Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Incorporating FLEX Strategies in Multi-Unit Probabilistic Risk Assessment

The catastrophic Fukushima nuclear accident reminded nuclear community about the possibilities of extreme accident scenarios, including those involving multiple reactor units on the same site. As the responses to the Fukushima accident, the nuclear power industry developed and implemented a series of strategies, including the Diverse and Flexible Coping Strategies (FLEX), to enhance the coping capacities of nuclear power plants (NPPs) under extreme accidents. This study intends to examine the impact of FLEX strategies on the risk from all the reactor units on the same NPP site, including risks from accidents involving a single unit and from accidents involving multiple units. The fundamental, methodological element of this study is Multi-Unit Probabilistic Risk Assessment (MUPRA), which requires a shift in Probabilistic Risk Assessment (PRA) from a “one-reactor-at-a-time” mindset to a “considering all reactors sharing a site as a unity” one. An integrated modeling approach for multi-unit event sequence development will be leveraged to develop MUPRA model and address the intra-unit and inter-unit dependencies. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), a PRA software developed and maintained by Idaho National Laboratory (INL) for the U.S. Nuclear Regulatory Commission (NRC), will serve as the platform for MUPRA modeling. This study selects Loss Of Offsite Power (LOOP) as a representative initiating event, which may occur on a generic two-unit NPP site and impacts both reactor units on the site. First, an MUPRA model, including multi-unit event trees, will be developed to obtain single-unit and multi-unit accident scenarios. Next, different FLEX strategies will be assumed, including FLEX equipment for a unit cannot be used for another unit, FLEX equipment for multiple units can be used in a cross-connected manner, etc. Lastly, the effectiveness of each postulated FLEX strategy will be evaluated by incorporating the corresponding FLEX equipment and deployment logic in the MUPRA model.

99 GENERAL AND MISCELLANEOUS↗

MO-E-9A-01: Risk Based Quality Management: TG100 In Action

One of the goals of quality management in radiation therapy is to gain high confidence that patients will receive the prescribed treatment correctly. To accomplish these goals professional societies such as the American Association of Physicists in Medicine (AAPM) has published many quality assurance (QA), quality control (QC), and quality management (QM) guidance documents. In general, the recommendations provided in these documents have emphasized on performing device-specific QA at the expense of process flow and protection of the patient against catastrophic errors. Analyses of radiation therapy incidents find that they are most often caused by flaws in the overall therapy process, from initial consult through final treatment, than by isolated hardware or computer failures detectable by traditional physics QA. This challenge is shared by many intrinsically hazardous industries. Risk assessment tools and analysis techniques have been developed to define, identify, and eliminate known and/or potential failures, problems, or errors, from a system, process and/or service before they reach the customer. These include, but are not limited to, process mapping, failure modes and effects analysis (FMEA), fault tree analysis (FTA), and establishment of a quality management program that best avoids the faults and risks that have been identified in the overall process. These tools can be easily adapted to radiation therapy practices because of their simplicity and effectiveness to provide efficient ways to enhance the safety and quality of treatment processes. Task group 100 (TG100) of AAPM has developed a risk-based quality management program that uses these tools. This session will be devoted to a discussion of these tools and how these tools can be used in a given radiotherapy clinic to develop a risk based QM program. Learning Objectives: Learn how to design a process map for a radiotherapy process. Learn how to perform a FMEA analysis for a given process. Learn what Fault tree analysis is all about. Learn how to design a quality management program based upon the information obtained from process mapping, FMEA and FTA.

60 APPLIED LIFE SCIENCES↗

Poster - 30: Use of a Hazard-Risk Analysis for development of a new eye immobilization tool for treatment of choroidal melanoma

Purpose: Our treatment for choroidal melanoma utilizes the GTC frame. The patient looks at a small LED to stabilize target position. The LED is attached to a metal arm attached to the GTC frame. A camera on the arm allows therapists to monitor patient compliance. To move to mask-based immobilization we need a new LED/camera attachment mechanism. We used a Hazard-Risk Analysis (HRA) to guide the design of the new tool. Method: A pre-clinical model was built with input from therapy and machine shop personnel. It consisted of an aluminum frame placed in aluminum guide posts attached to the couch top. Further development was guided by the Department of Defense Standard Practice - System Safety hazard risk analysis technique. Results: An Orfit mask was selected because it allowed access to indexes on the couch top which assist with setup reproducibility. The first HRA table was created considering mechanical failure modes of the device. Discussions with operators and manufacturers identified other failure modes and solutions. HRA directed the design towards a safe clinical device. Conclusion: A new immobilization tool has been designed using hazard-risk analysis which resulted in an easier-to-use and safer tool compared to the initial design. The remaining risks are all low probability events and not dissimilar from those currently faced with the GTC setup. Given the gains in ease of use for therapists and patients as well as the lower costs for the hospital, we will implement this new tool.

60 APPLIED LIFE SCIENCES↗

Transmission risk of Oropouche fever across the Americas

Abstract Background Vector-borne diseases (VBDs) are important contributors to the global burden of infectious diseases due to their epidemic potential, which can result in significant population and economic impacts. Oropouche fever, caused by Oropouche virus (OROV), is an understudied zoonotic VBD febrile illness reported in Central and South America. The epidemic potential and areas of likely OROV spread remain unexplored, limiting capacities to improve epidemiological surveillance. Methods To better understand the capacity for spread of OROV, we developed spatial epidemiology models using human outbreaks as OROV transmission-locality data, coupled with high-resolution satellite-derived vegetation phenology. Data were integrated using hypervolume modeling to infer likely areas of OROV transmission and emergence across the Americas. Results Models based on one-support vector machine hypervolumes consistently predicted risk areas for OROV transmission across the tropics of Latin America despite the inclusion of different parameters such as different study areas and environmental predictors. Models estimate that up to 5 million people are at risk of exposure to OROV. Nevertheless, the limited epidemiological data available generates uncertainty in projections. For example, some outbreaks have occurred under climatic conditions outside those where most transmission events occur. The distribution models also revealed that landscape variation, expressed as vegetation loss, is linked to OROV outbreaks. Conclusions Hotspots of OROV transmission risk were detected along the tropics of South America. Vegetation loss might be a driver of Oropouche fever emergence. Modeling based on hypervolumes in spatial epidemiology might be considered an exploratory tool for analyzing data-limited emerging infectious diseases for which little understanding exists on their sylvatic cycles. OROV transmission risk maps can be used to improve surveillance, investigate OROV ecology and epidemiology, and inform early detection.

60 APPLIED LIFE SCIENCES↗

INTEGRATED RISK ASSESSMENT OF DIGITAL I&C SAFETY SYSTEMS FOR NUCLEAR POWER PLANTS

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems provides the foremost means to improve performance and reduce costs for existing light-water reactors (LWRs). However, qualification of digital technologies remains a challenge?especially the issue of software common cause failure (CCF), which has been difficult to address. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, software CCFs due to design flaws might become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission (NRC) licensing procedures. In 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy?s (DOE?s) Light Water Reactor Sustainability (LWRS) Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, secure DI&C technologies for digital upgrades/designs. An integrated risk assessment for the DI&C (RADIC) process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. This paper summarizes these RISA efforts in the risk analysis of safety-related DI& systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Memory Concerns, Memory Performance and Risk of Dementia in Patients with Mild Cognitive Impairment

Concerns about worsening memory (‘‘memory concerns’’; MC) and impairment in memory performance are both predictors of Alzheimer’s dementia (AD). The relationship of both in dementia prediction at the pre-dementia disease stage, however, is not well explored. Refined understanding of the contribution of both MC and memory performance in dementia prediction is crucial for defining at-risk populations. We examined the risk of incident AD by MC and memory performance in patients with mild cognitive impairment (MCI). We analyzed data of 417 MCI patients from a longitudinal multicenter observational study. Patients were classified based on presence (n = 305) vs. absence (n = 112) of MC. Risk of incident AD was estimated with Cox Proportional-Hazards regression models. Risk of incident AD was increased by MC (HR = 2.55, 95%CI: 1.33–4.89), lower memory performance (HR = 0.63, 95%CI: 0.56–0.71) and ApoE4-genotype (HR = 1.89, 95%CI: 1.18–3.02). An interaction effect between MC and memory performance was observed. The predictive power of MC was greatest for patients with very mild memory impairment and decreased with increasing memory impairment. Our data suggest that the power of MC as a predictor of future dementia at the MCI stage varies with the patients’ level of cognitive impairment. While MC are predictive at early stage MCI, their predictive value at more advanced stages of MCI is reduced. This suggests that loss of insight related to AD may occur at the late stage of MCI.

59 BASIC BIOLOGICAL SCIENCES↗

Biodiversity and disease risk in an algal biofuel system: An experimental test in outdoor ponds using a before-after-control-impact (BACI) design

For outdoor cultivation of algal feedstocks to become a commercially viable and sustainable option for biofuel production, algal cultivation must maintain high yields and temporal stability in environmentally variable outdoor ponds. One of the main challenges is mitigating disease outbreaks that leads to culture crashes. Drawing on predictions from the ‘dilution effect’ hypothesis, in which increased biodiversity is thought to reduce disease risk in a community, a teste of whether algal polycultures would reduce disease risk and improve feedstock production efficiencies compared to monocultures was performed. While the positive benefits of biodiversity on disease risk have been demonstrated in various systems, to the best of our knowledge this is the first test in an algal biofuel system. Here, the results a before-after-control-impact (BACI) experimental design to compare mean monoculture (control) and polyculture (impact) yield, stability, and productivity before and after fungal infection when grown in 400-L outdoor raceway ponds are presented. It has been found that polycultures did not experience a reduction in disease risk compared to monocultures or differ in production efficiencies throughout the course of the 43-day experiment. These results show that polyculture feedstocks can maintain similar levels of productivity, stability, and disease resistance to that of a monoculture. Determining whether these results are generalizable or represent one case study requires additional outdoor experiments using a larger variety of host and pathogen species.

09 BIOMASS FUELS↗

Lung Cancer in the Mayak Workers Cohort: Risk Estimation and Uncertainty Analysis

The workers at the Mayak nuclear facility near Ozyorsk, Russia are a primary source of information about exposure to radiation at low-dose rates, since they were subject to protracted exposures to external gamma rays and to internal exposures from plutonium inhalation. Here we re-examine lung cancer mortality rates and assess the effects of external gamma and internal plutonium exposures using recently developed Monte Carlo dosimetry systems. Using individual lagged mean annual lung doses computed from the dose realizations, we fit excess relative risk (ERR) models to the lung cancer mortality data for the Mayak Workers Cohort using risk-modeling software. We then used the corrected information matrix (CIM) approach to widen the confidence intervals of ERR by taking into account the uncertainty in doses represented by multiple realizations from the Monte Carlo dosimetry systems. Findings of this work revealed that there were 930 lung cancer deaths during follow-up. Plutonium lung doses (but not gamma doses) were generally higher in the new dosimetry systems than those used in the previous analysis. This led to a reduction in the risk per unit dose compared to prior estimates. The estimated ERR/Gy for external gamma-ray exposure was 0.19 (95% CI: 0.07 to 0.31) for both sexes combined, while the ERR/Gy for internal exposures based on mean plutonium doses were 3.5 (95% CI: 2.3 to 4.6) and 8.9 (95% CI: 3.4 to 14) for males and females at attained age 60. Accounting for uncertainty in dose had little effect on the confidence intervals for the ERR associated with gamma-ray exposure, but had a marked impact on confidence intervals, particularly the upper bounds, for the effect of plutonium exposure [adjusted 95% CIs: 1.5 to 8.9 for males and 2.7 to 28 for females]. In conclusion, lung cancer rates increased significantly with both external gamma-ray and internal plutonium exposures. Accounting for the effects of dose uncertainty markedly increased the width of the confidence intervals for the plutonium dose response but had little impact on the external gamma dose effect estimate. Adjusting risk estimate confidence intervals using CIM provides a solution to the important problem of dose uncertainty. This work demonstrates, for the first time, that it is possible and practical to use our recently developed CIM method to make such adjustments in a large cohort study.

uncertainty, radiation risk estimation, Mayak Prod↗

Gasbuggy Site Assessment and Risk Evaluation

The Gasbuggy site is in northern New Mexico in the San Juan Basin, Rio Arriba County (Figure 1-1). The Gasbuggy experiment was designed to evaluate the use of a nuclear detonation to enhance natural gas production from the Pictured Cliffs Formation, a tight, gas-bearing sandstone formation. The 29-kiloton-yield nuclear device was placed in a 17.5-inch wellbore at 4,240 feet (ft) below ground surface (bgs), approximately 40 ft below the Pictured Cliffs/Lewis shale contact, in an attempt to force the cavity/chimney formed by the detonation up into the Pictured Cliffs Sandstone. The test was conducted below the southwest quarter of Section 36, Township 29 North, Range 4 West, New Mexico Principal Meridian. The device was detonated on December 10, 1967, creating a 335-ft-high chimney above the detonation point and a cavity 160 ft in diameter. The gas produced from GB-ER (the emplacement and reentry well) during the post-detonation production tests was radioactive and diluted, primarily by carbon dioxide. After 2 years, the energy content of the gas had recovered to 80 percent of the value of gas in conventionally developed wells in the area. There is currently no technology capable of remediating deep underground nuclear detonation cavities and chimneys. Consequently, the U.S. Department of Energy (DOE) must continue to manage the Gasbuggy site to ensure that no inadvertent intrusion into the residual contamination occurs. DOE has complete control over the 1/4 section (160 acres) containing the shot cavity, and no drilling is permitted on that property. However, oil and gas leases are on the surrounding land. Therefore, the most likely route of intrusion and potential exposure would be through contaminated natural gas or contaminated water migrating into a producing natural gas well outside the immediate vicinity of ground zero. The purpose of this report is to describe the current site conditions and evaluate the potential health risks posed by the most plausible contaminant exposure scenario, drilling of natural gas wells near the site. The results of this risk evaluation will guide DOE's future surveillance and monitoring activities in the area to ensure that site conditions are adequately protective of human health. This evaluation is not a comprehensive risk assessment for the site; it is intended to provide assurance that DOE's monitoring approach can detect the presence of site-related contamination at levels well below those that would pose an unacceptable risk to human health.

03 NATURAL GAS↗

Assessing Vulnerabilities, Risks, and Consequences of Damage to Critical Infrastructure

Since the publication of 'Critical Foundations: Protecting America's Infrastructure,' there has been a keen understanding of the complexity, interdependencies, and shared responsibility required to protect the nation's most critical assets that are essential to our way of life. The original 5 sectors defined in 1997 have grown to 18 Critical Infrastructures and Key Resources (CIKR), which are discussed in the 2009 National Infrastructure Protection Plan (NIPP) and its supporting sector-specific plans. The NIPP provides the structure for a national program dedicated to enhanced protection and resiliency of the nation's infrastructure. Lawrence Livermore National Laboratory (LLNL) provides in-depth, multi-disciplinary assessments of threat, vulnerability, and consequence across all 18 sectors at scales ranging from specific facilities to infrastructures spanning multi-state regions, such as the Oil and Natural Gas (ONG) sector. Like many of the CIKR sectors, the ONG sector is comprised of production, processing, distribution, and storage of highly valuable and potentially dangerous commodities. Furthermore, there are significant interdependencies with other sectors, including transportation, communication, finance, and government. Understanding the potentially devastating consequences and collateral damage resulting from a terrorist attack or natural event is an important element of LLNL's infrastructure security programs. Our work began in the energy sector in the late 1990s and quickly expanded other critical infrastructure sectors. We have performed over 600 physical assessments with a particular emphasis on those sectors that utilize, store, or ship potentially hazardous materials and for whom cyber security is important. The success of our approach is based on building awareness of vulnerabilities and risks and working directly with industry partners to collectively advance infrastructure protection. This approach consists of three phases: The Pre-Assessment Phase brings together infrastructure owners and operators to identify critical assets and help the team create a structured information request. During this phase, we gain information about the critical assets from those who are most familiar with operations and interdependencies, making the time we spend on the ground conducting the assessment much more productive and enabling the team to make actionable recommendations. The Assessment Phase analyzes 10 areas: Threat environment, cyber architecture, cyber penetration, physical security, physical penetration, operations security, policies and procedures, interdependencies, consequence analysis, and risk characterization. Each of these individual tasks uses direct and indirect data collection, site inspections, and structured and facilitated workshops to gather data. Because of the importance of understanding the cyber threat, LLNL has built both fixed and mobile cyber penetration, wireless penetration and supporting tools that can be tailored to fit customer needs. The Post-Assessment Phase brings vulnerability and risk assessments to the customer in a format that facilitates implementation of mitigation options. Often the assessment findings and recommendations are briefed and discussed with several levels of management and, if appropriate, across jurisdictional boundaries. The end result is enhanced awareness and informed protective measures. Over the last 15 years, we have continued to refine our methodology and capture lessons learned and best practices. The resulting risk and decision framework thus takes into consideration real-world constraints, including regulatory, operational, and economic realities. In addition to 'on the ground' assessments focused on mitigating vulnerabilities, we have integrated our computational and atmospheric dispersion capability with easy-to-use geo-referenced visualization tools to support emergency planning and response operations. LLNL is home to the National Atmospheric Release Advisory Center (NARAC) and the Interagency Modeling and Atmospheric Assessment Center (IMAAC). NARAC/IMAAC has capabilities to respond to toxic industrial chemical spills, nuclear-power plant accidents, fires, chemical/biological agents, radiological/nuclear devices (RDDs, INDs), and other airborne hazards. Our web-based systems provide hazards assessments of critical infrastructure for defensive planning and can provide infrastructure operators and emergency responders with a baseline for planning and exercises. LLNL's infrastructure security web mapping services facilitate dissemination of technical information for all phases of disaster management. Examples of some of these products are shown in the Figure 1.

03 NATURAL GAS↗

LANL Activities: FY12-Q2 National Risk Assessment Partnership (NRAP): Industrial Carbon Capture Program (Quarterly Report)

This report summarizes progress of LANL activities related to the tasks performed under the LANL FWP FE102-002-FY10, National Risk Assessment Partnership (NRAP): Industrial Carbon Capture Program. This FWP is funded through the American Recovery and Reinvestment Act (ARRA). Overall, the NRAP activities are focused on understanding and evaluating risks associated with large-scale injection and long-term storage of CO 2 in deep geological formations. One of the primary risks during large-scale injection is due to changes in geomechanical stresses to the storage reservoir, to the caprock/seals and to the wellbores. These changes may have the potential to cause CO 2 and brine leakage and geochemical impacts to the groundwater systems. While the importance of these stresses is well recognized, there have been relatively few quantitative studies (laboratory, field or theoretical) of geomechanical processes in sequestration systems. In addition, there are no integrated studies that allow evaluation of risks to groundwater quality in the context of CO 2 injection-induced stresses. The work performed under this project is focused on better understanding these effects. LANL approach will develop laboratory and computational tools to understand the impact of CO 2 -induced mechanical stress by creating a geomechanical test bed using inputs from laboratory experiments, field data, and conceptual approaches. The Geomechanical Test Bed will be used for conducting sensitivity and scenario analyses of the impacts of CO 2 injection. The specific types of questions will relate to fault stimulation and fracture inducing stress on caprock, changes in wellbore leakage due to evolution of stress in the reservoir and caprock, and the potential for induced seismicity. In addition, the Geomechanical Test Bed will be used to investigate the coupling of stress-induced leakage pathways with impacts on groundwater quality. LANL activities are performed under two tasks: (1) develop laboratory and computational tools to understand CO 2 -induced mechanical impacts and (2) use natural analog sites to determine potential groundwater impacts. We are using the Springerville-St. John Dome as a field site for collecting field data on CO 2 migration through faults and groundwater impacts as well as developing and validating computational models. During the FY12 second quarter we have been working with New England Research Company to construct a tri-axial core-holder. We have built fluid control system for the coreflood system that can be ported to perform in-situ imaging of core. We have performed numerical simulations for groundwater impacts of CO 2 and brine leakage using the reservoir model for Springerville-St John's Dome site. We have analyzed groundwater samples collected from Springerville site for major ion chemistry and isotopic composition. We are currently analyzing subsurface core and chip samples acquired for mineralogical composition.

25 ENERGY STORAGE↗

Risk-Informed Systems Analysis (RISA) Dynamic Fire PRA Roadmap

Modeling and implementing fire safety for nuclear power plants is a costly activity. Because of the complexity of fire phenomenon and multiple operational procedures, it is difficult to computationally provide assurance that the mitigation methods are adequate for critical areas using current analysis methods. An economical method to provide more accurate modeling and optimize mitigation methods is needed to improve nuclear power viability. This report describes the initial investigation into modeling and simulation tools for application of fire as part of the Risk-Informed Systems Analysis (RISA), formerly Risk-Informed Safety Margin Characterization (RISMC). The report provides a framework of how 3D modeling and simulation techniques could be combined with a dynamic Probabilistic Risk Analysis (PRA) to reduce compounding conservatism present in current Fire PRA methods. Electrical Power Research Institute has analyzed current Fire PRA practices and identified the most significant contributors to risk and areas for improving analysis. This framework describes how to apply dynamic PRA and simulation methods for key contributors/scenarios, credit missing factors of manual fire suppression, and applying conditional probabilities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Mars 2020 Risk Integration and Uncertainty Working Group Status Report, FY 2017

This report provides a list of accomplishments of the Mars 2020 Risk Integration and Uncertainty Working Group for the fiscal year 2017 which includes participation in the Technical Information Meeting #2, review and comments on the methodologies and results provided in the Mars 2020 Safety Analysis Report (SAR) Draft Databook, development of a Probabilistic Risk Assessment model in the risk assessment program SAPHIRE using the data provided in the SAR Databook, and an independent launch risk analysis based on the Mars 2020 launch vehicle’s lineage and design similarity to other launch vehicles.

99 GENERAL AND MISCELLANEOUS↗

Risk and Cost Analysis of Utilizing FLEX Equipment for O&M Cost Reduction in Nuclear Power Plants

Several Nuclear Power Plant (NPP) operators in USA have announced to close their plants despite there are remaining years on their operating licenses. The cause of these closures is because the plant operators suffer financial losses. Approximately 80% of USA NPPs would have undergone financial losses if they were situated in a deregulated electricity market. In a deregulated market, electricity generators are independent entities separate from the transmission companies and Independent System Operator (ISO) which manages the market. NPPs in this market are termed merchant NPPs, and their profitability is determined solely from electricity generation revenues. Meanwhile, regulated and public power nuclear units’ profitability is determined by the regulatory process in place for each unit. Due to the complexity of differentiating each regulated and public power NPP’s regulations 36 NPPs are at an immediate risk of retiring early to stop losses, while 27 units will likely to follow in the long run. Today, cost is well-recognized and important factor in NPP decision-making that cannot be ignored. Therefore, it is essential to consider risk and cost together in decision-making to strengthen the position of the nuclear industry in an economically challenging energy market. With operational and maintenance (O&M) cost at 70% of the total operating expenditure of an NPP and some plants closing prematurely despite excellent safety record, there is an urgent need to address the high O&M cost. One of the novel entities that provide additional safety resulting in reduced risk of nuclear power plants is Flex equipment. Flex strategies were postulated by the US NRC in the wake of Fukushima Dai-chi accident to address beyond design-basis accidents and improve plant flexibility. Flex strategy comprise both onsite and off-site component storage for the provision of additional materials and equipment. This work explored innovative ways of utilizing the onsite Flex equipment during regular plant operation, for purposes in addition to the intended use of beyond design basis accidents. This report describes the risk and cost analysis of using Flex equipment during regular or unplanned maintenance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Integrated Risk-Informed Condition Based Maintenance Capability and Automated Platform: Technical Report 1

Due to continuing global energy market trends, driven heavily by the abundant preserves of natural gas, there is an immediate need to reduce costs associated with operation and maintenance (O&M) for the current domestic nuclear power industry and for future reactor developments. This is to ensure that nuclear power generation remains an economically competitive and viable option in the energy market. O&M costs include labor-intensive preventive maintenance (PM) programs, which involve manually-performed inspection, calibration, testing, and maintenance of plant assets at periodic frequency and time-based replacement of assets, irrespective of their condition. This has resulted in an expensive, labor-centric business model to achieve high capacity factors. Fortunately, there are technologies (advanced sensors, data analytics, and risk assessment methodologies) that can enable the transition from a labor-centric business model to a technology-centric business model. The technology-centric business model will result in a significant reduction of PM activities, laying the foundation for real-time condition assessment of plant assets, reducing overall labor and part costs. To enable this transition, PKMJ Technical Services LLC is partnering with the U.S. Department of Energy’s Idaho National Laboratory (operated by the Battelle Energy Alliance, LLC) and the Public Services Enterprise Group (PSEG) Nuclear, LLC in the Integrated Risk-Informed Condition-Based Maintenance Capability and Automated Platform Project. In this report, the configuration of a digital cloud platform using Microsoft Azure is discussed, data from the PSEG Salem Nuclear Generating Station Units 1 & 2 are imported into a digital cloud platform, and the data is used for an evaluation of several key areas: cost impact analysis, risk-informed model development, and preventive maintenance strategy optimization. First, the cost impact analysis reviews which plant assets are potential good candidates for condition-based monitoring. Next, INL utilized the data in their local environment to develop the risk-informed model; which provides estimates of failure rates and probability of failures of assets based upon their past performance. The developed model is performed on assets selected from the cost impact analysis. Lastly, engineers assess the preventive maintenance strategy for the selected assets at PSEG against maintenance strategies in the nuclear industry for similar assets to potentially identify acceptable justification for the extension of current maintenance frequencies.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Gulf of Mexico Offshore Wind Energy Hurricane Risk Assessment

NREL's feasibility assessment of offshore wind in the Gulf of Mexico concluded that hurricane risk was one of the major challenges that would need to be overcome for a mature offshore wind industry to develop in the Gulf of Mexico. To ensure the robust design of wind turbines in the Gulf of Mexico, it is critical to understand the added risk posed by the threat of major hurricanes, as those affecting the Gulf of Mexico region have a significant potential to exceed design limits prescribed by the International Electrotechnical Commission (IEC) wind design standards. To satisfy this charge, this project defines the wind hazard for the Gulf of Mexico Offshore Wind Energy area using the hurricane hazard model develop by Applied Research Associates and published extensively in the open literature. In doing so, the return periods associated with the IEC Class 1A and Typhoon Class limit-state hurricanes are estimated on a grid with nominal resolution of 10 km to determine where hurricane risk results in the exceedance of the IEC design criteria. On the same grid, wind speeds hazard contours associated with return periods varying from 50 to 1,000 years are also estimated. An additional challenge in assessing hurricane wind speed risk in the Gulf of Mexico arises from inconsistent terminology across the Saffir-Simpson hurricane scale and the IEC design criteria. Saffir-Simpson definitions are based on 1-minute sustained wind speeds estimated at 10-m height over marine terrain, while the IEC uses a different averaging period (3-second versus 1-minute) and reference height (assumed herein a hub height of 150 m versus 10 m). Employing the latest research on turbulence characteristics of the hurricane boundary layer, conversions between various durations (e.g., 3-seconds, 1-minute, 10-minutes, 1-hour) and between elevations near the surface (10 m) to near hub height (assumed herein 150 m) are developed. IEC Class 1A and Typhoon Class limit states are also provided in terms of an equivalent Saffir-Simpson hurricane wind speed category.

17 WIND ENERGY↗

Wildfire Risk Mapping over the State of Mississippi: Land Surface Modeling Approach

Three fire risk indexes based on soil moisture estimates were applied to simulate wildfire probability over the southern part of Mississippi using the logistic regression approach. The fire indexes were retrieved from: (1) accumulated difference between daily precipitation and potential evapotranspiration (P-E); (2) top 10 cm soil moisture content simulated by the Mosaic land surface model; and (3) the Keetch-Byram drought index (KBDI). The P-E, KBDI, and soil moisture based indexes were estimated from gridded atmospheric and Mosaic-simulated soil moisture data available from the North American Land Data Assimilation System (NLDAS-2). Normalized deviations of these indexes from the 31-year mean (1980-2010) were fitted into the logistic regression model describing probability of wildfires occurrence as a function of the fire index. It was assumed that such normalization provides more robust and adequate description of temporal dynamics of soil moisture anomalies than the original (not normalized) set of indexes. The logistic model parameters were evaluated for 0.25 x0.25 latitude/longitude cells and for probability representing at least one fire event occurred during 5 consecutive days. A 23-year (1986-2008) forest fires record was used. Two periods were selected and examined (January mid June and mid September December). The application of the logistic model provides an overall good agreement between empirical/observed and model-fitted fire probabilities over the study area during both seasons. The fire risk indexes based on the top 10 cm soil moisture and KBDI have the largest impact on the wildfire odds (increasing it by almost 2 times in response to each unit change of the corresponding fire risk index during January mid June period and by nearly 1.5 times during mid September-December) observed over 0.25 x0.25 cells located along the state of Mississippi Coast line. This result suggests a rather strong control of fire risk indexes on fire occurrence probability over this region.

forest fire risk↗

Risk Retirement—Decreasing Uncertainty and Informing Consenting Processes for Marine Renewable Energy Development

Marine renewable energy (MRE) is under development in many coastal nations, adding to the portfolio of low carbon energy sources that power national electricity grids as well as off-grid uses in isolated areas and at sea. Progress in establishing the MRE industry, largely wave and tidal energy, has been slowed in part due to uncertainty about environmental risks of these devices, including harm to marine animals and habitats, and the associated concerns of regulators and stakeholders. A process for risk retirement was developed to organize and apply knowledge in a strategic manner that considered whether specific environmental effects are likely to cause harm. The risk retirement process was tested against two key MRE stressors: effects of underwater noise from operational MRE devices on marine animals, and effects of electromagnetic fields from MRE electrical export cables on marine animals. The effects of installation of MRE devices were not accounted for in this analysis. Applying the risk retirement process could decrease the need for costly investigations of each potential effect at every new MRE project site and help move the industry beyond current barriers.

16 TIDAL AND WAVE POWER↗