Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power Grid Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Learning Local Volt/VAR Controllers Toward Efficient Network Operation with Stability Guarantees: Preprint

This paper considers the problem of voltage regulation in distribution network. The primary motivation is to keep voltages within pre-assigned operating limits by commanding the reactive power output of distributed energy resources (DERs) deployed in the grid. We develop a framework for developing local Volt/Var control that comprises of two main steps. In the first, exploiting historical data and for each DER, we learn a function representing desirable equilibrium points for the power network. These points approximate solutions of an Optimal Power Flow problem. In the second, we propose a control scheme for steering the network towards these favorable configurations. Theoretical conditions are derived to formally guarantee the stability of the developed control scheme and numerical simulations illustrate the effectiveness of the proposed approach.

data-driven control↗

Incorporating Uncertainty of Wind Power Generation Forecast into Power System Operation, Dispatch, and Unit Commitment Procedures

An approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. An assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty - both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures). A new method called the 'flying-brick' technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through EMS integration illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems in control rooms.

17 WIND ENERGY↗

HydraGNN_OPF_GFM_2026 - Ensemble of predictive graph foundation models for power grid applications

This dataset supports research on graph foundation models for optimal power flow (OPF) on electric grids using HydraGNN. It contains heterogeneous graph representations of PGLib-OPF cases spanning systems from 14 to 13,659 buses, together with packed HDF5 datasets for pretraining, feasibility classification, and N-1 contingency analysis. The release includes OPF solution data, downstream fine-tuning datasets, pretrained HeteroSAGE and HeteroHEAT model checkpoints, hyperparameter-optimization summaries across multiple heterogeneous GNN architectures, and aggregated fine-tuning results for sample-efficiency studies. The dataset is designed to enable scalable training, evaluation, and transfer-learning studies for OPF surrogate modeling, including node-level AC-OPF solution prediction, graph-level prediction, feasibility classification, operating-condition generalization, and contingency-response tasks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Flexibility Reserve Reductions from an Energy Imbalance Market with High Levels of Wind Energy in the Western Interconnection

The anticipated increase in variable generation in the Western Interconnection (WI) over the next several years has raised concerns about how to maintain system balance, especially in smaller Balancing Areas (BAs). Given renewable portfolio standards in the West, it is possible that more than 50 gigawatts (GW) of wind capacity will be installed by 2020. Significant quantities of solar generationare likely to be added as well. The consequent increase in variability and uncertainty that must be managed by the conventional generation fleet and responsive load make it attractive to consider ways in which Balancing Area Authorities (BAAs) can pool their variability and response resources, thus taking advantage of geographic and temporal diversity to increase overall operational efficiency.Our analysis considers several alternative forms of an Energy Imbalance Market (EIM) that have been proposed in the non-market areas of the WI. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: BAA cooperation and sub-hourly dispatch. As proposed, the EIM does not consider any form of coordinated unitcommitment; however, over time it is possible that BAAs would develop formal or informal coordination plans. This report examines the benefits of several possible EIM implementations, both separately and in concert.

17 WIND ENERGY↗

Abstract - Cooperative Research and Development Agreement between DERP Technologies, LLC and National Energy Technology Laboratory

The CRADA between NETL and Derp Tech aims to evaluate potential for early adoption of novel utilityscale advanced power control systems in distributed generation systems. The goal is to enable the grid to add significant hybrid sources, including hybrid power and thermal/electric storage systems, for flexible and adaptive islanding microgrid capabilities. Controls research conducted using the Hybrid Performance Project facility (Hyper) has illustrated the potential for fuel cell turbine hybrid power systems to deal with load transients and offdesign operation. DERP Tech is involved in the design and deployment of commercial solutions for adding microgrids and DG (hybrid combinations for Utility marketplace) to the grid. The information gained from DERP’s sample cases will enable NETL to quantify its control strategies for real world scenarios and applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

WGRID-49 GMLC Project Report: Understanding the Role of Short-Term Energy Storage and Large Motor Loads for Active Power Controls by Wind Power

The GMLC project is built upon the results of pioneering research funded by the U.S. Department of Energy (DOE) and conducted by the National Renewable Energy Laboratory (NREL)—in collaboration with the Electric Power Research Institute and the University of Colorado—on active power controls (APC) by wind power during 2013–2016. The studies detailed in the first APC by wind power project have shown tremendous promise for the potential for wind power plants to provide APC. The goal of this project was to continue the previous work and develop and validate coordinated controls of APC by wind generation, short-term energy storage, and large industrial motor drives for providing various types of ancillary services to the grid and minimizing loading impacts on wind turbines (e.g., drivetrains), thereby reducing operation-and-maintenance (O&M) costs and subsequently reducing the cost of energy generated by wind power. This work used the $30 million, multiyear DOE investments and the unique characteristics of NREL’s existing National Wind Technology Center test site, including a combination of multimegawatt utility-scale wind turbine generators, a 1-MW/1-MWh battery energy storage system (BESS), industrial variable-frequency motor drives, a 1-MW solar photovoltaic (PV) array, and a 7-MVA controllable grid interface. This combination of technologies allows for the optimization, testing, and demonstration of various types of APC by wind power in coordination with other generation sources (including regenerative loads) and energy storage to allow for enhancing or, in some cases, substituting the APC services by wind power and reducing impacts on wind turbine component life and thus increasing the availability and reliability of the power supply from wind

17 WIND ENERGY↗

A Review of the Generic Grid-Forming Model Used by the System Operator in Chile

The objective in this project is to verify the applicability of using generic electro-magnetic transient domain models of GFM technology through a wide range of tests and system conditions proposed by subject matter experts of GFM technology through a wide range of tests and system conditions proposed by subject matter experts. For this study, we used the generic GFM electro-magnetic transient model available in the EMTP (Electromagnetic Transient Program) software library, and we assessed the model’s various GFM capabilities through 12 tests. In this report, we compare the performance of the model with that of an original equipment manufacturer (OEM) GFM model. We also share the key insights and lessons learned from this work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Visualization and Analytics of Distribution Systems with Deep Penetration of Distributed Energy Resources (VADER)

In its current state, the distribution system is incapable of handling small to moderate amounts of photovoltaic (PV) penetration. This is because it was initially designed for handling passive loads which, at the level of a substation, have low variability and are forecastable with high accuracy. It has been an open loop system with little monitoring and control. With the addition of PV energy sources, the overall scenario will change dramatically due to (1) two way power flow on network; and (2) high aggregate variability. Additionally, changes on the consumption side lead to a number of smart loads, Electric Vehicles (EVs), and Demand Response. These fundamental changes in the characteristics of the generation and consumption of power will lead to a number of practical engineering problems which must be overcome to allow increased penetration of Distributed PV. Solving the unique engineering challenges which arise at moderate levels of PV penetration requires closed loop integration of data from (1) PV sources; (2) customer load data from smart meters; (3) EV charging data; and (4) local and line mounted precision instruments. These data are not traditionally used by utilities in operations since they are ”non-SCADA” and the current grid does not require such levels of control. To integrate this data and provide real time intelligence from these non-SCADA data, we created the Visualization and Analytics of Distribution Systems with Deep Penetration of Distributed Energy Resources (VADER) platform. VADER is a collection of analytics enabled by integration of massive and heterogeneous data streams for granular real-time monitoring, visualization and control of Distributed Energy Resources (DER) in distribution networks. VADER analytics enable utilities to have greater visibility into distributed energy resources. We built several batch- and stream-analytics in VADER which help operators better understand the impact of distributed energy resources on the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrifying Airport GSE: Monte Carlo Grid Impacts

Airports globally are shifting from ICE-powered to electric Ground Support Equipment (eGSE) to enhance efficiency, reduce operational costs, and improve operator health. Leveraging predictable routes, flat terrain, and low operational speeds, airports provide ideal conditions for electrification. This study evaluates freight GSE electrification at Dallas-Fort Worth International Airport (DFW), USA, using the Agile@ platform, which integrates three analytical methods: Freight Facility Model (FFM), Activity-Structure-Intensity-Fuel (ASIF), and Monte Carlo simulations. Results from 10,000 simulations indicate modest but critical increases in electricity demand and significant variability in GSE energy consumption. These insights emphasize the importance of data-driven scheduling, targeted maintenance, and strategic infrastructure planning. For high-uncertainty scenarios, airports are advised to deploy buffer energy storage systems (battery banks), implement demand-response charging strategies, schedule flexible workforce shifts, and prioritize proactive maintenance-particularly for equipment with higher operational uncertainty, such as tug tractors with trailers. Agile@ thus offers a robust, scalable, and data-driven framework to optimize long-term GSE planning and enhance reliability across diverse airport environments.

Bose, Ranjan [ORNL] (ORCID:0009000791026327)↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

South Asia Group for Energy - Sri Lanka

Sri Lanka set a target of generating 70% of its electricity from renewable energy sources by 2030. This goal includes the addition of 5.8 GW of renewable power capacity, comprising hydropower, solar, wind, and biomass, between 2023 and 2030, with an interim target of adding 2.5 GW of renewable capacity by 2026. To accomplish this, Sri Lanka's power grid needs significant transformation and modernization to handle the integration of variable renewable energy sources effectively. The South Asia Group for Energy (SAGE) is helping Sri Lanka's grid operator, the Ceylon Electricity Board (CEB), understand the gaps for operating the grid with higher renewable share and identifying technology and research requirements to establish a variable renewable energy control center.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

High Performance Computing Peak Shaving for Microreactor Operation

There are multiple nuclear microreactors currently under development that are designed to provide autonomous power for as many as ten or more years without refueling and are designed to power high performance computing (HPC) datacenters. But the load-follow speeds for a nuclear microreactor will be much slower than grid power and slower than the power variance typical of a HPC system. HPC datacenters experience peak power load variance driven by several factors ranging from the operation of cooling systems to remove heat from the servers to supporting a wide range of user application workflows and architectures each with different power signatures. One mechanism to support the limited load-follow of a microreactor is peak shaving where an energy storage mechanism is used to shed peak load and reduce significant power variance. This work explores peak electrical load shaving using uninterruptible power supply (UPS) systems designed for HPC support in the context of peak shaving when operating using a nuclear microreactor with a load-follow limited to 10% of load per minute. Using a self contained HPC datacenter complete with stand-alone cooling system and provisioned with an x86 cluster, an ARM cluster, and a graphics processing unit (GPU) cluster, peak shaving for microreactor operation using the UPS battery backup is explored while running two classes of typical HPC user applications. HPC architecture suitability for microreactor operation under this type of peak shaving is examined.

97 MATHEMATICS AND COMPUTING↗

Decision-Dependent Uncertainty-Aware Distribution System Planning Under Wildfire Risk

The interaction between power systems and wildfires can be dangerous and costly. Distribution grids can be liable for the outbreak of wildfires during extreme weather. In wildfire-prone areas, investment planning should consider the impact of operational actions on wildfire-related uncertainties affecting line failure likelihood. Here, in this case, endogenous-based uncertainty modeling should comprise the backbone of the investment planning model viz-a-viz the inability of standard exogenous-based uncertainty modeling. Therefore, we propose a decision-dependent uncertainty (DDU) aware methodology to optimize investment portfolios for distribution systems, considering that high power-flow levels in high-threat areas can ignite wildfires and increase line failure probability. The methodology identifies the best combination of upgrades (new lines, hardening existing lines, and placing switching devices). Methodologically, we propose a two-stage distributionally robust planning optimization problem with DDU that considers the distribution system's multiperiod operation. The first stage determines optimal switching actions and line investments, and the second stage evaluates the worst-case expected operational cost under a DDU framework designed to account for the endogenous impact of power-flow levels and hardening investment decisions in the line failure probabilities. An iterative method is tailored to handle the problem and numerical experiments demonstrate a more prepared grid to deal with wildfire risk.

Power systems investment planning↗

Resilient Networks Minitrack

This minitrack focuses on enhancing the reliability of future electric power infrastructure. Advanced technologies will require sophisticated methods for understanding how they can be incorporated into increasingly complex and dynamic infrastructure. The minitrack is comprised of papers that examine issues of resiliency and secure interoperability of future grid systems, testbeds that will demonstrate the robustness of advanced technologies, and the associated computational and communication challenges associated with operating the power system.

Dagle, Jeffery E.↗

Flicker Mitigation for a Grid-Connected Tidal and River Power Generator Using the BESS

In the grid-connected tidal and river power generation, the water turbulence and the grid condition can induce the fluctuating output power. This power fluctuation may cause a power quality issue such as flicker, or voltage fluctuations, during the continuous operation. Hence, it is important to assess flicker emission and to mitigate flicker in order to solve this power quality issue. This paper proposes a Battery Energy Storage System (BESS)installed between the power converters of the tidal and river power system in order to mitigate flickers in different grid conditions. The BESS smooths the active power fluctuations and reduces flicker even from the weak grid with the low impedance angle in the distribution network. The feasibility of the proposed BESS system has been tested using a simplified simulation model with interconnected inverters developed in the validated simulation tool of PSCAD/EMTDC, and the obtained results from the case studies are presented.

16 TIDAL AND WAVE POWER↗