Developing generic design alternatives for dry storage of used nuclear fuel at an interim storage facility - 15480
The Department of Energy (DOE) is beginning to lay the groundwork for implementing interim storage of used nuclear fuel (UNF) as recommended by the Blue Ribbon Commission on America's Nuclear Future in their report to the Secretary of Energy published on January 26, 2012. These plans include activities to 1) establish one or more Interim Storage Facilities (ISF) using consent-based siting, and 2) prepare for large-scale transport of UNF. The Administration released its Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (Strategy) on January 11, 2013. The Strategy includes a phased, adaptive, and consent-based approach to siting and implementing a comprehensive management and disposal system. The Strategy calls for an operational Pilot ISF by 2021, a Larger ISF by 2025, and a geological repository by 2048. The DOE Nuclear Fuels Storage and Transportation Planning Project (NFST) prepared a report in April 2013 titled, -A Project Concept for Nuclear Fuels Storage and Transportation.- This report developed the functions and requirements necessary for development of a Pilot and Larger ISF to meet the framework outlined in the Strategy as follows: - The UNF inventory is limited for the Pilot and Larger ISF as described in the Strategy. - It is assumed that bare fuel will be received in reusable transportation casks in significant quantities for the larger ISF and will not be solely limited to the receipt of fuel in dry storage canister (DSC) as is the Pilot ISF. This assumption was made because the method for accepting UNF from the utilities once the larger ISF begins operating has not yet been decided. - UNF storage alternative concepts identified in previous reports must be more fully developed to support alternative analysis. The purpose of this topic is to report on the development of the generic design alternatives that have been evaluated for the receipt and storage of the UNF at the initial Pilot ISF and Larger ISF. The generic design alternatives have been developed over the past few months by collaboration between the DOE and industry experts experienced in UNF facilities. The design alternatives will enable volunteer host communities to investigate generic design alternatives that could be fully developed for a site-specific location based on their unique design requirements. The design alternatives provide flexibility for additional capabilities to be developed and executed in a modular fashion such that expansion from a Pilot ISF to a Larger ISF could be achieved in an orderly manner. (authors)