Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FERMILAB”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Fermilab Booster Beam Emittances from Quadrupole Modes Measured by BPMs

The measurement of beam emittances by extracting the quadrupole mode signal from a 4 plate beam position monitor (BPM) was published at least 40 years ago. Unfortunately, in practice, this method suffers from poor signal to noise ratio and requires a lot of tuning to extract out the emittances. In this paper, an improved method where multiple BPMs are used together with better mathematical analysis is described. The BPM derived emittances are then compared with those measured by the Ion Profile Monitor (IPM). Surprisingly, the BPM measured emittances behave very well and are more realistic than those measured by the IPM.

43 PARTICLE ACCELERATORS↗

LAr1-ND: Testing Neutrino Anomalies with Multiple LArTPC Detectors at Fermilab

This white paper describes LAr1-ND and the compelling physics it brings first in Phase 1 and next towards the full LAr1 program. In addition, LAr1-ND serves as a key step in the development toward large-scale LArTPC detectors. Its development goals will encompass testing existing and possibly innovative designs for LBNE while at the same time providing a training ground for teams working towards LBNE combining timely neutrino physics with experience in detector development.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Fermilab experience of post-annealing losses in SRF niobium cavities due to furnace contamination and the ways to its mitigation: a pathway to processing simplification and quality factor improvement

We investigate the effect of high temperature treatments followed by only high-pressure water rinse (HPR) of superconducting radio frequency (SRF) niobium cavities. The objective is to provide a cost effective alternative to the typical cavity processing sequence, by eliminating the material removal step post furnace treatment while preserving or improving the RF performance. The studies have been conducted in the temperature range 800-1000C for different conditions of the starting substrate: large grain and fine grain, electro-polished (EP) and centrifugal barrel polished (CBP) to mirror finish. An interesting effect of the grain size on the performances is found. Cavity results and samples characterization show that furnace contaminants cause poor cavity performance, and a practical solution is found to prevent surface contamination. Extraordinary values of residual resistances ~ 1 nOhm and below are then consistently achieved for the contamination-free cavities. These results lead to a more cost-effective processing and improved RF performance, and, in conjunction with CBP, open a potential pathway to acid-free processing.

43 PARTICLE ACCELERATORS↗

Study of neutrino oscillations and flux systematics in the NOvA experiment at Fermilab

The Standard Model of particle physics explains many experimental results using three generations of quarks, leptons, and their interactions, but fails to account for phenomena such as neutrino masses, matter-antimatter asymmetry, gravity, and the hierarchy problem. The study of neutrinos, especially neutrino oscillations, is crucial for advancing Beyond the Standard Model physics and the future of particle physics.newline

Sharma, Prachi [Panjab U.] (ORCID:0000000276586664↗

Design and Characterization of the 162.5 MHz RF Component Layout for Fermilab's PIP-II Reference Line

The Proton Improvement Plan II (PIP-II) Reference Line at Fermi National Accelerator Laboratory distributes phase-stable radio-frequency (RF) signals throughout the accelerator. PIP-II requires stable timing and phase reference signals so its accelerating cavities transfer energy to the particle beam at the correct point in each RF cycle. The full system includes 162.5, 325, and 650 MHz sections corresponding to the frequency sections of the PIP-II Linac, with this project focusing on the 162.5 MHz section. The Reference Line must provide a phase stable source signal while responding to phase changes caused by environmental conditions or system drift. Its RF components will be mounted on aluminum heat plates inside a temperature controlled enclosure to further limit temperature-driven phase changes. To prepare the system for manufacture, the project reviewed component functions and dimensions, developed a computer-aided design (CAD) model, and arranged the hardware to support short cable paths, grounding, fastener access, and maintenance. Several full scale, three dimensional printed prototypes allowed the available components to be mounted and inspected. These fit checks revealed mechanical conflicts and guided revisions to component placement, countersink geometry, labeling, and plate thickness. Electrical characterization was also performed on selected RF hardware to compare its measured behavior with the performance metrics that were set for our design. Overall, the project produced a manufacturable 162.5 MHz layout, physical fit-check prototypes, and documented electrical measurements that support review before metal fabrication. The 325 and 650 MHz layouts remain future work because they require additional minor mechanical changes.

Subedi, Harsheet [Unlisted, US, CA] (ORCID:0009000↗

Real time computations of cryogenic He properties

The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC and provide protons to the remainder of the existing accelerator complex. The new LINAC consists of a warm front end, 23 superconducting RF cryomodules, and a beam transfer line to the existing complex. The cryomodules (CMs) are to be tested at Fermilab's CryoModule Test Facility (CMTF).An important measurement in cryogenic testing is the heat load of each CM. Traditionally, at Fermilab, these measurements were made collecting archived data offline and analyzing it. The new control system for PIP-II is being developed with the EPICS (Experimental Physics and Industrial Control System) framework, which allows us to compute the heat load in real time using the HePak library.We are exploring other $He$ properties, such as flow, where flow meters are not available, which can also be calculated in real time and fed back to the cryogenics engineers.This paper details the real time heat load calculation and $He$ flow software developed for CM testing at CMTF, as well as the first results from the prototype HB650 CM. Future plans for 2-phase $LHe$ flow will also be outlined.

Hanlet, Pierrick [Fermilab]↗

Assessment of neutron skyshine near unmodified Accumulator Debuncher storage rings under Mu2e operational conditions

Preliminary plans for providing the proton beam needed by the proposed Mu2e experiment at Fermilab will require the transport of 8 GeV protons to the Accumulator/Debuncher where they be processed into an intensity and time structure useful for the experiment. The intensities involved are far greater that those encountered with antiprotons of the same kinetic energy in the same beam enclosures under Tevatron Collider operational conditions, the operating parameters for which the physical facilities of the Antiproton Source were designed. This note explores some important ramifications of the proposed operation for radiation safety and demonstrates the need for extensive modifications of significant portions of the shielding of the Accumulator Debuncher storage rings; notably that underneath the AP Service Buildings AP10, AP30, and AP50. While existing shielding is adequate for the current operating mode of the Accumulator/Debuncher as part of the Antiproton Source used in the Tevatron Collider program, without significant modifications of the shielding configuration in the Accumulator/Debuncher region and/or beam loss control systems far more effective than seen in most applications at Fermilab, the proposed operational mode for Mu2e is not viable for the following reasons: 1. Due to skyshine alone, under normal operational conditions large areas of the Fermilab site would be exposed to unacceptable levels of radiation where most of the Laboratory workforce and some members of the general public who regularly visit Fermilab would receive measurable doses annually, contrary to workforce, public, and DOE expectations concerning the As Low as Reasonably Achievable (ALARA) principle. 2. Under normal operational conditions, a sizeable region of the Fermilab site would also require fencing due to skyshine. The size of the areas involved would likely invite public inquiry about the significant and visible enlargement of Fermilab's posted radiological areas. 3. There would be aesthetics questions about the employment of so much new fencing on the Fermilab site. 4. The assumption of only 1.0% 'normal condition' beam losses over the three locations is regarded as being extremely optimistic. Thus, it is evident that it is necessary to pursue shielding improvements to support viable operation of the Mu2e experiment.

43 PARTICLE ACCELERATORS↗

FASPAX ASIC revision 1.b first articles testing and support

Fermi National Accelerator Laboratory (Fermilab) and Field Viewers Ltd. Inc. (FV) will work together for a period of two weeks to bring up the FASPAX_V1.0b. During this period, Fermilab will help FV come up to speed with the ASIC functionality testing and train in the usage of the FASPAX test setup at Fermilab that uses the NIPXIe architecture with FleXRIO modules. This setup will be initially used for testing of chips to ensure the basic functionality and design parameters. The NIPXIe setup was developed by the Fermilab team, but it is has not yet been verified to be capable of fully testing the FASPAX_V1.0 chip. Fermilab will offer the developed software and hardware to FV for the on-site use at Fermilab. No guarantee is given by Fermilab for the setup to be able to fully cover the scope of the necessary tests. FV will be responsible for using and modifying of the setup to achieve the DOE-BES Phase-I targets.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Italian Summer Students Program at the Fermi National Accelerator Laboratory and other US Laboratories

Since 1984 INFN scientists performing experiments at Fermilab have been running a two-month summer training program for Italian students at the lab. In 1984 the program involved only a few physics students from the Pisa group, but it was later extended to other groups and to engineering students. Since 2004 the program has been supported in part by DOE in the frame of an exchange agreement with INFN and has been run by the Cultural Association of Italians at Fermilab (CAIF). In 2007 the Sant’Anna School of Advanced Studies (Pisa) established an agreement with Fermilab to share the cost of four engineering students each year. In the 34 years of its history, the program has hosted at Fermilab approximately 530 Italian students from more than 20 Italian universities and from some non-Italian universities . In addition, in the years 2010-2018, with the support of INAF, ASI, and CAIF, 25 students were hosted in other US laboratories and universities. The Fermilab training programs spanned from data analysis to design and construction of particle detectors and accelerator components, R/D on superconductive elements, theory of accelerators, and analysis of astrophysical data. At the other US laboratories the offered training was on Space Science. In 2015 the University of Pisa endorsed the program as one of his own Summer Schools. The interns are enrolled as Pisa students for the duration of the internship. They are required to write summary reports published in the Fermilab and University of Pisa web pages. Upon positive evaluation by a University board, students are acknowledged 6 ECTS credits. In 2017 a new initiative of the Oxford Summer School "MovingKnowledge17" allowed three Fermilab summer students to be trained in neutrino physics to spend the month of July at Oxford to follow an advanced course on HEP.The entire program is expected to expand further under CAIF management. An agreement has been signed between ASI and CAIF, for ASI to support yearly three two-months fellowships in US space science laboratories. The program is also part of the Outreach of the European Projects MUSE (H2020-MSCA-RISE-2015, GA 690835), NEWS (H2020-MSCA-RISE-2016, GA 734303) and INTENSE (H2020-MSCA-RISE-2018, GA 822185 in preparation).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Future long-baseline neutrino oscillations: View from North America

In late 2012 the US Department of Energy gave approval for the first phase of the Long-Baseline Neutrino Experiment (LBNE) that will conduct a broad scientific program including neutrino oscillations, neutrino scattering physics, search for baryon violation, supernova burst neutrinos and other related astrophysical phenomena. The project is now being reformulated as an international facility hosted by the United States. The facility will consist of an intense neutrino beam produced at Fermi National Accelerator Laboratory (Fermilab), a highly capable set of neutrino detectors on the Fermilab campus, and a large underground liquid argon time projection chamber at Sanford Underground Research Facility (SURF) in South Dakota 1300 km from Fermilab. With an intense beam and massive far detector, the experimental program at the facility will make detailed studies of neutrino oscillations, including measurements of the neutrino mass hierarchy and Charge-Parity symmetry violation, by measuring neutrino and anti-neutrino mixing separately. At the near site, the high-statistics neutrino scattering data will allow for many cross section measurements and precision tests of the Standard Model. This presentation will describe the configuration developed by the LBNE collaboration, the broad physics program, and the status of the formation of the international facility.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

PIP-II Particle Accelerator Project

The PIP-II project is an essential upgrade of Fermilab’s particle accelerator complex. Groundbreaking occurred in March 2019. The upgrade will enable Fermilab’s accelerators to generate an unprecedented stream of neutrinos—subtle, subatomic particles that could hold the key to understanding the universe’s evolution—by creating the world’s most intense high-energy neutrino beams. This capability positions Fermilab to be the world leader in accelerator-based neutrino research. It enables the scientific program for the international, Fermilab-hosted Deep Underground Neutrino Experiment (DUNE) and Long-Baseline Neutrino Facility (LBNF). The key to PIP-II is power. When the PIP-II project is complete, Fermilab will be able to generate proton beams greater than 1 megawatt—60 percent higher than current capabilities. These powerful beams of protons will in turn create intense beams of neutrinos. Future PIP-II upgrades will triple the lab’s current beam power. PIP-II’s high-intensity proton beams will provide a flexible platform for the long-term future of the Fermilab accelerator complex and the U.S. accelerator-based particle physics program.

Fermilab, Fermilab↗