Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CERTIFICATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Managing Aging Effects on Dry Cask Storage Systems for Extended Long-Term Storage and Transportation of Used Fuel

The cancellation of the Yucca Mountain repository program in the United States raises the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Application for ISFSI license renewals must include the following: (1) Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation; and (2) a description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must also include design bases information as documented in the most recent updated final safety analysis report as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference provided that those references are clear and specific. The NRC has recently issued the Standard Review Plan (SRP) for renewal of used-fuel dry cask storage system (DCSS) licenses and Certificates of Compliance (CoCs), NUREG-1927, under which NRC may renew a specific license or a CoC for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and DCSS that address aging effects that could affect the safe storage of the used fuel. The information contained in the license and CoC renewal applications will require NRC review to verify that the aging effects on the SSCs in DCSSs/ ISFSIs are adequately managed for the period of extended operation. To date, all of the ISFSIs located across the United States with more than 1,500 dry casks loaded with used fuel have initial license terms of 20 years; three ISFSIs (Surry, H.B. Robinson and Oconee) have received their renewed licenses for 20 years, and two other ISFSIs (Calvert Cliffs and Prairie Island) have applied for license renewal for 40 years. This report examines issues related to managing aging effects on the SSCs in DCSSs/ISFSIs for extended long-term storage and transportation of used fuels, following an approach similar to that of the Generic Aging Lessons Learned (GALL) report, NUREG-1801, for the aging management and license renewal of nuclear power plants. The report contains five chapters and an appendix on quality assurance for aging management programs for used-fuel dry storage systems. Chapter I of the report provides an overview of the ISFSI license renewal process based on 10 CFR 72 and the guidance provided in NUREG-1927. Chapter II contains definitions and terms for structures and components in DCSSs, materials, environments, aging effects, and aging mechanisms. Chapter III and Chapter IV contain generic TLAAs and AMPs, respectively, that have been developed for managing aging effects on the SSCs important to safety in the dry cask storage system designs described in Chapter V. The summary descriptions and tabulations of evaluations of AMPs and TLAAs for the SSCs that are important to safety in Chapter V include DCSS designs (i.e., NUHOMS{reg_sign}, HI-STORM 100, Transnuclear (TN) metal cask, NAC International S/T storage cask, ventilated storage cask (VSC-24), and the Westinghouse MC-10 metal dry storage cask) that have been and continue to be used by utilities across the country for dry storage of used fuel to date. The goal of this report is to help establish the technical basis for extended long-term storage and transportation of used fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

EC Transmission Line Materials

The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Leakage Risk Assessment for a Potential CO 2 Storage Project in Saskatchewan, Canada

A CO 2 sequestration project is being considered to (1) capture CO 2 emissions from the Consumers Cooperative Refineries Limited at Regina, Saskatchewan and (2) geologically sequester the captured CO 2 locally in a deep saline aquifer. This project is a collaboration of several industrial and governmental organizations, including the Petroleum Technology Research Centre (PTRC), Sustainable Development Technology Canada (SDTC), SaskEnvironment Go Green Fund, SaskPower, CCRL, Schlumberger Carbon Services, and Enbridge. The project objective is to sequester 600 tonnes CO 2 /day. Injection is planned to start in 2012 or 2013 for a period of 25 years for a total storage of approximately 5.5 million tonnes CO 2 . This report presents an assessment of the leakage risk of the proposed project using a methodology known as the Certification Framework (CF). The CF is used for evaluating CO 2 leakage risk associated with geologic carbon sequestration (GCS), as well as brine leakage risk owing to displacement and pressurization of brine by the injected CO 2 . We follow the CF methodology by defining the entities (so-called Compartments) that could be impacted by CO 2 leakage, the CO 2 storage region, the potential for leakage along well and fault pathways, and the consequences of such leakage. An understanding of the likelihood and consequences of leakage forms the basis for understanding CO 2 leakage risk, and forms the basis for recommendations of additional data collection and analysis to increase confidence in the risk assessment.

02 PETROLEUM↗

Summary and Findings from the NREL/DOE Hydrogen Sensor Workshop (June 8, 2011)

On June 8, 2011, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) hosted a hydrogen sensor workshop attended by nearly 40 participants from private organizations, government agencies, and academic institutions. The participants represented a cross section of stakeholders in the hydrogen community, including sensor developers, end users, site safety officials, and code and standard developers. The goals were to identify critical applications for the emerging hydrogen infrastructure that require or would benefit from hydrogen sensors, to assign performance specifications for sensors deployed in each application, and to identify shortcomings or deficiencies (i.e., technical gaps) in the ability of current sensor technology to meet the assigned performance requirements. Current (e.g., on-board sensors for hydrogen forklifts) and emerging (e.g., residential) applications were included. The workshop was structured into two parts. The morning session consisted of topical talks that provided background information about various emerging hydrogen energy applications, the certification and listing processes, and about strategies for sensor deployment. Several critical key application areas were specifically identified, and for each application, breakout groups were formed to identify critical performance metrics, assign values to specifications, and identify shortcomings or deficiencies in current sensors to meet these requirements. Three sequential breakout sessions were held, which allowed workshop attendees to participate and provide input into multiple topical areas. Several breakout groups met in parallel, which restricted the size of each group to eight or fewer participants and enabled open discussions. Each breakout group was chaired by a topic expert.

08 HYDROGEN↗

Clean Energy Infrastructure Educational Initiative

The Clean Energy Infrastructure Educational Initiative represents a collaborative effort by the University of Dayton, Wright State University and Sinclair Community College. This effort above all aimed to establish energy related programs at each of the universities while also providing outreach to the local, state-wide, and national communities. At the University of Dayton, the grant has aimed at: solidfying a newly created Master's program in Renewable and Clean Energy; helping to establish and staff a regional sustainability organization for SW Ohio. As well, as the prime grantee, the University of Dayton was responsible for insuring curricular sharing between WSU and the University of Dayton. Finally, the grant, through its support of graduate students, and through cooperation with the largest utilities in SW Ohio enabled a region-wide evaluation of over 10,000 commercial building buildings in order to identify the priority buildings in the region for energy reduction. In each, the grant has achieved success. The main focus of Wright State was to continue the development of graduate education in renewable and clean energy. Wright State has done this in a number of ways. First and foremost this was done by continuing the development of the new Renewable and Clean Energy Master's Degree program at Wright State . Development tasks included: continuing development of courses for the Renewable and Clean Energy Master's Degree, increasing the student enrollment, and increasing renewable and clean energy research work. The grant has enabled development and/or improvement of 7 courses. Collectively, the University of Dayton and WSU offer perhaps the most comprehensive list of courses in the renewable and clean energy area in the country. Because of this development, enrollment at WSU has increased from 4 students to 23. Secondly, the grant has helped to support student research aimed in the renewable and clean energy program. The grant helped to solidify new research in the renewable and clean energy area. The educational outreach provided as a result of the grant included activities to introduce renewable and clean energy design projects into the Mechanical and Materials Engineering senior design class, the development of a geothermal energy demonstration unit, and the development of renewable energy learning modules for high school students. Finally, this grant supported curriculum development by Sinclair Community College for seven new courses and acquisition of necessary related instrumentation and laboratory equipment. These new courses, EGV 1201 Weatherization Training, EGV 1251 Introduction to Energy Management Principles, EGV 2301 Commercial and Industrial Assessment, EGV 2351 LEED Green Associate Exam Preparation, EGV 2251 Energy Control Strategies, EGV Solar Photovoltaic Design and Installation, and EGV Solar Thermal Systems, enable Sinclair to offer complete Energy Technology Certificate and an Energy Management Degree programs. To date, 151 students have completed or are currently registered in one of the seven courses developed through this grant. With the increasing interest in the Energy Management Degree program, Sinclair has begun the procedure to have the program approved by the Ohio Board of Regents.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Class 1 Permit Modification Notification Addition of Structures within Technical Area 54, Area G, Pad 11, Dome 375 Los Alamos National Laboratory Hazardous Waste Facility Permit, July 2012

The purpose of this letter is to notify the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of a Class 1 Permit Modification to the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit issued to the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) in November 2010. The modification adds structures to the container storage unit at Technical Area (TA) 54 Area G, Pad 11. Permit Section 3.1(3) requires that changes to the location of a structure that does not manage hazardous waste shall be changed within the Permit as a Class 1 modification without prior approval in accordance with Code of Federal Regulations, Title 40 (40 CFR), {section}270.42(a)(1). Structures have been added within Dome 375 located at TA-54, Area G, Pad 11 that will be used in support of waste management operations within Dome 375 and the modular panel containment structure located within Dome 375, but will not be used as waste management structures. The Class 1 Permit Modification revises Figure 36 in Attachment N, Figures; and Figure G.12-1 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Descriptions of the structures have also been added to Section A.4.2.9 in Attachment A, TA - Unit Descriptions; and Section 2.0 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Full description of the permit modification and the necessary changes are included in Enclosure 1. The modification has been prepared in accordance with 40 CFR {section}270.42(a)(l). This package includes this letter and an enclosure containing a description of the permit modification, text edits of the Permit sections, and the revised figures (collectively LA-UR-12-22808). Accordingly, a signed certification page is also enclosed. Three hard copies and one electronic copy of this submittal will be delivered to the NMED-HWB.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geothermal FIT Design: International Experience and U.S. Considerations

Developing power plants is a risky endeavor, whether conventional or renewable generation. Feed-in tariff (FIT) policies can be designed to address some of these risks, and their design can be tailored to geothermal electric plant development. Geothermal projects face risks similar to other generation project development, including finding buyers for power, ensuring adequate transmissioncapacity, competing to supply electricity and/or renewable energy certificates (RECs), securing reliable revenue streams, navigating the legal issues related to project development, and reacting to changes in existing regulations or incentives. Although FITs have not been created specifically for geothermal in the United States to date, a variety of FIT design options could reduce geothermalpower plant development risks and are explored. This analysis focuses on the design of FIT incentive policies for geothermal electric projects and how FITs can be used to reduce risks (excluding drilling unproductive exploratory wells).

15 GEOTHERMAL ENERGY↗

Wynkoop Building Performance Measurement: Water

This report is a summary of the water analysis performance for the Denver, Colorado Wynkoop Building. The Wynkoop Building (Figure 1) was built in 2006 as the Environmental Protection Agency (EPA) Region 8 Headquarters intended to house over 900 occupants in the 301,292 gross square feet (248,849 rentable square feet). The building was built on a brownfield in the Lower Downtown Historic District as part of an urban redevelopment effort. The building was designed and constructed through a public-private partnership with the sustainable design elements developed jointly by General Services Administration (GSA) and EPA. That partnership is still active with all parties still engaged to optimize building operations and use the building as a Learning Laboratory. The building design achieved U.S. Green Building Council Leadership in Energy and Environmental Design for New Construction (LEED-NC) Gold Certification in 2008 (Figure 2) and a 2008 EPA Energy Star Rating of 96 with design highlights that include: (1) Water use was designed to use 40% less than a typical design baseline. The design included low flow fixtures, waterless urinals and dual flush toilets; (2) Native and adaptive vegetation were selected to minimize the need for irrigation water for landscaping; and (3) Energy use intensity was modeled at 66.1 kBtus/gross square foot, which is 39% better than ASHRAE 90.1 1999. The Wynkoop Building water use (10 gallons/square foot) was measured at lower than industry average (15 gallons/square foot) and GSA goals (13 gallons/square foot), however, it was higher than building management expected it would be. The type of occupants and number of occupants can have a significant impact on fixture water use. The occupancy per floor varied significantly over the study time period, which added uncertainty to the data analysis. Investigation of the fixture use on the 2nd, 5th, and 7th floors identified potential for water use reduction if the flush direction of the dual-flush toilet handles was reversed. The building management retrofitted the building's toilets with handles that operated on reduced flush when pushed down (0.8 gallons) and full flush when pulled up (1.1 gallons). The water pressure on the 5th floor (< 30 psi) is less than half the pressure on the 7th floor (>80 psi). The measured water savings post-retrofit was lower on the 5th floor than the 7th floor. The differences in water pressure may have had an impact on the quantity of water used per floor. The second floor water use was examined prior to and following the toilet fixture retrofit. This floor is where conference rooms for non-building occupants are available for use, thus occupancy is highly variable. The 3-day average volume per flush event was higher post-retrofit (0.79 gallons per event), in contrast to pre-retrofit (0.57 gallons per event). There were 40% more flush events post retrofit, which impacted the findings. Water use in the third floor fitness center was also measured for a limited number of days. Because of water line accessibility, only water use on the men's side of the fitness center was measured and from that the total fitness center water use was estimated. Using the limited data collected, the fitness center shower water use is approximately 2% of the whole building water use. Overall water use in the Wynkoop Building is below the industry baseline and GSA expectations. The dual flush fixture replacement appears to have resulted in additional water savings that are expected to show a savings in the total annual water use.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Site Sustainability Plan integrating with the Environmental Management System [Slides]

The ISO 14001 Environmental Management System (EMS) ensures robust, certified EMS for LANL decision-makers and workers and provides consistent comprehensive, and documented management of all activities, products, and services with environmental interactions. A successful External Re-Certification Audit (2/13 – 2/17/2012) resulted in no findings of non-conformance. The EMS process is used to document and track progress towards Institutional environmental objectives and targets, including those in the Site Sustainability and 50 Year Environmental Stewardship Plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Arms Reduction Treaties and Attribute Measurement [Slides]

This set of slides provides an overview of the drivers and current state of technology for arms control treaty verification systems. This overview includes the definitions of “authentication,” “certification,” “attribute,” “template,” and “information barrier” as well as a discussion of first, second and third generation attribute measurement systems. We include examples of U.S./Russian interactions and conclude with discussion of the concepts of joint design and random selection.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Lessons Learned from PNNL Support to Army Corp of Engineers Munitions Sites

PNNL developed and demonstrated statistically-based methods for characterizing sites where unexploded ordnance (UXO) is a concern. These methods, incorporated into PNNL’s Visual Sample Plan (VSP) software, can be used to design geophysical transect surveys and conduct data analyses to identify potential target areas, map and estimate anomaly density across the study area, and delineate target areas where UXO are most likely to be found. These methods have been tested and demonstrated on several wide area sites under the Department of Defense Environmental Security Technology Certification Program (ESTCP).

Pulsipher, Brent A.↗

Summary and Analysis of Responses to Surveys on Experience with GHP Installations in Federal Facilities and Minimum Qualifications of GHP-related Professionals

To increase customer confidence in geothermal heat pump (GHP) technology, reduce the potential of improperly installed GHP systems, and ensure the quality and performance of GHP installations, the Geothermal Heat Pump Consortium (GHPC, now known as the Geothermal Exchange Organization or GEO) is leading an effort to develop the first national certification standard for all primary personnel involved in the implementation of GHP systems. This standard will be developed through a collaborative methodology that solicits information and input from consumers, industry stakeholders, and professional and trade organizations to identify the required qualifications of all the primary personnel and incorporate this information into the standard.

GSHP National Survey↗

Practices and Processes of Leading High Performance Home Builders in the Upper Midwest

The NorthernSTAR Building America Partnership team proposed this study to gain insight into the business, sales, and construction processes of successful high performance builders. The knowledge gained by understanding the high performance strategies used by individual builders, as well as the process each followed to move from traditional builder to high performance builder, will be beneficiant proposing more in-depth research to yield specific action items to assist the industry at large transform to high performance new home construction. This investigation identified the best practices of three successful high performance builders in the upper Midwest. In-depth field analysis of the performance levels of their homes, their business models, and their strategies for market acceptance were explored. All three builders commonly seek ENERGY STAR certification on their homes and implement strategies that would allow them to meet the requirements for the Building America Builders Challenge program. Their desire for continuous improvement, willingness to seek outside assistance, and ambition to be leaders in their field are common themes. Problem solving to overcome challenges was accepted as part of doing business. It was concluded that crossing the gap from code-based building to high performance based building was a natural evolution for these leading builders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Recovery Linac: Laser and Laser Light Transport

Operation of the photocathode gun in the ERL requires that a tightly controlled optical pulse train, consisting of temporally and spatially shaped pulses, be delivered at the photocathode in synchrony with the RF field in the gun cavity. The pulse train must also be dynamically variable, in order to tune or ramp up the current in the ERL. A laser was developed especially for this task by Lumera Laser GmbH, of Kaiserslautern Germany, under design supervision and review of the ERL project. Following the final design review, the laser was delivered in August 2009. Preliminary tests certifying its compliance with design specifications have been performed, with further tests to follow the final certification of the ERL laser room in January 2010. The development of the necessary spatial and temporal shaping techniques is an ongoing project: proof of principle experiments have been successfully carried out with a laser of similar pulse width, operating at 532 nm and 81.5 MHz. The next stage is to evaluate the application of these techniques and alternatives, using the operations laser. A transport line has been designed and the propagation of a shaped pulse through it to the photocathode simulated and tested experimentally. As the performance of the complete photocathode drive system is critical for ERL operation, an extensive set of diagnostics will be in place to monitor and maintain its performance. The block diagram in Fig. 1 breaks the optical system down into its basic components, which are discussed in turn in the following sections.

43 PARTICLE ACCELERATORS↗

Duration Test Report for the SWIFT Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Duration testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, safety and function, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

17 WIND ENERGY↗

Overview of Deployed EDS Technologies And Third Party Involvement with Advancedments

The term explosive detection system (EDS) is used by the TSA to describe equipment that is certified to detect explosives in checked bags. The EDS, as certified, by the TSL must consist of device for interrogating a bag and an automated detection algorithm (ATD) for evaluating the results of the interrogation. We only consider CT as the interrogation device in this report. A schematic drawing of a CT-based EDS is shown in Figure 2. The output of the ATD is the binary decision of alarm or non-alarm. Alarms may true- or false-positives. Non-alarms may be true- or false-negatives. False positives are also denoted false alarms. The true detection means that the ATD reports an alarm when a threat is present in the scanned bag. The probability of detecting a threat given that a threat is present is denoted the probability of detection (PD). The probability of false alarm (PFA) is the case when an alarm is reported when a threat is not present in a bag. Certification in this context means passing tests for PD and PFA at the TSL. The results of the EDS include CT cross-sectional images of the bag and specifics about the alarmed objects generated by ATD. These results are presented on a display so that a person may override the decision of ATD and declare the alarm to be a non-alarm. This process is denoted clearing. Bags that are not cleared by the person are sent to a secondary inspection process. Here the bags may be opened or assessed with explosive trace detection (ETD) in order to clear the bags. Bags that are not cleared at this point are evaluated by an ordinance disposal team. The CT scanner along with ATD is denoted Level 1 screening. The process of clearing on a display is denoted Level 2 screening. Secondary inspection is denoted Level 3 screening. Vendors of the deployed EDSs supply the TSA with equipment for all three levels. Therefore, the term EDS may include the equipment provided for Levels 1, 2 and 3. A schematic diagram of an EDS and the levels of screening are shown in Figure 7. The decision processes used as a bag is scanned and cleared is shown in Figure 8. Shield alarms and exceptions are discussed below. Since most alarms are false alarms, the probability of alarm is oftentimes denoted the probability of a false alarm. The expenses associated with clearing false alarms occur in Levels 2 and 3.

42 ENGINEERING↗

Using Third-Party Inspectors in Building Energy Codes Enforcement in India

India is experiencing fast income growth and urbanization, and this leads to unprecedented increases in demand for building energy services and resulting energy consumption. In response to rapid growth in building energy use, the Government of India issued the Energy Conservation Building Code (ECBC) in 2007, which is consistent with and based on the 2001 Energy Conservation Act. ECBC implementation has been voluntary since its enactment and a few states have started to make progress towards mandatory implementation. Rajasthan is the first state in India to adopt ECBC as a mandatory code. The State adopted ECBC with minor additions on March 28, 2011 through a stakeholder process; it became mandatory in Rajasthan on September 28, 2011. Tamil Nadu, Gujarat, and Andhra Pradesh have started to draft an implementation roadmap and build capacity for its implementation. The Bureau of Energy Efficiency (BEE) plans to encourage more states to adopt ECBC in the near future, including Haryana, Uttar Pradesh, Karnataka, Maharashtra, West Bengal, and Delhi. Since its inception, India has applied the code on a voluntary basis, but the Government of India is developing a strategy to mandate compliance. Implementing ECBC requires coordination between the Ministry of Power and the Ministry of Urban Development at the national level as well as interdepartmental coordination at the state level. One challenge is that the Urban Local Bodies (ULBs), the enforcement entities of building by-laws, lack capacity to implement ECBC effectively. For example, ULBs in some states might find the building permitting procedures to be too complex; in other cases, lack of awareness and technical knowledge on ECBC slows down the amendment of local building by-laws as well as ECBC implementation. The intent of this white paper is to share with Indian decision-makers code enforcement approaches: through code officials, third-party inspectors, or a hybrid approach. Given the limited capacity and human resources available in the state and local governments, involving third-party inspectors could rapidly expand the capacity for plan reviews and broad implementation. However, the procedures of involving third-parties need to be carefully designed in order to guarantee a fair process. For example, there should be multiple checks and certification requirements for third-party inspectors, and the government should have the final approval when third-party inspectors are used in a project. This paper discusses different approaches of involving third-parties in ECBC enforcement; the Indian states may choose the approaches that work best in their given circumstances.

Yu, Sha↗

Guidelines for Home Energy Professionals Project: Multifamily Job Task Analyses Needs Assessment

This report describes the efforts carried out to determine whether there is a need to develop separate, multifamily-specific JTAs for the four proposed job categories. The multifamily SWS market committee considered these job designations to be the best candidates for developing JTAs and certification blueprints, as well as having the greatest potential for promoting job growth in the multifamily home performance industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗