Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “In Space Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

A System for Measuring the Sway of the Vehicle Assembly Building

A system was developed to measure the sway of the Vehicle Assembly Building (VAB) at Kennedy Space Center. This system was installed in the VAB and gathered more than one total year of data. The building movement was correlated with measurements provided by three wind towers in order to determine the maximum deflection of the building during high-wind events. The VAB owners were in the process of obtaining new platforms for use in assembling very tall rockets when analysis of the VAB showed that a high wind could move the building sufficiently that an upper platform might impact a rocket. The problem arises because safety requires a relatively small gap between the platform and the rocket, while a large enough gap is needed to ensure that stacking tolerances prevent contact between the rocket and the platform. This only leaves an inch or two (approximately 2 to 5 cm) of total clearance, so when the analysis showed that more than a couple of inches of motion could occur in a high wind, there was a potential for damaging the rocket. The KSC Applied Physics Laboratory was asked to install a system in the VAB that could measure the motion of the building in high winds to determine the actual building sway. The motion of the VAB roof under wind load was measured optically, and under analysis, it was determined that a relatively large-aperture optical system would be required to reduce diffraction effects to less than a small fraction of an inch (approximately mm) at a distance of 500 ft (≈150 m). A 10-in. (approximately 250 mm) telescope was placed on the floor of the building, looking at the ceiling. On the ceiling, a flat plate with three white LEDs was mounted in an "L" shape, such that the telescope was essentially looking at three stars. Software was written to track the motion of these three points using an image processing system. This provided a better than 1/10-in. (approximately 2.5-mm) 2D measurement faster than once a second. Data was downloaded once a month for comparison with the wind tower data. The system was fully operational and provided enough data to show that the VAB will only move 1 in. (approximately 2.5 cm) at the ceiling under 70-knot winds. Adjustable platforms are not required.

Youngquist, Robert↗

Performance, Stability and Compatibility of Oxygen/RP-1 Multi-Element Oxidizer-Rich Staged-Combustion Injectors

In 2015 and 2016, the National Aeronautics and Space Administration Marshall Space Flight Center designed, fabricated, assembled and hot-fire tested an oxygen/RP-1 propellant multi-element oxidizer-rich staged-combustion test article. The main objective was to provide thrust chamber combustion stability data as part of the Combustion Stability Tool Development program, although demonstration of performance and compatibility of oxidizer-rich main injectors was also important. Funding was provided by the Air Force Space and Missile Systems Center. Five configurations of main injectors were designed and fabricated, using conventional gas-centered swirl coaxial injector element designs generally similar to those used in oxygen/kerosene oxidizer-rich staged combustion engines such as the Russian RD-180 or NK-33 engines. Variations of element features included element size, recess depth, fuel gap width, and the presence of the sleeve separating the swirling fuel flow from the axial oxidizer flow. Ablative combustion chambers were fabricated based on hardware previously used at the NASA MSFC for testing at similar size and pressure. Existing oxygen/RP-1 oxidizer-rich subscale preburner injectors and hot gas ducts from a previous NASA-funded program were modified for use to supply the oxidizer-rich combustion products to the oxidizer circuit of the main injector of the thrust chamber. Testing of the resulting integrated test article - which included the preburner, inter-connecting hot gas duct, main injector, and ablative combustion chamber - was conducted at Test Stand 116 at the East Test Area of the NASA MSFC. The test article was well instrumented with static and dynamic pressure, temperature, and vibration sensors. This paper presents and discusses all the hot-fire test results of the integrated test article thrust chamber. Eighteen successful hot-fire tests of the integrated rig were conducted. Testing was accomplished with all five of the injector element concepts. Main combustion chamber pressures ranged from 710 to 2350 psia, and main combustion chamber mixture ratios ranged from 2.47 to 2.87. A chamber barrier fuel film coolant of about 2% to 4% of the total fuel flow was used for most tests. Characteristic exhaust velocity efficiency excluding the influence of the fuel film cooling ranged from 91% to 98% of theoretical. All tests of the thrust chamber exhibited stable combustion, even down to 40% of nominal operating pressures. Compatibility of the injector face and combustion chamber walls was acceptable. This paper is a follow-on to publication of preliminary test data presented at the 2016 JANNAF Liquid Propulsion Subcommittee meeting.

Hulka, J. R.↗

Space Station Freedom secondary power wiring requirements

Secondary power is produced by DDCU's (direct current to direct current converter units) and routed to and through secondary power distribution assemblies (SPDA's) to loads or tertiary distribution assemblies. This presentation outlines requirements of Space Station Freedom (SSF) EEE (electrical, electronic, and electromechanical) parts wire and the approved electrical wire and cable. The SSF PDRD (Program Definition and Requirements Document) language problems and resolution are reviewed. The cable routing to and from the SPDA's is presented as diagrams and the wire recommendations and characteristics are given.

Sawyer, C. R.↗

Crystallization in Ordered Polydisperse Polyolefin Diblock Copolymers

The morphologies of polydisperse ethylene-octene diblock copolymers, synthesized via a novel coordinative chain transfer polymerization process, are examined using two-dimensional synchrotron small-angle and wide-angle X-ray scattering on flow-aligned specimens. The diblock copolymers comprise one amorphous block with high 1-octene content and one semicrystalline block with relatively low 1-octene content, and each block ideally exhibits the most-probable distribution. Near-symmetric diblocks with a sufficiently large octene differential between the amorphous and semicrystalline blocks show well-ordered lamellar domain structures with long periods exceeding 100 nm. Orientation of these domain structures persists through multiple melting/recrystallization cycles, reflecting a robust structure which self-assembles in the melt. The domain spacings are nearly 3-fold larger than those in near-monodisperse polyethylene block copolymers of similar molecular weights. Although the well-ordered lamellar domain structure established in the melt is preserved in the solid state, the crystallites are isotropic in orientation. These materials display crystallization kinetics consistent with a spreading growth habit, indicating that the lamellae do not confine or template the growing crystals. The exceptionally large domain spacings and isotropic crystal growth are attributed to interblock mixing resulting from the large polydispersity; short hard blocks dissolved in the soft-block-rich domains swell the domain spacing in the melt and allow hard block crystallization to proceed across the lamellar domain interfaces.

43 PARTICLE ACCELERATORS↗

Preface: International Reference Ionosphere - Progress in Ionospheric Modelling

The international reference ionosphere (lRI) is the internationally recommended empirical model for the specification of ionospheric parameters supported by the Committee on Space Research (COSPAR) and the International Union of Radio Science (URSI) and recognized by the International Standardization Organization (ISO). IRI is being continually improved by a team of international experts as new data become available and better models are being developed. This issue chronicles the latest phase of model updates as reported during two IRI-related meetings. The first was a special session during the Scientific Assembly of the Committee of Space Research (COSPAR) in Montreal, Canada in July 2008 and the second was an IRI Task Force Activity at the US Air Force Academy in Colorado Springs in May 2009. This work led to several improvements and additions of the model which will be included in the next version, IRI-201O. The issue is divided into three sections focusing on the improvements made in the topside ionosphere, the F-peak, and the lower ionosphere, respectively. This issue would not have been possible without the reviewing efforts of many individuals. Each paper was reviewed by two referees. We thankfully acknowledge the contribution to this issue made by the following reviewers: Jacob Adeniyi, David Altadill, Eduardo Araujo, Feza Arikan, Dieter Bilitza, Jilijana Cander, Bela Fejer, Tamara Gulyaeva, Manuel Hermindez-Pajares, Ivan Kutiev, John MacDougal, Leo McNamara, Bruno Nava, Olivier Obrou, Elijah Oyeyemi, Vadym Paznukhov, Bodo Reinisch, John Retterer, Phil Richards, Gary Sales, J.H. Sastri, Ludger Scherliess, Iwona Stanislavska, Stamir Stankov, Shin-Yi Su, Manlian Zhang, Y ongliang Zhang, and Irina Zakharenkova. We are grateful to Peggy Ann Shea for her final review and guidance as the editor-in-chief for special issues of Advances in Space Research. We thank the authors for their timely submission and their quick response to the reviewer comments and humbly apologize for any delays in the editing process.

Bilitza Dieter↗

Microbial Bioburden on NASA Cleanroom Surfaces: Cell Counting and Fluorescence in situ Hybridization

Spacecraft assembly cleanrooms can harbor a low number of microbial cells that could contaminate hardware designed for life detection missions (known as “bioburden”). We are evaluating epifluorescence microscopy and fluorescence in situ hybridization (FISH) as rapid, accurate, and cost-effective methods to complement other contamination detection techniques. This study is part of a larger effort to characterize background organic contamination and the efficacy of cleaning procedures in Johnson Space Center (JSC) Astromaterials Curation Laboratories and Goddard Space Flight Center (GSFC) spacecraft assembly rooms. The low level of biomass required careful use of blanks during each stage of sample collection and preparation. FISH was performed using general archaeal and bacterial probes, as well as some group-specific probes. While some active bacteria were identified, a large majority of them were dead or inactive, and thus were difficult to identify by standard FISH. Our results are consistent with other studies that show that the bioburden present in clean rooms includes active, dormant, and dead cells.

C J Huff↗

Unpressurized Logistics Carriers for the International Space Station: Lessons Learned

The International Space Station has been in development since 1984, and has recently begun on orbit assembly. Most of the hardware for the Space Station has been manufactured and the rest is well along in design. The major sets of hardware that are still to be developed for Space Station are the pallets and interfacing hardware for resupply of unpressurized spares and scientific payloads. Over the last ten years, there have been numerous starts, stops, difficulties and challenges encountered in this effort. The Space Station program is now entering the beginning of orbital operations. The Program is only now addressing plans to design and build the carriers that will be needed to carry the unpressurized cargo for the Space Station lifetime. Unpressurized carrier development has been stalled due to a broad range of problems that occurred over the years. These problems were not in any single area, but encompassed budgetary, programmatic, and technical difficulties. Some lessons of hindsight can be applied to developing carriers for the Space Station. Space Station teams are now attempting to incorporate the knowledge gained into the current development efforts for external carriers. In some cases, the impacts of these lessons are unrecoverable for Space Station, but can and should be applied to future programs. This paper examines the progress and problems to date with unpressurized carrier development identifies the lessons to be learned, and charts the course for finally accomplishing the delivery of these critical hardware sets.

Robbins, William W., Jr.↗

NASA’s Space Launch System Stands Ready on Doorstep of Maiden Voyage Launch and Progress Made to Future Missions

NASA and its partners made significant progress towards the Artemis I launch in 2022. The integrated Space Launch System (SLS)vehicleand Orion spacecraft were first rolled out of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in March. SLS is a super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars, and beyond. It isthebackbone of the Artemis human lunar exploration program. Rollout transported the vehicle to Launch Pad 39B for a series of tests, including the wet dress rehearsal (WDR). Multiple attempts were required to complete WDR, each building on the one before. Following the WDR campaign, NASA teams refined hardware and launch procedures, and the vehicle was prepared for its first launch attempt scheduled for August 29. Challenges with the weather and hardware resulted in a scrub on the 29th, and the second attempt was set for Sept. 3. A hydrogen leak on the tail service mast umbilical forced a scrub. NASA teams completed repairs and testing on the vehicle on Launch Pad 39B to preserve a launch attempt at the end of September. Managers chose to return the vehicle to the VAB to protect it fromthe threat of Hurricane Ian. Within the VAB, NASA further inspected and prepared SLS for selected November windows. In addition to progress to the Artemis I mission, significant progress was made on the Artemis II and Artemis III rockets. Progress was also made towards on the Block 1B and Block 2 variants, beginning on the fourth and ninth flight, respectively. Both variants will provide significant improvements in both launch mass and mission flexibility to multiple destinations. This paper will discuss Artemis I vehicle integration, testing, and available results from the launch campaign to date.

Bruce Askins↗

Mediated Inner‐Sphere Electron Transfer Induces Homogeneous Reduction of CO 2 via Through‐Space Electronic Conjugation**

Abstract The electrocatalytic reduction of CO 2 is an appealing method for converting renewable energy sources into value‐added chemical feedstocks. We report a co‐electrocatalytic system for the reduction of CO 2 to CO comprised of a molecular Cr complex and dibenzothiophene‐5,5‐dioxide (DBTD) as a redox mediator, which achieves high activity (TOF=1.51–2.84×10 5 s −1 ) and quantitative selectivity. Under aprotic or protic conditions, DBTD produces a co‐electrocatalytic response with 1 by coordinating trans to the site of CO 2 binding and mediating electron transfer from the electrode with quantitative efficiency for CO. This assembly is reliant on through‐space electronic conjugation between the π frameworks of DBTD and the bpy fragment of the catalyst ligand, with contributions from dispersive interactions and weak sulfone coordination.

Hooe, Shelby L.↗

Precise Alignment and Permanent Mounting of Thin and Lightweight X-ray Segments

To provide observations to support current research efforts in high energy astrophysics. future X-ray telescope designs must provide matching or better angular resolution while significantly increasing the total collecting area. In such a design the permanent mounting of thin and lightweight segments is critical to the overall performance of the complete X-ray optic assembly. The thin and lightweight segments used in the assemhly of the modules are desigued to maintain and/or exceed the resolution of existing X-ray telescopes while providing a substantial increase in collecting area. Such thin and delicate X-ray segments are easily distorted and yet must be aligned to the arcsecond level and retain accurate alignment for many years. The Next Generation X-ray Optic (NGXO) group at NASA Goddard Space Flight Center has designed, assembled. and implemented new hardware and procedures mth the short term goal of aligning three pairs of X-ray segments in a technology demonstration module while maintaining 10 arcsec alignment through environmental testing as part of the eventual design and construction of a full sized module capable of housing hundreds of X-ray segments. The recent attempts at multiple segment pair alignment and permanent mounting is described along with an overview of the procedure used. A look into what the next year mll bring for the alignment and permanent segment mounting effort illustrates some of the challenges left to overcome before an attempt to populate a full sized module can begin.

Biskach, Michael P.↗

Evolution of the Space Station Robotic Manipulator

The Space Station Remote Manipulator System (SSRMS), Canadarm2, was launched in 2001 and deployed on the International Space Station (ISS). The Canadarm2 has been instrumental in ISS assembly and maintenance. Canadarm2 shares its heritage with the Space Shuttle Arm (Canadarm). This article explores the evolution from the Shuttle Canadarm to the Space Station Canadarm2 design, which incorporates a 7 degree of freedom design, larger joints, and changeable operating base. This article also addresses phased design, redundancy, life and maintainability requirements. The design of Canadarm2 meets unique ISS requirements, including expanded handling capability and the ability to be maintained on orbit. The size of ISS necessitated a mobile manipulator, resulting in the unique capability of Canadarm2 to relocate by performing a walk off to base points located along the Station, and interchanging the tip and base of the manipulator. This provides the manipulator with reach and access to a large part of the Station, enabling on-orbit assembly of the Station and providing support to Extra-Vehicular Activity (EVA). Canadarm2 is evolving based on on-orbit operational experience and new functionality requirements. SSRMS functionality is being developed in phases to support evolving ISS assembly and operation as modules are added and the Station becomes more complex. Changes to sustaining software, hardware architecture, and operations have significantly enhanced SSRMS capability to support ISS mission requirements. As a result of operational experience, SSRMS changes have been implemented for Degraded Joint Operations, Force Moment Sensor Thermal Protection, Enabling Ground Controlled Operations, and Software Commutation. Planned Canadarm2 design modifications include: Force Moment Accommodation, Smart Safing, Separate Safing, and Hot Backup. In summary, Canadarm2 continues to evolve in support of new ISS requirements and improved operations. It is a tribute to the design that this evolution can be accomplished while conducting critical on-orbit operations with minimal hardware changes.

Razvi, Shakeel↗

Lessons Learned in Launching Ares I-X

The Ares I-X flight test, scheduled for 2009, is the first opportunity for the Constellation Program and Ares Projects to obtain important data on the in-flight loads, first stage recovery, and ground-handling characteristics of the Ares I crew launch vehicle. The flight test vehicle will incorporate a mix of flight and mockup hardware, reflecting an acceptable representation of the mass and outer mold line characteristics of the operational Ares I vehicle. It will be powered by a four-segment solid rocket motor from the Space Shuttle inventory and will include a fifth, inert spacer segment and new forward structures to make it the same shape as the Ares I first stage. The vehicle also includes mass simulators for the upper stage, Orion crew module, and launch abort system to match the outer mold line of Ares I; an active roll control system; and avionics derived from Shuttle and Atlas hardware. This suborbital mission will take the flight test vehicle from stacking in the Vehicle Assembly Building (VAB) at Kennedy Space Center (KSC) through liftoff, maximum dynamic pressure, first stage separation, and recovery. Ares I-X presented NASA with unique project management challenges. This presentation will address those unique challenges, including managing a virtual nationwide team under a constrained timeline; designing and building the launch vehicle and ground systems; working concurrently with Space Shuttle activities; and integrating technical and management functions. It also will identify key data collected and lessons learned from the flight that will be applied to future exploration missions.

Davis, Stephan R.↗

Space structures concepts and materials

An extension is preseted of the evaluation of graphite/aluminum metal matrix composites (MMC) for space structures application. A tubular DWG graphite/aluminum truss assembly was fabricated having the structural integrity and thermal stability needed for space application. DWG is a proprietary thin ply continuous graphite reinforced aluminum composite. The truss end fittings were constructed using the discontinuous ceramic particulate reinforced MMC DWAl 20 (trademark). Thermal stability was incorporated in the truss by utilizing high stiffness, negative coefficient of thermal expansion (CTE) P100 graphite fibers in a 6061 aluminum matrix, crossplied to provide minimized CTE in the assembled truss. Tube CTE was designed to be slightly negative to offset the effects of the end fitting and sleeve, CTE values of which are approx. 1/2 that of aluminum. In the design of the truss configuration, the CTE contribution of each component was evaluated to establish the component dimension and layup configuration required to provide a net zero CTE in the subassemblies which would then translate to a zero CTE for the entire truss bay produced.

Nowitzky, A. M.↗

Technical support package: Large, easily deployable structures. NASA Tech Briefs, Fall 1982, volume 7, no. 1

Design and test data for packaging, deploying, and assembling structures for near term space platform systems, were provided by testing light type hardware in the Neutral Buoyancy Simulator. An optimum or near optimum structural configuration for varying degrees of deployment utilizing different levels of EVA and RMS was achieved. The design of joints and connectors and their lock/release mechanisms were refined to improve performance and operational convenience. The incorporation of utilities into structural modules to determine their effects on packaging and deployment was evaluated. By simulation tests, data was obtained for stowage, deployment, and assembly of the final structural system design to determine construction timelines, and evaluate system functioning and techniques.

Source record↗

Space station architectural issues - The view from science

The evolution from current missions in space from Shuttle-directed to space station-directed is projected, with consideration given to space station missions that will affect the station architecture. The Shuttle science mission is basically to support astronomy and astrophysics work into the 1990s, particularly in launching and refurbishing satellites such as the SMM, the Space Telescope, and the Gamma Ray Observatory. Various new observational facilities are being planned and may be carried by the Shuttle for assembly in orbit. The assembly crews could live on a space station if sufficient capabilities and size were built into the station. The construction of large instruments in orbit, instruments that cannot be launched by any current booster, could permit enough data to be gathered to successfully characterize the evolution of the Universe.

Mcdonald, F. B.↗

Open control/display system for a telerobotics work station

A working Advanced Space Cockpit was developed that integrated advanced control and display devices into a state-of-the-art multimicroprocessor hardware configuration, using window graphics and running under an object-oriented, multitasking real-time operating system environment. This Open Control/Display System supports the idea that the operator should be able to interactively monitor, select, control, and display information about many payloads aboard the Space Station using sets of I/O devices with a single, software-reconfigurable workstation. This is done while maintaining system consistency, yet the system is completely open to accept new additions and advances in hardware and software. The Advanced Space Cockpit, linked to Grumman's Hybrid Computing Facility and Large Amplitude Space Simulator (LASS), was used to test the Open Control/Display System via full-scale simulation of the following tasks: telerobotic truss assembly, RCS and thermal bus servicing, CMG changeout, RMS constrained motion and space constructible radiator assembly, HPA coordinated control, and OMV docking and tumbling satellite retrieval. The proposed man-machine interface standard discussed has evolved through many iterations of the tasks, and is based on feedback from NASA and Air Force personnel who performed those tasks in the LASS.

Keslowitz, Saul↗

Preparation for and Performance of a Pseudomonas aeruginosa Biofilm Experiment On Board the International Space Station

Biofilms are a problem on Earth given their ability to degrade the materials upon which they grow and due to their relevance to infections. Remarkably, 65% and 80% of infections and chronic diseases on Earth are associated with biofilms, respectively. In space, these problems' impact is higher because the crew's lives and mission success depend on nominal operation of mechanical systems. Furthermore, the isolated confined environment nature of spaceflight may increase the rates of disease transmission. In the case of the International Space Station (ISS), biofilms are an identified problem on the Environmental Control and Life Support System (ECLSS), namely on the water processor assembly (WPA). In late 2019, the Space Biofilms experiment launched towards ISS to (i) characterize the mass, thickness, morphology, and gene expression of biofilms formed in space with respect to matched Earth controls, (ii) interrogate the expression of antimicrobial resistance genes, and (iii) test novel materials as potential biofilm control strategies for future ECLSS components. For this, 288 bacterial samples were prepared prior to the launch of the Northrop Grumman CRS-12 mission from NASA's Wallops Flight Facility. The samples were integrated into the spaceflight hardware, BioServe's Fluid Processing Apparatus (FPA) packed in sets of eight in Group Activation Packs (GAP). Half of these samples were activated and terminated on orbit by NASA astronauts Jessica Meir and Christina Koch, while the remaining half were processed equivalently on Earth. The spaceflight bacterial samples of Space Biofilms returned on board SpaceX' CRS-19 Dragon spacecraft, in early 2020. We here describe the test campaign implemented to verify the experiment design and confirm it would enable us to achieve the project's scientific goals. This campaign ended with the Experiment Verification Test (EVT), from which we here present example morphology and transcriptomic results. We describe in detail the sample preparation prior to flight, including cleaning and sterilization of the coupons of six materials (SS316, passivated-SS316, lubricant impregnated surface, catheter-grade silicone with and without a nanotopography, and cellulose membrane), loading and integration of growth media, bacterial inoculum, fixative and preservative to enable experiment termination on orbit. Additionally, we describe the performance of the experiment on board the ISS, including crew activities, use of assets, temperature profile, and experiment timeline; all leading to a successful spaceflight experiment.

Pamela Flores↗

Development of a machine vision system for automated structural assembly

Research is being conducted at the LaRC to develop a telerobotic assembly system designed to construct large space truss structures. This research program was initiated within the past several years, and a ground-based test-bed was developed to evaluate and expand the state of the art. Test-bed operations currently use predetermined ('taught') points for truss structural assembly. Total dependence on the use of taught points for joint receptacle capture and strut installation is neither robust nor reliable enough for space operations. Therefore, a machine vision sensor guidance system is being developed to locate and guide the robot to a passive target mounted on the truss joint receptacle. The vision system hardware includes a miniature video camera, passive targets mounted on the joint receptacles, target illumination hardware, and an image processing system. Discrimination of the target from background clutter is accomplished through standard digital processing techniques. Once the target is identified, a pose estimation algorithm is invoked to determine the location, in three-dimensional space, of the target relative to the robots end-effector. Preliminary test results of the vision system in the Automated Structural Assembly Laboratory with a range of lighting and background conditions indicate that it is fully capable of successfully identifying joint receptacle targets throughout the required operational range. Controlled optical bench test results indicate that the system can also provide the pose estimation accuracy to define the target position.

Sydow, P. Daniel↗