Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lessons learned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

State Strategies to Bring Solar to Low- and Moderate-Income Communities

This Final Technical Report describes the goals, objectives, activities, results, and accomplishments of the State Strategies to Bring Solar to Low- and Moderate-Income Communities Project, managed by the Clean Energy States Alliance. This project enabled five states (Connecticut, Minnesota, New Mexico, Oregon, and Rhode Island) and the District of Columbia to develop and implement strategies for expanding market penetration of solar PV among LMI residents and communities. The project disseminated successful strategies and lessons learned from those states to other states and stakeholders across the country.

14 SOLAR ENERGY↗

Adopting Energy-Efficient Technologies for Street Lighting: Overcoming Challenges for Utilities

This brief discusses energy-efficient street lighting technologies and conversions from the utility’s perspective and identifies various business cases for undertaking street lighting upgrades. Section 1 of the brief reviews the costs and benefits of utility investment in energy efficiency technologies and smart infrastructure for utility-owned streetlights. Section 2 presents lessons learned and best practices for light-emitting diode (LED) conversions for utility-owned street lights. Section 3 discusses street light buyback options from the utility’s perspective. Section 4 reviews success factors for LED conversions. The resources listed at the end of the brief provide more information.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building Blocks of Electric Vehicle Deployment: A Guide for Developing Countries

Countries can use electric transportation to help fulfill numerous goals, including greenhouse gas (GHG) emissions targets, local air quality goals, mobility objectives, energy security, and transportation resiliency. Vehicle electrification is a promising pathway to achieving clean energy transitions in the transport sector at scale. As vehicles electrify, the traditionally siloed electricity and transport sectors increasingly converge to create technical, institutional, and economic opportunities and challenges. To navigate this transition effectively, we propose the following foundational pillars or “building blocks” that undergird effective electric vehicle (EV) deployment. Jurisdictions with experience and mature EV markets offer useful lessons learned that may enable developing countries to leapfrog over common roadblocks. Nonetheless, developing countries face distinct challenges collectively, and individually, from developed countries that require careful consideration. From our work around the world, the U.S. Agency for International Development (USAID) and National Renewable Energy Laboratory (NREL) have witnessed interest growing in EVs for a variety of reasons. Lao People’s Democratic Republic (PDR), for example, looks toward EVs as a way to use their surplus of hydropower to displace expensive oil. Thailand and Pakistan seek economic development opportunities in EV manufacturing. Cities including Mexico City, Surat, India, and Kingston, Jamaica see the potential of bus electrification to improve local air quality and reduce traffic congestion. Many USAID partner countries in Southeast Asia are trying to understand how to reach ambitious EV deployment targets and implement EV and transportation plans. This pursuit is prompting questions about EV supply equipment (EVSE) standards, tariff design, and business models that affirm the importance of the building blocks outlined in this report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lessons from the COVID Era and Visions for the Future

In December 2020, the U.S. Department of Energy Office of Science convened a virtual Roundtable of its 27 operating scientific user facilities to discuss facility challenges and lessons learned during the COVID-19 pandemic as well as facility responses, best practices, and innovations that could be adopted going forward. Roundtable participants included facility staff, users, and user executive committee chairs. This report summarizes their discussions, which encompassed topics such as user research and facility operations in virtual and physically distanced contexts; user training and engagement; computation, data, and network resources; and crosscutting issues.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NNSA/CEA Workflow Workshop Report 2021

Researchers from three NNSA labs plus CEA recently met for a half-day workshop on scientific and engineering workflows in March of 2021. Tools, projects and use cases from each institution were described. A wide range of unique capabilities and requirements were represented. The workshop highlights the fact that the CEA/NNSA workflows space mirrors the broader open science workflows community, with multiple technologies under development in a number of science domains and under a number of funding streams, with differing capabilities and focuses. Despite the number of tools, presentations and discussions have shown that these tools cover specific mission spaces at the four labs, each with distinctive capabilities that do not completely overlap with each other. We believe there is a strong interest in the short term for sharing lessons learned and collaborating on benchmarks and site evaluation of projects. This report, prepared by the NNSA/CEA Workflows Working Group, briefly summarizes the presentations in the areas of domain specific workflows, end user environments, data management, job and resource management, and infrastructure, and then identifies six broad areas for potential collaboration. A key finding is that users could benefit from greater interoperability, compatibility, and composability of the workflow technologies under development and that point-to-point collaboration opportunities should be identified to explore these aspects.

97 MATHEMATICS AND COMPUTING↗

Clean Grid Vision: A U.S. Perspective - Executive Summary

Clean Grid Vision: A U.S. Perspective aims to present a range of possible pathways for future grid development and call attention to some common trends. It focuses on the lessons learned through NREL’s studies of the U.S. power sector that have measured the impacts of high-penetration VRE and have tested strategies for enhancing grid flexibility and reliability. As such, this report is limited in its scope and does not attempt to review or summarize all grid integration literature. While it refers to relevant external literature to provide context when needed, this report is primarily a summary of the National Renewable Energy Laboratory’s (NREL’s) research in the past 5 years on five key topics: grid planning and operation, grid reliability at the distribution level, grid reliability at the transmission level, demand-side resources, and power markets—each corresponds to a chapter in this report. The main insights of the report are presented in this executive summary.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Investigating User Experiences with Data Abstractions on High Performance Computing Systems

Scientific exploration generates expanding volumes of data that commonly require High Performance Computing (HPC) systems to facilitate research. HPC systems are complex ecosystems of hardware and software that frequently are not user friendly. The Usable Data Abstractions (UDA) project set out to build usable software for scientific workflows in HPC environments by undertaking multiple rounds of qualitative user research. Qualitative research investigates how individuals accomplish their work and our interview-based study surfaced a variety of insights about the experiences of working in and with HPC ecosystems. This report examines multiple facets to the experiences of scientists and developers using and supporting HPC systems. We discuss how stakeholders grasp the design and configuration of these systems, the impacts of abstraction layers on their ability to successfully do work, and the varied perceptions of time that shape this work. Examining the adoption of the Cori HPC at NERSC we explore the anticipations and lived experiences of users interacting with this system’s novel storage feature, the Burst Buffer. We present lessons learned from across these insights to illustrate just some of the challenges HPC facilities and their stakeholders need to account for when procuring and supporting these essential scientific resources to ensure their usability and utility to a variety of scientific practices.

97 MATHEMATICS AND COMPUTING↗

USAID Energy Storage Decision Guide for Policymakers

The purpose of this report is to arm relevant decision makers with the initial layer of information they need to understand energy storage and to make informed policy, regulatory, and investment decisions around grid-connected energy storage. While many of the case studies presented in this report are based on experiences from the U.S. and Europe, the lessons learned can be applied to power sectors in emerging economies. Importantly, this report covers topics related grid-connected energy storage for power sector applications. The term “grid-connected” implies that the storage system is interconnected to a centralized power system. Topics related to off-grid, micro-grid and mini-grid energy storage applications are not covered in this report, nor are procurement practices for energy storage.

25 ENERGY STORAGE↗

Flight Test of a Balloon-Borne Aeroseismometer

The azimuth of an incoming acoustic wave cannot be determined using microbarometers on a free floating balloon. A single observation of infrasound-induced acceleration on a large zero pressure balloon suggested that a motion sensing "aeroseismometer" could fill this gap. Here, a flight test of prototype balloon-borne aeroseismometers is presented. Two balloons, each carrying accelerometers and IMUs, recorded three sets of chemical explosions. The resulting balloon motion time series allows the explosive source to be geolocated. The future of this technology is discussed, along with a planned publication. Finally, recommendations and lessons learned from the campaign are discussed.

47 OTHER INSTRUMENTATION↗

High-Temperature Particle Heat Exchanger for sCO2 Power Cycles [Award 30342]

This report describes the design, development, and testing of a prototype 100 kWt particle-to-supercritical CO 2 (sCO2) heat exchanger. An analytic hierarchy process was implemented to compare and evaluate alternative heat-exchanger designs (fluidized bed, shell-and-plate moving packed bed, and shell-and-tube moving packed bed) that could meet the high pressure (≥ 20 MPa) and high temperature (≥ 700 °C) operational requirements associated with sCO2 power cycles. Cost, heat-transfer coefficient, structural reliability, manufacturability, parasitics and heat losses, scalability, compatibility, erosion and corrosion, transient operation, and inspection ease were considered in the evaluation. A 100 kWt shell-and-plate design was selected for construction and integration with Sandia’s falling particle receiver system that heats the particles using concentrated sunlight. Sandia worked with industry to design and construct the moving packed-bed shell-and-plate heat exchanger. Tests were performed to evaluate its performance using both electrical heating and concentrated sunlight to heat the particles. Overall heat transfer coefficients at off-design conditions (reduced operating temperatures and only three stainless steel banks in the counter-crossflow heat exchanger) were measured to be approximately ~25 - 70 W/m 2 -K, significantly lower than simulated values of >100 W/m 2 -K. Tests using the falling particle receiver to heat the particles with concentrated sunlight yielded overall heat transfer coefficients of ~35 – 80 W/m 2 -K with four banks (including a nickel-alloy bank above the three stainless steel banks). The overall heat transfer coefficient was observed to decrease with increasing particle inlet temperatures, which contrasted the results of simulations that showed an increase in heat transfer coefficient with temperature due to increased effective particle-bed thermal conductivity from radiation. The likely cause of the discrepancy was particle-flow maldistributions and funnel flow within the heat exchanger caused by internal ledges and cross-bracing, which could have been exacerbated by increased particle-wall friction at higher temperatures. Additional heat loss at higher temperatures may also contribute to a lower overall heat-transfer coefficient. Design challenges including pressure drop, particle and sCO2 flow maldistribution, and reduced heat transfer coefficient are discussed with approaches for mitigation in future designs. Lessons learned regarding instrumentation, performance characterization, and operation of particle components and sCO2 flow loops are also discussed. Finally, a 200 MWt commercial-scale shell-and-plate heat-exchanger design based on the concepts investigated in this report is proposed.

14 SOLAR ENERGY↗

Production Facility Prototype Blower 1000 Hour Test Results V

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Thirteen long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All thirteen long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the thirteenth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, III, and IV.

36 MATERIALS SCIENCE↗

Waste Management Fundamentals for Environmental Professionals (UTrain 50448) [Slides]

At the pilot of this course, we discovered that we need to focus on how we do waste management at LANL. Environmental Professionals have a variety of jobs - most impact waste in some way. Finding a balance between comprehensive enough and too much is key. The goals of this training are for it to be good, consistent, and helpful, not just a requirement. The course modules are: Intro to Waste, Waste Regulations and Requirements, Waste Planning, Waste Generation and Tracking, Waste Characterization, Waste Packaging, Waste Accumulation and Storage, Waste Treatment, Waste Shipping, and Operation Experience and Lessons Learned.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Science and Engineering of Cybersecurity by Uncertainty quantification and Rigorous Experimentation (SECURE) (Final Report)

This report summarizes the activities performed as part of the Science and Engineering of Cybersecurity by Uncertainty quantification and Rigorous Experimentation (SECURE) Grand Challenge LDRD project. We provide an overview of the research done in this project, including work on cyber emulation, uncertainty quantification, and optimization. We present examples of integrated analyses performed on two case studies: a network scanning/detection study and a malware command and control study. We highlight the importance of experimental workflows and list references of papers and presentations developed under this project. We outline lessons learned and suggestions for future work.

97 MATHEMATICS AND COMPUTING↗

Coal-dependent Communities in Transition: Identifying Best Practices to Ensure Equitable Outcomes

The U.S. coal industry is experiencing a sharp increase in the numbers of retired and/or decommissioned coal-fired power plants across the U.S. In the years between 2010-2019, around 102 gigawatts (GW) of coal-fired generating capacity has been announced to be decommissioned, representing more than 546 coal-fired power plant units, and an additional 17 GW is planned to be decommissioned by 2025. This change in the energy production landscape presents an impact on the social, environmental, and economic prospects of coal-dependent communities. This report examined the role of communities in the coal power plant decommissioning process and provided community-identified best practices to ensure an equitable process. The experiences of four coal-dependent communities—Wise County, VA, Muskegon, MI, Anderson County, TN, and Becker, MN—are presented as case studies to understand the impacts of the decommissioning process, and associated best practices, from the communities’ perspective. The report results highlight the need to recognize that the decommissioning decision-making process must be community-based to be equitable. Each community’s input is key to the transition away from coal power because there is no one-size-fits-all development plan. In other words, each community’s trajectory through the decommissioning process—from the retirement decision-making stage to the final site redevelopment phase—is unique because each community has distinct needs and wants from the energy transition. What is best for one community may not be suited for another. Ultimately, the framework for site development and community revitalization post-decommissioning cannot be universal because each community’s profile—from a social, cultural, and economic perspective—is different. Community impacts of power plant decommissioning are not limited to job and revenue losses. Communities are likely to be impacted culturally, socially, environmentally, and have long-term health-based impacts that should be acknowledged and addressed in post-retirement plans. Commonly identified decommissioning best practices include: Early and continued engagement throughout, with a number of mediums for communication and feedback (e.g., in-person sessions, virtual meetings, written comment opportunities); Early planning of post-decommissioning projects to replace lost jobs, revenue, and economic activity; Recognition (and mitigation, if possible) of social impacts on the community due to plant closure; Transparency throughout the process, with trusted information being provided about the decommissioning process and timeline; potential impacts on the workforce, economy, and environment; and the feasibility of alternative site uses; Identification of funding sources, technical experts, and/or strategic partnerships to support decommissioning and the affected communities upfront; and, Acknowledgment of communities as stakeholders who have a role in the conversation and right to determine their futures. Three key areas for assisting coal-dependent communities affected by the energy transition: Technical assistance: assessment of site feasibility for alternative uses or to repower with new technologies; Cross-partnership engagement and collaboration: facilitate knowledge-sharing of “lessons learned” about the decommissioning process between communities and provide guidance for decision-making processes; and, Financial assistance: access to grant and/or loan programs to assist with redevelopment survey, bolster community economic security through job creation, and cover environmental clean-up costs. Technical assistance, cross-partnership engagement, and financial aid can be mobilized to help communities throughout various stages of the decommissioning process, including the retirement decision, the site reclamation phase, and eventual revitalization of the site and surrounding community.

01 COAL, LIGNITE, AND PEAT↗

Information Products & Communications Materials for COR and Contractors' Meetings [Slides]

Contents include the following: 1) Large Scale CO 2 Storage in the Lower Tuscaloosa Massive Sand Formation, December 12, 2007; 2) CoalFleet Program Update and Workshops, July 26-28, 2005; 3) Regional Carbon Sequestration Partnership Annual Review Meeting, November 18, 2009; 4) SECARB U. S. Regional Partnerships from Pilot to Demonstration, November 5, 2009; 5) The SECARB Anthropogenic Test–CO 2 Capture/Transportation/Storage, August 21-23, 2012; 6) Citronelle Project–Experiences With Permitting and Regulations on CCS, August 21, 2013; 7) Partnering With Industry for Large Scale CCS Projects, August 22, 2013; 8) Plant Barry-Citronelle Field Project, August 13, 2104; 9) SECARB's Early Test at Cranfield, Mississippi; 10) SECARB Partnership Early Test at Cranfield Status, August 18-20, 2015; 11) Citronelle Project, August 18, 2015; 12) Plant Barry 25 MW Demo; 13) SECARB Phase III Citronelle Project (Anthropogenic Test) in Alabama, August 18, 2015; 14) SECARB Early Test Retrospective; 15) SECARB Anthropogenic Test Lessons Learned, August 16-18, 2016; 16) SECARB Early Test at Cranfield, August 1-3, 2017; 17) Carbon Storage and Oil and Natural Gas Technologies Review Meeting, August 1-3, 2017; 18) SECARB Partnership Early Test at Cranfield, August 13-16, 2018; 19) SECARB Anthropogenic Test Update, August 13-16, 2018; 20) SECARB Partnership Early Test at Cranfield, August 26-30, 2019; 21) SECARB (Citronelle) Phase III, August 27, 2019.

01 COAL, LIGNITE, AND PEAT↗

Igiugig Site Visit Report

The National Renewable Energy Laboratory (NREL) team conducted a site visit during January 23-25, 2019 with the Igiugig Village Council (IVC) and other stakeholders to assist the community of Igiugig in refining their long-term energy strategy. The agenda included a tour of the village, data collection, presentations, long-term visioning exercises, identification of energy scenarios, and a school presentation. Participants in the site visit activities spanned a range of local, regional, government, and industry participation. There were 24 attendees at the all-day community workshop on Thursday, January 24th, with participants from the IVC, NREL, Bristol Bay Native Association (BBNA), Bristol Bay Native Corporation (BBNC), Lake and Peninsula Borough, Alaska Energy Authority, Intergrid, ORPC, Deer Stone Consulting, the Southwest Alaska Municipal Conference, and University of Alaska Fairbanks - Alaska Center for Energy and Power. Igiugig is a well-organized rural Alaskan community, with a leadership team that appears to have broad community support. The use of consensus-based decision making is one tangible example of how the leadership team actively invokes and promotes community-focused thinking. The NREL team observed anecdotal evidence of how this approach seems to be strengthening the community: active participation in the visioning exercise, a student hosted fund-raiser dinner at the school, a clean and organized landfill, and well-maintained roads and buildings. Igiugig has wind, solar, and river hydrokinetic resources readily available within the community. Wind has shown to be a promising resource in the region, and has been integrated into microgrids around the state, but the community has had mixed success with wind technologies: some devices failed quickly and others continue to operate. The economics of solar energy are improving in Alaska, and economical solar projects are being installed around the state. Considering that economic activity in Igiugig peaks during the summer sport fishing season, solar could prove to be a valuable supplement to the electrical system. Igiugig has been a test site for two different river hydrokinetic devices, and they have began a third project to operate ORPC's RivGen device, which is delivering valuable device performance data, operations and maintenance experience, and design refinement information. Already, this device has made over 7-million revolutions, and delivered over 8 MWh of power to the community. Igiugig's river resource is fairly unique because it is available year-round and has the potential to provide reliable base-load power for months at a time. A preliminary investigation of this diverse resource mix suggests that Igiugig could achieve very high levels (70% or more) of annual renewable generation contributions. A critical step in pursuing this path is identifying the mix of energy assets (generation and storage) that best meets the community's budget, needs, and goals. The assets that a community installs early in their grid-modernization initiative can constrain the options that are economical at later stages, which may lead to sub-optimal solutions. This is where technical and economic analysis of potential scenarios (i.e., distinct mixes of energy assets) can be useful in identifying the most promising pathways so that a community can make informed and strategic decisions about the assets they install. These analyses are most accurate and informative when they are based on actual technology performance and cost data. As the RivGen project continues to operate and generate this data, we will be better prepared to evaluate the technology's long-term viability and to identify research areas that would improve it. Igiugig's energy projects are at the cutting edge of two intersecting technology areas: 1) deploying an operational river hydrokinetic turbine, and 2) integrating renewable energy sources to achieve very high percent renewables. If these projects are successful, the lessons learned and technologies developed could be valuable for other microgrids around the world. Igiugig's unique resource mix make it an ideal location for this work, and the community's organizational strength make it an ideal partner in this ground-breaking work. Ongoing support for technical assistance to manage and address technical challenges along the way will maximize the probability of project success.

13 HYDRO ENERGY↗

R3IT, Rapid Rural Resilient Interconnection Toolkit, Final Technical Report

Utilities nationwide are beginning to experience multiple solar interconnection requests per day. This request volume will soon overwhelm utility engineers, especially at smaller utilities which serve the majority of the landmass of the United States. In this project, we developed open-source software tool that automates the interconnection approval process and removes 80% of the time required to approve an interconnection and hence allow more solar to be quickly and safely integrated with the grid. This software is accompanied by a guidebook detailing interconnection best practices and utility lessons learned. Competing solar interconnection software is extremely expensive at ten times the cost of typical distribution engineering tools, it’s closed source which makes it hard to integrate into utility workflows, and it doesn’t address the hardest power flow modeling challenges of interconnection screening. Our solution was built built with our utility partners who are already experiencing multiple interconnection requests per day and integrates best practices from our past work with DOE and the cooperative community on solar integration. The resulting free and open-source solution has been disseminated through our media channels and conferences that engage over 1,900 utilities nationwide.

14 SOLAR ENERGY↗

Software-defined Networking for Energy Delivery Systems (SDN4EDS): An Architectural Blueprint (Final Report)

This is the initial version of a reference for suppliers and energy companies of all sizes to deploy networks based on software-defined networking technology (SDN) to improve reliability, reduce cyber security attack surface, and facilitate mitigation of adversarial behavior. It is a living document and will progress over the life cycle of the Software-Defined Networking for Energy Delivery Systems (SDN4EDS) project. Version 2 of this report provides information on the Red Team tabletop assessment performed against the initial reference architecture. Version 3 of this report updates the reference architecture with lessons learned from the Red Team tabletop assessment, as well as provides additional details for the use cases. It also provides information on the decision process that could be used by an organization when considering deploying SDN in their environment. The final version of this report consolidates all the interim reports generated by the project into a final report. It also draws from PNNL’s experience in deploying SDN to make recommendations on how SDN could be deployed in a utility environment, and provides rationale for those decisions allowing individual utilities to make risk-based and knowledge-based decisions on how to best deploy SDN in their own environment

97 MATHEMATICS AND COMPUTING↗