Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Flight Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Marshall Space Flight Center Propulsion Systems Department (PSD) Knowledge Management (KM) Initiative

NASA Marshall Space Flight Center's Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities within the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center of Excellence (AISCE), lntergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KNI implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to suppo~th e planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have beon pedormed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural1KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level svstems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, - evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.

Caraccioli, Paul↗

NASA Commercial Crew Program Crew Transportation System Certificate of Flight Readiness Plan

NASA Commercial Crew Program (CCP) Crew Transportation System (CTS) Certification of Flight Readiness (CoFR) is the authorization granted by the Agency that certifies the flight readiness of a Commercial Provider’s CTS to conduct a flight test or mission to transport NASA Crew to and from the ISS. The Commercial Provider is responsible for developing and executing its plan for certifying the flight readiness of its CTS. The CCP with the International Space Station (ISS) Program must substantiate the Commercial Provider’s CoFR assertion to ensure compliance with NASA requirements and NASA Crew safety. NASA CCP CTS CoFR is the approval of the Commercial Provider’s evidence that: • The physical as-built CTS was produced, assembled, integrated, and tested within the approved production and operational constraints. • The mission specific requirements are enveloped within the certified CTS capabilities. • The CTS personnel are trained and certified to support the mission. • All aspects of the CTS are ready for the mission.

Certification of Flight Readiness↗

The Repair and Return to Flight of Solid Rocket Booster Forward Skirt Serial Number 20022

On April 5, 1991, a solid rocket booster (SRB) forward skirt serial number (S/N) 20022 sustained buckling damage during water impact after the launch of Space Transportation System Flight 37 (STS-37). As of that date, five forward skirts had been lost during water impact. Repair attempts began with the least damaged skirt available (S/N 20022). Sp ecial hydraulic tooling was used to remove buckled areas of the skirt. Afterwards, its aft clevis pinholes were found to be out of alignment with the redesigned solid rocket motor (RSRM) check gauge, but weld passes were used to correct this condition. Meanwhile, USA Analytics generated mechanical property data for buckled and subsequently debuckled material. Their analysis suggested that structural integrity might be improved by adding stringer reinforcements, stiffeners, to the aft bay section of the skirt. This improvement was recommended as a fleet modification to be implemented on a case-by-case basis.

Malone, T. W.↗

A summary of the mechanical design, testing and performance of the IMP-H and J attitude control systems

The main aspects of the attitude control system used on both the IMP-H and J spacecraft are presented. The mechanical configuration is described. Information on all the specific components comprising the flight system is provided. The acceptance and qualification testing of both individual components and the installed system are summarized. Functional information regarding the operation and performance in relation to the orbiting spacecraft and its mission is included. Related topics which are discussed are: (1) safety requirements, (2) servicing procedures, (3) anomalous behavior, and (4) pyrotechnic devices.

Metzger, J. R.↗

Definition of ground test for Large Space Structure (LSS) control verification

An overview for the definition of a ground test for the verification of Large Space Structure (LSS) control is given. The definition contains information on the description of the LSS ground verification experiment, the project management scheme, the design, development, fabrication and checkout of the subsystems, the systems engineering and integration, the hardware subsystems, the software, and a summary which includes future LSS ground test plans. Upon completion of these items, NASA/Marshall Space Flight Center will have an LSS ground test facility which will provide sufficient data on dynamics and control verification of LSS so that LSS flight system operations can be reasonably ensured.

Waites, H. B.↗

Architectural Analysis of Complex Evolving Systems of Systems

The goal of this collaborative project between FC-MD, APL, and GSFC and supported by NASA IV&V Software Assurance Research Program (SARP), was to develop a tool, Dynamic SAVE, or Dyn-SAVE for short, for analyzing architectures of systems of systems. The project team was comprised of the principal investigator (PI) from FC-MD and four other FC-MD scientists (part time) and several FC-MD students (full time), as well as, two APL software architects (part time), and one NASA POC (part time). The PI and FC-MD scientists together with APL architects were responsible for requirements analysis, and for applying and evaluating the Dyn-SAVE tool and method. The PI and a group of FC-MD scientists were responsible for improving the method and conducting outreach activities, while another group of FC-MD scientists were responsible for development and improvement of the tool. Oversight and reporting was conducted by the PI and NASA POC. The project team produced many results including several prototypes of the Dyn-SAVE tool and method, several case studies documenting how the tool and method was applied to APL s software systems, and several published papers in highly respected conferences and journals. Dyn-SAVE as developed and enhanced throughout this research period, is a software tool intended for software developers and architects, software integration testers, and persons who need to analyze software systems from the point of view of how it communicates with other systems. Using the tool, the user specifies the planned communication behavior of the system modeled as a sequence diagram. The user then captures and imports the actual communication behavior of the system, which is then converted and visualized as a sequence diagram by Dyn-SAVE. After mapping the planned to the actual and specifying parameter and timing constraints, Dyn-SAVE detects and highlights deviations between the planned and the actual behavior. Requirements based on the need to analyze two inter-system communication protocols that are representative of protocols used in the Aerospace industry have been specified. The protocols are related: APL s Common Ground System (CGS) as used in the MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) and the Radiation Belt Space Probes (RBSP) missions. The analyzed communications were implementations of the Telemetry protocol and the CCSDS File Delivery Protocol (CFDP) protocol. Based on these requirements, three prototypes of Dyn-SAVE were developed and applied to these protocols. The application of Dyn-SAVE to these protocols resulted in the detection of several issues. Dyn-SAVE was also applied to several Testbeds that have previously been used for experimentation earlier on this project, as well as, to other protocols and logs for testing its broader applicability. For example, Dyn-SAVE was used to analyze 1) the communication pattern between a web browser and a web server, 2) the system log of a computer in order to detect offnominal computer shut-down behavior, and 3) the actual test cases of NASA Goddard s Core Flight System (CFS) and automatically generated test cases in order to determine the overlap between the two sets of test cases. In all cases, Dyn-SAVE assisted in providing insightful conclusions about each of the cases identified above.

Lindvall, Mikael↗

Space Interferometry Mission

The Space Interferometry Mission (SIM) fligt system will be launched in June of 2005 into a nearly circular orbit arount the Earth. A Delta II 7920 launch vehicle will boost the SIM flight System from the Vandenberg Air Force Base into Earth orbit.

science↗

Rapid Spacecraft Payload Development: In-Orbit Demonstration of Flight Software Reuse, Scalability, and Dependability

As space mission design trends towards shared, multi-mission platforms and high-performance onboard computing architectures, the number of spacecraft launched into operation is also steadily rising. Through ridesharing, spacecraft miniaturization, and other cost-reduction measures, the barriers to space are lowering, resulting in compounded growth in the amount of flight software being deployed. To meet the needs of both the growing quantity and evolving nature of spacecraft, flight software design must accordingly adapt to support more efficient development, solutions to computational resource-sharing, and software reusability. This paper focuses on a software payload demonstrating several core technologies that improve the state-of-the-art in these identified areas. Launched into low-earth orbit in January 2022, our software payload was conceived, designed, and delivered in a span of merely two months. It was developed on top of the NASA core Flight System (cFS) framework and the Distributed Spacecraft Autonomy (DSA) Comm cFS application, which translates cFS software bus messages across a Data Distribution Service (DDS) network. The flight software, packaged in Linux container images, was deployed as one of 18 flight applications managed through the Unibap SpaceCloud Framework. The applications were run on a Unibap iX5-102 radiation-tolerant payload computer, hosted on the D-Orbit SCV-004 spacecraft as part of an ESA-sponsored in-orbit technology test. Our payload, referred to as the DSA D-Orbit software, demonstrates the reusability of the DSA Comm app in a substantially different context and purpose as its original mission. Comm’s original design goal was to reliably distribute messages between spacecraft swarms of arbitrary size and dynamic network topology. However, we leverage this same functionality to introduce redundancy and opportunistic parallel data processing in the context of a representative onboard image processing workload. This adaptive mission architecture was enabled in part by the SpaceCloud Framework’s use of container virtualization as the payload integration interface. By using a base container image with common high-level language runtimes and libraries, we were able to rapidly design, develop, and validate our image processing application without many of the technological barriers common to flight software development. We present details the goals, approach, results, and lessons learned through this technology demonstration experiment and contextualize those observations against present and future challenges in spacecraft software development.

computer programming↗

NASA Space Engineering Research Center for VLSI System Design

This annual report outlines the activities of the past year at the NASA SERC on VLSI Design. Highlights for this year include the following: a significant breakthrough was achieved in utilizing commercial IC foundries for producing flight electronics; the first two flight qualified chips were designed, fabricated, and tested and are now being delivered into NASA flight systems; and a new technology transfer mechanism has been established to transfer VLSI advances into NASA and commercial systems.

Source record↗

Strapdown system redundancy management flight demonstration

The suitability of strapdown inertial systems in providing highly reliable short-term navigation for vertical take-off and landing (VTOL) aircraft operating in an intra-urban setting under all-weather conditions was assessed. A preliminary design configuration of a skewed sensor inertial reference system employing a redundancy management concept to achieve fail-operational, fail-operational performance, was developed.

Source record↗

Deployer Performance Results for the TSS-1 Mission

Performance of the Tethered Satellite System (TSS) Deployer during the STS-46 mission (July and August 1992) is analyzed in terms of hardware operation at the component and system level. Although only a limited deployment of the satellite was achieved (256 meters vs 20 kilometers planned), the mission served to verify the basic capability of the Deployer to release, control and retrieve a tethered satellite. - Deployer operational flexibility that was demonstrated during the flight is also addressed. Martin Marietta was the prime contractor for the development of the Deployer, under management of the NASA George C. Marshall Space Flight Center (MSFC). The satellite was provided by Alenia, Torino, Italy under contract to the Agencia Spaziale Italiana (ASI). Proper operation of the avionics components and the majority of mechanisms was observed during the flight. System operations driven by control laws for the deployment and retrieval of the satellite were also successful for the limited deployment distance. Anomalies included separation problems for one of the two umbilical connectors between the Deployer and satellite, tether jamming (at initial Satellite fly-away and at a deployment distance of 224 meters), and a mechanical interference which prevented tether deployment beyond 256 meters. The Deployer was used in several off-nominal conditions to respond to these anomalies, which ultimately enabled a successful satellite retrieval and preservation of hardware integrity for a future re-flight. The paper begins with an introduction defining the significance of the TSS-1 mission. The body of the paper is divided into four major sections: (1) Description of Deployer System and Components, (2) Deployer Components/Systems Demonstrating Successful Operation, (3) Hardware Anomalies and Operational Responses, and (4) Design Modifications for the TSS-1R Re-flight Mission. Conclusions from the TSS-1 mission, including lessons learned are presented at the end of the manuscript.

Marshall, Leland S.↗

Structural Alignment Sensor Feasibility Demonstration

A structural alignment sensor (SAS) was developed for use with large deployable antenna systems for contour measurement and/or active control. The SAS is a laser ranging system using frequency modulation and accurate phase measurement to determine distance. Work was done with a CO2 and HeNe laser. The capability of the SAS to measure antenna rib contours was studied over ranges of 50 meters to a resolution of 100 microns. Initial resolution data was taken with the CO2 system. This data shows that it will indeed meet the SAS requirements. The development of the HeNe system was initiated because it offers substantial improvement in size, weight, and power over the CO2 system. The final demonstration was made with the HeNe system and it too showed that the SAS requirements could be met with this alternate approach. The projection of these results to a conceptual design for a flight system and its application are described.

Anderson, R. H.↗

The 30/20 GHz experimental communications satellite system

NASA is continuing to pursue an agressive satellite communications technology development program focused on the 30/20 GHz frequency band. A review of the program progress to date is presented. Included is a discussion of the technology program status as well as a description of the experimental system concept under study. Expected system performance characteristics together with spacecraft and payload configuration details including weight and power budget is presented. Overall program schedules of both the technology development and the flight system development are included.

Sivo, J. N.↗

Model Based Mission Assurance: Emerging Opportunities for Robotic Systems

The emergence of Model Based Systems Engineering (MBSE) in a Model Based Engineering framework has created new opportunities to improve effectiveness and efficiencies across the assurance functions. The MBSE environment supports not only system architecture development, but provides for support of Systems Safety, Reliability and Risk Analysis concurrently in the same framework. Linking to detailed design will further improve assurance capabilities to support failures avoidance and mitigation in flight systems. This also is leading new assurance functions including model assurance and management of uncertainty in the modeling environment. Further, the assurance cases, a structured hierarchal argument or model, are emerging as a basis for supporting a comprehensive viewpoint in which to support Model Based Mission Assurance (MBMA).

Mission Assurance↗

Development of a Human Systems Integration Plan

NASA defines Human Systems Integration (HSI) as part of the overall systems engineering and acquisition strategy for space systems. The HSI Plan defines how HSI activities will be implemented across the lifecycle of the mission, as required by NPR 7123.1C, NASA Systems Engineering Processes and Requirements, and NPR 8705.2C Human-Rating Requirements for Space Systems. The goal of this presentation is to share with government and industry how an HSI Plan can be implemented. The presentation will cover HSI implementation for flight systems, vehicle processing, and interfaces. These are divided into six NASA HSI Domains: human factors engineering, operations resources, safety, training, maintainability and supportability, habitability and environment. HSI activities go across the mission’s lifecycle from pre-formulation and acquisition through design, development, operations, maintenance, and decommissioning. The HSI Plan includes a description of the HSI activities and products that are essential for human rating, operability, maintainability, supportability, and affordability of the mission systems. It also describes the role of the HSI Team required as part of the Human Rating process. The HSI Plan utilizes the operational expertise within NASA to ensure designs and testing are successful, leading to acceptable human spaceflight vehicles.

Jackelynne Silva-Martinez↗

Demonstrating Assurance of Model-Based Fault Diagnosis Systems on an Operational Mission

Developers of robotic scientific and commercial spacecraft are trending towards use of onboard autonomous capabilities for responding quickly to dynamic environments and rapidly changing situations. These capabilities need to know the state of the spacecraft’s health. Model-based fault diagnosis (MBFD) is an approach to estimating health by continuously verifying accurate behavior and diagnosing off-nominal behavior. Proper functioning of MBFD depends on 1) the quality of the diagnostic system model that is analyzed and compared to commands and onboard measurements to estimate a system’s health state, and 2) the correct functionality of the diagnosis engine interrogating the model and comparing its analyses to observed system behavior. Our goal is to develop Verification and Validation (V&V) techniques for MBFD to provide future missions sufficient confidence in its functionality and performance to deploy it on the systems they develop. Our work has been focused on infusing the techniques we developed earlier to an operational mission. First, we are constructing diagnostic models of a spacecraft attitude control system and updating our diagnostic engine so they can be demonstrated aboard the Arcsecond Space Telescope Enabling Research in Astrophysics (ASTERIA) mission, an operational spacecraft for which experiments in autonomy are being planned and executed, using the V&V techniques we have previously developed to assure they are both correct and complete. Since it is nearing the end of its life, ASTERIA provides a unique opportunity to demonstrate MBFD since the monitored components are expected to fail. Our demonstration will give system developers additional confidence to make timely, informed MBFD deployment decisions. Second, we will be completing performance assessments of the diagnostic engine/diagnostic model ensemble both on the flight system and ground-based testbeds to gain confidence in MBFD’s ability to run successfully in a spacecraft’s resource-constrained environment without adversely affecting other on-board activities. Finally, we are capturing our experience in preparing this demonstration in a set of checklists and guidance documents. Current practice includes high-level institutional guidance documents and standards, but at a high level of abstraction that does not necessarily address specific MBFD concerns. The purpose of the new checklists is to provide future mission developers clear, unambiguous, procedure-oriented guidance on assuring MBFD. This paper describes our work in these areas. For the first area, we describe the diagnostic models and updated diagnostic engine that will be used for the on-board demonstration. We describe how the V&V techniques we developed earlier are used to assure model and engine correctness and completeness. For the second area, we identify the performance measurement and assessment techniques used to characterize the diagnostic engine and diagnostic models, and discuss the effect of measured performance on overall mission operation. Finally, we present the checklist and guidance documents and describe how they meet the goals of providing system developers with clear, unambiguous, procedure-oriented guidance on MBFD assurance. We show how the techniques we have developed map into those artifacts.

Nikora, Allen↗

Thermal control for the ground simulation of a space IR sensor system

Active and passive thermal controls for simulations of a space IR sensor system operating in cryogenic temperatures were designed, built, and tested from a component level to a system level. The test results from component tests and integrated system tests have compared very well with theoretical predictions, and thus verify component and integrated thermal math models. These verified models can be modified for use to predict flight systems thermal performance. Thermal vacuum simulations and demonstrations of a space IR system consisted of a target and background scene generator, telescope mirrors supported by a graphite-epoxy metering structure, and an IR sensor. These components are required to operate at cryogenic temperature levels. Each component has its unique thermal control needs. Descriptions are presented of thermal control systems for the test article from component design level to integrated system level along with discussions of component and integrated demonstration tests, and correlation of test data with thermal finite difference models.

Lee, E.↗