Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Deployable”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

DEVELOPMENT AND DEPLOYMENT OF VACUUM SALT DISTILLATION AT THE SAVANNAH RIVER SITE

The Savannah River Site has a mission to dissolve fissile materials and disposition them. The primary fissile material is plutonium dioxide (PuO{sub 2}). To support dissolution of these materials, the Savannah River National Laboratory (SRNL) designed and demonstrated a vacuum salt distillation (VSD) apparatus using both representative radioactive samples and non-radioactive simulant materials. Vacuum salt distillation, through the removal of chloride salts, increases the quantity of materials suitable for processing in the site's HB-Line Facility. Small-scale non-radioactive experiments at 900-950 C show that >99.8 wt % of the initial charge of chloride salt distilled from the sample boat with recovery of >99.8 wt % of the ceric oxide (CeO{sub 2}) - the surrogate for PuO{sub 2} - as a non-chloride bearing 'product'. Small-scale radioactive testing in a glovebox demonstrated the removal of sodium chloride (NaCl) and potassium chloride (KCl) from 13 PuO{sub 2} samples. Chloride concentrations were distilled from a starting concentration of 1.8-10.8 wt % to a final concentration <500 mg/kg chloride. Initial testing of a non-radioactive, full-scale production prototype is complete. A designed experiment evaluated the impact of distillation temperature, time at temperature, vacuum, product depth, and presence of a boat cover. Significant effort has been devoted to mechanical considerations to facilitate simplified operation in a glovebox.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STRATOS: A cyber-energy SAAS platform to manage real-time experiment configuration and deployment [SWR-23-16]

STRATOS is a novel management SAAS platform for achieving multi-environment, multi-tenant real-time cyber-energy experimentation. The platform empowers users to configure a wide variety of experiment environments by automating the initialization process and providing a framework for building system configurations. During run-time the platform ensures resources are allocated appropriately and the environment remains stable until the required cyber-energy events have occurred. This capability to manage this complex process in a single user-focused application significantly reduces difficulty and setup time for performing high-impact cyber-energy research.

Van Natta, Joshua↗

An Intelligent Adaptable Monitoring Package. Final Report

The “Intelligent Adaptable Monitoring Package” project was a four-year effort that demonstrated the feasibility of integrated sensing packages at tidal and wave energy sites. Such integration is generally required by the breadth of sensors required to understand environmental effects at marine energy sites and the operational difficulty of deploying, maintaining, and recovering such sensors. Over the course of the project, the Adaptable Monitoring Package (AMP) was deployed in multiple settings, each corresponding to a project budget period: - Budget Period 1: Demonstration of cabled deployment at Pacific Northwest National Laboratory’s Marine Science Laboratory. The deployment highlighted AMP hardware endurance over a 4-month deployment in a tidally-dominated environment and laid the groundwork for machine learning algorithms to detect and classify targets present in active sonar data. - Budget Period 2: Demonstration of an autonomous deployment at PacWave South off the coast of Newport, Oregon. The deployment highlighted the stability of AMP hardware and software, with the autonomous package collecting data on a duty cycle over a 1.5-month deployment. - Budget Period 3: Demonstration of an autonomous deployment powered by a wave energy converter at the U.S. Navy’s Wave Energy Test Site. The deployment highlighted the potential of wave energy to power ocean observatories and led to the development of machine learning algorithms to detect and classify targets in optical camera data. In aggregate, this project’s greatest success was demonstrating the AMP’s flexibility in a range of deployment scenarios. Each budget period represented a “first of a kind” demonstration of integrated instrumentation – cabled AMP, autonomous AMP, wave-energy powered AMP – and each deployment helped to identify and set goals for the next. Further, despite the exploratory nature of these deployments, each one achieved high system up-time and proved that flexible integration of multiple sensors in a single package represents a viable strategy for marine energy environmental monitoring. The key lessons learned from the project are: - Without continuous power, either from a shore cable or in situ source, many of the benefits of integration are lost (If continuous power is not available, the ability to detect rare events is lost, as is the ability to minimize the risk of behavioral changes through adaptive sensing. However, even on a duty cycle, there is still value in being able to acquire synchronous data from multiple sensors.); and - Observations from a moving platform present substantially greater data processing challenges than those from stationary platforms. Finally, these deployments also demonstrate an important truth: successful integration alone does not guarantee that relevant data are collected. To grow the knowledge base about environmental interactions with marine energy converters, integrated systems, like the AMP, need to include the right sensor mix and connect the data pipelines to effective processing algorithms. These deployments establish a strong foundation for future collaborations with the environmental research community: not only to understand the environmental effects of marine energy, but also to improve our general ability to study life in the sea.

16 TIDAL AND WAVE POWER↗

Computational Tools and Workflows for Quantitative Risk Assessment and Decision Support for Geologic Carbon Storage Sites: Progress and Insights from the U.S. DOE’s National Risk Assessment Partnership

The 2005 Intergovernmental Panel on Climate Change (IPCC) Special Report on CCS raised the profile of CO2 capture and storage (CCS) as an important technology for reducing greenhouse gas (GHG) emissions. CCS is now recognized as a key component of most climate change mitigation scenarios. Since publication of that report the international research, development, and deployment (RD&D) community has advanced key technical aspects, clarified regulatory requirements, explored value chain and infrastructure solutions, and developed incentive paradigms to enable and promote large-scale deployment of CCS. These efforts have included research to better characterize geologic storage resources, to improve injection performance and storage efficiency, to assess and manage subsurface environmental risks, and to advance monitoring technologies to assure system conformance. These efforts have helped to build confidence in the viability of geologic carbon storage (GCS), but stakeholder concerns about long-term risks and liability associated with GCS remain a hurdle to broad acceptance and large-scale deployment of CCS. Since 2010, the U.S. DOE’s National Risk Assessment Partnership (NRAP) – a research collaboration between five contributing national laboratories – has worked to establish and demonstrate methods and tools to quantify and manage the subsurface environmental risks associated with GCS, amidst uncertainty. This work supports the Office of Fossil Energy and Carbon Management Carbon Transport and Storage Program’s goal of advancing safe and secure commercial-scale GCS deployment. To address the technical challenge of simulating the physical response of the GCS site to large-scale CO2 injection, NRAP has adopted an approach that relies on coupling computationally efficient reduced-order and/or data-driven proxy models of important system components (i.e., storage reservoir, sealing caprock, leakage pathways, intermediate formations, overlying groundwater aquifers, and the atmosphere) in integrated assessment framework. That integrated model of the physical system is complemented with fit-for purpose functionality to support site characterization and risk-related decisions. The recently released NRAP Phase II toolset includes the Open-Source Integrated Assessment Model (NRAP-Open-IAM) for evaluation of trends in leakage risk and potential impact, tools to support monitoring design optimization (Designs for Risk Evaluation and Management – DREAM v3.0 and Passive Seismic Monitoring Tool - PSMT), and tools for state of stress evaluation (State-of-Stress Analysis Tool - SOSAT) and forecasting induced seismicity risk. The NRAP team has also released a pair of reports describing conceptual workflows to incorporate physics-based, quantitative risk assessment into many of the design, planning, operation, and closure decisions for GCS projects. An online catalogue highlights published studies where these tools and methods are demonstrated. In this presentation, the utility of these products to assess risks and address key stakeholder questions will be highlighted through examples, and related insights about the safety and security of geologic carbon storage in qualified storage sites will be discussed. The prospect of rapid, large-scale deployment of GCS technology to aggressively reduce anthropogenic CO2 emissions requires careful consideration of interference between multiple commercial-scale storage projects within a basin. Going forward, NRAP is expanding and adapting site-scale risk quantification tools and methods to enable assessment of risks and inform management decisions for basin-scale deployment. Increasingly, this work will leverage next-generation approaches for surrogate modelling, fast prediction, and advanced visualization enabled by machine learning and artificial intelligence to promote virtual learning, scenario evaluation, and augment risk-based decision making.

quantitative risk assessment, geologic carbon stor↗

The Impact of Behind-the-Meter Heterogeneous Distributed Energy Resources on Distribution Grids

The increasing integration of distributed energy resources (DERs) on the electric grid brings new challenges and opportunities for utility grid operations. With the rapid deployment of DERs, there is emerging interest in integrating these controllable devices with utility operations at all levels for monitoring and management. To understand the challenges with increasing behind-the-meter (BTM) DERs and to identify the needs in deploying advanced controls, a comprehensive grid impact study is indispensable. This paper presents the analysis which help visualize the DER impact on the grid, identify the challenges and provides an insight into the new distribution management and control needs to enable reliable and resilient grid operations.

behind-the-meter↗

"Dedicated To The Continued Education, Training and Demonstration of PEM Fuel Cell Powered Lift Trucks In Real-World Applications."

The project objective was to further assist in the commercialization of fuel cell and H2 technology by building further upon the successful fuel cell lift truck deployments that were executed by LiftOne in 2007, with longer deployments of this technology in real-world applications. We involved facilities management, operators, maintenance personnel, safety groups, and Authorities Having Jurisdiction. LiftOne strived to educate a broad group from many areas of industry and the community as to the benefits of this technology. Included were First Responders from the local areas. We conducted month long deployments with end-users to validate the value proposition and the market requirements for fuel cell powered lift trucks. Management, lift truck operators, Authorities Having Jurisdiction and the general public experienced 'hands on' fuel cell experience in the material handling applications. We partnered with Hydrogenics in the execution of the deployment segment of the program. Air Products supplied the compressed H2 gas and the mobile fueler. Data from the Fuel Cell Power Packs and the mobile fueler was sent to the DOE and NREL as required. Also, LiftOne conducted the H2 Education Seminars on a rotating basis at their locations for lift trucks users and for other selected segments of the community over the project's 36 month duration. Executive Summary The technology employed during the deployments program was not new, as the equipment had been used in several previous demos and early adoptions within the material handling industry. This was the case with the new HyPx Series PEM - Fuel Cell Power Packs used, which had been demo'd before during the 2007 Greater Columbia Fuel Cell Challenge. The Air Products HF-150 Fueler was used outdoors during the deployments and had similarly been used for many previous demo programs. The methods used centered on providing this technology as the power for electric sit-down lift trucks at high profile companies operating large fleets. As a long-standing lift truck dealership, LiftOne was able to introduce the fuel cells to such companies in the demanding applications. Accomplishments vs Objectives: We were successful in respect to the stated objectives. The Education Segment's H2 Education Sessions were able to introduce fuel cell technology to many companies and reached the intended broad audience. Also, demos of the lift truck at the sessions as well as the conferences; expos and area events provided great additional exposure. The Deployments were successful in allowing the 6 participating companies to test the 2 fuel cell powered lift trucks in their demanding applications. One of the 6 sites (BMW) eventually adopted over 80 fuel cells from Plug Power. LiftOne was one of the 3 fuel cell demonstrators at BMW for this trial and played a major role in helping to prove the viability and efficiency of this alternative form of energy for BMW. The other 5 companies that participated in the project's deployments were encouraged by the trials and while not converting over to fuel cell power at this time, expressed the desire to revisit acquisition scenarios in the near future as the cost of fuel cells and infrastructure continue to improve. The Education sessions began in March of 2009 at the 7 LiftOne Branches and continued throughout the duration of the project. Attendees came from a large base of lift truck users in North Carolina, South Carolina and Virginia. The sessions were free and invitations were sent out to potential users and companies with intrigue. In addition to the Education content at the sessions (which was offered in a 'H2 101' format), LiftOne was able to demonstrate a working fuel cell powered lift truck, which proved to be a big draw with the 'hands on' experience. LiftOne also demo'd the fuel cell lift trucks at many conferences, expos, professional association meetings, trade shows and 'Green' events in major cities region including Charlotte, Greenville, and Columbia. Such events allowed for H2 Education Material to be presented, and recruit attendees for future sessions. The Deployments began in May '09 and continued through August'10. While the overall results were good, there were some technical problems with the fuel cells at times during the trials. These items are detailed in the attachment provided with this submission. There were never any safety issues during the trials as design features and diagnostic capabilities allowed for quick analysis and field repairs. There were no products developed during this award, as we demo'd existing products. During the project, Tom Dever was able to speak at several panel type discussions and presentations at the NHA/ Fuel Cell & H2 Energy Annual Conference, as well as at the Promat Show in Chicago. Expertise and deployment/ education experiences were imparted during these events. The presentations are included as attachments.

08 HYDROGEN↗

TRACER-Coastal Urban Boundary-Layer Interactions with Convection (TRACER-CUBIC) Field Campaign Report

To better understand the complicated web of processes governing convective cloud life cycle and aerosol-convection interactions, the U.S. Department of Energy (DOE)’s Atmospheric Radiation Measurement (ARM) user facility supported deployment of a variety of advanced atmospheric measurement systems to the greater Houston, Texas, area from 1 October 2021 to 30 September 2022 as part of the Tracking Aerosol Convection Interactions Experiment (TRACER). Houston was selected as a study area because isolated convection and a variety of aerosol conditions are common in this region. This one-year ARM Mobile Facility (AMF) deployment featured a four-month intensive operational period (IOP) during summer 2022 (1 June–30 September). The ARM instrumentation was deployed at three sites along an east-west transect from La Porte, Texas to an ancillary site in a less-polluted rural region southwest of downtown Houston (Figure 1). At the La Porte Site, which is located near the Houston ship channel in an area that experiences significant pollution, the first ARM Mobile Facility (AMF1) was deployed. During the IOP, the ARM tethered balloon system (TBS) operated at the ancillary site. The second-generation C-Band Scanning ARM Precipitation Radar (CSAPR) operated near Pearland, Texas, roughly halfway between the Laporte and ancillary sites. As part of the TRACER- Coastal Urban Boundary-Layer Interactions with Convection (CUBIC) project, three boundary-layer profiling systems) were deployed along a north-south transect spanning from the University of Houston Coastal Center to the Aldine site north of downtown Houston (also blue dot in Figure 1) during the TRACER IOP. These systems included the National Oceanic and Atmospheric Administration (NOAA) National Severe Storms Laboratory CLAMPS2 (C2), which was deployed at the UHCC, the University of Wisconsin SPARC, which was deployed at the ARM CSAPR site near Pearland (orange diamond in middle of map in Figure 1), and the University of Oklahoma CLAMPS1 (C1), which was deployed at Aldine. These three systems have been successfully operated in various field campaigns, providing data sets that collectively offer new insights into atmospheric-boundary-layer (ABL) processes, sea-breeze (SB) circulations, and convection initiation (CI). For the TRACER IOP window, these systems ran continuously between 1 June and 26 September, 2022. Due to commitments to NOAA projects, the Doppler lidar at the UHCC site was not available until 24 June 2022. The CLAMPS and SPARC profiling systems are self-contained platforms that have benefited from several years of development and deployment. Instruments and data processing were maintained remotely, which made the 4-month deployment for the TRACER-CUBIC IOP period possible. The same basic instrument configuration comprises each system: a scanning Doppler wind lidar for flow characterization and passive profiler(s) for characterizing planetary-boundary-layer (PBL) thermodynamic properties. Each platform includes a Halo Streamline Doppler wind lidar, an Atmospheric Emitted Radiance Interferometer (AERI), and a surface meteorology station. CLAMPS1 and CLAMPS2 each also include a microwave radiometer (MWR, Figure 1d). The TRACER-CUBIC hypotheses included (i) Interactions of SB and urban circulations and how they affect the PBL structure in the Houston environment, causing spatially (horizontally and vertically) and temporally highly variable flow patterns, (ii) heat, moisture, and aerosol transport and mixing depend on these flow dynamics, and (iii) an improved understanding of the flow patterns and PBL structure are critical for investigating the processes leading to CI. To test these hypotheses, the project aimed at (i) characterizing SB circulations and their impacts on the diurnal evolution of the structure of the ABL, (ii) studying the evolution of Houston’s complex urban boundary layer, and (iii) identifying effects of urban-induced circulations on pre-convective environments. TRACER-CUBIC observations generally provide good coverage during the summer IOP. Initial screening of the data indicates a good number of cases with bay-breeze (BB) and/or SB signatures, local CI, and interesting boundary-layer features such as strong nocturnal low-level jets (LLJs, Table 1). The numbers listed in rows 3-5 in this table will be further updated as part of ongoing in-depth analyses and systematic identification of local circulations and CI events. More detailed information about the data availability and quality for each instrument is provided in the “readme” files that were submitted to the ARM Data Center along with each archived data sets. These “readme” files also provide instrument descriptions, information about the data collection and processing procedures, data formats, and any additional information relevant for further data analysis.

54 ENVIRONMENTAL SCIENCES↗

New Generator Technology

New generator technology project is driven by the need to be able to remotely deploy generator technology where it is needed, when it is needed. Both the military and aid programs that provide assistance after disasters could use the ability to deploy energy generation that fits the needs of the situation. Currently, pre-specified generators are deployed, sometime more than half way around the world to provide electricity. Through our Phase-I to Phase III DARPA grant, we will provide a mechanism where a 3d print station and raw materials could be shipped to a deployment site and remotely deployed personnel. These remote personnel can collaborate with engineers at a home location where 3d print plans can be optimized for the remote purpose. The plans can then be sent electronically to the remote location for printing, much like NASA sent the plans for a socket wrench to the International Space Station for printing in . If multiple generators need to be deployed at different remote locations, within miles of each other the printer rig can be moved to print the generators where they are needed. 3d printing is growing in the field of manufacturing. 3d printing has matured to the point where many types of materials are now available for many types of manufacturing. Both magnetic and electrically conductive material materials have recently been developed which can now lead to 3d printing of engines and generators. Our project will provide a successful printer rig that can be remotely deployed, to print a generator design in the field as well as provide a process for deploying the printed generator as well. This Systems Engineering Management Plan(SEMP) will provide the planning required for a Phase I DARPA grant that may also include goals for Phase II and Phase II grants. The SEMP provides a proposed project schedule, references, system engineering processes, specialty engineering system deployment and product support sections. Each section will state how our company will provide the necessary services to make this project succeed.

3D printing, manufacturing, generator technology, ↗

Development of an Unmanned Mobile Current Turbine Platform: Preprint

The design and development of a prototype unmanned mobile floating platform, equipped with a custom low-flow marine current turbine for autonomously seeking and harnessing tidal/coastal currents is described. The platform is an unmanned surface vehicle in the form of a catamaran with two electric outboard motors and capabilities for autonomous navigation. An undershot water wheel, aided by a custom flow concentrator, has been selected as the basic design for the marine current turbine, which is mounted on the stern of the unmanned surface vehicle platform. The concept of operation is that the platform would navigate to a designated marine current resource, autonomously anchor at the location, align itself in the current and deploy the current turbine using a custom cable-lift deployment mechanism. As the turbine harnesses the local current, an onboard power-take-off device converts the harnessed mechanical energy to electricity which is stored in onboard batteries. Considerations of deployment in tidal and coastal waters required obtaining the necessary environmental permits for conducting in-water testing; developing required mitigation measures in protecting local wildlife and their habitats; and identifying potential in-water test sites and surveying them for their suitability in terms of the current resource, bottom type, water depth, and local boat traffic. The design and development of the turbine and the results of initial in-water testing are discussed. The potential for scaling up the system for extended capacity is presented.

ENGINEERING,TIDAL AND WAVE POWER↗

Bioenergy Technologies in Long-Run Climate Change Mitigation: Results from the EMF-33 Study

Bioenergy is expected to play an important role in long-run climate change mitigation strategies as highlighted by many integrated assessment model (IAM) scenarios. These scenarios, however, also show a very wide range of results, with uncertainty about bioenergy conversion technology deployment and biomass feedstock supply. To date, the underlying differences in model assumptions and parameters for the range of results have not been conveyed. Here we explore the models and results of the 33rd study of the Stanford Energy Modeling Forum to elucidate and explore bioenergy technology specifications and constraints that underlie projected bioenergy outcomes. We first develop and report consistent bioenergy technology characterizations and modeling details. We evaluate the bioenergy technology specifications through a series of analyses—comparison with the literature, model intercomparison, and an assessment of bioenergy technology projected deployments. We find that bioenergy technology coverage and characterization varies substantially across models, spanning different conversion routes, carbon capture and storage opportunities, and technology deployment constraints. Still, the range of technology specification assumptions is largely in line with bottom-up engineering estimates. We then find that variation in bioenergy deployment across models cannot be understood from technology costs alone. Important additional determinants include biomass feedstock costs, the availability and costs of alternative mitigation options in and across end-uses, the availability of carbon dioxide removal possibilities, the speed with which large scale changes in the makeup of energy conversion facilities and integration can take place, and the relative demand for different energy services.

bioenergy↗

Anomaly Identification of Synchronized Voltage Waveform for Situational Awareness of Low Inertia Systems

Inverter-based resources (IBRs) such as photovoltaics (PVs), wind turbines, and battery energy storage systems (BESSs) are widely deployed in low-carbon power systems. However, these resources typically do not provide the inertia needed for grid stability, resulting in a low-inertia power system. IBRs and lack of inertia have been known to cause anomalies such as waveform distortions and wideband oscillations in power systems due to the limited inertia level, leading to increased generation trips and load shedding. Here, to achieve effective anomaly identification, this paper proposes a synchro-waveform-based algorithm utilizing real-time synchronized voltage waveform measurements from waveform measurement units (WMUs). In the proposed method, different physical characteristics, as well as statistical features, are extracted from synchronized voltage waveform measurements to filter anomalies. Then, the anomaly identification approach based on the random forest is developed and deployed into the FNET/GridEye system considering trade-offs among accuracy, computational burden, and deployment cost. Moreover, four WMUs are specially designed and deployed on Kauai Island to receive instantaneous synchronized voltage waveform measurements. To verify the performance of the proposed algorithm, different experiments are carried out with collected field test data. The result demonstrates that the performance of the proposed synchro-waveform-based anomaly categorization algorithm can accurately identify anomalies 95.35% of the time, which has comparable performance among benchmarking algorithms.

Situational awareness↗

Long Island Smart Metering Pilot Project

The Long Island Power Authority (LIPA) Smart Meter Pilots provided invaluable information and experience for future deployments of Advanced Metering Infrastructure (AMI), including the deployment planned as part of LIPA's Smart Grid Demonstration Project (DE-OE0000220). LIPA will incorporate lessons learned from this pilot in future deployments, including lessons relating to equipment performance specifications and testing, as well as equipment deployment and tracking issues. LIPA ultimately deployed three AMI technologies instead of the two that were originally contemplated. This enabled LIPA to evaluate multiple systems in field conditions with a relatively small number of meter installations. LIPA experienced a number of equipment and software issues that it did not anticipate, including issues relating to equipment integration, ability to upgrade firmware and software over the air (as opposed to physically interacting with every meter), and logistical challenges associated with tracking inventory and upgrade status of deployed meters. In addition to evaluating the technology, LIPA also piloted new Time-of-Use (TOU) rates to assess customer acceptance of time-differentiated pricing and to evaluate whether customers would respond by adjusting their activities from peak to non-peak periods. LIPA developed a marketing program to educate customers who received AMI in the pilot areas and to seek voluntary participation in TOU pricing. LIPA also guaranteed participating customers that, for their initial year on the rates, their electricity costs under the TOU rate would not exceed the amount they would have paid under the flat rates they would otherwise enjoy. 62 residential customers chose to participate in the TOU rates, and every one of them saved money during the first year. 61 of them also elected to stay on the TOU rate without the cost guarantee at the end of that year. The customer who chose not to continue on the rate was also the one who achieved the greatest savings. However, after the first year, the customer in question installed equipment that would have made TOU rates a more costly option than the residential flat rate. During the second year, all but one customer saved money. That customer increased usage during peak hours, and as a result saw an increase in annual costs (as compared to the flat rate) of $\$$24.17. The results were less clear for commercial customers, which LIPA attributes to rate design issues that it will take into account for future deployments. LIPA views this pilot as a complete success. Not only is LIPA better prepared for a larger deployment of AMI, but it is confident that residential customers will accept AMI and TOU rates and shift their energy consumption from peak to non-peak periods in response to pricing. On a larger scale, this will benefit LIPA and all of its customers by potentially lowering peak demand when energy costs are highest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

On the Path to SunShot. Emerging Issues and Challenges in Integrating Solar with the Distribution System

This report analyzes distribution-integration challenges, solutions, and research needs in the context of distributed generation from PV (DGPV) deployment to date and the much higher levels of deployment expected with achievement of the U.S. Department of Energy's SunShot targets. Recent analyses have improved estimates of the DGPV hosting capacities of distribution systems. This report uses these results to statistically estimate the minimum DGPV hosting capacity for the contiguous United States using traditional inverters of approximately 170 GW without distribution system modifications. This hosting capacity roughly doubles if advanced inverters are used to manage local voltage and additional minor, low-cost changes could further increase these levels substantially. Key to achieving these deployment levels at minimum cost is siting DGPV based on local hosting capacities, suggesting opportunities for regulatory, incentive, and interconnection innovation. Already, pre-computed hosting capacity is beginning to expedite DGPV interconnection requests and installations in select regions; however, realizing SunShot-scale deployment will require further improvements to DGPV interconnection processes, standards and codes, and compensation mechanisms so they embrace the contributions of DGPV to system-wide operations. SunShot-scale DGPV deployment will also require unprecedented coordination of the distribution and transmission systems. This includes harnessing DGPV's ability to relieve congestion and reduce system losses by generating closer to loads; minimizing system operating costs and reserve deployments through improved DGPV visibility; developing communication and control architectures that incorporate DGPV into system operations; providing frequency response, transient stability, and synthesized inertia with DGPV in the event of large-scale system disturbances; and potentially managing reactive power requirements due to large-scale deployment of advanced inverter functions. Finally, additional local and system-level value could be provided by integrating DGPV with energy storage and 'virtual storage,' which exploits improved management of electric vehicle charging, building energy systems, and other large loads. Together, continued innovation across this rich distribution landscape can enable the very-high deployment levels envisioned by SunShot.

14 SOLAR ENERGY↗

Demand Driven Cycamore Archetypes

Future nuclear fuel cycle options may present advantages over today’s once-through fuel cycle. Nuclear fuel cycle simulation tools assess the performance of those fuel cycles as well as the dynamics of long-term technology transitions. In many nuclear fuel cycle simulation tools, it has historically been the responsibility of the user to manually define facility deployment schemes and all facility parameters. While this is straightforward in simple fuel cycles, transitions from one fuel cycle to another can be more complex. In particular, deployment schemes for supportive fuel cycle facilities beyond the reactor become complex if the analyst desires to avoid gaps in the nuclear fuel and power supply chain during those transition scenarios. As nuclear fuel cycle analysis approaches questions regarding the feasibility and performance of the deployment schemes and technology choices during technology transition, automation of this historically manual process is necessary. The main objective of this work was to develop and demonstrate Cyclus automation capabilities toward key nuclear fuel cycle transition scenarios. While deploying reactors to meet power demand is trivial, and existed in the earliest versions of CYCLUS, automated, predictive deployment and decommissioning of other facilities is more complex. These include mining, milling, enrichment, fuel fabrication, reprocessing, and others. For example, a balanced closed fuel cycle may require ensuring that there is enough fast reactor fuel for their operation and may drive deployment of a fleet of light water reactors. This concern comprises the main challenge that drove the project effort. The Demand-Driven Cycamore Archetype project (NEUP-FY16-10512) aimed to develop CYCAMORE demand-driven deployment capabilities and thereby automate transition scenario definition. The developed software package, d3ploy, in the form of a CYCLUS Institution agent, deploys Facilities to meet the front-end and back-end demands of the fuel cycle. The University of South Carolina and the University of Illinois applied multiple algorithmic approaches to this challenge. This project developed an in situ demand-driven development schedule calculation through non-optimizing, deterministic-optimizing, and stochastic-optimizing algorithms as CYCLUS archetypes and demonstrated these new archetypes in program-supporting fuel cycle transition scenarios. Both objectives were achieved. This report documents the results and deliverables obtained toward these achievements in detail.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Representing DC-Coupled PV+Battery Hybrids in a Capacity Expansion Model

Recent technology cost and performance improvements and the federal investment tax credit (ITC) have driven growing interest in coupling solar photovoltaic (PV) and battery systems. Combining these technologies into co-located or hybridized PV+battery systems has the potential to lower costs and increase energy output relative to multiple independent systems. In this work, we provide an overview of PV+battery systems and demonstrate methods for incorporating them into NREL’s Regional Energy Deployment System (ReEDS) capacity expansion model. Although the methods are applied to a specific model, we anticipate that the approaches used here can be useful for informing PV+battery method development for other capacity expansion models. The implemented method relies heavily on the native representations of PV and battery technologies; therefore, the focus of this work is on capturing and parameterizing the interactions between them for a configuration in which the PV and battery technologies share a single bi-directional inverter. This work also demonstrates the impacts of including PV+battery systems in the ReEDS optimization for the conterminous United States through 2050. In particular, we perform parametric sensitivities for input assumptions that are uncertain and expected to influence PV+battery deployment levels, including (a) the cost of PV+battery systems relative to independent PV and battery systems, (b) the battery component’s qualification for the ITC, and (c) future cost trajectories for PV and battery systems. We find that PV+battery deployment could occur throughout the conterminous United States if there are cost savings associated with DC coupling PV and battery technologies. If even modest (5%) cost savings can be achieved (through a shared inverter and balance-of-system costs), then approximately one-third of utility-scale PV deployment through 2050 adopts the DC-coupled hybrid configuration, resulting in total PV+battery deployment that exceeds the magnitude of PV+battery projects in U.S. interconnection queues in 2020. If greater cost savings can be achieved through DC coupling (e.g., due to a growing amount of shared balance-of-system costs, reduced financial risk, or modularity) or more rapid cost and performance improvements are realized for PV and battery technologies, then total PV+battery deployment and the share of PV and battery deployment that adopts the hybrid configuration grows (to >50%). In all cases, growing PV+battery deployment primarily displaces independent PV and battery technologies, indicating the strong competition between the hybrid and independent configurations comprising technologies with similar performance characteristics.

14 SOLAR ENERGY↗

Multiscale Electricity Modeling for Evaluating Carbon Capture and Sequestration Technologies (Final Report)

Carbon capture and sequestration (CCS) technologies that can operate with a high degree of operating flexibility could provide necessary electric grid flexibility in a system with high shares of variable renewables. This project examines the deployment and dispatch potential of twelve unique flexible CCS (FLECCS) technologies that encompass post-combustion carbon dioxide (CO 2 ) capture designs, concepts using a storage media to enable energy arbitrage, and hybrid processes that integrate CCS with direct air capture (DAC) for flexibility with net zero or negative CO 2 emissions. FLECCS technology potential is explored with a multi-model, multi-scale framework including the Regional Energy Deployment System (ReEDS) electric sector capacity expansion model (CEM) and the PLEXOS production cost model (PCM). Innovative methods were developed to represent FLECCS technology operating modes, performance, and cost in the two models. ReEDS was then used to simulate nine scenarios for each FLECCS technology, three CO 2 emissions price futures reaching $\$$150, $\$$225, and $\$$300/tCO 2 in 2050; and three scenarios for FLECCS technology deployment favorability relative to competing technologies. For each CO 2 price and reference FLECCS favorability, the 2050 infrastructures from ReEDS model are downscaled and implemented in PLEXOS to examine hourly dispatch under detailed operational constraints that are not included in ReEDS. FLECCS technologies exhibited a wide range of deployment potential ranging from none to several hundred gigawatts of capacity, with outcomes highly sensitive to input cost and performance parameters that are inherently highly uncertain. When deployed, FLECCS tended to displace a combination of wind, solar, and natural gas-based technologies rather than supporting increased renewable deployment. As a result, CO 2 emissions reductions facilitated by FLECCS deployment tended to come with higher overall system costs and electricity prices. When economically competitive, FLECCS technologies can contribute significant flexible generation and firm capacity to the grid, but continued technology development and an expanded analytical scope are necessary to fully understand FLECCS deployment potential its impact on the electric power sector. Follow-on analysis incorporating captured CO 2 tax credit value from the Inflation Reduction Act (IRA) and other potential policy scenarios could be particularly valuable, as this policy can substantially change the relative competitiveness of FLECCS technologies.

03 NATURAL GAS↗

Atmospheric Radiation Measurement program climate research facility operations quarterly report July 1 - September 30, 2008.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1 - September 30, 2008, for the fixed sites. The AMF has been deployed to China, but the data have not yet been released. The fourth quarter comprises a total of 2,208 hours. The average exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has a central facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. The TWP locale has the Manus, Nauru, and Darwin sites. HFE represents the AMF statistics for the Shouxian, China, deployment in 2008. FKB represents the AMF statistics for the Haselbach, Germany, past deployment in 2007. NIM represents the AMF statistics for the Niamey, Niger, Africa, past deployment in 2006. PYE represents just the AMF Archive statistics for the Point Reyes, California, past deployment in 2005. In addition, users who do not want to wait for data to be provided through the ACRF Archive can request a research account on the local site data system. The seven computers for the research accounts are located at the Barrow and Atqasuk sites; the SGP central facility; the TWP Manus, Nauru, and Darwin sites; and the DMF at PNNL. In addition, the ACRF serves as a data repository for a long-term Arctic atmospheric observatory in Eureka, Canada (80 degrees 05 minutes N, 86 degrees 43 minutes W) as part of the multiagency Study of Environmental Arctic Change (SEARCH) Program. NOAA began providing instruments for the site in 2005, and currently cloud radar data are available. The intent of the site is to monitor the important components of the Arctic atmosphere, including clouds, aerosols, atmospheric radiation, and local-scale atmospheric dynamics. Because of the similarity of ACRF NSA data streams and the important synergy that can be formed between a network of Arctic atmospheric observations, much of the SEARCH observatory data are archived in the ARM archive. Instruments will be added to the site over time. For more information, please visit http://www.db.arm.gov/data. The designation for the archived Eureka data is YEU and is now included in the ACRF user metrics. This quarterly report provides the cumulative numbers of visitors and user accounts by site for the period October 1, 2007 - September 30, 2008. Table 2 shows the summary of cumulative users for the period October 1, 2007 - September 30, 2008. For the fourth quarter of FY 2008, the overall number of users is down substantially (about 30%) from last quarter. Most of this decrease resulted from a reduction in the ACRF Infrastructure users (e.g., site visits, research accounts, on-site device accounts, etc.) associated with the AMF China deployment. While users had easy access to the previous AMF deployment in Germany that resulted in all-time high user statistics, physical and remote access to on-site accounts are extremely limited for the AMF deployment in China. Furthermore, AMF data have not yet been released from China to the Data Management Facility for processing, which affects Archive user statistics. However, Archive users are only down about 10% from last quarter. Another reason for the apparent reduction in Archive users is that data from the Indirect and Semi-Direct Aerosol Campaign (ISDAC), a major field campaign conducted on the North Slope of Alaska, are not yet available to users. For reporting purposes, the three ACRF sites and the AMF operate 24 hours per day, 7 days per week, and 52 weeks per year. Time is reported in days instead of hours. If any lost work time is incurred by any employee, it is counted as a workday loss. Table 3 reports the consecutive days since the last recordable or reportable injury or incident causing damage to property, equipment, or vehicle for the period July 1 - September 30, 2008. There were no incidents this reporting period.

54 ENVIRONMENTAL SCIENCES↗