Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “river”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Integrated salt waste processing at the Savannah River Site - 15301

Treatment and disposition of salt waste is the critical path to completion of the Savannah River Site Liquid Waste (LW) Disposition and Cleanup Program. The new Salt Waste Processing Facility (SWPF) is a critical link in the pre-treatment chain and will process high curie salt waste removed from various SRS liquid waste storage tanks. Significant infrastructure modifications are needed in the existing LW facilities in order to integrate the SWPF into the LW system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concluding a steam injection remediation project at a dense non-aqueous phase liquid source zone at the Savannah River site - 15303

Multiple subsurface dense non-aqueous phase liquid (DNAPL) source zones served as the sources for a groundwater plume within the A/M Area of the Savannah River Site. Between 1952 and 1985 over 1,600 metric tons of trichloroethylene, tetrachloroethylene, and 1,1,1-trichloroethane were released to the environment resulting in a 648 hectare plume with the M-Area Settling Basin receiving over half of the solvent discharges. In 1991, DNAPL was found in a water table well and steam injection technology was selected to remediate the source zone. Based on characterization data, the treatment area was 1.21 hectare with depths between 13.7 to 50.3 m. The remediation system included 96 vertical, horizontal, and angled steam injection and soil vapor extraction wells and a thermal monitoring system. Construction of the system began in 2004 and operation began in 2005. Steam was applied to the deep vadose zone first, then progressed to the aquifer, followed by the mid-vadose zone. Multiple steam strategies were utilized to enhance mass removal and were concluded in 2009. Soil vapor extraction continues, with residual temperatures in the deep permeability zones still exceeding 65 deg.C. To date over 204 metric tons of volatile organic compounds (VOCs) have been removed. Post-remediation soil, vapor, temperature, and groundwater data were used to evaluate steam injection effectiveness and demonstrated significant reduction in soil concentration, including removal of DNAPL that was evident in several soil cores prior to treatment. Heating the subsurface increased VOC solubility in groundwater and increased mass removal rates outside the target zone. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reporting improvements to the annual Savannah River site environmental report - 15313

The Savannah River Site (SRS) began publishing the yearly SRS Environmental Report over 50 years ago. The report was first made available to the public in 1959. SRS has always tried to be very clear about the impact of its operations on neighboring communities. However, environmental reporting depends on public understanding for its success. The scientific nature of environmental information often makes it difficult to communicate information in lay terms and a meaningful manner. Over the past two years, SRS has focused its efforts on improving the readability of these documents using plain language techniques. In the 2013 report and summary, the goals were to: - Organize information so the most important message comes first; - Break complex information into understandable chunks; - Use simple language and define technical terms; and - Use appealing formats, including graphics and ample white space, to engage and hold readers. SRS also used plain language guidelines and techniques such as using short sentences and active voice as suggested by feedback from our readers. Plain language is not a simplified style of writing. It involves more than replacing jargon and complex language with shorter sentences and familiar words. Plain language examines at the whole message - from the reader's point of view. Clear writing, effective organization, and inviting presentation are all keys to creating readable and informative documents. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Grout testing to support tank closure at the Savannah River Site - 15370

Final operational closure of the Savannah River Site (SRS) waste tanks is performed by filling the voids inside the tanks with a series of tailored grout formulas thereby stabilizing the remaining residuals. These tailored grout formulas were each developed to meet the demands of the closure process. The needs identified for the closure process include (1) a flowable, self-consolidating, reducing grout for tank fill, (2) a highly flowable grout capable of filling the 7-1/4 kilometers (4-1/2 miles) of 5-centimeter (2-inch) diameter cooling coils inside the tank, and (3) a highly flowable grout capable of filling equipment remaining in the tank. The specific characteristics of each of the grout formulations were tested to ensure they would function as required during implementation. Performance testing was also done on some of the grout formulations to confirm mix effectiveness and improve worker handling proficiency and conducted additional testing on the bulk fill grout to expand the placement capabilities of the grout. This paper focuses on the evolution of the closure process' identified needs, formulation development, and the subsequent testing of the tailored grout formulations utilized in the past tank closure processes at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inspection and assessment of the H-Canyon ventilation system at the Savannah River Site - 15385

Innovative methods and unique equipment were required to perform the inspection of a large inaccessible sand filter tunnel in an aging facility. Among the singular methods utilized was a specialized robot that addressed the difficulties encountered while performing mandatory structural integrity inspections of the Department of Energy (DOE) Savannah River Site (SRS) H-Canyon Sand Filter Tunnel. There were many unanticipated hazards related to degraded conditions. Novel approaches and support equipment were used, including new measurement techniques, high-strength Kevlar{sup TM} cable, a boom-mounted camera, and a larger, more robust robot. With each evolution, additional analysis mandated requirements and considerations for future inspections. Because this was a visual inspection, many photos were taken to document the mission and lessons learned from the earlier incomplete robotic attempts to inspect these areas. Anyone working with aging facilities that have inaccessible structures, systems and components will find the technical process, with resulting solutions, useful. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste minimization efforts at the H-Canyon nuclear materials processing facility located at the Savannah River Site - 15535

During the last decade, the H-Canyon at the Savannah River Site (SRS) has employed various means to minimize liquid waste generation and/or to segregate liquid waste that favors generation of low level vs high level wastes. The primary drivers were cost reduction and support of SRS liquid waste tank farm feed to the SRS's Defense Waste Processing Facility. Recent High Level Waste (HLW) volume restrictions (transfers of liquid waste from the H-Canyon to the SRS's Liquid Waste System) imposed on H-Canyon have renewed waste minimization efforts. For the next several years, H-Canyon is faced with a HLW transfer reduction of approximately 65% (reduced from approximately 300,000 gallons to 100,000 gallons). This comes at a time when H-Canyon (and a companion facility named HB-Line) are about to begin executing two high profile missions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring of U(VI) Bioreduction after ARCADIS demonstration at Savannah River Site F-Area - 15699

The F/H Area Seepage Basins located in the center of Savannah River Site (SRS) received approximately 1.8 billion gallons of acidic waste solutions. The acidic nature of the basin waste solutions triggered the mobilization of metals and radionuclides including soluble uranium (VI). SRS F-Area sediments are acidic and composed predominantly of quartz sand with varying amounts of fine-grained minerals and iron-oxides. In 2010, ARCADIS implemented in-situ injections of a carbohydrate substrate to establish anaerobic reactive zones for metal and radionuclide remediation via the Enhanced Anaerobic Reductive Precipitation (EARP) process at the SRS F-Area (Figure 2). The addition of the molasses substrate solution to groundwater produces anaerobic conditions with redox values in the methanogenic or sulfate-reducing range conducive to the reductive precipitation of uranium. Objectives: Determine the mineral composition of SRS fine clay fractions and identify all iron-oxide phases. Establish if ferrous carbonate and ferrous sulfide compounds will be present in the sediment after the bioreduction process has occurred. The presence of these compounds will indicate that anaerobic reductive conditions were established. Determine the types of reactions that might occur in the anaerobic aquifer. Determine if conditions will return to the initial state once samples are returned to aerobic conditions. Microcosm studies were prepared with SRS sediments treated using a basal medium solution augmented with sulfate and molasses as well as a trace metal solution. To create anaerobic conditions necessary for the experiment, a vinyl anaerobic airlock chamber from COY Lab Products was used to ensure that no oxygen reached the samples. Half of the samples were augmented with sulfate in an attempt to create iron sulfide and stabilize reduced uranium. A pH evolution study was conducted to find the type of pH changes that occurred in the samples. Samples were sieved to 180 mm before X-ray Diffraction (XRD) analysis was conducted to identify any mineralogical changes in the samples. The experimental patterns were compared against known XRD patterns for siderite and pyrite. Liquid samples were filtered through 0.45 mm filters and were diluted by a factor of 200 in nitric acid (1%) for ICP-OES analysis to determine the ferrous iron concentration. XRD analysis indicated that the sediments contained quartz, kaolinite, montmorillonite, and goethite. All of the samples have followed a similar trend, with a decline in the pH values. It was noted that samples amended with sulfates had slightly higher pH than sulfate-free samples. The pH drop can be attributed to the fermentation process of molasses and the natural acidity of SRS soil used for the microcosm study. The low pH conditions are believed to have hindered the formation of bicarbonate/carbonate ions used to form the iron precipitates. XRD results confirmed the assumption that with low pH values no iron compounds would precipitate in the samples. The experimental patterns for each sample was compared with the patterns for siderite and pyrite; the results for these analyses were negative. ICP-OES analysis confirmed that there is ferrous iron present in the samples. The highest iron concentration being 13312.8 ppb for Batch 1, Sample 1-2, the lowest were in Batch 2 Samples 2,3, and 4 which may be below the calibration curve. This may also be an indication that the iron has precipitated in these samples. Future work: Conduct ICP analysis on the Batch 2 samples using a lower dilution factor. Determine the types of reactions that might occur in the anaerobic aquifer. Verify the continued sequestration of U(VI) in relation to the possible re-oxidation of minerals from the bioreduction zone. Sulfate concentrations will be examined using an ion analysis technique. Determine pH levels, sulfate concentrations, and iron concentrations after re-oxygenation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Column testing of the migration and distribution of humate injected into subsurface systems at Savannah River Site's F/H area - 15713

The F-Area seepage basins at Savannah River Site (SRS) have received approximately 1.8 billion gallons of low-level waste solutions, containing nitric acid, radionuclides and dissolved metals due to plutonium separation operations from 1955 to 1988. The waste solutions became a source of contamination for groundwater and soil at the site, with U(VI) and other radionuclides above their maximum contaminant levels (MCLs). For remediation, humic acid (HA) technology has shown to be a potential approach for controlling mobility of radionuclides. Because sorbed HA and uranium develop a strong bond at slightly acidic pH, the mobility of the contaminant molecules should decrease with flushing of SRS groundwater. Column experiments are planned using SRS soil from the F/H Area to examine the sorption and desorption properties of HA in SRS soil. The data from these experiments will then be used to perform modeling of the migration and distribution of HA injected into the subsurface. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pursuing Cost Effective Tank Waste Characterization at the Savannah River Site - 16172

The U. S. Department of Energy Office of Environmental Management has tasked the Savannah River National Laboratory (SRNL) with developing strategies and technologies to understand, optimize, scale, and speed up tank waste characterization. This scope is part of a multi-year project with the end goal of implementing programmatic changes that accelerate tank waste processing and tank closure schedules, and at the same time reduce characterization costs, while maintaining data integrity. The project is currently in its second year. During the first year of the project, SRNL completed a series of activities focused on understanding the range of current characterization practices, needs, gaps, risks, and potential alternative approaches. Based on the results, conclusions were drawn regarding aspects of the programs that are most costly and time consuming; particular waste constituents that drive costs, schedule, and program risks; alternative characterization approaches (other than sampling and analysis) that are less expensive and more rapid; new laboratory methods holding the greatest promise for reducing characterization costs and schedule; and in whole, the primary areas where current characterization practices can be improved. SRNL's current scope is focusing on three primary activities: 1) development of a technical basis/strategy for improving the cost effectiveness and schedule of SRNL's tank closure characterization program; 2) design/assembly of hardware, plumbing, and software for automating select radiochemical separation and waste removal processes; and 3) development and testing of alternative radiochemical separation protocols most likely to improve high resource demand/time consuming analysis methods (such as Ra-226, Pa-231, Tc-99/I-129, and/or Y/trivalent actinide separations). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Filtration Improvements in Support of Increased Salt Waste Processing Throughput at the Savannah River Site - 16173

Crossflow Filtration is currently used at the U.S. Department of Energy (DOE) Savannah River Site (SRS) for the removal of actinides, strontium and sludge solids from the high-level salt waste stored in underground tanks. At SRS, crossflow filtration is deployed in the Actinide Removal Process (ARP). Salt waste is transferred from an underground waste tank to one of two strike tanks where it is struck with Monosodium Titanate (MST), which adsorbs uranium, plutonium and strontium. The MST laden salt waste is then transferred to the ARP filtration facility, which contains the crossflow filter. The filtrate, which is called Clarified Salt Solution (CSS), is sent to a downstream facility for cesium removal, while the MST and sludge solids are concentrated at the filtration facility and eventually sent to the Defense Waste Processing Facility (DWPF) for vitrification. ARP and the downstream cesium removal facility, the Modular Caustic Side Solvent Extraction Unit (MCU), were both developed as an interim salt waste processing technology and as smaller scale radioactive demonstration plants for the Salt Waste Processing Facility (SWPF), which is currently under construction. Since the beginning of ARP in 2008, there have been challenges with achieving desired filtration rates through the crossflow filter system. Historically the crossflow filter system has been the flow limiter in salt waste processing and many changes have been made and are planned to achieve desired throughput, especially as MCU increases its processing capacity. Some of these changes include the design of a new crossflow filter, the implementation of a new process chemistry flowsheet and several operational changes. The modifications to the ARP crossflow filter have helped contribute to periods of record throughput in salt waste processing in FY 2015. This paper will discuss the technical challenges and system limitations of retrofitting an older facility as well as past, present and future modifications to the ARP filtration process in order to achieve salt waste processing goals at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Strategies for Decommissioning the Fuel Storage and Reprocessing Complex at Chalk River Laboratories - 16183

For over 60 years, Canadian Nuclear Laboratories (CNL), previously Atomic Energy of Canada Limited (AECL), has been a world leader in developing peaceful and innovative applications from nuclear technology. Resulting from these years of nuclear research there are legacy liabilities consisting of outdated and unused research facilities and buildings, a wide variety of buried and stored wastes, and affected lands. In 2006, the Government of Canada established the Nuclear Legacy Liabilities Program (NLLP) to safely and cost-effectively eliminate, to the extent practicable, the nuclear legacy liabilities. The National Research Experimental (NRX) fuel rod storage and handling facility, as well as two dedicated fuel reprocessing facilities at the Chalk River Laboratories (CRL) known as the Building 200 (B200) Complex, are examples of these legacy liabilities. It is planned to remove these facilities as part of a logical progression of activities to reduce CNL's liabilities under the NLLP and to prepare the property for the physical redevelopment of the CRL site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overcoming Waste Removal Challenges at Savannah River Site: A Case Study of Tank 15 - 16198

Tank 15 is a High Level Waste Tank at the Savannah River Site containing sludge waste that had been allowed to dry due to several flaws in the primary tank wall. In order to remove the tank waste, the sludge had to first be re-hydrated. Due to the age of Tank 15 and the thirty years of 'dry sludge tank' status, there were numerous technical challenges and risks that had to be addressed to demonstrate operational readiness to add liquid to a tank with known flaws. Liquid management was a key to readiness since Tank 15 did not have the infrastructure to mitigate waste accumulating in the annulus or to transfer waste out of the primary tank as a means to control a large leak. The project team's fundamental expectation was that some amount of liquid would migrate to the annulus through identified flaws as the sludge waste was re-hydrated. Communication was crucial to ensuring this expectation was propagated to management, the customer, and the regulators. Equipment upgrades, provisions for annulus liquid management (monitoring and removal), and readiness for outgoing transfers mitigated waste migration. Liquid addition methodology and facility modifications were developed to safely re-hydrate the sludge while monitoring the integrity of the primary tank. These efforts culminated in successfully adding 697 m{sup 3} (184,000 gal) of liquid to Tank 15, re-hydrating the sludge waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Gamma-Ray Assay of the 235-F Plutonium Fuel Form Facility at the Savannah River Site - 16293

The Plutonium Fuel Form (PuFF) Facility is located in Building 235-F near the geographic center of the Savannah River Site. Between 1978 and 1984, the facility was used to produce approximately 165 kilograms of iridium-encapsulated Pu-238 spheres and pellets for use as radioisotope thermal generators, primarily for the space program. The facility is divided between two cell lines, the east cell line used to process powdered Pu-238 oxide raw material into fuel forms and the west cell line used to encapsulate the fuel forms in iridium. Scoping in-situ gamma-ray assays were performed in the PuFF Facility in 2006 and estimated that hundreds of grams of Pu-238 holdup were within the facility. Using this holdup estimate as a source term, SRS has performed a risk analysis that indicated a seismic event that induces a full-facility fire in 235-F could lead to a 28,800 rem dose to a co-located worker. Based on this risk assessment, SRS is taking steps to decontaminate the facility. One of the first steps taken has been to improve upon the quality of the in-situ gamma-ray assay data. Carts and collimators were specially designed to survey the equipment in the PuFF Facility. The cell interiors were assayed along with the furnaces and storage coolers that protrude beneath the cells. While the previous scoping work consisted of 32 measurements, the current series of measurements included nearly 400 measurements using both high-purity germanium and lanthanum bromide detectors. Data analysis for the current set of measurements was conducted with greater rigor as well. MCNP5 was used to evaluate a variety of possible physical distributions for the Pu-238 source term and estimate cross-talk between neighboring cells. Data analysis was performed using three gamma-rays emitted by Pu-238 (99.85 keV, 152.7 keV, and 766.4 keV) providing three independent estimates of the mass of Pu-238 holdup in each of the cells. This also allowed the application of matrix correction factors to adjust gamma-ray attenuation. The weighted mean of these three results was used as the best estimate of Pu-238 holdup in the PuFF facility. This work lowered the estimate of holdup in the PuFF facility by approximately 100 grams compared to the previous estimate, a 0.55's difference. The uncertainty in the Pu-238 holdup was also reduced substantially relative to the 2006 scoping assay. Further radiological measurements are planned for the near future including in-situ gamma-ray assays of wing cabinets in the east cell line maintenance area, the transfer tube between the two cell lines, and some of the furnaces and storage coolers. A germanium gamma imager, the GeGI, will also be used to map out the distribution of the Pu-238 source term in the PuFF Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site Defense Waste Processing Facility Melt Cell Remote Cleanup - 18037

This paper documents experiences at Savannah River Site (SRS) related to both the modification and use of a commercial remote vehicle to remove years of process-related litter (glass and various objects) from a hot cell floor during a production outage. The outage was necessary to replace a Department of Energy Environmental Management (DOE-EM) remotely-operated glass melter that had vitrified waste for 14 years at the Defense Waste Processing Facility. Both chunks of waste glass and numerous items littered the floor of the cell all associated with the long production run. The presence of litter become problematic as it could eventually impede movement or placement of items necessary to continue facility operation. The cleanup also reduces radiation rates within the hot cell which is beneficial. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of D-Area Ash Units, Savannah River Site - 18151

At the Savannah River Site (SRS), under the tri-party Federal Facility Agreement (FFA) between the United States Department of Energy (US DOE), United States Environmental Protection Agency (US EPA), and South Carolina Department of Health and Environmental Control (SCDHEC), agreement was reached to remediate two ash basins, one coal pile runoff basin and one ash landfill as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Removal Actions within a schedule of five years (2014 - 2019). These removal actions complete the remediation of these basins and the ash landfill which originated from nearly 60 years of powerhouse operations and cover a total area of nearly 40.5 hectares (100 acres). Utilizing proven as well as state of the art technologies and methods, the completed actions culminate in two protective multi-layer cover systems and the conversion of the coal pile runoff basin to an ecological diverse storm water retention basin. Completion of these removal actions has been determined to provide protection of future industrial workers and ecological receptors as well as prevent migration of mobile contaminants found in coal residues (e.g., arsenic) from powerhouse operations, achieving all applicable or relevant and appropriate requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Collaborative Advanced Technology Demonstration (ATD) - 18313

In support of the Department of Energy's Environmental Management Office of Technology Development (DOE-EM TD) Robotics Technology thrust to pull innovative commercial off the shelf (COTS) and near ready technologies to the field to expedite remaining EM mission clean up and enhance worker safety, the required FY19 Savannah River Site (SRS) H-Canyon Air Exhaust (HCAEX) tunnel inspection task will be used to demonstrate and evaluate the benefit of pulling advanced technology solutions to EM facilities. Presently a biannual visual inspection of the SRS HCAEX tunnel is required to evaluate the structural integrity of the tunnel. While the ability to see inside the tunnel in recent years has been highly invaluable, it is desirable to have a better understanding of the tunnel environment to support a more thorough structural integrity analysis and for long term planning purposes. This higher order of understanding can be accomplished through state of the art COTS sensors and those currently in development and near ready. The ATD will identify and develop for deployment advanced technologies to be hosted on the FY19 inspection platform to acquire high value data desired by the stakeholder. This presentation will include an overview of the ATD mission, background on the tunnel and harsh remote environment in which the inspection robot will work and the high priority inspection needs identified by the H-Canyon facility stakeholders. Discussion will include previous and planned robotic platform modifications to facilitate work in the tunnel and a discussion on the advanced technologies identified to be implemented for the inspection. The ATD will be completed over approximately a 2-year period and has already begun in the form of planning, identification of stakeholder needs, specification of a robust platform and identification of the high priority sensor needs to be pursued. This presentation will be a status of the ATD at approximately the 7-month mark. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Failure Evaluation of Savannah River Site High-Level Waste Evaporator 242-25H - 18480

The Savannah River Site 242-25H High Level Waste Evaporator was designed in the early 1990's, put into service in January 2000, and discovered to be leaking about 0.4 liters per minute in February 2016. In February 2017, remote investigations revealed that the evaporator has multiple sites in the vessel's bottom spherical head that leak when the steam lance is activated. The leakage was contained within the evaporator's cell, which prevented a hazard to personnel and a release to the environment. An evaporator shell leak is unique in the site's nearly six-decade history of high-level waste evaporator operations. The site's evaporators typically have failed by either fatigue or corrosion attack of the thin steam tubes in the tube-bundle, which supplies heat to the liquid waste in the vessel. The 25H Evaporator design emphasized preventing such failures. However, after 16 years of service, the 25H Evaporator vessel shell leaked rather than the steam tubes. The failure evaluation determined that the leak is due to solid particle erosion in the bottom spherical head, induced by steam flow from the lance, which operates about one-third of the time to keep waste mobilized. Over 16 years, the lance steam flow eroded about 5 mm wall thickness over about one-third of the bottom head's internal surface area, which is equivalent to about 5 kg of metal removed. The vessel is being repaired by remotely welding an elliptical head and ring assembly onto the bottom of the existing vessel. Improvements are being considered for future evaporators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

River Protection Project System Plan, Rev. 8 - 18661

The River Protection Project System Plan comprises a set of scenarios that evaluate options for safely treating the high-level radioactive waste stored in underground tanks at the DOE Hanford Site. It establishes a baseline case, used for communicating the DOE's strategy to various stakeholders, as well as ten alternative scenarios that evaluate initiatives to potentially accelerate cleanup and/or address risks. The scenarios were modeled using TOPSim, a custom flowsheet simulator that includes chemistry and mass transfer elements used to estimate operating durations and completion dates, quantities of waste treated through various processes, as well as the time required to complete treatment. The TOPSim results are aligned to a resource-loaded Oracle{sup R} Primavera P6 schedule to estimate the life cycle cost of the cleanup mission. This paper will outline the results of the System Plan, Rev. 8 modeling effort. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗