on establishing criteria and process to determine the size of the plume and ingestion exposure pathway emergency planning zone. The review of emergency planning in place for existing licensed nuclear facilities provides insight and informs the suggested process for establishing this Emergency Planning Zone (EPZ) process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tools, Feasibility, and Cost of Monitoring Plan (SECARB Phase III 9.1.1a, b, c, d, e, f, g)

This report completes several Phase III milestone reporting obligations in Subtask 9.1.1 and Budget Period 3 general reporting requirements, specifically Phase III milestone 9.1.1. g "Subsurface Monitoring Plan" with subparts a-g, Assessment of Feasibility, Cost & Likely Success of Cross-Well EM, crosswell acoustic, CASSM, VSP, borehole logging, repeat seismic, geochemical monitoring, and related methods and backup and archival methods. This report builds on work done for Phase II and in the first year of Phase III and reflects the integration of results of a teamwide planning meeting held in Austin at the Bureau of Economic Geology (BEG) April 8–9, 2008, and a planning and review meeting held September 23, 2008. This report provides the consensus plan for site-specific characterization and monitoring that were used to guide engineering design. The team expected that further plan modifications would be required during the engineering design, cost evaluation, and timeline adjustment that will occur prior to drilling and installation. This report was then updated to include additional adjustments needed as site characterization data were gathered during fieldwork in the summer of 2009 and as the design was finalized.

01 COAL, LIGNITE, AND PEAT↗

SECARB Surface Monitoring Plan

This report documents the status of planning for SECARB’s Phase III Early (at Cranfield) surface monitoring plan. Proposed near surface monitoring includes an integrated plan of baseline monitoring, groundwater head measurement, groundwater sampling and modeling, groundwater geochemical analysis, and an approach to assessment of feasibility, cost, and likely success of other prospective surface monitoring methods, including groundwater, capillary fringe, vadose zone, soil and above-ground sites, variability through time and space, and separation of signal from noise. It also considers water sampling, gas sampling, engineered tracers, installed devises, and various geophysical tools sets, and optimal sampling frequencies and strategies. Surface monitoring approaches consider the results the 2007-2008 ZERT test at Montana State University, results of other international, and RCSP Phase II results. The plan selects optimum sampling sites and documents how land-owner arrangements are planned.

01 COAL, LIGNITE, AND PEAT↗

SECARB Complete Subcontract and Begin Deployment of Surface Monitoring Plan

This report documents the status of planning and progresses for SECARB’s Phase III Early (at Cranfield) surface monitoring plan. Proposed near surface monitoring includes an integrated plan of baseline monitoring, groundwater head measurement, groundwater sampling and modeling, groundwater geochemical analysis, and an approach to assessment of feasibility, cost, and likely success of other prospective surface monitoring methods, including groundwater, capillary fringe, vadose zone, soil and above-ground sites, variability through time and space, and separation of signal from noise. It also considers water sampling, gas sampling, engineered tracers, installed devises, and various geophysical tool sets, and optimal sampling frequencies and strategies. Surface monitoring approaches consider the results the 2007-2008 ZERT test at Montana State University, results of other international, and RCSP Phase II results. The plan selects optimum sampling sites and documents how land-owner arrangements are planned.

01 COAL, LIGNITE, AND PEAT↗

ASME Code Qualification Plan for LPBF 316 SS

This report describes a plan to qualify laser powder bed fusion (LPBF) 316 stainless steel for use with the American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code Section III, Division 5 rules for metallic components in high temperature nuclear reactors. Accomplishing this goal would make the material and manufacturing process available to vendors for inclusion in the next generation of advanced, high temperature reactors. The general approach adopted here is to treat LPBF 316 as if it was a completely new material and to develop a plan to qualify the material according to the current ASME practices. One key goal of this work is to explore and develop accelerated qualification approaches that might reduce the time required to qualify new materials by reducing the need for long term testing. However, the qualification plan here does not employ any accelerated qualification approaches to provide a limiting, bounding description of the number, duration, and types of testing required to qualify LPBF 316 without such techniques and to describe a comprehensive dataset that could be used to explore and validate accelerated qualification approaches in the future. The report addresses the fundamental challenges to qualifying Advanced Manufacturing (AM) materials for high temperature applications and summarizes the ASME Section III qualification process as well as current efforts to qualify LBPF and DED 316 for low temperature applications. The report then discusses specific issues, both material and logistical, related to qualifying PBF 316 steel. The final chapters of the report describe a complete test plan designed to generate sufficient data to qualify the material as well as a data management plan for how to store and manage the data to eventually provide the test data packaged needed to qualify the material with ASME.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗