Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ORION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Optical Communication Activities Through the Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) Office

The Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) office at Goddard Space Flight Center (GSFC) manages two NASA optical communication related projects, the Orion EM-2 Optical Communications Terminal (O2O) and the Integrated Laser Communications Relay Demonstration (LCRD) Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) projects. The main goal of LEMNOS project is to implement optical communications technologies on NASA missions starting with demonstrations of operational utility on Orion EM-2 and the International Space Station.

Seas, Antonios A.↗

Lightweight Broadcloth Recovery Parachute Testing and Reconstruction

Early in the Orion CPAS (Capsule Parachute Assembly System) project a main parachute was fabricated with lighter weight broadcloth in the lower part of the parachute skirt in order to look into different options for reducing the mass of the CPAS. At the end of Orion CPAS airdrop testing this parachute was used as a test equipment recovery parachute in order to gather data on the performance of this parachute. The parachute was the single recovery parachute in order to achieve the proper load under the parachute. It was flown on the final CPAS qualification test CQT 4-8 in September 2018.This paper will include imagery analysis, performance analysis based on all the gathered data, a full description of the configuration of the recovery parachute, as well as a comparison between this parachute and other CPAS recovery parachutes and other CPAS Main parachutes.

Ray, Eric S.↗

Project Management of the Capsule Parachute Assembly System (CPAS)

Since the time of contract award of the Orion Crew Exploration Vehicle in 2006, NASA has spearheaded the design, development, test and evaluation of the Orion aerodynamic decelerator system through a Government Furnished Equipment project in the Engineering Directorate of the Johnson Space Center. This paper will describe the Project structure and organization, the interfaces to the major stakeholders, the processes applied, and a few major budget, schedule and technical challenges overcome.

Johnson, Chris J.↗

Assembling and Testing NASA’s Space Launch System for First Flight

NASA is planning its next step toward human expansion into the solar system. The Space Launch System (SLS) (Figure 1) is a critical enabling component of that expansion. SLS payloads for its early missions include the Orion crew vehicle and components for Gateway, a lunar outpost orbiting the Moon that will facilitate research, technology and partnerships for eventual Mars missions. All major core stage hardware for test and flight completed structural manufacturing in 2018. The major components for the first flight vehicle are complete or approaching completion of internal equipment installation. The core stage forward join operation is also complete. The 10 booster segments needed for first flight have been cast and are ready to ship to NASA’s Kennedy Space Center (KSC) for mating and stacking. The four RS-25 core stage engines completed processing at NASA’s Stennis Space Center (SSC) and are ready for core stage integration. The Orion Stage Adapter (OSA) joined the Interim Cryogenic Propulsion Stage (ICPS) at KSC to await the rest of SLS flight hardware. Production and preparation of hardware for the second mission is also underway. Looking ahead to a busy 2019, liquid oxygen (LOX) tank, liquid hydrogen (LH2) tank and intertank structural testing will take place. This paper will discuss the current and planned status of SLS development in context of NASA’s overall exploration plans.

Askin, Bruce R.↗

Testing Astronaut-Controlled Telerobotic Operation of Rovers From the International Space Station as a Precursor to Lunar Missions

Missions to Earth-Moon libration points can advance capabilities for human exploration and provide unique opportunities to advance scientific knowledge. For example, NASA’s Orion spacecraft, currently under development, could serve as a platform from which astronauts would explore the lunar farside using robots that they remotely operate from a libration point. During Summer 2013, we conducted initial testing of this “surface telerobotics” concept of operations using the International Space Station (ISS) as a proxy for Orion orbiting the Moon. Over the course of three test sessions, Expedition 36 astronauts Chris Cassidy, Luca Parmitano, and Karen Nyberg on the ISS remotely operated NASA’s “K10” planetary rover in an outdoor terrain located at the NASA Ames Research Center (ARC). In this paper, we discuss the motivation for Earth-Moon libration point missions, describe the surface telerobotics tests performed to date, and outline directions for future ISS testing.

Fong, Terrence↗

Initial Criticality Assessments to Guide FMEAs on Rocket Engine Hot Fire Testing

Presented is an explanation of the use of the Initial Criticality Assessment (ICA) technique, a triage process for prioritizing required Failure Modes and Effects Analysis (FMEAs), for the European Service Module's main propulsion system's hot-fire test bed at White Sands New Mexico. Rather than instinctively performing many FMEAs of subsystems, or one large system level FMEA where every subcomponent is analyzed, the ICA guided an informed analysis of only the hardware that had a large impact to hazards. The low criticality hardware was documented via the ICA and no FMEA was performed; the work could then focus on the high criticality hardware. Thus a savings of Program resources was achieved. The experiences gained in creating these ICAs for this international collaborative project confirmed that the need for continuous communication across the technical teams is one of the greatest areas of emphasis. The European Space Agency (ESA) is developing the European Service Module (ESM), with its primary contractor, Airbus Defence and Space in Germany, for delivery to the National Aeronautics and Space Administration (NASA). The module will be equipped with a total of 21 engines to support NASA’s Orion spacecraft: one U.S. Space Shuttle Orbital Maneuvering System-Engine (OMS-E), eight auxiliary thrusters and 12 smaller RCS (Reaction Control System) thrusters. The main ESM propulsion system, used for large translational maneuvers, consists of one OMS-E... To qualify the design of the ESM propulsion subsystem (PSS) an all-steel Propulsion Qualification Module (PQM) structure is used to test the propulsion systems on Orion, including “hot firing” of the OMS engine, thrusters, and RCS. The PQM has been developed as a hot-fire test bed to be tested at the NASA White Sands Test Facility (WSTF). One of the objectives of the testing is to assure that the OMS-E can be safely operated with the PQM. Testing will also demonstrate that the PQM can set the proper upstream pressures and temperatures for the OMS-E to operate nominally given the PQM has never been tested in hot-fire operation with OMS-E before. In order to safely conduct the test campaign, hardware such as the engine subassembly, fluid feed lines, valves, electrical power lines, instrumentation, stiff links, installation Ground Support Equipment (GSE), and diffuser [whose objectives are to collect the exhaust of the OMS-E to actively cool down the exhaust gases, reduce thermal exchanges, and create a vacuum at OMS-E level before igniting], had to be analyzed for any hazards and failure modes.

Fault Tolerance↗

TPSAS-NF1676L-31853-DND

Risk that Orion arrives later than Space Launch System (SLS). MSO mitigates this risk by using a mass simulator for SLS’ tests. An Orion simulator for the Integrated Modal Test (IMT) and Umbilical Release and Retraction Tests (URRT) mitigates schedule risk by significant timeframe. A clean sheet alternate being pursued - analysis shows matching modal characteristics unnecessary; rigid simulator is acceptable wrt existing SLS accelerometer locations and shaker placement/size. Key Simulator Requirements: Representative mass, CG, rigid modal characteristics, high fidelity interface at MSA. Pre-test analyses show that MSO vertical CG could be up to 40” low without affecting IMT.

Steve Cutright↗

TPSAS-NF1676L-15307-DND

Unique facility allows for the testing of items from coupons to airframes: - Composites, metals, honeycombs, foams, struts, ATDs, - MD-500, CH 46, Orion Boilerplates, Orion Pallets, “Iron Birds”.

Justin Littell↗

Evolution of Hardware and Philosophy of Emergency Response Actions on the International Space Station and Future Spacecrafts

Human spaceflight is dangerous for numerous reasons. This ranges from the dynamic environment of launching on a rocket, flying in space among the thousands and thousands pieces of space debris, to the hazards of re-entry & landing, as well as being surrounded by vehicle systems containing hazardous materials or gasses. In-flight emergencies fall into four categories: Rapid Depressurization, Fire, Toxic Spill, and Medical emergency. This paper will address the first three, which fall under the responsibility of the Environmental Control and Life Support (ECLS) Systems flight control and engineering teams. It will review the evolution of the International Space Station’s emergency response philosophy, procedures, training, and equipment changes over the years. The International Space Station (ISS) emergency equipment has evolved over the last two decades of operations in many ways, but in some it has remained the same. The core actions the flight crew takes to ensure team safety, personal safety, vehicle safety, and equipment safety has not changed. However, the equipment and capabilities provided to them have. From early days of minimal capability when the ISS consisted of a few modules, to today’s 30,000 ft^3 vehicle with over a dozen isolatable segments. From use of positive pressure O2 masks, to the development of respirators. From a lack of procedures for a deadly ammonia leak scenario to a memorized response utilizing numerous atmosphere measurement systems. This paper will review all these various areas that fall under the umbrella of “on-board emergencies”. In addition, the comparison to the planned emergency operations on the Orion vehicle will be reviewed. The Orion vehicle differs from the ISS in that it has no isolatable volume, being approximately 2% the size of ISS, as well as not having a quick return to earth capability.

Barry Tobias↗

NASA’s Space Launch System: New Launch Capability for Artemis Lunar and Deep Space Science Missions

With stacking and integration of the initial Block 1 Space Launch System (SLS) expected to begin in 2020, NASA’s powerful new launch vehicle is ready to take center stage in the agency’s Artemis program to return astronauts to the Moon. Combining the highest launch thrust and largest payload capacity ever developed, SLS also enables a new generation of high-C3 science missions to destinations such as the gas and ice giants, the Kuiper Belt, and even beyond the solar system. Block 1 is only the beginning, as the vehicle has a planned evolution path to progressively more powerful variants. In addition to these block upgrades providing increased lift capability, the vehicle can be configured to fly in crew configuration with the Orion spacecraft or in cargo configuration with payload fairings for launching science mission or large infrastructure, providing a flexible launch option. For Artemis I, the first SLS flight, the Block 1 vehicle in the crew configuration will send an uncrewed Orion spacecraft to lunar orbit for a thorough systems checkout before the crewed Artemis II flight. The Block 1 vehicle uses a proven propulsion system consisting of solid rocket boosters and RS-25 engines to lift more than 27 metric tons [t] to trans-lunar injection (TLI). In its cargo configuration, Block 1 can be fitted with a 5 m payload fairing. The second variant, Block 1B, uses a more powerful upper stage to increase payload mass to TLI to 38-42 t, depending on crew or cargo configuration. In the crew configuration, a co-manifested payload of up to 10 t can ride along in the Universal Stage Adapter (USA), which has as much volume for payloads as a 5 m-class payload fairing. The Block 2 evolved variant will lift 43-46 t to TLI, depending on crew or cargo configuration. The Block 1B and Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing, available in 19.1 m and 27.4 m lengths, providing unprecedented volume for payloads. Larger-diameter 10 m fairings may also be an option in the future on the Block 2 vehicle. The unrivalled mass, volume and high-energy launches of SLS can provide significant mission flexibility for payloads and/or additional upper stages to open trade space for a new generation of exploration missions. SLS was designed to meet requirements for launching large-volume infrastructure as outlined in numerous studies of missions to cislunar space or Mars. Mission concept studies from the science community also point toward new possibilities enabled by SLS. Probes with more robust science packages can be sent to the gas giants. Dual spacecraft can be manifested for missions to Uranus and Neptune. Additional third or fourth payload stages can be encapsulated in the payload fairings to achieve missions to the Kuiper Belt or beyond. In addition, the large volume can be used to design and deploy wide-aperture mirrors on future space telescopes and to enable nuclear-thermal propulsion missions. At AIAA Ascend, the SLS Program will provide technical information on vehicle capabilities as well as descriptions of ongoing discussions with mission planners for utilizing the vehicle for an array of deep space missions.

Stephen Creech↗

From Safer Space Travel to Improved Fisheries Monitoring: Wave Energy Modeling Tool Helps Design Tomorrow's Tech

What does wave energy have to do with space exploration? It turns out, plenty. The National Aeronautics and Space Administration (NASA) is working toward launching the Artemis I mission, an uncrewed lunar test flight, in 2021. It will be the maiden flight of the Space Launch System heavy-lift launch vehicle, as well as the Orion crew module (CM). Orion will orbit the moon for multiple days before returning to Earth and landing in the Pacific Ocean.

Tannen S Vanzwieten↗

Space Launch System Engine Out Capabilities

NASA's Space Launch System (SLS) is being developed with the primary purpose of returning people to the Moon and eventually landing people on Mars. With these lofty goals, ensuring mission completion is paramount even in the event of an in-flight mishap. One possible mishap is the loss of an engine in flight. While SLS was not required to show full engine out capability, the program took an ``assess to'' approach to see when the launch vehicle could complete the mission after an engine failure versus when the launch vehicle targets required a down-mode to an alternate mission target to ensure at least some flight objectives were complete, or at a minimum ensure safe return of Orion and the Crew. While this paper will focus on Artemis I, an uncrewed mission, some comparisons will be made to how the engine out capability will change for the subsequent Crewed flights of SLS and Orion.

Engine Out↗

Space Launch System Engine Out Capabilities

NASA's SLS is being developed with the primary purpose of returning people to the Moon and eventually landing people on Mars. With these lofty goals, ensuring mission completion is paramount even in the event of an in-flight mishap. One possible mishap is the loss of an engine in flight. While SLS was not required to show full engine out capability, the program took an ``assess to'' approach to see when the launch vehicle could complete the mission after an engine failure versus when the launch vehicle targets required a down-mode to an alternate mission target to ensure at least some flight objectives were complete, or at a minimum ensure safe return of Orion and the Crew. While this paper will focus on Artemis I, an uncrewed mission, some comparisons will be made to how the engine out capability will change for the subsequent Crewed flights of SLS and Orion.

Space Launch System↗

Artemis Innovative Assembly and Integration Operations of the Launch Abort Systemat KSC

This paper describes the Artemis program assembly and integration approach that enables affordable and low risk processing operations for the Launch Abort System at KSC. NASA is currently developing the Artemis 1 spacecraft to meet the test objectives of an uncrewed orbital mission to the moon and return to earth in 2021. The Artemis Orion spacecraft consists of a Crew Module (CM), a Service Module (SM), and a Launch Abort System (LAS) to safely transport a crew of 4 to the moon and return to earth. The LAS enables the CM to have an abort capability for the crew during the launch phase of the mission from the launch pad throughout the ascent phase. The LAS includes motor elements for abort, attitude control, and stage separation is assembled at the Launch Abort System Facility (LASF) adjacent to the CM/SM (CSM) assembly operations in the Neil Armstrong Operations and Checkout Building (O&C) at KSC. The LAS integration to the CSM is completed in the LASF and the completed Artemis spacecraft is integrated to the Space Launch System (SLS) in the Vehicle Assembly Building (VAB) at KSC. A significant LAS development flight test milestone was recently completed in 2019 for the Ascent Abort (AA-2) flight test at Cape Canaveral Air Force Station where a high-altitude abort test was successfully achieved using a Peacekeeper booster stage exercising all of the LAS systems including propulsion, avionics, and pyrotechnics demonstrating he LAS readiness for crewed flight. The first operational flight of the LAS will be for the Artemis 2 mission which is the first crewed mission for the Orion program planned in 2023.

William J Koenig↗

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

NASA's Current Optical Communications Efforts

NASA continues to make significant investments in optical communications technology for near Earth and deep space applications. Optical communications will enable new science and exploration missions by providing high data rates and better navigation over long distances. Small low mass terminals, even at low data rates, is also extremelty beneficial to NASA. In 2021, NASA will launch the Laser Communications Relay Demonstration (LCRD) on a Department of Defense Space Test Program satellite. LCRD consists of two optical terminals in geosynchronous (GEO) orbit and two ground stations, and it is a joint project between NASA’s Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL). Also in 2021, GSFC and MIT/LL will fly the TeraByte InfraRed Delivery (TBIRD) 200 Gbps Cubesat Demo in Low Earth Orbit. In 2022, JPL will launch Psyche to a unique metal asteroid orbiting the Sun between Mars and Jupiter. Psyche will carry the Deep Space Optical Communications (DSOC) payload. In 2023, NASA will do a lunar flyby with the first crewed mission of the Orion spacecraft and it will carry the MIT/LL developed Optical to Orion (O2O) payload. In addition to these flight demonstrations of optical communications, NASA is also working with civil space agencies around the world to develop international standards for optical communications via the Interagency Operations Advisory Group (IOAG) and the Consultative Committee for Space Data Systems (CCSDS).

Bernard L Edwards↗

NASA Space Launch System Completes Key Hotfire Test And Begins Vehicle Integration

NASA and its commercial and international partners are on the way back to the Moon. As directed by the White House in 2019, the agency team is striving to return humans to the Moon and land the first woman and the first person of color on the lunar surface. NASA and its commercial partners made significant progress in the second half of 2020 and the first half of 2021 on the agency’s Space Launch System (SLS), one of the key parts of the Artemis program. The team is preparing for a 2021 launch of Artemis I, the first integrated launch of the Block 1 variant of SLS with the Orion crew capsule. Hardware for the Artemis II launch, which will be the first to launch crew on SLS and Orion, is progressing through assembly, and hardware for Artemis III has started manufacturing. Artemis IV manufacturing has also started, and engines for Artemis V are in development/manufacturing. This paper will discuss the progress made in the last year and the items currently in work on for future SLS flights and variants.

Bruce R Askins↗

In-Space Loads Analysis of SLS/Orion

The Space Launch System and Orion spacecraft experience unique load cases during upper stage flight since the Orion must deploy its solar arrays before the upper stage engine fires. The low frequency bending modes of the deployed arrays have the potential to interact with the slosh modes of the upper stage, and with the upper stage flight steady-state accelerations this can induce high loads in the array mechanisms. A time-domain transient response solution is used to evaluate the array mechanism loads, sensitivities are noted, and the final loads are determined to be within the capability of the mechanism. Section loads and accelerations are also recovered and assessed.

SLS↗