Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LEVELS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Predicting Land-Ice Retreat and Sea-Level Rise with the Community Earth System Model

Coastal stakeholders need defensible predictions of 21st century sea-level rise (SLR). IPCC assessments suggest 21st century SLR of {approx}0.5 m under aggressive emission scenarios. Semi-empirical models project SLR of {approx}1 m or more by 2100. Although some sea-level contributions are fairly well constrained by models, others are highly uncertain. Recent studies suggest a potential large contribution ({approx}0.5 m/century) from the marine-based West Antarctic Ice Sheet, linked to changes in Southern Ocean wind stress. To assess the likelihood of fast retreat of marine ice sheets, we need coupled ice-sheet/ocean models that do not yet exist (but are well under way). CESM is uniquely positioned to provide integrated, physics based sea-level predictions.

58 GEOSCIENCES↗

Removal of Historic Low-Level Radioactive Sediment from the Port Hope Harbour - 13314

At the Port Hope Harbour, located on the north shore of Lake Ontario, the presence of low-level radioactive sediment, resulting from a former radium and uranium refinery that operated alongside the Harbour, currently limits redevelopment and revitalization opportunities. These waste materials contain radium-226, uranium, arsenic and other contaminants. Several other on-land locations within the community of Port Hope are also affected by the low-level radioactive waste management practices of the past. The Port Hope Project is a community initiated undertaking that will result in the consolidation of an estimated 1.2 million cubic metres of the low-level radioactive waste from the various sites in Port Hope into a new engineered above ground long-term waste management facility. The remediation of the estimated 120,000 m{sup 3} of contaminated sediments from the Port Hope Harbour is one of the more challenging components of the Port Hope Project. Following a thorough review of various options, the proposed method of contaminated sediment removal is by dredging. The sediment from the dredge will then be pumped as a sediment-water slurry mixture into geo-synthetic containment tubes for dewatering. Due to the hard substrate below the contaminated sediment, the challenge has been to set performance standards in terms of low residual surface concentrations that are attainable in an operationally efficient manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Walk the Line: The Development of Route Selection Standards for Spent Nuclear Fuel and High-level Radioactive Waste in the United States - 13519

Although storage facilities for spent nuclear fuel (SNF) and high-level radioactive waste (HLRW) are widely dispersed throughout the United States, these materials are also relatively concentrated in terms of geographic area. That is, the impacts of storage occur in a very small geographic space. Once shipments begin to a national repository or centralized interim storage facility, the impacts of SNF and HLRW will become more geographically distributed, more publicly visible, and almost certainly more contentious. The selection of shipping routes will likely be a major source of controversy. This paper describes the development of procedures, regulations, and standards for the selection of routes used to ship spent nuclear fuel and high-level radioactive waste in the United States. The paper begins by reviewing the circumstances around the development of HM-164 routing guidelines. The paper discusses the significance of New York City versus the Department of Transportation and application of HM-164. The paper describes the methods used to implement those regulations. The paper will also describe the current HM-164 designated routes and will provide a summary data analysis of their characteristics. This analysis will reveal the relatively small spatial scale of the effects of HM 164. The paper will then describe subsequent developments that have affected route selection for these materials. These developments include the use of 'representative routes' found in the Department of Energy (DOE) 2008 Supplemental Environmental Impact Statement for the formerly proposed Yucca Mountain geologic repository. The paper will describe recommendations related to route selection found in the National Academy of Sciences 2006 report Going the Distance, as well as recommendations found in the 2012 Final Report of the Blue Ribbon Commission on America's Nuclear Future. The paper will examine recently promulgated federal regulations (HM-232) for selection of rail routes for hazardous materials transport. The paper concludes that while the HM 164 regime is sufficient for certain applications, it does not provide an adequate basis for a national plan to ship spent nuclear fuel and high-level radioactive waste to centralized storage and disposal facilities over a period of 30 to 50 years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reevaluation of Vitrified High-Level Waste Form Criteria for Potential Cost Savings at the Defense Waste Processing Facility - 13598

At the Savannah River Site (SRS) the Defense Waste Processing Facility (DWPF) has been immobilizing SRS's radioactive high level waste (HLW) sludge into a durable borosilicate glass since 1996. Currently the DWPF has poured over 3,500 canisters, all of which are compliant with the U. S. Department of Energy's (DOE) Waste Acceptance Product Specifications for Vitrified High-Level Waste Forms (WAPS) and therefore ready to be shipped to a federal geologic repository for permanent disposal. Due to DOE petitioning to withdraw the Yucca Mountain License Application (LA) from the Nuclear Regulatory Commission (NRC) in 2010 and thus no clear disposal path for SRS canistered waste forms, there are opportunities for cost savings with future canister production at DWPF and other DOE producer sites by reevaluating high-level waste form requirements and compliance strategies and reducing/eliminating those that will not negatively impact the quality of the canistered waste form. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and Disposition of Legacy Low-Level Waste at the Y-12 National Security Complex - 12133

The Y-12 National Security Complex (Y-12) is concluding a multi-year program to characterize and dispose of all legacy low-level waste (LLW). The inventory of legacy waste at Y-12 has been reduced from over 3500 containers in Fiscal Year (FY) 2000 to 6 containers at the end of FY2011. In addition, the site recently eliminated the inventory of other low-level waste that is greater than 365 days old (i.e., >365-Day LLW), to be in full compliance with DOE Order 435.1. A consistent technical characterization approach emerged for both of these populations of backlogged waste: (1) compile existing historical data and process knowledge and conduct interviews with site personnel; (2) inspect the containers and any tags, labels, or other markings to confirm or glean additional data; (3) with appropriate monitoring, open the container, visually inspect and photograph the contents while obtaining preliminary radiological surveys; (4) obtain gross weight and field non-destructive assay (NDA) data as needed; (5) use the non-public Oak Ridge Reservation Haul Road to ship the container to a local offsite vendor for waste sorting and segregation; (6) sort, drain, sample, and remove prohibited items; and (7) compile final data and prepare for shipment to disposal. After disposing of this backlog, the focus has now turned to avoiding the recurrence of this situation by maintaining low inventories of low-level waste and shortening the duration between waste generation and disposal. An enhanced waste tracking system and monthly metric charts are used to monitor and report progress to contractor and federal site office management. During the past 2 years, the average age of LLW onsite at Y-12 has decreased from more than 180 days to less than 60 days. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Method for Implementing Subsurface Solid Derived Concentration Guideline Levels (DCGL) - 12331

The U.S. Nuclear Regulatory Commission (NRC) and other federal agencies currently approve the Multi-Agency Radiation Site Survey and Investigation Manual (MARSSIM) as guidance for licensees who are conducting final radiological status surveys in support of decommissioning. MARSSIM provides a method to demonstrate compliance with the applicable regulation by comparing residual radioactivity in surface soils with derived concentration guideline levels (DCGLs), but specifically discounts its applicability to subsurface soils. Many sites and facilities undergoing decommissioning contain subsurface soils that are potentially impacted by radiological constituents. In the absence of specific guidance designed to address the derivation of subsurface soil DCGLs and compliance demonstration, decommissioning facilities have attempted to apply DCGLs and final status survey techniques designed specifically for surface soils to subsurface soils. The decision to apply surface soil limits and surface soil compliance metrics to subsurface soils typically results in significant over-excavation with associated cost escalation. MACTEC, Inc. has developed the overarching concepts and principles found in recent NRC decommissioning guidance in NUREG 1757 to establish a functional method to derive dose-based subsurface soil DCGLs. The subsurface soil method developed by MACTEC also establishes a rigorous set of criterion-based data evaluation metrics (with analogs to the MARSSIM methodology) that can be used to demonstrate compliance with the developed subsurface soil DCGLs. The method establishes a continuum of volume factors that relate the size and depth of a volume of subsurface soil having elevated concentrations of residual radioactivity with its ability to produce dose. The method integrates the subsurface soil sampling regime with the derivation of the subsurface soil DCGL such that a self-regulating optimization is naturally sought by both the responsible party and regulator. This paper describes the concepts and basis used by MACTEC to develop the dose-based subsurface soil DCGL method. The paper will show how MACTEC's method can be used to demonstrate that higher concentrations of residual radioactivity in subsurface soils (as compared with surface soils) can meet the NRC's dose-based regulations. MACTEC's method has been used successfully to obtain the NRC's radiological release at a site with known radiological impacts to subsurface soils exceeding the surface soil DCGL, saving both time and cost. Having considered the current NRC guidance for consideration of residual radioactivity in subsurface soils during decommissioning, MACTEC has developed a technically based approach to the derivation of and demonstration of compliance with subsurface soil DCGLs for radionuclides. In fact, the process uses the already accepted concepts and metrics approved for surface soils as the foundation for deriving scaling factors used to calculate subsurface soil DCGLs that are at least equally protective of the decommissioning annual dose standard. Each of the elements identified for consideration in the current NRC guidance is addressed in this proposed method. Additionally, there is considerable conservatism built into the assumptions and techniques used to arrive at subsurface soil scaling factors and DCGLs. The degree of conservatism embodied in the approach used is such that risk managers and decision makers approving and using subsurface soil DCGLs derived in accordance with this method can be confident that the future exposures will be well below permissible and safe levels. The technical basis for the method can be applied to a broad variety of sites with residual radioactivity in subsurface soils. Given the costly nature of soil surveys, excavation, and disposal of soils as low-level radioactive waste, MACTEC's method for deriving and demonstrating compliance with subsurface soil DCGLs offers the possibility of significant cost savings over the traditional approach of applying surface soil DCGLs to subsurface soils. Furthermore, while yet untested, MACTEC believes that the concepts and methods embodied in this approach could readily be applied to other types of contamination found in subsurface soils. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Testing of a High Level Waste Slurry Sampling Technique to Support Hanford Waste Processing - 17164

The Hanford Tank Operations Contractor must demonstrate the capability to adequately sample staged high-level waste feed. The sampler employed must have accuracy and precision performance that allow the Tank Operations Contractor (TOC) to meet the Waste Treatment and Immobilization Plant (WTP) Waste Acceptance Criteria Data Quality Objectives (DQO). A full-scale sampling loop was used at a test facility to develop and demonstrate sampler capability. This paper will discuss the modifications to a sampler configuration previously tested - modifications focused on the improvement of the accuracy of test results. This work targets one of the remaining technical issues with the high-level waste treatment mission at Hanford. The sampling method employed must support both Tank Operations and Waste Treatment and Immobilization Plant requirements. To facilitate information transfer between the two facilities the mixing and sampling demonstrations are led by the TOC's Chief Technology Office in conjunction with the One System Integrated Project Team. Results of the testing showed that performance of the Isolok{sup R} sampler, chosen for implementation, can be greatly improved by modifying the systems configuration to provide accurate, repeatable results for Hanford's simulated high level waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Repository planning for spent nuclear fuel and high-level radioactive waste: insights from U.S.. and international programs - 15638

For decades, the United States and other nations with nuclear programs have been planning for permanent disposition of spent nuclear fuel and high-level waste, to address the increasingly difficult problem of storing these materials for the long term. These plans are complicated by issues ranging from technological factors to regulatory approaches and public concerns about health and environmental protection. In its 2012 report, the Blue Ribbon Commission (BRC) on America's Nuclear Future identified a number of recommendations for creating a safe, long-term solution to the nation's problem of managing and disposing of its spent fuel and high-level radioactive waste. These include a recommendation that the U.S. Environmental Protection Agency (EPA) revise its standards for a high-level waste repository. The EPA is currently reviewing and synthesizing literature relevant to such standards, including: (1) existing national and international standards and guidelines for repositories; and (2) benefits and barriers to such standards, including limitations related to current technologies, as well as siting, licensing, and construction processes. This paper highlights findings of this literature review and synthesis. More than 90 countries, from Albania to Vietnam and Yemen, were identified as potential sources of relevant information based on existing nuclear programs or consideration of such programs to address future energy needs. Pursuant to the BRC recommendations, the U.S. Department of Energy (DOE) has compiled extensive information resources relevant to spent fuel and radioactive waste repositories in the Centralized Used Fuel Resource and Information Exchange (CURIE) database developed by Oak Ridge National Laboratory. Further valuable sources of information include annual proceedings of recent Waste Management Symposia, which provide insights into recent trends and progress across various national and international programs. Recent literature from a number of countries, including the United States and Canada, and the United Kingdom, Finland, Sweden, France, Germany, and other countries in Western Europe, as well as other regions including Australia, indicates that consent-based siting has emerged as a dominant theme. In addition to effective siting processes, key program needs identified in the literature include regulatory standards and performance context, as well as reliable technologies and engineered systems, such as for deep drilling and assured safe containment of these radioactive materials extending into the very long term. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing of Novel Application of GOTHIC{sup TM} to Modelling of Hydrogen Distribution in Intermediate Level Waste Storage Facilities - 16499

One of the strategies for treatment of intermediate level waste in the United Kingdom is to retrieve the waste from the legacy storage area, condition in a suitable storage container and then hold on-site in an intermediate level waste store until permanent storage in a geological disposal facility becomes available. During storage, hydrogen may be generated inside the containers at a slow rate by a number of mechanisms. The containers can be equipped with vents that release hydrogen and other gasses into the intermediate level waste store, a building which would be constructed to high standards to minimise ingress of moisture. With the low number of air changes associated with the building design there is the potential for gas to accumulate over time. There is, therefore, a requirement to be able to predict future gas concentrations inside the building over a range of operating conditions to ensure that a safe operating envelope is maintained. The usual approach to this problem is to model the evolution of the hydrogen distribution by use of computational fluid dynamics tools. In a situation where weeks of real time need to be simulated in order to understand the slow build-up of a very small volumetric concentration of hydrogen, the use of computational fluid dynamics is not practicable within the time scales demanded by industry. This paper investigates a new approach to tackling this problem using the thermal hydraulic code GOTHIC{sup TM} (GOTHIC{sup TM} incorporates technology developed for the electric power industry under the sponsorship of EPRI, the Electric Power Research Institute). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Development of a U.S. Rail Transport Capability for Spent Nuclear Fuel and High-Level Waste - 19092

This paper provides an overview of the progress to date, and discussion of the path forward, related to designing, fabricating and testing prototype railcars that will comply with the safety standard S-2043. This standard was developed by the Association of American Railroads (AAR) specifically for railcars used to transport High-Level Radioactive Material (HLRM). AAR defines the term HLRM to include both spent nuclear fuel (SNF) and high-level radioactive waste (HLW). DOE is in the process of developing and testing prototype railcars that will satisfy Standard S-2043. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low-Level Waste Minimization and Management Planning at the Western Waste Management Facility, Ontario Power Generation - 19235

The purpose of this study was to examine the strategies intended to mitigate the temporary storage restrictions for Low-Level radioactive waste at the Western Waste Management Facility to enable continued accommodation of waste generation rates, and to recover storage capacity from 2018-2023 to optimize long-term sustainability for radioactive waste management. The management options considered were based on existing waste processing technologies and programs available at the Western Waste Management Facility, in combination with third party volume-reduction services. Completed analysis measured the consumption of Low-Level Waste storage space as influenced by the projected volumes from nuclear generating stations, and the various processing scenarios developed; such as reducing the volume of surplus processable waste on-site, and the reduction of specific waste streams previously considered to be non-processable. Results from the quantitative analysis indicated which strategies will be most effective for minimizing waste volumes for long-term storage and for recovering low-level storage space at the Western Waste Management Facility. The strategic path forward is presented in short- to long-term management objectives. Results from this study will contribute to the waste stream planning and management of major reactor refurbishment projects and to the technological advancements and innovation of radioactive waste processing and minimization. With further understanding of the refurbishment-specific waste types and volumes, it is expected that Nuclear Waste Management and the nuclear generating stations will achieve increasingly improved minimization results with the progression of each refurbished reactor. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review Guidelines for Biosphere Safety Assessment of Low-Level Waste Disposal Repository in Taiwan - 19606

Conducting reviews of radiological dose assessments is a crucial step toward the approval of long-term radiological safety requirements for low-level radioactive waste (LLW) disposal facilities. However, the concentration of radionuclides released from the near field into the biosphere and the radiation exposure levels to an individual can influence the performance acceptability of the LLW disposal facility and safety of the disposal environment. Therefore, all LLW must be managed and disposed of such that it minimizes risk to individuals and the environment. A dose of 0.25 mSv/year is the limit for individuals expected to receive the highest level of exposure to residual radioactivity. In Taiwan, a review for license applications has been proposed for LLW disposal facilities. These review guidelines are based on the Standard Review Plan (NUREG-1200) and are amended according to the environmental conditions in Taiwan. These guidelines can help reviewers to perform safety assessment reviews of applications for the construction and operation of LLW disposal facilities. The review guidelines for biosphere safety assessment include radiological dose assessment, description of waste characteristics, radionuclide transport characteristics, radiation dose under normal and unusual conditions, radionuclide release into the biosphere, and interpretation of evaluation results in various transfer mechanisms. These guidelines can also serve as references for regulatory departments conducting safety assessments of radiological doses in LLW disposal facilities in Taiwan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Development of a U.S. Rail Transport Capability for Spent Nuclear Fuel and High-Level Waste - 20466

This paper provides an overview of the progress to date, and discussion of the path forward, related to designing, fabricating and testing prototype railcars that will comply with the safety standard S-2043. This standard was developed by the Association of American Railroads (AAR) specifically for railcars used to transport High-Level Radioactive Material (HLRM). AAR defines the term HLRM to include both spent nuclear fuel (SNF) and high-level radioactive waste (HLW). DOE is in the process of developing and testing prototype railcars that will satisfy Standard S-2043. This is a technical paper that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this paper in no manner supersedes, overrides, or amends the Standard Contract. This paper reflects technical work which could support future decision making by the Department of Energy (DOE or Department). No inferences should be drawn from this paper regarding future actions by DOE, which are limited both by the terms of the Standard Contract and a lack of Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The HRA/Solarium Project: Feedback Based on 20 Years of Experience in Treatment of Medium Level Waste - 20185

Since the 1980's the management of the historical site of Mol has been transferred to the National Agency for Radioactive Waste and Enriched Fissile Materials (ONDRAF/NIRAS). Belgoprocess is entrusted by ONDRAF/NIRAS with the operational waste management and site remediation. One of the major challenges has been the characterization, treatment and conditioning of approximately 200 m{sup 3} of medium level waste. These waste packages were stored in poor conditions in storage vaults ('HRA') or concrete containers ('Solarium'). They have been produced in various research programs and reactor operations at the Belgian nuclear energy research centre SCK.CEN, isotope production, decontamination and dismantling operations from the 1960's up to the 1980's. Despite the limited volume, this historical waste consists of a great variation of waste characteristics and waste configurations. To tackle these liabilities, a new processing facility was built in the 1990's to allow safe transfers, handling, characterization and treatment of these packages. Also some auxiliary facilities have been built to deal with the by-products, like emptied concrete containers. The engineering of the installation, safety procedures and (characterization) methodology that has been developed generically have been proved to be successful. Nevertheless, the specific nature of some items made it necessary to organize a step-by-step treatment in distinct campaigns in which some relevant extra (safety) measures had to be taken into account. This dynamic approach made it possible to process a great variety of waste types in order to to ensure that this legacy is no longer left for subsequent generations. After about 20 years of operations, there has been a great build-up of experience and feed-back concerning the waste management of these specific waste streams. Some cases will be highlighted to specify the approach followed for treatment of e.g.: - Na/NaK containing equipment; - spent radioactive sources; - fuel element residues; - medium level waste originating from activation experiments; - radium bearing medium level waste originating from Ac-227 production research. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Warrick Conductivity Level Controllers Series 3H

This is my internship poster. In the poster I talk about the level controllers that I wired together and installed to support electrolysis testing systems in efforts to make the systems more efficient and run based on the communication between devices to ensure a closed loop system that can run on its own in a safe and controlled manner. I included pictures of some of the wiring as well as the level sensor devices and relays. I also included pictures of the tanks that will be filled at different heights with deionized water based on where the level sensors are.

08 HYDROGEN↗

A Three-Dimensional Level Set Simulation of Coupled Reactive Transport and Precipitation/Dissolution

Direct simulation of reactive transport in porous media is challenging due to the difficulty of tracking the dynamics of evolving solid-fluid interfaces. To meet this challenge, a level set method for capturing interface evolution due to dissolution and/or precipitation has been integrated into the standard grid-based finite-difference approach for simulating flow and transport in complex geometries. Based on the level set description of the interface geometry, Chorin’s projection method was modified to approximately satisfy the nonslip boundary condition at the grain surface, and a sharp interface methodwas developed for calculating the concentration field near the grain surface in the presence of surface reaction. Compared with the pixel representations of the interface used in other methods, the sub-grid representation using level set method offers significantly improved accuracy and efficiency. The advantage of the method is demonstrated in a systematic investigation of precipitation/dissolution in a simple three dimensional pore-throat with varying throat apertures. The simulation was first validated in a grid-refinement study. The effects of flow conditions, reaction rates and three-dimensional geometries are explored both qualitatively and quantitatively. The permeability-porosity relationship calculated from simulations is compared with Carman-Kozeny constitutive models to illustrate the limited capability of these empirical models, which are based on simplified pore-scale geometries and conditions.

58 GEOSCIENCES↗