Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FASTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Mathematical and Numerical Aspects of the Adaptive Fast Multipole Poisson-Boltzmann Solver

This paper summarizes the mathematical and numerical theories and computational elements of the adaptive fast multipole Poisson-Boltzmann (AFMPB) solver. We introduce and discuss the following components in order: the Poisson-Boltzmann model, boundary integral equation reformulation, surface mesh generation, the nodepatch discretization approach, Krylov iterative methods, the new version of fast multipole methods (FMMs), and a dynamic prioritization technique for scheduling parallel operations. For each component, we also remark on feasible approaches for further improvements in efficiency, accuracy and applicability of the AFMPB solver to large-scale long-time molecular dynamics simulations. Lastly, the potential of the solver is demonstrated with preliminary numerical results.

97 MATHEMATICS AND COMPUTING↗

Quantifying the Effect of Fast Charger Deployments on Electric Vehicle Utility and Travel Patterns via Advanced Simulation: Preprint

The disparate characteristics between conventional (CVs) and battery electric vehicles (BEVs) in terms of driving range, refill/recharge time, and availability of refuel/recharge infrastructure inherently limit the relative utility of BEVs when benchmarked against traditional driver travel patterns. However, given a high penetration of high-power public charging combined with driver tolerance for rerouting travel to facilitate charging on long-distance trips, the difference in utility between CVs and BEVs could be marginalized. We quantify the relationships between BEV utility, the deployment of fast chargers, and driver tolerance for rerouting travel and extending travel durations by simulating BEVs operated over real-world travel patterns using the National Renewable Energy Laboratory's Battery Lifetime Analysis and Simulation Tool for Vehicles (BLAST-V). With support from the U.S. Department of Energy's Vehicle Technologies Office, BLAST-V has been developed to include algorithms for estimating the available range of BEVs prior to the start of trips, for rerouting baseline travel to utilize public charging infrastructure when necessary, and for making driver travel decisions for those trips in the presence of available public charging infrastructure, all while conducting advanced vehicle simulations that account for battery electrical, thermal, and degradation response. Results from BLAST-V simulations on vehicle utility, frequency of inserted stops, duration of charging events, and additional time and distance necessary for rerouting travel are presented to illustrate how BEV utility and travel patterns can be affected by various fast charge deployments.

25 ENERGY STORAGE↗

Cybersecurity Framework Profile for Electric Vehicle Extreme Fast Charging Infrastructure

This document is the Cybersecurity Framework Profile (Profile) developed for the Electric Vehicle Extreme Fast Charging (EV/XFC) ecosystem, including the four domains that relies on the ecosystem (i) Electric Vehicles (EV); (ii) Extreme Fast Charging (XFC); (iii) XFC Cloud or Third-Party Operations; and (iv) Utility and Building Networks. This Profile utilizes the NIST Cybersecurity Framework Version 1.1 and provides voluntary guidance to help relevant parties develop Profiles specific to their organization to understand, assess, and communicate their cybersecurity posture as a part of their risk management process. The Profile is intended to supplement, not replace, an existing risk management program or cybersecurity standards, regulations, and industry guidelines that are in current use by the EV/XFC industry.

33 ADVANCED PROPULSION SYSTEMS↗

Thin filament diversity and physiological properties of fast and slow fiber types in astronaut leg muscles

Slow type I fibers in soleus and fast white (IIa/IIx, IIx), fast red (IIa), and slow red (I) fibers in gastrocnemius were examined electron microscopically and physiologically from pre- and postflight biopsies of four astronauts from the 17-day, Life and Microgravity Sciences Spacelab Shuttle Transport System-78 mission. At 2.5-microm sarcomere length, thick filament density is approximately 1,012 filaments/microm(2) in all fiber types and unchanged by spaceflight. In preflight aldehyde-fixed biopsies, gastrocnemius fibers possess higher percentages (approximately 23%) of short thin filaments than soleus (9%). In type I fibers, spaceflight increases short, thin filament content from 9 to 24% in soleus and from 26 to 31% in gastrocnemius. Thick and thin filament spacing is wider at short sarcomere lengths. The Z-band lattice is also expanded, except for soleus type I fibers with presumably stiffer Z bands. Thin filament packing density correlates directly with specific tension for gastrocnemius fibers but not soleus. Thin filament density is inversely related to shortening velocity in all fibers. Thin filament structural variation contributes to the functional diversity of normal and spaceflight-unloaded muscles.

Non-NASA Center↗

(abstract) A Low-Cost Mission to 2060 Chiron Based on the Pluto Fast Flyby

The Pluto Fast Flyby-based mission to Chiron described in this paper is a low cost, scientifically rewarding, focused mission in the outer solar system. The proposed mission will make a flyby of 2060 Chiron, an active 'comet' with over 10(sup 4) times the mass of Halley, and an eccentric, Saturn-crossing orbit which ranges from 8.5 to 19 AU. This mission concept achieves the flyby 4.2 years after launch on a direct trajectory from Earth, is independent of Jupiter launch windows, and fits within Discovery cost guidelines. This mission offers the scientific opportunity to examine a class of object left unsampled by the trail-blazing Mariners, Pioneers, Voyagers, and missions to Halley. Spacecraft reconnaissance of Chiron addresses unique objectives relating to cometary science, other small bodies, the structure of quasi-bound atmospheres on modest-sized bodies, and the origin of primitive bodies and the giant planets. Owing to Chiron's large size (180<D<370 km), unique nature, and unusual orbit, this mission is likely to draw significant public interest. As described by COMPLEX, the SSEC, and later the SSES, flybys are the appropriate scale missions for initial reconnaissance missions. Carrying three sophisticated instruments, the proposed flyby will return critical data about Chiron's size, shape, polar obliquity, atmosphere, surface morphology, surface composition, internal structure, surface activity (including the nature of Chiron's outbursts), and origin. Engineering analysis indicates that the spacecraft is capable of navigating to and encountering Chiron at close approach distances of less than 5 000 km, well inside the 50 000 to 150 000 km coma, and perhaps within the collisional chemistry zone of the coma. The low cost of the proposed Chiron mission is based on the opportunity to use the planned Pluto Flyby spare spacecraft and a Proton Expendable Launch Vehicle (ELV) (the pluto spacecraft is being designed to be compatible with a Proton launch). Backup launch opportunities on Delta II and Atlas ELVs are available. The Pluto Fast Flyby mission plans to develop a low cost ($150M), lightweight (<150 kg) outer planet spacecraft which is well suited to flyby reconnaissance in the outer solar system. This Chiron flyby mission is designed to leverage SSED's Pluto spacecraft investment into a scientifically valuable successor mission within the Discovery cost cap. Taking advantage of the spare spacecraft, we estimate the Discovery Chiron intercept mission can be launched for less than $100 M. We believe this makes a highly attractive proposal, which maintains US presence and leadership in the study of the outer solar system, and enables the first-time exploration of a wholly new class of planetary target, an outer solar system planetesimal.

2060 Chiron planetesimal flyby Pluto Fast Flyby sp↗

Performance of a Space-Based Wavelet Compressor for Plasma Count Data on the MMS Fast Plasma Investigation

Data compression has been a staple of imaging instruments for years. Recently, plasma measurements have utilized compression with relatively low compression ratios. The Fast Plasma Investigation (FPI) on board the Magnetospheric Multiscale (MMS) mission generates data roughly 100 times faster than previous plasma instruments, requiring a higher compression ratio to fit within the telemetry allocation. This study investigates the performance of a space-based compression standard employing a Discrete Wavelet Transform and a Bit Plane Encoder (DWT/BPE) in compressing FPI plasma count data. Data from the first 6 months of FPI operation are analyzed to explore the error modes evident in the data and how to adapt to them. While approximately half of the Dual Electron Spectrometer (DES) maps had some level of loss, it was found that there is little effect on the plasma moments and that errors present in individual sky maps are typically minor. The majority of Dual Ion Spectrometer burst sky maps compressed in a lossless fashion, with no error introduced during compression. Because of induced compression error, the size limit for DES burst images has been increased for Phase 1B. Additionally, it was found that the floating point compression mode yielded better results when images have significant compression error, leading to floating point mode being used for the fast survey mode of operation for Phase 1B. Despite the suggested tweaks, it was found that wavelet-based compression, and a DWT/BPE algorithm in particular, is highly suitable to data compression for plasma measurement instruments and can be recommended for future missions.

plasma↗

Performance Evaluation of Conflict-Free Trajectory Taxiing in Airport Ramp Area Using Fast-Time Simulations

The German Aerospace Center (DLR) and the National Aeronautics and Space Administration (NASA) have been collaborating to conduct joint research addressing future surface traffic management challenges. The surface management tool from DLR, called Taxi Routing for Aircraft: Creation and Controlling (TRACC), was adapted to be integrated in NASA's fast-time simulation environment called Surface Operations Simulator and Scheduler (SOSS). The research described in this paper 1) applied TRACC to trajectory-based ramp traffic management, where TRACC generates conflict-free aircraft trajectories in a congested ramp area, 2) investigated the feasibility of the concept through the integrated TRACC-SOSS fast-time simulation, and 3) evaluated the performance of the integrated system. For this activity, TRACC was adapted for ramp operations at Charlotte Douglas International Airport, called TRACC_PB (TRACC for pushback optimization). TRACC_PB provides four-dimensional taxi trajectories with a command speed profile for each aircraft following standard taxi routes within the ramp area. In this study, departures are given the Target Movement Area entry Times (TMATs) provided by the baseline surface metering scheduler based on NASA's Spot and Runway Departure Advisor (SARDA). TRACC_PB also calculates optimal pushback times for departures, as well as the times when arrivals shall enter the ramp, the Target Movement area Exit Times (TMETs). The initial results showed that the TRACC_PB successfully generated conflict-free trajectories for the ramp area taxi operations and improved taxiing efficiency compared to the baseline results. TRACC_PB aimed to provide conflict-free taxi routes avoiding any stops while taxiing. This resulted in longer gate hold times for departures and postponed throughput values compared to the baseline simulation without trajectory optimization. Having conflict-free routes without stoppage also created shorter taxi times but required renegotiation of the given TMATs. TRACC_PB also achieved reductions in both fuel consumption and engine emissions (17% for departures and 10% for arrivals), which correlate with the ramp taxi time reduction.

trajectory-based taxi operations↗

UAS Integration in the NAS Project: Fast-Time Simulation Studies

NASA is working on the project for Unmanned Aircraft System (UAS) integration into the National Airspace System (NAS) and helping the RTCA's Special Committee 228 (RTCA SC-228) to develop the minimum operational performance standards (MOPS) for detect-and avoid (DAA) systems. The Ames' Separation Assurance-Sense and Avoid Interoperability (SSI) team for the project is supporting this effort through fast-time simulation studies using the Airspace Concept Evaluation System (ACES) simulation platform. This presentation introduces the Ames SSI team's tasks and shows some results from accomplished fast-time simulation studies. It is a part of overall presentations for NASA's efforts for the UAS integration into the NAS project.

fast time simulation↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Lattice Confinement Fusion and Fusion-Fast-Fission Energy Source Development

NASA and the US Navy have demonstrated Lattice Confinement Fusion (LCF) and the Fusion-Fast-Fission of natural uranium and thorium. Both methods build upon decades of research, and the latter benefits from conventional nuclear fission and fusion results. However, this nascent technology doesn’t require fissile isotopes and avoids nuclear weapons proliferation concerns from uranium 235U isotopic enrichment or plutonium 239Pu separation. Of particular note, LCF doesn’t need power hungry magnets, lasers, or particle beams. Potentially, it could provide watts to hundreds of kilowatts of electrical power and process heat suitable for space power and high Isp nuclear electric propulsion (NEP) as well as distributed terrestrial power. Finally, there are indications that LCF fast-fission products are more benign than those of conventional fission reactors. Our goal is to scale the reactions and increase the power output through higher temperature operation and increased material masses.

lattice confinement fusion↗

A Qualitative Assessment of Diversion Scenarios for an Example Sodium Fast Reactor Using the GEN IV PR&PP Methodology

FAST REACTORS;NUCLEAR ENERGY;NUCLEAR MATERIALS MANAGEMENT;PROLIFERATION;SAFEGUARDS;THEFT; A working group was created in 2002 by the Generation IV International Forum (GIF) for the purpose of developing an internationally accepted methodology for assessing the Proliferation Resistance of a nuclear energy system (NES) and its individual elements. A two year case study is being performed by the experts group using this methodology to assess the proliferation resistance of a hypothetical NES called the Example Sodium Fast Reactor (ESFR). This work demonstrates how the PR and PP methodology can be used to provide important information at various levels of details to NES designers, safeguard administrators and decision makers. The study analyzes the response of the complete ESFR nuclear energy system to different proliferation and theft strategies. The challenges considered include concealed diversion, concealed misuse and 'break out' strategies. This paper describes the work done in performing a qualitative assessment of concealed diversion scenarios from the ESFR.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A fast high-order method to calculate wakefield forces in an electron beam

In this paper we report on a high-order fast method to numerically calculate wakefield forces in an electron beam given a wake function model. This method is based on a Newton-Cotes quadrature rule for integral approximation and an FFT method for discrete summation that results in an O(Nlog(N)) computational cost, where N is the number of grid points. Using the Simpson quadrature rule with an accuracy of O(h4), where h is the grid size, we present numerical calculation of the wakefields from a resonator wake function model and from a one-dimensional coherent synchrotron radiation (CSR) wake model. Besides the fast speed and high numerical accuracy, the calculation using the direct line density instead of the first derivative of the line density avoids numerical filtering of the electron density function for computing the CSR wakefield force. I. INTRODUCTION

43 PARTICLE ACCELERATORS↗

Effects of Electric Vehicle Fast Charging on Battery Life and Vehicle Performance

As part of the U.S. Department of Energy’s Advanced Vehicle Testing Activity, four new 2012 Nissan Leaf battery electric vehicles were instrumented with data loggers and operated over a fixed on-road test cycle. Each vehicle was operated over the test route, and charged twice daily. Two vehicles were charged exclusively by AC level 2 EVSE, while two were exclusively DC fast charged with a 50 kW charger. The vehicles were performance tested on a closed test track when new, and after accumulation of 50,000 miles. The traction battery packs were removed and laboratory tested when the vehicles were new, and at 10,000-mile intervals. Battery tests include constant-current discharge capacity, electric vehicle pulse power characterization test, and low peak power tests. The on-road testing was carried out through 70,000 miles, at which point the final battery tests were performed. The data collected over 70,000 miles of driving, charging, and rest are analyzed, including the resulting thermal conditions and power and cycle demands placed upon the battery. Battery performance metrics including capacity, internal resistance, and power capability obtained from laboratory testing throughout the test program are analyzed. Results are compared within and between the two groups of vehicles. Specifically, the impacts on battery performance, as measured by laboratory testing, are explored as they relate to battery usage and variations in conditions encountered, with a primary focus on effects due to the differences between AC level 2 and DC fast charging. The contrast between battery performance degradation and the effect on vehicle performance is also explored.

Electric Vehicle↗

Fast Acting Eddy Current Driven Valve for Massive Gas Injection on ITER

Tokamak plasma disruptions present a significant challenge to ITER as they can result in intense heat flux, large forces from halo and eddy currents, and potential first-wall damage from the generation of multi-MeV runaway electrons. Massive gas injection (MGI) of high Z material using fast acting valves is being explored on existing tokamaks and is planned for ITER as a method to evenly distribute the thermal load of the plasma to prevent melting, control the rate of the current decay to minimize mechanical loads, and to suppress the generation of runaway electrons. A fast acting valve and accompanying power supply have been designed and first test articles produced to meet the requirements for a disruption mitigation system on ITER. The test valve incorporates a flyer plate actuator similar to designs deployed on TEXTOR, ASDEX upgrade, and JET [1 3] of a size useful for ITER with special considerations to mitigate the high mechanical forces developed during actuation due to high background magnetic fields. The valve includes a tip design and all-metal valve stem sealing for compatibility with tritium and high neutron and gamma fluxes.

Fast Acting Eddy current↗

Impact of Fast Charging on Life of EV Batteries

Utilization of public charging infrastructure is heavily dependent on user-specific travel behavior. The availability of fast chargers can positively affect the utility of battery electric vehicles, even given infrequent use. Estimated utilization rates do not appear frequent enough to significantly impact battery life. Battery thermal management systems are critical in mitigating dangerous thermal conditions on long distance tours with multiple fast charge events.

25 ENERGY STORAGE↗

Mathematical Modeling and Analysis of a Wide Bandwidth Bipolar Power Supply for the Fast Correctors in the APS Upgrade

This paper presents the mathematical modeling and analysis of a wide bandwidth bipolar power supply for the fast correctors in the APS Upgrade. A wide bandwidth current regulator with a combined PI and phase-lead compensator has been newly proposed, analyzed, and simulated through both a mathematical model and a physical electronic circuit model using MATLAB and PLECS. The proposed regulator achieves a bandwidth with a -1.23dB attenuation and a 32.40° phase-delay at 10 kHz for a small signal less than 1% of the DC scale. The mathematical modeling and design, simulation results of a fast corrector power supply control system are presented in this paper.

APS upgrade↗

FAST Model Calibration and Validation of the OC5- DeepCwind Floating Offshore Wind System Against Wave Tank Test Data: Preprint

During the course of the Offshore Code Comparison Collaboration, Continued, with Correlation (OC5) project, which focused on the validation of numerical methods through comparison against tank test data, the authors created a numerical FAST model of the 1:50-scale DeepCwind semisubmersible system that was tested at the Maritime Research Institute Netherlands ocean basin in 2013. This paper discusses several model calibration studies that were conducted to identify model adjustments that improve the agreement between the numerical simulations and the experimental test data. These calibration studies cover wind-field-specific parameters (coherence, turbulence), hydrodynamic and aerodynamic modeling approaches, as well as rotor model (blade-pitch and blade-mass imbalances) and tower model (structural tower damping coefficient) adjustments. These calibration studies were conducted based on relatively simple calibration load cases (wave only/wind only). The agreement between the final FAST model and experimental measurements is then assessed based on more-complex combined wind and wave validation cases.

17 WIND ENERGY↗