Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Flight Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Initial Design Guidelines for Onboard Automation of Flight Path Management

Achieving the National Academy of Science’s vision of advanced aerial mobility will depend on significant developments in automation to achieve safe and efficient operations. Flight path management (FPM), a major category of automation functionality needed to achieve this vision, will provide dynamic management of an aircraft’s flight path, ensuring that it remains feasible to fly to mission completion, deconflicted from hazards, coordinated with other traffic, flexible to accommodate future disturbances, and optimized to meet business objectives. While efforts are underway to advance FPM technology for the Urban Air Mobility application, initial design guidelines are presented for FPM automation capabilities to achieve each of these objectives based on 15+ years of prior FPM automation research and development. Methods to efficiently account for uncertainty in the prediction of trajectories are described, as are additional considerations for prioritizing safety in the design of FPM automation capabilities and interactions between aircraft. Recommendations are supported by extensive experience gained via previous work with the FPM reference automation system, Autonomous Operations Planner, developed by NASA. By employing capable FPM automation supported by cooperative operational flight rules and information sharing, future aircraft operators will benefit from an increased ability to plan and execute safe and efficient flights and to achieve mission success in a dynamic airspace.

Flight Path Management↗

Aeroheating Analysis for the Mars Reconnaissance Orbiter with Comparison to Flight Data

The aeroheating environment of the Mars Reconnaissance Orbiter (MRO) has been analyzed using the direct simulation Monte Carlo and free-molecular techniques. The results of these analyses were used to develop an aeroheating database to be used for the preflight planning and the in-flight operations support for the aerobraking phase of the MRO mission. The aeroheating predictions calculated for the MRO include the heat transfer coefficient (CH) over a range of angles-of-attack, sideslip angles, and number densities. The effects of flow chemistry, surface temperature, and surface grid resolution were also investigated to determine the aeroheating database uncertainties. Flight heat flux data has been calculated from surface temperature sensor data returned to Earth from the MRO in orbit around Mars during the aerobraking phase of its mission. The heat flux data have been compared to the aeroheating database and agree favorably.

Liechty, Derek S.↗

Autonomous Mission Operations Roadmap

As light time delays increase, the number of such situations in which crew autonomy is the best way to conduct the mission is expected to increase. However, there are significant open questions regarding which functions to allocate to ground and crew as the time delays increase. In situations where the ideal solution is to allocate responsibility to the crew and the vehicle, a second question arises: should the activity be the responsibility of the crew or an automated vehicle function? More specifically, we must answer the following questions: What aspects of mission operation responsibilities (Plan, Train, Fly) should be allocated to ground based or vehicle based planning, monitoring, and control in the presence of significant light-time delay between the vehicle and the Earth?How should the allocated ground based planning, monitoring, and control be distributed across the flight control team and ground system automation? How should the allocated vehicle based planning, monitoring, and control be distributed between the flight crew and onboard system automation?When during the mission should responsibility shift from flight control team to crew or from crew to vehicle, and what should the process of shifting responsibility be as the mission progresses? NASA is developing a roadmap of capabilities for Autonomous Mission Operations for human spaceflight. This presentation will describe the current state of development of this roadmap, with specific attention to in-space inspection tasks that crews might perform with minimum assistance from the ground.

Mission Operations↗

Science and Observation Recommendations for Future NASA Carbon Cycle Research

Between October 2000 and June 2001, an Agency-wide planning, effort was organized by elements of NASA Goddard Space Flight Center (GSFC) to define future research and technology development activities. This planning effort was conducted at the request of the Associate Administrator of the Office of Earth Science (Code Y), Dr. Ghassem Asrar, at NASA Headquarters (HQ). The primary points of contact were Dr. Mary Cleave, Deputy Associate Administrator for Advanced Planning at NASA HQ (Headquarters) and Dr. Charles McClain of the Office of Global Carbon Studies (Code 970.2) at GSFC. During this period, GSFC hosted three workshops to define the science requirements and objectives, the observational and modeling requirements to meet the science objectives, the technology development requirements, and a cost plan for both the science program and new flight projects that will be needed for new observations beyond the present or currently planned. The plan definition process was very intensive as HQ required the final presentation package by mid-June 2001. This deadline was met and the recommendations were ultimately refined and folded into a broader program plan, which also included climate modeling, aerosol observations, and science computing technology development, for contributing to the President's Climate Change Research Initiative. This technical memorandum outlines the process and recommendations made for cross-cutting carbon cycle research as presented in June. A separate NASA document outlines the budget profiles or cost analyses conducted as part of the planning effort.

McClain, Charles R.↗

Feasibility Study for Low Drag Acoustic Liners Final Report

This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.

Riedel, Brian↗

X-ray satellite (Rosat)

An overview of the current status of the ROSAT X-Ray satellite project is given. Areas discussed include an overview of problem areas, systems and mechanical subsystems, the electrical subsystem, power supply, data processing and transmission, the wide field camera, ground support equipment and the production scheduling. It is shown that the project is proceeding according to schedule, including the hardware production and costs. However, it is stated that estimated additional costs will exceed the plan. The previous schedule for production of the flight model will no longer be met. A modified milestone plan has been worked out with Dornier Systems. The current working schedule calls for a launch data of December 21, 1987; however, this does not take into account a 4-week buffer prior to transporting the flight model to the launch site. As of the date of this report, milestone M5 has been met. Previous problems with the gold vapor deposition on the flight model mirror due to contamination have been eliminated.

Source record↗

Space Shuttle Orbiter approach and landing program status

The approach and landing test (ALT) phase of the Space Shuttle program aims at assessing the Orbiter's subsonic aerodynamic flight and landing characteristics along with the support equipment, ground facilities, and the approximate hardware and software to be used in the terminal phase of orbital missions. The program also evaluates the performance of the Shuttle carrier aircraft (SCA) as related to the transport of the Orbiter to the launch sites during the stages of Space Shuttle operations. Results are presented for the SCA inert Orbiter flight testing and the program plans up to the completion of the ALT program. Emphasis is placed on testing the airworthiness of the mated B-747 Shuttle carrier aircraft and Orbiter, checkout of the Orbiter systems in captive flight, and launching the Orbiter with and without the tail cone installed. Major program milestones before the first manned orbital flight are summarized in graphic form.

Andrews, W. H.↗

Spacelab operations planning

The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

Lee, T. J.↗

STS-40 Space Shuttle mission report

The STS-40 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem operations during the forty-first flight of the Space Shuttle and the eleventh flight of the Orbiter Vehicle Columbia (OV-102). In addition to the Columbia vehicle, the flight vehicle consisted of an External Tank (ET) designated as ET-41 (LWT-34), three Space Shuttle main engines (SSME's) (serial numbers 2015, 2022, and 2027 in positions 1, 2, and 3, respectively), and two Solid Rocket Boosters (SRB's) designated as BI-044. The primary objective of the STS-40 flight was to successfully perform the planned operations of the Spacelab Life Sciences-1 (SLS-1) payload. The secondary objectives of this flight were to perform the operations required by the Getaway Special (GAS) payloads and the Middeck O-Gravity Dynamics Experiment (MODE) payload.

Fricke, Robert W.↗

STS-50 Space Shuttle mission report

The STS-50 Space Shuttle Program Mission Report contains a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle main engine (SSME) subsystem performance during the forty-eighth flight of the Space Shuttle Program, and the twelfth flight of the Orbiter vehicle Columbia (OV-102). In addition to the Columbia vehicle, the flight vehicle consisted of the following: an ET which was designated ET-50 (LUT-43); three SSME's which were serial numbers 2019, 2031, and 2011 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-051. The lightweight/redesigned RSRM's installed in each SRB were designated 360L024A for the left RSRM and 360M024B for the right RSRM. The primary objective of the STS-50 flight was to successfully perform the planned operations of the United States Microgravity Laboratory (USML-1) payload. The secondary objectives of this flight were to perform the operations required by the Investigations into Polymer Membrane Processing (IPMP), and the Shuttle Amateur Radio Experiment 2 (SAREX-2) payloads. An additional secondary objective was to meet the requirements of the Ultraviolet Plume Instrument (UVPI), which was flown as a payload of opportunity.

Fricke, Robert W.↗

Obtaining Public Opinion about sUAS Activity in an Urban Environment

The Unmanned Aircraft Systems (UAS) Traffic Management (UTM) research project has been developing and testing concept ideas for enabling small UAS (sUAS) operations in low altitude airspace (ground to 400 feet). To do this, a series of flight test demonstrations were organized over five years at seven test sites. Technology Capability Level-4 (TCL4), the most complex flight tests, were conducted in Texas, USA, during August 2019. This testing resulted in over 400 data collection flights using eight live rotorcraft, with nine flight crews flying pre-planned scenarios in the urban downtown and waterfront areas of Corpus Christi, Texas. Test scenarios were designed to include a variety of elements, including live and simulated vehicles, and personnel in many different roles, including flight crews and mission personnel. One group of people who did not have a role in the flight tests but will be affected by UAS operations as they become more ubiquitous, are the general public. What do the public think about sUAS operations in urban areas? In order to obtain a reference point that noted the public's view of the operations in the TCL4 demonstration, a short survey was developed and offered to members of the public who wished to comment on the sUAS activities they saw in their city during two weeks in August, 2019.Forty five people completed the online public opinion survey. Participants volunteered to take it, creating a self-selected sample. The survey included eleven questions that asked participants about their level of comfort and concerns with UAS activity; their knowledge of UAS operations; and, whether a traffic management system like UTM would increase their confidence in urban UAS activity. The general public in Corpus Christi showed a good level of knowledge of sUAS regulations, with almost half of their responses to the knowledge portion of the survey being correct. They expressed a moderate level of concern (x = 4.7 out of 7) at urban sUAS activity and, of those who cited a concern, the majority reported this was about privacy (54%), which are all responses in line with those reported in earlier research on public opinion. Views on UTM were mixed, with respondents indicating they thought the introduction of UTM will improve safety somewhat (5.2 out of 7) but it will also increase their concern a little (4.6 out of 7). This would indicate there needs to be more information and educational material about the UTM concept made available to the public with the aim to reduce public concerns about the system.

Caterina Grossi↗

Obtaining Public Opinion About sUAS Activity in an Urban Environment

The Unmanned Aircraft Systems (UAS) Traffic Management (UTM) research project has been developing and testing concept ideas for enabling small UAS (sUAS) operations in low altitude airspace (ground to 400 feet). To do this, a series of flight test demonstrations were organized over five years at seven test sites. Technology Capability Level-4 (TCL4), the most complex flight tests, were conducted in Texas, USA, during August 2019. This testing resulted in over 400 data collection flights using eight live rotorcraft, with nine flight crews flying pre-planned scenarios in the urban downtown and waterfront areas of Corpus Christi, Texas. Test scenarios were designed to include a variety of elements, including live and simulated vehicles, and personnel in many different roles, including flight crews and mission personnel. One group of people who did not have a role in the flight tests but will be affected by UAS operations as they become more ubiquitous, are the general public. What do the public think about sUAS operations in urban areas? In order to obtain a reference point that noted the public’s view of the operations in the TCL4 demonstration, a short survey was developed and offered to members of the public who wished to comment on the sUAS activities they saw in their city during two weeks in August, 2019. Forty five people completed the online public opinion survey. Participants volunteered to take it, creating a self-selected sample. The survey included eleven questions that asked participants about their level of comfort and concerns with UAS activity; their knowledge of UAS operations; and, whether a traffic management system like UTM would increase their confidence in urban UAS activity. The general public in Corpus Christi showed a good level of knowledge of sUAS regulations, with almost half of their responses to the knowledge portion of the survey being correct. They expressed a moderate level of concern (x = 4.7 out of 7) at urban sUAS activity and, of those who cited a concern, the majority reported this was about privacy (54%), which are all responses in line with those reported in earlier research on public opinion. Views on UTM were mixed, with respondents indicating they thought the introduction of UTM will improve safety somewhat (5.2 out of 7) but it will also increase their concern a little (4.6 out of 7). This would indicate there needs to be more information and educational material about the UTM concept made available to the public with the aim to reduce public concerns about the system.

UTM↗

Development of a verification program for deployable truss advanced technology

Use of large deployable space structures to satisfy the growth demands of space systems is contingent upon reducing the associated risks that pervade many related technical disciplines. The overall objectives of this program was to develop a detailed plan to verify deployable truss advanced technology applicable to future large space structures and to develop a preliminary design of a deployable truss reflector/beam structure for use a a technology demonstration test article. The planning is based on a Shuttle flight experiment program using deployable 5 and 15 meter aperture tetrahedral truss reflections and a 20 m long deployable truss beam structure. The plan addresses validation of analytical methods, the degree to which ground testing adequately simulates flight and in-space testing requirements for large precision antenna designs. Based on an assessment of future NASA and DOD space system requirements, the program was developed to verify four critical technology areas: deployment, shape accuracy and control, pointing and alignment, and articulation and maneuvers. The flight experiment technology verification objectives can be met using two shuttle flights with the total experiment integrated on a single Shuttle Test Experiment Platform (STEP) and a Mission Peculiar Experiment Support Structure (MPESS). First flight of the experiment can be achieved 60 months after go-ahead with a total program duration of 90 months.

Dyer, Jack E.↗

Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan

A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.

Source record↗

Space Ops 2002: Bringing Space Operations into the 21st Century. Track 3: Operations, Mission Planning and Control. 2nd Generation Reusable Launch Vehicle-Concepts for Flight Operations

With the successful implementation of the International Space Station (ISS), the National Aeronautics and Space Administration (NASA) enters a new era of opportunity for scientific research. The ISS provides a working laboratory in space, with tremendous capabilities for scientific research. Utilization of these capabilities requires a launch system capable of routinely transporting crew and logistics to/from the ISS, as well as supporting ISS assembly and maintenance tasks. The Space Shuttle serves as NASA's launch system for performing these functions. The Space Shuttle also serves as NASA's launch system for supporting other science and servicing missions that require a human presence in space. The Space Shuttle provides proof that reusable launch vehicles are technically and physically implementable. However, a couple of problems faced by NASA are the prohibitive cost of operating and maintaining the Space Shuttle and its relative inability to support high launch rates. The 2nd Generation Reusable Launch Vehicle (2nd Gen RLV) is NASA's solution to this problem. The 2nd Gen RLV will provide a robust launch system with increased safety, improved reliability and performance, and less cost. The improved performance and reduced costs of the 2nd Gen RLV will free up resources currently spent on launch services. These resource savings can then be applied to scientific research, which in turn can be supported by the higher launch rate capability of the 2nd Gen RLV. The result is a win - win situation for science and NASA. While meeting NASA's needs, the 2nd Gen RLV also provides the United States aerospace industry with a commercially viable launch capability. One of the keys to achieving the goals of the 2nd Gen RLV is to develop and implement new technologies and processes in the area of flight operations. NASA's experience in operating the Space Shuttle and the ISS has brought to light several areas where automation can be used to augment or eliminate functions performed by crew and ground controllers. This experience has also identified the need for new approaches to staffing and training for both crew and ground controllers. This paper provides a brief overview of the mission capabilities provided by the 2nd Gen RLV, a description of NASA's approach to developing the 2nd Gen RLV, a discussion of operations concepts, and a list of challenges to implementing those concepts.

Hagopian, Jeff↗