Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Demand Response”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

The Implications of Reduced Ground Reaction Forces During Space Flight for Bone Strains

The specific mechanisms regulating bone mass are not known, but most investigators agree that bone maintenance is largely dependent upon mechanical demand and the resultant local bone strains. During space flight, bone loss such as that reported by LeBlanc et al. may result from failure to effectively load the skeleton and generate sufficient localized bone strains. In microgravity, a gravity replacement system can be used to tether an exercising subject to a treadmill. It follows that the ability to prevent bone loss is critically dependent upon the external ground reaction forces (GRFs) and skeletal loads imparted by the tethering system. To our knowledge, the loads during orbital flight have been measured only once (on STS 81). Based on these data and data from ground based experiments, it appears likely that interventions designed to prevent bone loss in micro-gravity generate GRFs substantially less than body weight. It is unknown to what degree reductions in external GRFs will affect internal bone strain and thus the bone maintenance response. To better predict the efficacy of treadmill exercise in micro-gravity we used a unique cadaver model to measure localized bone strains under conditions representative of those that might be produced by a gravity replacement system in space.

Peterman, Marc M.↗

Remote Support of ISS Payload Operations During the COVID19 Pandemic

As part of the Human Health and Performance Contract (HHPC) with the NASA Johnson Space Center, the Human Research Program’s (HRP) Research Operations and Integration (ROI) element conducts the planning, implementation, and closing of human research operations on-board the International Space Station (ISS). These operations are supported out of the Telescience Support Center (TSC) located in the Mission Control Center at Houston’s Johnson Space Center (MCC-H). HRP ROI has an Emergency Response Plan in place to allow for remote operations to be completed in the case of inclement weather or other natural disaster; however, nominally, the remote support is only expected to last one to two weeks. In response to the COVID-19 global pandemic, HRP ROI was challenged to complete a quick transition to supporting on-orbit operations remotely and distanced for an indefinite amount of time. This shift in ground support required close collaboration with various external groups as well as the implementation or adaptation of various technologies and tools to ensure no loss of science data. Operational adjustments were put into place for ground commanding, telemetry monitoring, personnel staffing and private and public audio and video with the ISS. Adjustments were also put in place for communication and collaboration with MCC-H, the Payload Operation and Integration Center (POIC) at Marshall Space Flight Center (MSFC), as well as between the various HRP ROI console team members spread across Houston, TX. The ability to successfully support a variety of on-orbit operations from any remote location is more in demand as the commercialization of low Earth orbit is expanding.

Operations↗

Co-occurrence of native white-tailed deer and invasive wild pigs: Evidence for competition?

Understanding whether invasive and native species compete for shared resources where they co-occur is essential for mitigating the negative impacts of invasive species on native ecosystems. Here, we examined how the presence and density of an invasive species, wild pigs (Sus scrofa), affect native white-tailed deer (Odocoileus virginianus; hereafter, deer) on the Savannah River Site, SC, USA. We examined potential changes in deer areas of use, temporal overlap, and occupancy to evaluate the effects of wild pig occurrence and density on deer space use, diel activity, and co-occurrence with wild pigs across 9 months during 2018 and 2019. Wild pig density had the strongest effect on deer space use in high- and moderate-use areas. Declines in deer space use in response to wild pig density were most pronounced in March and October 2018 and April 2019 for females, while male space use declined in response to wild pig density in October and December 2018. Both species were largely nocturnal with high overlap in diel activity across months. Deer occupancy responses to wild pig density varied across months, with negative responses in May and October 2018 and positive responses in July 2018 and April 2019. Deer and wild pigs co-occurred at 30%–59% of camera stations across months, with broadscale co-occurrence patterns being unaffected by changes in shared cover or wild pig occurrence. Overall, our results suggest that deer make fine-scale behavioral adjustments to avoid wild pigs, providing evidence that competition is likely occurring even where wild pig density is relatively low. Such fine-scale behavioral plasticity in deer appears to mitigate the costs of competition with wild pigs and may be a mechanism enabling long-term co-existence of deer and wild pigs. Our study provides novel insight on the complexities of spatiotemporal relationships between invasive wild pigs and native deer and suggests that the negative effects of interactions between deer and wild pigs may be more pronounced when deer life history needs are particularly demanding. In areas where eradication of invasive wild pigs may be impossible, maintaining low wild pig densities may help mitigate, but may not eliminate, the negative effects of wild pigs on deer.

resource partitioning↗

Output Data: gcam_usa_v5p3_im3

Output databases and tables supporting the publication: Khan, Z., Zhao, M., Ahsan, H., Wolfram, P., Vernon, C., Rice, J., Iyer, G., Binsted, M., Snyder, A., Graham, N., Kyle, P., 2023. Coevolution of future water, energy and land systems across the United States in response to national and global socioeconomic, climate, and energy policy drivers. (In progress) Earths Future, DOI: XXX with further details available at the meta-repository: https://immm-sfa.github.io/khan-etal_2023_im3gcamusa Folder: gcam_usa_im3_outputs (GCAM USA v 5.3 used for IM3 experiment Output Databases): database_rcp45cooler_ssp3.tar.gz database_rcp45cooler_ssp5.tar.gz database_rcp45hotter_ssp5.tar.gz database_rcp45hotter_ssp5.tar.gz database_rcp85cooler_ssp3.tar.gz database_rcp85cooler_ssp5.tar.gz database_rcp85hotter_ssp5.tar.gz database_rcp85hotter_ssp5.tar.gz Folder: gcam_usa_im3_gcamextractor_outputs (gcamextractor post-processing of the GCAM databases for specific downstream models ): dataGCAM_cerf.tar.gz (For CERF Model) dataGCAM_demeter.tar.gz (For Demeter model) dataGCAM_go.tar.gz (For GO model) gcamDataTable.tar.gz (All IM3 scenarios)

Climate Change↗

Postdoctoral insights on mentoring excellence: a framework for best practices at Sandia National labs

The Sandia National Laboratories Strategic Plan FY24-FY27, updated for FY25, outlines Sandia’s two Big Labs-wide Goals, Accelerate Innovation and Lead in Modern Engineering. The goal of Accelerate Innovation is that “by FY27, Sandia will be a leader in scientific, engineering and operational innovation and an employer of choice for highly innovative and creative talent.” Sandia’s postdocs are leaders in innovation, well-versed in emerging techniques and cutting-edge methods, and capable of acting as a highly agile technical force across domains at the lab. As a federally funded research and development center (FFRDC), Sandia National Laboratories attracts top doctoral talent by offering a unique opportunity for postdoctoral researchers to develop at the crossroads of government, academia, and industry, working in multi-disciplinary teams and performing cutting-edge, mission-specific research that responds to immediate needs of national interest. However, this creates unique opportunities and demands of both postdoctoral appointees and the Sandia staff who act as their mentors, making mentorship key to attract talent. Since 2007 the Sandia Postdoctoral Development (SPD) Board, originally Postdoc To Professional (PD2P), a networking group at Sandia composed of a voluntary board of current postdocs and two staff liaisons, has advocated for postdoctoral development within Sandia National Labs. In this white paper, SPD board members and the Sandia Postdoctoral Development Office, organized in 2019, have come together to develop a comprehensive overview of the postdoctoral mentoring landscape at Sandia National Labs as we currently know it. By scouring various forms of data from efforts since 2018, we’ve compiled a community-derived perspective on what makes postdoctoral mentorship at Sandia unique. First, we analyze working sessions held between mentors and mentees to develop a comprehensive map of who is involved in postdoctoral mentorship at the lab and how the responsibilities are divided amongst mentors and mentees. We then combine multiple forms of data, including exit surveys, annual surveys, and community workshops, to identify the specific challenges that mentors and mentees encounter at the national lab. Finally, we use text mining and sentiment analysis to analyze mentoring award data to develop an idea of what postdocs are self-identifying as excellent mentorship within the lab. It is our goal that this white paper act as an ongoing resource to the postdoc and postdoc mentoring communities and provide a firm foundation for further conversations on the future of postdoctoral mentorship at Sandia National Labs.

99 GENERAL AND MISCELLANEOUS↗

Airborne Trajectory Management (ABTM): A Blueprint for Greater Autonomy in Air Traffic Management

The aviation users of the National Airspace System (NAS) - the airlines, General Aviation (GA), the military and, most recently, operators of Unmanned Aircraft Systems (UAS) - are constrained in their operations by the design of the current paradigm for air traffic control (ATC). Some of these constraints include ATC preferred routes, departure fix restrictions and airspace ground delay programs. As a result, most flights cannot operate on their most efficient business trajectories and a great many flights are delayed even getting into the air, which imposes a significant challenge to maintaining efficient flight and network operations. Rather than accepting ever more sophisticated scheduling solutions to accommodate the existing constraints in the airspace, a series of increasingly capable airborne technologies, integrated with planned improvements in the ground system through the Federal Aviation Administration (FAA) Next Generation Air Traffic Management System (NextGen) programs, could produce much greater operational flexibility for flight path optimization by the aviation system users. These capabilities, described in research coming out of NASA's Aeronautics Research Mission Directorate, can maintain or improve operational safety while taking advantage of air and ground NextGen technologies in novel ways. The underlying premise is that the nation's physical airspace is still abundant and underused, and that the delays and inefficient flight operations resulting from artificial structure in airspace use and procedural constraints on those operations may not be necessary for safe and efficient flight. This article is not an indictment of today's NAS or the people who run it. Indeed, it is an exceptional achievement that Air Traffic Management (ATM) - the complex human/machine conglomeration of communications, navigation and surveillance equipment and the rules and procedures for controlling traffic in the airspace - has both the capacity and enables the degree of efficiency in air travel that it does. But it is also true that sixty years of the "radar religion" (i.e., reliance on radar-based command and control) has produced several generations of ATM system operators and researchers who believe that introducing automation within the existing functional structure of ATM is the only way to "modernize" the system. Even NextGen, which began as a proposal for "transformational" change in the way ATC is performed, has morphed over the last decade and a half to become just the inclusion of Global Positioning System (GPS) for navigation, Automatic Dependent Surveillance Broadcast (ADS-B) for surveillance, and Data Communications (Data Comm) for communications, while still operating in rigidly structured airspace with human controllers being responsible for separation and traffic flow management (TFM) within defined sectors of airspace, using the same horizontal separation standards that have been in use since raw primary radar was introduced in the 1950s. No system as massive as the current NAS ATM can be replaced with a better system while simultaneously meeting the transportation and other aviation needs of the nation. A new generation of more flexible operations must emerge and yet coexist in harmony with the current operation (i.e., share the same airspace without segregation), thereby enabling a long-term transformation to take place in the way increasing numbers of flights are handled. Market forces will be the ultimate driver of this transformation, and investment realities mandate that real benefits must accrue to the first operators to adopt these new capabilities. In fact, the kinds of missions envisioned in the emerging world of UAS operations, unachievable under conventional ATM, demand that this transformation take place. Airborne Trajectory Management (ABTM) is proposed as a series of transformational steps leading to vastly increased flexibility in flight operations and capacity in the airspace to accommodate many varied airspace uses while improving safety. As will be described, ABTM enables the gradual emergence of a new paradigm for user-based trajectory management in ATM that brings tangible benefits to equipped operators at every step while leveraging the air and ground investments of NextGen. There are five steps in this ABTM transformation.1 NASA has extensively studied the first and last of these steps, and a roadmap of increasing capabilities and benefits is proposed for bridging between these operational concepts.

Cotton, William B.↗

Challenges of Sustaining the International Space Station Through 2020 and Beyond: Reassessing Confidence Targets for System Availability

The International Space Station (ISS) was originally designed to operate until 2015 with a plan for deorbiting the ISS in 2016. Currently, the international partnership has agreed to extend the operations until 2020 and discussions are underway to extend the life even further to 2028. Each partner is responsible for the sustaining engineering, sparing, and maintenance of their own segments. National Aeronautics and Space Administration's (NASA's) challenge is to purchase the needed number of spares to maintain the functional availability of the ISS systems necessary for the United States On-Orbit Segment s contribution. This presentation introduces an analytical approach to assessing uncertainty in ISS hardware necessary to extend the life of the vehicle. Some key areas for consideration are: establishing what confidence targets are required to ensure science can be continuously carried out on the ISS, defining what confidence targets are reasonable to ensure vehicle survivability, considering what is required to determine if the confidence targets are too high, and whether sufficient number of spares are purchased. The results of the analysis will provide a methodological basis for reassessing vehicle subsystem confidence targets. This analysis compares the probability of existing spares exceeding the total expected unit demand of the Orbital Replacement Unit (ORU) in functional hierarchies approximating the vehicle subsystems. In cases where the functional hierarchies' availability does not meet subsystem confidence targets, the analysis will further identify which ORUs may require additional spares to extend the life of the ISS. The resulting probability is dependent upon hardware reliability estimates. However, the ISS hardware fleet carries considerable epistemic uncertainty which must be factored into the development and execution of sparing risk postures. In addition, it is also recognized that uncertainty in the assessment is due to disconnects between modeled functions and actual subsystem operations. Perhaps most importantly, it is acknowledged that conservative confidence targets per subsystem are currently accepted. This presentation will also discuss how subsystem confidence targets may be relaxed based on calculating the level of uncertainty for each corresponding ORU-function. The presentation will conclude with the various strengths and limitations for implementing the analytical approach in sustaining the ISS through end of life; 2020 and beyond.

Lutomski, Michael G.↗

MLCommons Science Benchmarks

Benchmarks are a cornerstone of modern machine learning practice, providing standardized eval- uations that enable reproducibility, comparison, and scientific progress. Yet, as AI systems particularly deep learning models become increasingly dynamic, traditional static benchmarking approaches are losing their relevance. Models rapidly evolve in architecture, scale, and capability; datasets shift; and deployment contexts continuously change, creating a moving target for evaluation. Without adaptive benchmarking frame- works, both scientific assessment and real-world de- ployment risk becoming misaligned with actual system behavior. Drawing on our experience from MLCommons, educa- tional initiatives, and government programs such as the DOE s Million Parameter Consortium, we identify key barriers that hinder the broader adoption and utility of benchmarking in AI. These include substantial resource demands, limited access to specialized hardware, lack of expertise in benchmark design, and uncertainty among practitioners about how to relate benchmark results to their own application domains. Moreover, current benchmarks often emphasize peak performance on leadership-class hardware, offering limited guidance for more diverse, real-world deployment scenarios. We argue that benchmarking itself must become dy- namic in order to incorporate evolving models, updated data, and heterogeneous computational platforms while maintaining transparency, reproducibility, and inter- pretability. Democratizing this process requires not only technical innovation, but also systematic educational efforts spanning undergraduate to professional levels to develop sustained expertise in benchmark design and use. Finally, benchmarks should be framed and com- municated to support application-relevant comparisons, enabling both developers and users to make informed, context-sensitive decisions. Advancing dynamic and inclusive benchmarking practices will be essential to ensure that evaluation keeps pace with the evolving AI landscape and supports responsible, reproducible, and accessible AI deployment.

Hawks, Benjamin G. [Fermilab]↗

An Assessment of the Potential for Utility-Scale Solar Energy Development on the Navajo Nation

The Navajo Nation covers about 27,000 square miles in the Southwestern United States with approximately 270 sunny days a year. Therefore, the Navajo Nation has the potential to develop utility-scale solar photovoltaic (PV) energy for the Navajo people and export electricity to major cities to generate revenues. In April 2019, the Navajo Nation issued a proclamation to increase residential and utility-scale renewable energy development on the Navajo Nation. In response, this research assesses the potential for utility-scale solar energy development on the Navajo Nation using criteria such as access to roads, transmission lines, slope/terrain data, aspect/direction, and culturally sensitive sites. These datasets are applied as layers using ArcGIS to identify regions that have good potential for utility-scale solar PV installations. Land availability on the Navajo Nation has been an issue for developing utility-scale solar PV, so this study proposes potential locations for solar PV and how much energy these potential sites could generate. Furthermore, two coal-fired power plants, the Navajo Generating Station and the San Juan Generating Station, will close soon and impact the Navajo Nation's energy supply and economy. This study seeks to answer two main questions: whether utility- scale solar energy could be used to replace the energy generated by both coal-fired powerplants, and what percentage of the Navajo Nation's energy demands can be met by utility-scale solar energy development? Economic development is a major concern; therefore, this study also examines what utility-scale solar development will mean for the Navajo Nation economy. The results of this study show that the Navajo Nation has a potential PV capacity of 45,729 MW to 91,459 MW. Even with the lowest calculated capacity, utility-scale solar PV has the potential to generate more than 11 times the power of the NGS and SJGS combined.

14 SOLAR ENERGY↗

Global Design Optimization for Aerodynamics and Rocket Propulsion Components

Modern computational and experimental tools for aerodynamics and propulsion applications have matured to a stage where they can provide substantial insight into engineering processes involving fluid flows, and can be fruitfully utilized to help improve the design of practical devices. In particular, rapid and continuous development in aerospace engineering demands that new design concepts be regularly proposed to meet goals for increased performance, robustness and safety while concurrently decreasing cost. To date, the majority of the effort in design optimization of fluid dynamics has relied on gradient-based search algorithms. Global optimization methods can utilize the information collected from various sources and by different tools. These methods offer multi-criterion optimization, handle the existence of multiple design points and trade-offs via insight into the entire design space, can easily perform tasks in parallel, and are often effective in filtering the noise intrinsic to numerical and experimental data. However, a successful application of the global optimization method needs to address issues related to data requirements with an increase in the number of design variables, and methods for predicting the model performance. In this article, we review recent progress made in establishing suitable global optimization techniques employing neural network and polynomial-based response surface methodologies. Issues addressed include techniques for construction of the response surface, design of experiment techniques for supplying information in an economical manner, optimization procedures and multi-level techniques, and assessment of relative performance between polynomials and neural networks. Examples drawn from wing aerodynamics, turbulent diffuser flows, gas-gas injectors, and supersonic turbines are employed to help demonstrate the issues involved in an engineering design context. Both the usefulness of the existing knowledge to aid current design practices and the need for future research are identified.

Shyy, Wei↗

Integrated assessment modeling of a zero-emissions global transportation sector

Currently responsible for over one fifth of carbon emissions worldwide, the transportation sector will need to undergo a substantial technological transition to ensure compatibility with global climate goals. Few studies have modeled strategies to achieve zero emissions across all transportation modes, including aviation and shipping, alongside an integrated analysis of feedbacks on other sectors and environmental systems. Here, we use a global integrated assessment model to evaluate deep decarbonization scenarios for the transportation sector consistent with maintaining end-of-century warming below 1.5 °C, considering varied timelines for fossil fuel phase-out and implementation of advanced alternative technologies. We highlight the leading low carbon technologies for each transportation mode, finding that electrification contributes most to decarbonization across the sector. Biofuels and hydrogen are particularly important for aviation and shipping. Our most ambitious scenario eliminates transportation emissions by mid-century, contributing substantially to achieving climate targets but requiring rapid technological shifts with integrated impacts on fuel demands and availability and upstream energy transitions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The NASA CSTI High Capacity Power Program

The SP-100 program was established in 1983 by DOD, DOE, and NASA as a joint program to develop the technology necessary for space nuclear power systems for military and civil applications. During 1986 and 1987, the NASA Advanced Technology Program was responsible for maintaining the momentum of promising technology advancement efforts started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for future space applications. In 1988, the NASA Advanced Technology Program was incorporated into NASA's new Civil Space Technology Initiative (CSTI). The CSTI program was established to provide the foundation for technology development in automation and robotics, information, propulsion, and power. The CSTI High Capacity Power Program builds on the technology efforts of the SP-100 program, incorporates the previous NASA advanced technology project, and provides a bridge to the NASA exploration technology programs. The elements of CSTI high capacity power development include conversion systems: Stirling and thermoelectric, thermal management, power management, system diagnostics, and environmental interactions. Technology advancement in all areas, including materials, is required to provide the growth capability, high reliability, and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall program will develop and demonstrate the technology base required to provide a wide range of modular power systems while minimizing the impact of day/night operations as well as attitudes and distance from the Sun. Significant accomplishments in all of the program elements will be discussed, along with revised goals and project timelines recently developed.

Winter, Jerry M.↗

A Cognitive-System Model for En Route Air Traffic Management

NASA Ames Research Center has been engaged in the development of advanced air traffic management technologies whose basic form is cognitive aiding systems for air traffic controller and flight deck operations. In the design and evaluation of such systems the dynamic interaction between the airborne aiding system and the ground-based aiding systems forms a critical coupling for control. The human operator is an integral control element in the system and the optimal integration of human decision and performance parameters with those of the automation aiding systems offers a significant challenge to cognitive engineering. This paper presents a study in full mission simulation and the development of a predictive computational model of human performance. We have found that this combination of methodologies provide a powerful design-aiding process. We have extended the computational model Man Machine Integrated Design and Analysis System (N13DAS) to include representation of multiple cognitive agents (both human operators and intelligent aiding systems), operating aircraft airline operations centers and air traffic control centers in the evolving airspace. The demands of this application require the representation of many intelligent agents sharing world-models, and coordinating action/intention with cooperative scheduling of goals and actions in a potentially unpredictable world of operations. The operator's activity structures have been developed to include prioritization and interruption of multiple parallel activities among multiple operators, to provide for anticipation (knowledge of the intention and action of remote operators), and to respond to failures of the system and other operators in the system in situation-specific paradigms. We have exercised this model in a multi-air traffic sector scenario with potential conflict among aircraft at and across sector boundaries. We have modeled the control situation as a multiple closed loop system. The inner and outer loop alerting structure of air traffic management has many implications that need to be investigated to assure adequate design. First, there are control and stability factors implicit in the design. As the inner loop response time approaches that of the outer loop, system stability may be compromised in that controllers may be solving a problem the nature of which has already been changed by pilot action. Second, information exchange and information presentation for both air and ground must be designed to complement as opposed to compete with each other. Third, the level of individual and shared awareness in trajectory modification and flight conformance needs to be defined. Fourth, the level of required awareness and performance impact of mixed fleet operations and failed-mode recovery must be explored.

Corker, Kevin M.↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. NASA conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km (distances relevant to LTV-SYS071 and -029 requirements). Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 11.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “first-look” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

Transient Modelling of HTGR Thermal Load Follow in Modelica

The ability of nuclear power plants to load follow electrical power demand is particularly important as we move to higher variable renewable (VRE) energy production on low carbon energy grids. High temperature gas reactors (HTGRs) are capable of load following by adjusting thermal output, but their high temperatures and thermal inertia significantly impact the power transients they are able to follow. To aid investigation into new integrated energy systems with advanced reactors, it is necessary to have an open-source transient model of a full HTGR primary and secondary. This paper introduces two new open-source models for a HTGR and corresponding balance of plant (BOP) written for the HYBRID library developed at Idaho National Laboratory. A transient thermal load follow test case was taken by the work from Brits et al. to benchmark our open-source model against transient operation results from other proprietary codes that exist. The control scheme for the two new models in combination is discussed and a comparison of the response in transient load follow between the two codes performed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydropower: Supply Chain Deep Dive Assessment

The report “America’s Strategy to Secure the Supply Chain for a Robust Clean Energy Transition” lays out the challenges and opportunities faced by the United States in the energy supply chain as well as the federal government plans to address these challenges and opportunities. It is accompanied by several issue-specific deep dive assessments, including this one, in response to Executive Order 14017 “America’s Supply Chains,” which directs the Secretary of Energy to submit a report on supply chains for the energy sector industrial base. The Executive Order is helping the federal government to build more secure and diverse U.S. supply chains, including energy supply chains. Hydropower is a vital component of the U.S. Energy Sector Industrial Base. The United States has mature conventional hydropower and pumped storage hydropower (PSH) fleets with corresponding mature supply chains. Given the slow pace of new construction over the past few decades, the U.S. hydropower industry primarily supports the existing domestic fleets—the U.S. conventional hydropower fleet (80.3 GW) is the 4 th largest in the world and the U.S. PSH fleet (21.8 GW) is the third largest in the world. Additionally, U.S. hydropower manufacturing facilities export part of their output. This report examines the hydropower supply chain to identify potential bottlenecks, challenges, and opportunities, particularly if the U.S. demand for hydropower components grows significantly to meet decarbonization targets.

13 HYDRO ENERGY↗

Role of the BIPM in UTC Dissemination to the Real Time User

The generation and dissemination of International Atomic Time (TAI), and Coordinated Universal Time (UTC) are explicitly mentioned in the list of principal tasks of the Bureau International des Poids et Mesures (BIPM), that appears in the Compes Rendus of the the 18e Conference Generales des Poids et Measures, in 1987. These time scales are used as the ultimate reference in the most demanding scientific applications and must, therefore, be of the best metrological quality in terms of reliability, long term stability, and conformity of the scale interval with the second, the unit of time of the International System of Units. To meet these requirements, it is necessary that the readings of the atomic clocks, spread all over the world, that are used as basic timing data for TAI and UTC generation, must be combined in the most efficient way possible. In particular, to take full advantage of the quality of each contributing clock calls for observation of its performance over a sufficiently long time. At present, the computation period treats data in blocks covering two months. TAI and UTC are thus deferred-time scales that cannot be immediately available to real-time users. The BIPM can, nevertheless be of help to real-time users. The predictability of UTC is a fundamental attribute of the scale for institutions responsible for the dissemination of real-time time scales. It allows them to improve their local representations of UTC and, thus, implement a more thorough steering of the time scales diffused in real-time. With a view to improving the predicatbility of UTC, the BIPM examines in detail timing techniques and basic theories in order to propose alternative solutions for timing algorithms. This, coupled with a recent improvement of timing data, makes UTC more stable and thus, more predictable. At a more practical level, effort is being devoted to putting in place automatic procedures for reducing the time needed for data collection and treatment: monthly results are already available ten days earlier than before.

Quinn, T. J.↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. The National Aeronautics and Space Administration (NASA) conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km. Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 1–1.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “firstlook” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗