Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Avionics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Advancing the practice of systems engineering at JPL

In FY 2004, JPL launched an initiative to improve the way it practices systems engineering. The Lab's senior management formed the Systems Engineering Advancement (SEA) Project in order to "significantly advance the practice and organizational capabilities of systems engineering at JPL on flight projects and ground support tasks." The scope of the SEA Project includes the systems engineering work performed in all three dimensions of a program, project, or task: 1. the full life-cycle, i.e., concept through end of operations 2. the full depth, i.e., Program, Project, System, Subsystem, Element (SE Levels 1 to 5) 3. the full technical scope, e.g., the flight, ground and launch systems, avionics, power, propulsion, telecommunications, thermal, etc. The initial focus of their efforts defined the following basic systems engineering functions at JPL: systems architecture, requirements management, interface definition, technical resource management, system design and analysis, system verification and validation, risk management, technical peer reviews, design process management and systems engineering task management, They also developed a list of highly valued personal behaviors of systems engineers, and are working to inculcate those behaviors into members of their systems engineering community. The SEA Project is developing products, services, and training to support managers and practitioners throughout the entire system lifecycle. As these are developed, each one needs to be systematically deployed. Hence, the SEA Project developed a deployment process that includes four aspects: infrastructure and operations, communication and outreach, education and training, and consulting support. In addition, the SEA Project has taken a proactive approach to organizational change management and customer relationship management - both concepts and approaches not usually invoked in an engineering environment. This paper'3 describes JPL's approach to advancing the practice of systems engineering at the Lab. It describes the general approach used and how they addressed the three key aspects of change: people, process and technology. It highlights a list of highly valued personal behaviors of systems engineers, discusses the various products, services and training that were developed, describes the deployment approach used, and concludes with several lessons learned.

process improvement↗

Ikhana: A NASA UAS Supporting Long Duration Earth Science Missions

The NASA Ikhana unmanned aerial vehicle (UAV) is a General Atomics Ae ronautical Systems Inc. (San Diego, California) MQ-9 Predator-B modif ied to support the conduct of Earth science missions for the NASA Sci ence Mission Directorate and, through partnerships, other government agencies and universities. It can carry over 2000 lb of experiment p ayloads in the avionics bay and external pods and is capable of missi on durations in excess of 24 hours at altitudes above 40,000 ft. The aircraft is remotely piloted from a mobile ground control station (GC S) that is designed to be deployable by air, land, or sea. On-board s upport capabilities include an instrumentation system and an Airborne Research Test System (ARTS). The Ikhana project will complete GCS d evelopment, science support systems integration, external pod integra tion and flight clearance, and operations crew training in early 2007 . A large-area remote sensing mission is currently scheduled for Summ er 2007.

Cobleigh, B.↗

Hybrid Power Management (HPM)

The NASA Glenn Research Center s Avionics, Power and Communications Branch of the Engineering and Systems Division initiated the Hybrid Power Management (HPM) Program for the GRC Technology Transfer and Partnership Office. HPM is the innovative integration of diverse, state-of-the-art power devices in an optimal configuration for space and terrestrial applications. The appropriate application and control of the various power devices significantly improves overall system performance and efficiency. The advanced power devices include ultracapacitors and fuel cells. HPM has extremely wide potential. Applications include power generation, transportation systems, biotechnology systems, and space power systems. HPM has the potential to significantly alleviate global energy concerns, improve the environment, and stimulate the economy. One of the unique power devices being utilized by HPM for energy storage is the ultracapacitor. An ultracapacitor is an electrochemical energy storage device, which has extremely high volumetric capacitance energy due to high surface area electrodes, and very small electrode separation. Ultracapacitors are a reliable, long life, maintenance free, energy storage system. This flexible operating system can be applied to all power systems to significantly improve system efficiency, reliability, and performance. There are many existing and conceptual applications of HPM.

Eichenberg, Dennis J.↗

Rapid Contingency Simulation Modeling of the NASA Crew Launch Vehicle

The NASA Crew Launch Vehicle is a two-stage orbital launcher designed to meet NASA's current as well as future needs for human space flight. In order to free the designers to explore more possibilities during the design phase, a need exists for the ability to quickly perform simulation on both the baseline vehicle as well as the vehicle after proposed changes due to mission planning, vehicle configuration and avionics changes, proposed new guidance and control algorithms, and any other contingencies the designers may wish to consider. Further, after the vehicle is designed and built, the need will remain for such analysis in the event of future mission planning. An easily reconfigurable, modular, nonlinear six-degree-of-freedom simulation matching NASA Marshall's in-house high-fidelity simulator is created with the ability to quickly perform simulation and analysis of the Crew Launch Vehicle throughout the entire launch profile. Simulation results are presented and discussed, and an example comparison fly-off between two candidate controllers is presented.

Betts, Kevin M.↗

Producing a Live HDTV Program from Space

By the year 2000, NASA had flown HDTV camcorders on three Space Shuttle missions: STS-95, STS-93 and STS-99. All three flights of these camcorders were accomplished with cooperation from the Japanese space agency (then known as NASDA and now known as JAXA). The cameras were large broadcast-standard cameras provided by NASDA and flight certified by both NASA and NASDA. The high-definition video shot during these missions was spectacular. Waiting for the return of the tapes to Earth emphasized the next logical step: finding a way to downlink the HDTV live from space. Both the Space Shuttle and the International Space Station (ISS) programs were interested in live HDTV from space, but neither had the resources to fully fund the technology. Technically, downlinking from the ISS was the most effective approach. Only when the Japanese broadcaster NHK and the Japanese space agency expressed interest in covering a Japanese astronaut's journey to the ISS did the project become possible. Together, JAXA and NHK offered equipment, technology, and funding toward the project. In return, NHK asked for a live HDTV downlink during one of its broadcast programs. NASA and the ISS Program sought a US partner to broadcast a live HDTV program and approached the Discovery Channel. The Discovery Channel had proposed a live HDTV project in response to NASA's previous call for offers. The Discovery Channel agreed to provide addItional resources. With the final partner in place, the project was under way. Engineers in the Avionics Systems Division at NASA's Johnson Space Center (JSC) had already studied the various options for downlinking HDTV from the ISS. They concluded that the easiest way was to compress the HDTV so that the resulting data stream would "look" like a payload data stream. The flight system would consist of a professional HDTV camcorder with live HD-SDI output, an HDTV MPEG-2 encoder, and a packetizer/protocol converter.

Grubbs, Rodney↗

Methods and apparatus for graphical display and editing of flight plans

Systems and methods are provided for an integrated graphical user interface which facilitates the display and editing of aircraft flight-plan data. A user (e.g., a pilot) located within the aircraft provides input to a processor through a cursor control device and receives visual feedback via a display produced by a monitor. The display includes various graphical elements associated with the lateral position, vertical position, flight-plan and/or other indicia of the aircraft's operational state as determined from avionics data and/or various data sources. Through use of the cursor control device, the user may modify the flight-plan and/or other such indicia graphically in accordance with feedback provided by the display. In one embodiment, the display includes a lateral view, a vertical profile view, and a hot-map view configured to simplify the display and editing of the aircraft's flight-plan data.

Gibbs, Michael J.↗

Test and Verification Approach for the NASA Constellation Program

This viewgraph presentation is a test and verification approach for the NASA Constellation Program. The contents include: 1) The Vision for Space Exploration: Foundations for Exploration; 2) Constellation Program Fleet of Vehicles; 3) Exploration Roadmap; 4) Constellation Vehicle Approximate Size Comparison; 5) Ares I Elements; 6) Orion Elements; 7) Ares V Elements; 8) Lunar Lander; 9) Map of Constellation content across NASA; 10) CxP T&V Implementation; 11) Challenges in CxP T&V Program; 12) T&V Strategic Emphasis and Key Tenets; 13) CxP T&V Mission & Vision; 14) Constellation Program Organization; 15) Test and Evaluation Organization; 16) CxP Requirements Flowdown; 17) CxP Model Based Systems Engineering Approach; 18) CxP Verification Planning Documents; 19) Environmental Testing; 20) Scope of CxP Verification; 21) CxP Verification - General Process Flow; 22) Avionics and Software Integrated Testing Approach; 23) A-3 Test Stand; 24) Space Power Facility; 25) MEIT and FEIT; 26) Flight Element Integrated Test (FEIT); 27) Multi-Element Integrated Testing (MEIT); 28) Flight Test Driving Principles; and 29) Constellation s Integrated Flight Test Strategy Low Earth Orbit Servicing Capability.

Strong, Edward↗

The Pressurized Logistics Module: Providing Consumables and Resupply Logistics to the Lunar Surface for a Long-duration Manned Mission

In response to President Bush s 2004 Vision for Space Exploration initiative, NASA established an agency-wide Lunar Architecture Team (LAT) to develop the high-level requirements, assumptions, ground-rules and objectives for a manned mission to the moon. During Phase II of the evaluation, the Habitation Focus Element Group was directed to conceptually develop and design a Pressurized Logistics Module (PLM). The PLM task was delivered with one major requirement: to derive a system with minimal mass and cost, and a maximum, functional, internal volumetric area in order to provide the maximum amount of consumables, supportability and logistic re-supply for a crew of four to the Lunar surface with an overall integrated maximum weight of 5200kg. The PLM was derived from the Habitation Group s "mini-Hab" option. This concept required that the PLM have an aluminum-clad graphite epoxy external truss, utilized for increased mobility and stability, which would encompass a 2.7 meter diameter pressurized aluminum-lithium cylinder. Several trade studies and analyses were performed to determine the final length and orientation of the module, the number of systems required to maintain the PLM, and the number of hatches/mating mechanisms which would successfully and efficiently meet the requirements. Of the five specific configurations assessed, the PLM was determined to have a 3 meter by 3 meter by 5 meter external truss with a 2.7 meter diameter and 5 meter long horizontal, pressurized cylinder with one hatch/mating mechanism on one end cone. Two major assumptions aided in the formulation of the technical baseline: 1) the PLM should be sustainable for up to 18 months on the Lunar Lander without connection to its final destination, the Lunar Outpost, and 2) it must be self-sufficient to withstand a maximum eight hour transit from the Lander to the Outpost. Per these assumptions, eight major systems constitute the PLM: structures, passive mating, protection, power, thermal, avionics, life support and outfitting. Including a conservative 20% growth, the overall estimated tare weight for the PLM was determined to be 2181kg. The tare weight of the design allowed the available internal volume of the cylinder with a 0.20 meter high floor to transport the maximum of either 176 single Crew Transfer Bags (CTBs) or 3019kg.

Carpenter, Amanda↗

Early Impacts of a Human-in-the-Loop Evaluation in a Space Vehicle Mock-up Facility

The development of a new space vehicle, the Orion Crew Exploration Vehicle (CEV), provides Human Factors engineers an excellent opportunity to have an impact early in the design process. This case study highlights a Human-in-the-Loop (HITL) evaluation conducted in a Space Vehicle Mock-Up Facility and will describe the human-centered approach and how the findings are impacting design and operational concepts early in space vehicle design. The focus of this HITL evaluation centered on the activities that astronaut crewmembers would be expected to perform within the functional internal volume of the Crew Module (CM) of the space vehicle. The primary objective was to determine if there are aspects of a baseline vehicle configuration that would limit or prevent the performance of dynamically volume-driving activities (e.g. six crewmembers donning their suits in an evacuation scenario). A second objective was to step through concepts of operations for known systems and evaluate them in integrated scenarios. The functional volume for crewmember activities is closely tied to every aspect of system design (e.g. avionics, safety, stowage, seats, suits, and structural support placement). As this evaluation took place before the Preliminary Design Review of the space vehicle with some designs very early in the development, it was not meant to determine definitely that the crewmembers could complete every activity, but rather to provide inputs that could improve developing designs and concepts of operations definition refinement.

Byrne, Vicky↗

Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

The Ares I Crew Launch Vehicle (CLV) is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew access to the International Space Station (ISS) and, together with the Ares V Cargo Launch Vehicle (CaLV), serves as one component of a future launch capability for human exploration of the Moon. During the system requirements definition process and early design cycles, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements: the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine, will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle dynamic test (IVDT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, and a highaltitude actuation of the launch abort system (LAS) following separation. The Orion-1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch.

Cockrell, Charles E., Jr.↗

Operational Use of GPS Navigation for Space Shuttle Entry

The STS-118 flight of the Space Shuttle Endeavour was the first shuttle mission flown with three Global Positioning System (GPS) receivers in place of the three legacy Tactical Air Navigation (TACAN) units. This marked the conclusion of a 15 year effort involving procurement, missionization, integration, and flight testing of a GPS receiver and a parallel effort to formulate and implement shuttle computer software changes to support GPS. The use of GPS data from a single receiver in parallel with TACAN during entry was successfully demonstrated by the orbiters Discovery and Atlantis during four shuttle missions in 2006 and 2007. This provided the confidence needed before flying the first all GPS, no TACAN flight with Endeavour. A significant number of lessons were learned concerning the integration of a software intensive navigation unit into a legacy avionics system. These lessons have been taken into consideration during vehicle design by other flight programs, including the vehicle that will replace the Space Shuttle, Orion.

Goodman, John L.↗

Integrated Software Systems for Crew Management During Extravehicular Activity in Planetary Terrain Exploration

Initial planetary explorations with the Apollo program had a veritable ground support army monitoring the safety and health of the 12 astronauts who performed lunar surface extravehicular activities (EVAs). Given the distances involved, this will not be possible on Mars. A spacesuit for Mars must be smart enough to replace that army. The next generation suits can do so using 2 software systems serving as virtual companions, LEGACI (Life support, Exploration Guidance Algorithm and Consumable Interrogator) and VIOLET (Voice Initiated Operator for Life support and Exploration Tracking). The system presented in this study integrates data inputs from a suite of sensors into the MIII suit s communications, avionics and informatics hardware for distribution to remote managers and data analysis. If successful, the system has application not only for Mars but for nearer term missions to the Moon, and the next generation suits used on ISS as well. Field tests are conducted to assess capabilities for next generation spacesuits at Johnson Space Center (JSC) as well as the Mars and Lunar analog (Devon Island, Canada). LEGACI integrates data inputs from a suite of noninvasive biosensors in the suit and the astronaut (heart rate, suit inlet/outlet lcg temperature and flowrate, suit outlet gas and dewpoint temperature, pCO2, suit O2 pressure, state vector (accelerometry) and others). In the Integrated Walkback Suit Tests held at NASA-JSC and the HMP tests at Devon Island, communication and informatics capabilities were tested (including routing by satellite from the suit at Devon Island to JSC in Houston via secure servers at VCU in Richmond, VA). Results. The input from all the sensors enable LEGACI to compute multiple independent assessments of metabolic rate, from which a "best" met rate is chosen based on statistical methods. This rate can compute detailed information about the suit, crew and EVA performance using test-derived algorithms. VIOLET gives LEGACI voice activation capability, allowing the crew to query the suit, and receive feedback and alerts that will lead to corrective action. LEGACI and VIOLET can also automatically control the astronaut's cooling and consumable use rate without crew input if desired. These findings suggest that non-invasive physiological and environmental sensors supported with data analysis can allow for more effective management of mission task performance during EVA. Integrated remote and local view of data metrics allow crewmember to receive real time feedback in synch with mission control in preventing performance shortcomings for EVA in exploration missions.

Kuznetz, Lawrence↗

High-Performance, Radiation-Hardened Electronics for Space and Lunar Environments

The Radiation Hardened Electronics for Space Environments (RHESE) project develops advanced technologies needed for high performance electronic devices that will be capable of operating within the demanding radiation and thermal extremes of the space, lunar, and Martian environment. The technologies developed under this project enhance and enable avionics within multiple mission elements of NASA's Vision for Space Exploration. including the Constellation program's Orion Crew Exploration Vehicle. the Lunar Lander project, Lunar Outpost elements, and Extra Vehicular Activity (EVA) elements. This paper provides an overview of the RHESE project and its multiple task tasks, their technical approaches, and their targeted benefits as applied to NASA missions.

Keys, Andrew S.↗

Remotely Operated Aircraft (ROA) Impact on the National Airspace System (NAS) Work Package, 2005: Composite Report on FAA Flight Plan and Operational Evaluation Plan. Version 7.0

The purpose of this document is to present the findings that resulted from a high-level analysis and evaluation of the following documents: (1) The OEP (Operational Evolution Plan) Version 7 -- a 10-year plan for operational improvements to increase capacity and efficiency in U.S. air travel and transport and other use of domestic airspace. The OEP is the FAA commitment to operational improvements. It is outcome driven, with clear lines of accountability within FAA organizations. The OEP concentrates on operational solutions and integrates safety, certification, procedures, staffing, equipment, avionics and research; (2) The Draft Flight Plan 2006 through 2010 -- a multi-year strategic effort, setting a course for the FAA through 2001, to provide the safest and most efficient air transportation system in the world; (3) The NAS System Architecture Version 5 -- a blueprint for modernizing the NAS and improving NAS services and capabilities through the year 2015; and (4) The NAS-SR-1000 System Requirements Specification (NASSRS) -- a compilation of requirements which describe the operational capabilities for the NAS. The analysis is particularly focused on examining the documents for relevance to existing and/or planned future UAV operations. The evaluation specifically focuses on potential factors that could materially affect the development of a commercial ROA industry, such as: (1) Design limitations of the CNS/ATM system, (2) Human limitations, The information presented was taken from program specifications or program office lead personnel.

Source record↗

Plan for the Characterization of HIRF Effects on a Fault-Tolerant Computer Communication System

This report presents the plan for the characterization of the effects of high intensity radiated fields on a prototype implementation of a fault-tolerant data communication system. Various configurations of the communication system will be tested. The prototype system is implemented using off-the-shelf devices. The system will be tested in a closed-loop configuration with extensive real-time monitoring. This test is intended to generate data suitable for the design of avionics health management systems, as well as redundancy management mechanisms and policies for robust distributed processing architectures.

Torres-Pomales, Wilfredo↗

Proceedings of the Sixth NASA Langley Formal Methods (LFM) Workshop

Today's verification techniques are hard-pressed to scale with the ever-increasing complexity of safety critical systems. Within the field of aeronautics alone, we find the need for verification of algorithms for separation assurance, air traffic control, auto-pilot, Unmanned Aerial Vehicles (UAVs), adaptive avionics, automated decision authority, and much more. Recent advances in formal methods have made verifying more of these problems realistic. Thus we need to continually re-assess what we can solve now and identify the next barriers to overcome. Only through an exchange of ideas between theoreticians and practitioners from academia to industry can we extend formal methods for the verification of ever more challenging problem domains. This volume contains the extended abstracts of the talks presented at LFM 2008: The Sixth NASA Langley Formal Methods Workshop held on April 30 - May 2, 2008 in Newport News, Virginia, USA. The topics of interest that were listed in the call for abstracts were: advances in formal verification techniques; formal models of distributed computing; planning and scheduling; automated air traffic management; fault tolerance; hybrid systems/hybrid automata; embedded systems; safety critical applications; safety cases; accident/safety analysis.

Rozier, Kristin Yvonne↗

Challenges and Demands on Automated Software Revision

In the past three decades, automated program verification has undoubtedly been one of the most successful contributions of formal methods to software development. However, when verification of a program against a logical specification discovers bugs in the program, manual manipulation of the program is needed in order to repair it. Thus, in the face of existence of numerous unverified and un- certified legacy software in virtually any organization, tools that enable engineers to automatically verify and subsequently fix existing programs are highly desirable. In addition, since requirements of software systems often evolve during the software life cycle, the issue of incomplete specification has become a customary fact in many design and development teams. Thus, automated techniques that revise existing programs according to new specifications are of great assistance to designers, developers, and maintenance engineers. As a result, incorporating program synthesis techniques where an algorithm generates a program, that is correct-by-construction, seems to be a necessity. The notion of manual program repair described above turns out to be even more complex when programs are integrated with large collections of sensors and actuators in hostile physical environments in the so-called cyber-physical systems. When such systems are safety/mission- critical (e.g., in avionics systems), it is essential that the system reacts to physical events such as faults, delays, signals, attacks, etc, so that the system specification is not violated. In fact, since it is impossible to anticipate all possible such physical events at design time, it is highly desirable to have automated techniques that revise programs with respect to newly identified physical events according to the system specification.

Bonakdarpour, Borzoo↗

Technical Progress on the Ares I-X Flight Test

Ares I-X will be NASA's first test flight for a new human-rated launch vehicle since 1981, and the team is well on its way toward completing the vehicle's design and hardware fabrication for an April 2009 launch. This uncrewed suborbital development test flight gives NASA its first opportunities to: gather critical data about the flight dynamics of the integrated launch vehicle; understand how to control its roll during flight; better characterize the stage separation environments during future flight; and demonstrate the first stage recovery system. The Ares I-X Flight Test Vehicle (FTV) incorporates a mix of flight and mockup hardware. It is powered by a four-segment solid rocket booster, and will be modified to include a fifth, spacer segment; the upper stage, Orion crew exploration vehicle, and launch abort system are simulator hardware to make the FTV aerodynamically similar to the same size, shape, and weight of Ares I. The Ares IX first stage includes an existing Shuttle solid rocket motor and thrust vector control system controlled by an Ascent Thrust Vector Controller (ATVC) designed and built by Honeywell International. The avionics system will be tested in a dedicated System Integration Laboratory located at Lockheed Martin Space Systems (LMSS) in Denver, Colorado. The Upper Stage Simulator (USS) is made up of cylindrical segments that will be stacked and integrated at Kennedy Space Center (KSC) for launch. Glenn Research Center is already building these segments, along with their internal access structures. The active Roll Control System (RoCS) includes two thruster units harvested from Peacekeeper missiles. Duty cycle testing for RoCS was conducted, and fuel tanking and detanking tests will occur at KSC in early 2008. This important flight will provide valuable experience for the ground operations team in integrating, stacking, and launching Ares I. Data from Ares I-X will ensure the safety and reliability of America's newest launch vehicle.

Davis, S.R.↗