Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Configuration planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Results of tests OA12 and IA9 in the Ames Research Center unitary plan wind tunnels on an 0.030 scale model of the space shuttle vehicle 2A to determine aerodynamic loads, volume 7

Tests were conducted in wind tunnels during April and May 1973, on an 0.030-scale replica of the Space Shuttle Vehicle Configuration 2A. Aerodynamic loads data were obtained at Mach numbers from 0.6 to 3.5. The investigation included tests on the integrated (launch) configuration and on the isolated orbiter (entry configuration). The integrated vehicle was tested at angles of attack and sideslip from -8 deg. The isolated orbiter was tested at angles of attack from -15 deg to +40 deg and angles of sideslip from -10 deg to +10 deg as dictated by trajectory considerations. The effects of orbiter/external tank incidence angle and deflected control surfaces on aerodynamic loads were also investigated.

Spangler, R. H.↗

Results of tests OA12 and IA9 in the Ames Research Center unitary plan wind tunnels on an 0.030-scale model of the Space Shuttle Vehicle 2A to determine aerodynamic loads, volume 11

Tests were conducted in wind tunnels during April and May 1973, on an 0.030-scale replica of the Space Shuttle Vehicle Configuration 2A. Aerodynamic loads data were obtained at Mach numbers from 0.6 to 3.5. The investigation included tests on the integrated (launch) configuration and on the isolated orbiter (entry configuration). The integrated vehicle was tested at angles of attack from -15 degrees to +40 degrees and angles of sideslip from -10 degrees to +10 degrees as dictated by trajectory considerations. The effects of orbiter/external tank incidence angle and deflected control surfaces on aerodynamic loads were also investigated. Tabulated pressure data are presented for: orbiter fuselage and base, upper MPS nozzle, OMS nozzle, body flap, OMS pod outside, and lower wing surface.

Spangler, R. H.↗

Results of tests OA12 and IA9 in the Ames Research Center unitary plan wind tunnels on an 0.030-scale model of the space shuttle vehicle 2A to determine aerodynamic loads, volume 13

Tests were conducted in wind tunnels during April and May 1973, on a 0.030-scale replica of the Space Shuttle Vehicle Configuration 2A. Aerodynamic loads data were obtained at Mach numbers from 0.6 to 3.5. The investigation included tests on the integrated (launch) configuration and on the isolated orbiter (entry configuration). The integrated vehicle was tested at angles of attack and sideslip from -8 deg to +8 deg. The isolated orbiter was tested at angles of attack from -15 deg to +40 deg and angles of sideslip from -10 deg to +10 deg as dictated by trajectory considerations. The effects of orbiter/external tank incidence angle and deflected control surfaces on aerodynamic loads were also investigated. Tabulated pressure data are given for the following components: orbiter fuselage and base; OMS and upper MPS nozzles; body flap; and OMS pod outside.

Spangler, R. H.↗

Results of tests OA12 and IA9 in the Ames Research Center unitary plan wind tunnels on an 0.030-scale model of the space shuttle vehicle 2A to determine aerodynamic loads, volume 14

Tests were conducted in wind tunnels during April and May 1973, on a 0.030-scale replica of the Space Shuttle Vehicle Configuration 2A. Aerodynamic loads data were obtained at Mach numbers from 0.6 to 3.5. The investigation included tests on the integrated (launch) configuration and the isolated orbiter (entry configuration). The integrated vehicle was tested at angles of attack and sideslip from -8 degrees to +8 degrees. The isolated orbiter was tested at angles of attack from -15 degrees to +40 degrees and angles of sideslip from -10 degrees to +10 degrees as dictated by trajectory considerations. The effects of orbiter/external tank incidence angle and deflected control surfaces on aerodynamic loads were also investigated. Tabulated pressure data were obtained for upper and lower wing surfaces and left and right vertical tail surfaces.

Spangler, R. H.↗

Relativistic Heavy Ion Collider spin flipper commissioning plan

The commissioning of the RHIC spin flipper in the RHIC Blue ring during the RHIC polarized proton run in 2009 showed the detrimental effects of global vertical coherent betatron oscillation induced by the 2-AC dipole plus 4-DC dipole configuration. This global orbital coherent oscillation of the RHIC beam in the Blue ring in the presence of collision modulated the beam-beam interaction between the two RHIC beams and affected Yellow beam lifetime. The experimental data at injection with different spin tunes by changing the snake current also demonstrated that it was not possible to induce a single isolated spin resonance with the global vertical coherent betatron oscillation excited by the two AC dipoles. Hence, RHIC spin flipper was re-designed to eliminate the coherent vertical betatron oscillation outside the spin flipper by adding three additional AC dipoles. This paper presents the experimental results as well as the new design.

43 PARTICLE ACCELERATORS↗

Dosimetric impact of image artifact from a wide-bore CT scanner in radiotherapy treatment planning

Purpose: Traditional computed tomography (CT) units provide a maximum scan field-of-view (sFOV) diameter of 50 cm and a limited bore size, which cannot accommodate a large patient habitus or an extended simulation setup in radiation therapy (RT). Wide-bore CT scanners with increased bore size were developed to address these needs. Some scanners have the capacity to reconstruct the CT images at an extended FOV (eFOV), through data interpolation or extrapolation, using projection data acquired with a conventional sFOV. Objects that extend past the sFOV for eFOV reconstruction may generate image artifacts resulting from truncated projection data; this may distort CT numbers and structure contours in the region beyond the sFOV. The purpose of this study was to evaluate the dosimetric impact of image artifacts from eFOV reconstruction with a wide-bore CT scanner in radiotherapy (RT) treatment planning. Methods: Testing phantoms (i.e., a mini CT phantom with equivalent tissue inserts, a set of CT normal phantoms and anthropomorphic phantoms of the thorax and the pelvis) were used to evaluate eFOV artifacts. Reference baseline images of these phantoms were acquired with the phantom centrally positioned within the sFOV. For comparison, the phantoms were then shifted laterally and scanned partially outside the sFOV, but still within the eFOV. Treatment plans were generated for the thoracic and pelvic anthropomorphic phantoms utilizing the Eclipse treatment planning system (TPS) to study the potential effects of eFOV artifacts on dose calculations. All dose calculations of baseline and test treatment plans were carried out using the same MU. Results: Results show that both body contour and CT numbers are altered by image artifacts in eFOV reconstruction. CT number distortions of up to -356 HU for bone tissue and up to 323 HU for lung tissue were observed in the mini CT phantom. Results from the large body normal phantom, which is close to a clinical patient size, show average CT number changes of up to -49 HU. Wider distribution (i.e., standard deviation) of the HU values was seen when the phantom was placed at more than 2.8 cm beyond the 50 cm sFOV. Anthropomorphic phantom studies with several standard beam configurations show that body contour distortion causes tumor dose calculation reduction of 3.0 and 1.9% for 6 and 23 MV x-rays, respectively, when not accounting for tissue heterogeneities during dose computation. When heterogeneity correction is used in planning, the competing effects of the body contour distortion and the CT number distortion cause a smaller error in tumor dose calculation. Less than 0.9% error in calculated dose was observed in volumetric modulated arc therapy (VMAT) treatment plans. Conclusions: The image artifacts from eFOV reconstruction alter the CT numbers and body contours of the imaged objects, which has the potential to produce inaccuracies in dose calculations during radiotherapy treatment planning. The radiation therapy team should be aware of these image artifacts and their effects on target dose calculations during CT simulation as well as treatment planning.

61 RADIATION PROTECTION AND DOSIMETRY↗

Acute Radiation Risk and BRYNTRN Organ Dose Projection Graphical User Interface

The integration of human space applications risk projection models of organ dose and acute radiation risk has been a key problem. NASA has developed an organ dose projection model using the BRYNTRN with SUM DOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUM DOSE are a Baryon transport code and an output data processing code, respectively. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN. A GUI for the ARR and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. BRYNTRN code operation requires extensive input preparation. Only a graphical user interface (GUI) can handle input and output for BRYNTRN to the response models easily and correctly. The purpose of the GUI development for ARRBOD is to provide seamless integration of input and output manipulations for the operations of projection modules (BRYNTRN, SLMDOSE, and the ARR probabilistic response model) in assessing the acute risk and the organ doses of significant Solar Particle Events (SPEs). The assessment of astronauts radiation risk from SPE is in support of mission design and operational planning to manage radiation risks in future space missions. The ARRBOD GUI can identify the proper shielding solutions using the gender-specific organ dose assessments in order to avoid ARR symptoms, and to stay within the current NASA short-term dose limits. The quantified evaluation of ARR severities based on any given shielding configuration and a specified EVA or other mission scenario can be made to guide alternative solutions for attaining determined objectives set by mission planners. The ARRBOD GUI estimates the whole-body effective dose, organ doses, and acute radiation sickness symptoms for astronauts, by which operational strategies and capabilities can be made for the protection of astronauts from SPEs in the planning of future lunar surface scenarios, exploration of near-Earth objects, and missions to Mars.

Cucinotta, Francis A.↗

Stability of Markers Used for Real-Time Tumor Tracking After Percutaneous Intrapulmonary Placement

Purpose: To determine the stability of markers used for real-time tumor tracking after percutaneous intrapulmonary placement. Methods and Materials: A total of 42 patients with 44 lesions, 111 markers, and {>=}2 repeat computed tomography (CT) scans were studied. The tumor on the repeat CT scans was registered with the tumor on the planning CT scan. Next, the three-dimensional marker coordinates were determined on the planning CT scan and repeat CT scans. Marker stability was analyzed by the displacement of the markers and the displacement of the center of mass (COM) of the marker configurations. In addition, we assessed the reliability of using the intermarker distance as a check for displacements in the COM of the marker configurations. Results: The median marker displacement was 1.3 mm (range, 0.1-53.6). The marker displacement was >5 mm in 12% of the markers and >10 mm in 5% of the markers. The causes of marker displacement >5 mm included marker migration (2 of 13) and target volume changes (5 of 13). Nonsynchronous tumor and marker movement during breathing might have been responsible for the displacements >5 mm in the other 6 of 13 markers. The median displacement in the COM of the marker configurations was 1.0 mm (range, 0.1-23.3). Displacements in the COM of the marker configurations of {>=}2.0 mm were detected by changes in the intermarker distance of >1.5 mm in 96% of the treatment fractions. Conclusion: The median marker displacement was small (1.3 mm). Nevertheless, displacements >5 mm occurred in 12% of the markers. Therefore, we recommend the implantation of multiple markers because multiple markers will enable a quick and reliable check of marker displacement by determining the change in the intermarker distance. A displacement in the COM of the marker configuration of {>=}2.0 mm was almost always detected (96%) by a change in the distance between the markers of >1.5 mm. This enabled the displaced marker to be disabled, such that tumor localization was not compromised.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Enhancing Distribution System Resiliency through a Novel Transactive Energy Systems Framework

Restoration of end-use loads during bulk transmission system outages is a key challenge for electric utilities. During those outages, utilities often do not have enough resources to fully restore the end-use loads. Additionally, not all available switching options are feasible due to voltage and load limits. Incentivizing non-utility flexible assets to provide their flexibility during resiliency events is a potential solution to improve resiliency. This paper presents a new transactive energy system framework (TESF) to incentivize distributed energy resources (DERs) to provide reactive power for supporting the self-healing functions of distribution management system (DMS). TESF engages non-utility DERs during resiliency events by incentivizing them through transactive signals computed using marginal cost of producing reactive power and marginal benefit of additional switching operations. TESF calculates additional switching options, which DMS then leverages to identify new optimal switching plans to restore additional loads. Test system consisting of multiple IEEE-13 node distribution feeders is used to demonstrate the performance of the proposed method. For the given system configuration and use-case, TESF results in 24.82 % additional load restoration and one additional switching operation.

Distribution system, reconfiguration, resiliency, ↗

Transverse-momentum-dependent parton distribution/fragmentation functions at an electron-ion collider

We present a summary of a recent workshop held at Duke University on Partonic Transverse Momentum in Hadrons: Quark Spin-Orbit Correlations and Quark-Gluon Interactions. The transverse momentum dependent parton distribution functions (TMDs), parton-to-hadron fragmentation functions, and multi-parton correlation functions, were discussed extensively at the Duke workshop. In this paper, we summarize first the theoretical issues concerning the study of partonic structure of hadrons at a future electron-ion collider (EIC) with emphasis on the TMDs. We then present simulation results on experimental studies of TMDs through measurements of single spin asymmetries (SSA) from semi-inclusive deep-inelastic scattering (SIDIS) processes with an EIC, and discuss the requirement of the detector for SIDIS measurements. The dynamics of parton correlations in the nucleon is further explored via a study of SSA in D (`D) production at large transverse momenta with the aim of accessing the unexplored tri-gluon correlation functions. The workshop participants identified the SSA measurements in SIDIS as a golden program to study TMDs in both the sea and valence quark regions and to study the role of gluons, with the Sivers asymmetry measurements as examples. Such measurements will lead to major advancement in our understanding of TMDs in the valence quark region, and more importantly also allow for the investigation of TMDs in the sea quark region along with a study of their evolution.

Compass Collaboration↗

Time Delay from Corona to Breakdown

This report describes measurements of the time delay between the onset of corona and complete electrical breakdown between a point and a plane in dry air near atmospheric pressure as a function of the distance between the point and the plane. The large variation in these time delays is representative of the stochastic nature of electrical breakdown and the many possible phenomena that occur between the initiation and completion of electrical breakdown, including initiation without complete electrical breakdown. The purpose of this work is to provide data which will be accurately modeled when a model contains the appropriate mechanisms with the proper priorities to describe this fundamental electrical breakdown configuration. The acquisition of these measurements completes a level three milestone for the WSEAT program which sponsors this research. Also included in this report is a description of our plans to “automate” the experimental procedure, protect the high sensitivity fast-gated camera, and add diagnostics and new experimental techniques to the test facility. This will provide measurements of the time delay distributions with improved statistics and additional experimental information about the processes that occur during electrical breakdown.

42 ENGINEERING↗

Transportation Hub Infrastructure Expansion: Decision Support Under Uncertainty

The Athena project (www.athena-mobility.org) has worked to investigate the relationship between the Dallas-Fort Worth Airport (DFW) and the greater Dallas area in order to better understand and therefore better inform future decision-making regarding the critical infrastructure that influence mobility between the airport and the city. Through this work, infrastructure related to curbside pickup and drop-off, parking, public transit, and the road network congestion were identified as critical to the operation of the DFW transportation hub. The infrastructure analysis and expansion aspect of the Athena project is focused on the restructuring of the CTA curb as a hierarchical curb and the building or repurposing of parking infrastructure as the interplay between these two areas. Many sources of uncertainty exist that may impact future airport and transportation hub operations, such as passenger volume growth, population demographic changes over time, electric vehicle (EV) adoption rates, and autonomous vehicle (AV) adoption rates. Due to these sources of uncertainty, we have selected for our research a modeling framework that can capture various types of uncertainty and hedge against those uncertainties in the optimization process. We analyze road network and curb congestion, the rise of transportation networking companies, trends in parking usage, existing policies around this infrastructure, airport revenue streams, and other contributing factors to enable infrastructure decision making with less uncertainty. To accomplish this wholistic analysis, we have developed a novel multi-stage, multi-period stochastic optimization model which considers the airport's decisions from 2025-2045 under different possible future macro trajectories and day-to-day variations in operational conditions captured as "annual representation of operations" scenarios with respective probabilities. This model has also been designed to leverage the outputs of various efforts under the Athena project to create a combined decision framework for infrastructure decisions. These various efforts include the route optimization model, the ASPIRES simulation, the mode choice model, and the SUMO traffic simulation. Our computational experiments of this system at scale have resulted in a working version of our infrastructure model which enables the explicit representation and consideration of various sources of uncertainty in the decision process to enable robust, flexible decision-making. This model has been effectively run on NREL's HPC system, Eagle, with large numbers of stochastic scenarios and shows promise as a scalable tool for robust consideration of uncertainties in airport planning. We have tested our model using 30,240 operational circumstances in total, resulting in a problem with more 200 million variables. This model was solved in several different configurations, and a workflow to simulate the performance of the infrastructure model results was developed and deployed. In general, our results indicate that a combination of remote parking, remote curb infrastructure, and dynamic pricing can generate revenue, reduce emissions, accommodate emerging technologies such as AVs and EVs, and manage airport passenger growth over time. We note the success of the proposed strategy depends on the data collection and forecasting abilities of DFW. We have also seen that the AV adoption by TNCs might necessitate larger amounts of remote curb. The results of this work inform strategies for airport infrastructure decision making, as well as demonstrate the value of an adaptable model, but also indicate that there are avenues remaining where further research would be of value.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessment of NuScale SMR Steam Heat Augmentation for Chemical Plant Decarbonization

Nearly 50% of the total energy consumed by the industrial sector in the United States is used to produce process steam with natural gas and coal-fired boilers1 . This project conducts a technoeconomic assessment of a NuScale Small Modular Reactor (SMR) coupled with a chemical plant as an Integrated Energy System (IES) where nuclear produces steam and electric power to meet the requirements of a large chemical plant. In a 2020 study, ORNL evaluated the feasibility of using advanced SMRs, including the NuScale design, to supply energy to the Eastman Chemical Plant. However, since that report was published, NuScale received NRC approval for its uprated 77 MWe design with 56% more power and has also introduced a high-temperature, high pressure, steam heat-augmentation system, a key focus of the new study. The new study also benefits from revised capital costs, a 10-day refueling outage time, reduced plant staffing, higher capacity factors, and a site boundary Emergency Planning Zone methodology. The study consists of a techno-economic assessment of two possible energy sources (nuclear and natural gas) in a number of steam and power generation configurations (NuScale Power Modules (NPMs), boilers and combinations of both) to satisfy the steam and power demand with the most reliable and cost competitive system. A total of 2,947.3 klb/hr of steam and 72.5 MWe of electricity are required for the demonstration case. A range of scenarios and solutions are explored, from a 12-NPM plant (3,000 MWth)—with excess capacity and redundancy, capable of supplying a significant amount of extra power to the grid—to a 4-NPM (1,000 MWth) plant—supplemented with existing boilers or grid power for redundancy. The study uses historical steam and power data from a chemical plant and examines the sensitivity to natural gas and grid power cost variations. Scenarios with up to two times gas and electricity costs were considered. Profitability in a 60-year time horizon was analyzed, consistent with NuScale’s design life specification. A steady-state site integration and reliability analysis was performed, and trade-offs were identified.

20 FOSSIL-FUELED POWER PLANTS↗

Development of a laboratory prototype spraying flash evaporator.

A functional description of the flash evaporator that is being developed as a candidate for the Space Shuttle Environmental Control System thermal control is presented. A single evaporator configuration uses water as an evaporant to accommodate on-orbit peak heat loads and Freon 22 for terrestrial flight phases below 120,000 ft altitude. Development history, test plans, and operational characteristics are described. Detailed information is included to show: design features, fabrication techniques used for a prototype unit, redundancy considerations, and the control arrangement.

Gaddis, J. L.↗

Acoustical Evaluation of the NASA Langley V/STOL Wind Tunnel

The results are presented of the acoustical measurements made to supply NASA Langley operating personnel with the acoustical characteristics of the tunnel test section needed for the planning of acoustical measurements and to identify the major noise sources. The results of the preliminary measurements of the spatial distribution of the sound field in the closed tunnel configuration indicate that the total sound power output of an unknown sound source placed in the test section could most probably be evaluated by measuring the sound pressure in two properly chosen locations in the duct - one upstream and one downstream of the test section. However, it is recommended that the practicability of this method of sound power output measurements be further investigated, preferably in a small scale model of the V/STOL Tunnel.

Ver, I. L.↗

Space Station battery system design and development

The Space Station Electric Power System will rely on nickel-hydrogen batteries in its photovoltaic power subsystem for energy storage to support eclipse and contingency operations. These 81-Ah batteries will be designed for a 5-year life capability and are configured as orbital replaceable units (ORUs), permitting replacement of worn-out batteries over the anticipated 30-year Station life. This paper describes the baseline design and the development plans for the battery assemblies, the battery ORUs and the battery system. Key elements reviewed are the cells, mechanical and thermal design of the assembly, the ORU approach and interfaces, and the electrical design of the battery system. The anticipated operational approach is discussed, covering expected performance as well as the processor-controlled charge management and discharge load allocation techniques. Development plans cover verification of materials, cells, assemblies and ORUs, as well as system-level test and analyses.

Haas, R. J.↗

In-step Two-phase Flow (TPF) Thermal Control Experiment

The Two-Phase Flow Thermal Control Experiment is part of the NASA/OAST In-Space Technology Experiments (In-STEP) Program. The experiment is configured for the Hitchhiker Shuttle payload system and consists of a capillary pumped loop, heatpipe radiator, and two-phase flow heat exchanger. The flight experiment design approach, test plan, payload design, and test components are described in outline and graphic form.

Source record↗

The CHANDRA X-Ray Observatory: Thermal Design, Verification, and Early Orbit Experience

The CHANDRA X-ray Observatory (formerly AXAF), one of NASA's "Great Observatories" was launched aboard the Shuttle in July 1999. CHANDRA comprises a grazing-incidence X-ray telescope of unprecedented focal-length, collecting area and angular resolution -- better than two orders of magnitude improvement in imaging performance over any previous soft X-ray (0.1-10 keV) mission. Two focal-plane instruments, one with a 150 K passively-cooled detector, provide celestial X-ray images and spectra. Thermal control of CHANDRA includes active systems for the telescope mirror and environment and the optical bench, and largely passive systems for the focal plans instruments. Performance testing of these thermal control systems required 1-1/2 years at increasing levels of integration, culminating in thermal-balance testing of the fully-configured observatory during the summer of 1998. This paper outlines details of thermal design tradeoffs and methods for both the Observatory and the two focal-plane instruments, the thermal verification philosophy of the Chandra program (what to test and at what level), and summarizes the results of the instrument, optical system and observatory testing.

Boyd, David A.↗