Forming a Turbomachinery Seals Working Group: An Overview and Discussion

Purose: Identify technical challenges to improving turbomachinery seal leakage and wear performance, reliability and cost effectiveness. Develop a coordinated effort to resolve foundational issues for turbomachinery seal technologies. Identify and foster opportunities for collaboration. Advocate for funding.

Proctor, Margaret P.↗

Initial Noise Assessment of an Embedded-wing-propulsion Concept Vehicle

Vehicle acoustic requirements are considered for a Cruise-Efficient Short Take-Off and Landing (CESTOL) vehicle concept using an Embedded-Wing-Propulsion (EWP) system based on a review of the literature. Successful development of such vehicles would enable more efficient use of existing airports in accommodating the anticipated growth in air traffic while at the same time reducing the noise impact on the community around the airport. A noise prediction capability for CESTOL-EWP aircraft is developed, based largely on NASA's FOOTPR code and other published methods, with new relations for high aspect ratio slot nozzles and wing shielding. The predictive model is applied to a preliminary concept developed by Boeing for NASA GRC. Significant noise reduction for such an aircraft relative to the current state-of-the-art is predicted, and technology issues are identified which should be addressed to assure that the potential of this design concept is fully achieved with minimum technical risk.

Stone, James R.↗

Grid-Integrated Distributed Solar: Addressing Challenges for Operations and Planning, Greening the Grid

Greening the Grid provides technical assistance to energy system planners, regulators, and grid operators to overcome challenges associated with integrating variable renewable energy into the grid. This document introduces a brief overview of common technical impacts of PV on distribution systems and operations, as well as emerging strategies for successfully addressing some of the priority issues.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A French Industrial Management Plan for Very Low Level Radioactive Wastes (VLLW) at the CIRES Facility - 17012

Since 2003, very-low-level waste has been disposed of at the Andra CIRES disposal facility, the first disposal facility in the world for this type. It is now the main route in terms of volumes for the management of French radioactive waste. The 2015 national inventory has identified 1.1 million m{sup 3} of VLLW to be produced until 2030. Several waste management scenarios were then analyzed, including issues associated with the flow reduction of the waste to be stored. The key avenues to reduce the volumes of waste, technical and economic viability of which still needing to be challenged, are at this stage: - Favor the reuse of large amounts of metallic VLLW to be produced within the next decade. - To service the recycling of metals, different opportunities for reuse should be considered -including within the non-nuclear sector. - 30% to 50% of VLLW produced in the so-called 'nuclear waste' areas probably have zero or non-detectable radioactivity levels and questions about the introduction of a clearance level. - A disposal route based on a concept derived from waste storage facility for non-nuclear and non-hazardous wastes could be an alternative to the clearance level for the least active inert waste. Therefore volumetric optimizations appear possible, even if the waste management costs will be higher than the current route. Furthermore, efficiency gains and progresses in operating modes would increase the technical capacity of the CIRES of about 250 000 m{sup 3}. In all cases studied, it appears essential to create around 2030 a new VLLW disposal facility, particularly for the dismantling of the current fleet of reactors. According to the proposed optimizations, the necessary capacity for a second VLLW disposal facility would range between 600 000 m{sup 3} and 1.2 million m{sup 3}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges in the UK Generic Design Assessment Process - 17062

In the UK, Generic Design Assessment (GDA) is a voluntary step-wise joint assessment process undertaken by the Office for Nuclear Regulation (ONR) and the Environment Agency (EA) of a generic reactor design. The process focuses purely on the reactor design and does not consider any site specific issues. The key objective of GDA is for the regulators to consider the adequacy of claims, arguments and evidence (CAE) put forward by a requesting party (RP) to demonstrate the safety of its design in the UK context. This includes all CAE relating to management of spent fuel and radioactive waste. The CAE are generally applied to a reference design put forward by the RP that is substantially complete in terms of the overall concepts and functions of the major systems, having already been deployed elsewhere. GDA assessment encompasses a broad range of topic areas which include fuel and core design, management of spent fuel, radioactive waste management and decommissioning. Other technical disciplines also have valid interests in particular aspects of the management of spent fuel. This paper summarises the UK GDA process and the types of issues raised; in particular aspects of the proposed operation of liquid waste management systems and Spent Fuel Interim Storage are presented and the instructive resolution of the RP's original limited design scope to allow the regulators to carry out a meaningful assessment. Some examples are presented and useful lessons learned for future GDAs are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA's UAS NAS Access Project

The vision of the Unmanned Aircraft System (UAS) Integration in the National Airspace System (NAS) Project is "A global transportation system which allows routine access for all classes of UAS." The goal of the UAS Integration in the NAS Project is to "contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS." This goal will be accomplished through a two-phased approach based on development of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Phase 1 will take place the first two years of the Project and Phase 2 will take place the following three years. The Phase 1 and 2 technical objectives are: Phase 1: Developing a gap analysis between current state of the art and the Next Generation Air Transportation System (NextGen) UAS Concept of Operations . Validating the key technical areas identified by this Project . Conducting initial modeling, simulation, and flight testing activities . Completing Sub-project Phase 1 deliverables (spectrum requirements, comparative analysis of certification methodologies, etc.) and continue Phase 2 preparation (infrastructure, tools, etc.) Phase 2: Providing regulators with a methodology for developing airworthiness requirements for UAS, and data to support development of certifications standards and regulatory guidance . Providing systems-level, integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and human systems integration in operationally relevant environments. The UAS in the NAS Project will demonstrate solutions in specific technology areas, which will address operational/safety issues related to UAS access to the NAS. Since the resource allocation for this Project is limited ($150M over the five years), the focus is on reducing the technical barriers where NASA has unique capabilities. As a result, technical areas, such as Sense and Avoid (SAA) and beyond line of sight command and control will not be addressed. While these are critical barriers to UAS access, currently, there is a great deal of global effort being exercised to address these challenge areas. Instead, specific technology development in areas where there is certainty that NASA can advance the research to high technology readiness levels will be the Project's focus. Specific sub-projects include Separation Assurance, Human Systems Integration, Communications, Certification, and Integrated Test and Evaluation. Each sub-project will transfer technologies to relevant key stakeholders and decision makers through research transition teams, technology forums, or through other analogous means.

Johnson, Charles W.↗

Operational Issues in the Development of a Cost-Effective Reusable LOX/LH2 Engine

The NASA Space Launch Initiative (SLI) was initiated in early 2001 to conduct technology development and to reduce the business and technical risk associated with developing the next-generation reusable launch system. In the field of main propulsion, two LOXLH2 rocket engine systems, the Pratt & Whitney / Aerojet Joint Venture (JV) COBRA and the Rocketdyne RS-83, were funded to develop a safe, economical, and reusable propulsion system. Given that a large-thrust reusable rocket engine program had not been started in the U.S. since 1971, with the Space Shuttle Main Engine (SSME), this provided an opportunity to build on the experience developed on the SSME system, while exploiting advances in technology that had occurred in the intervening 30 years. One facet of engine development that was identified as being especially vital in order to produce an optimal system was in the areas of operability and maintainability. In order to achieve the high levels of performance required by the Space Shuttle, the SSME system is highly complex with very tight tolerances and detailed requirements. Over the lifetime of the SSME program, the engine has required a high level of manpower to support the performance of inspections, maintenance (scheduled and unscheduled) and operations (prelaunch and post-flight). As a consequence, the labor- intensive needs of the SSME provide a significant impact to the overall cost efficiency of the Space Transportation System (STS). One of the strategic goals of the SLI is to reduce cost by requiring the engine(s) to be easier (Le. less expensive) to operate and maintain. The most effective means of accomplishing this goal is to infuse the operability and maintainability features into the engine design from the start. This paper discusses some of the operational issues relevant to a reusable LOx/LH2 main engine, and the means by which their impact is mitigated in the design phase.

Ballard, Richard O.↗

Evaluation of Flight Attendant Technical Knowledge

Accident and incident reports have indicated that flight attendants have numerous opportunities to provide the flight-deck crew with operational information that may prevent or lessen the severity of a potential problem. Additionally, as carrier fleets transition from three person to two person flight-deck crews, the reliance upon the cabin crew for the transfer of this information may increase further. Recent research indicates that flight attendants do not feel confident in their ability to describe mechanical parts or malfunctions of the aircraft, and the lack of flight attendant technical training has been referenced in a number of recent reports. Chute and Wiener describe five factors which may produce communication barriers between cockpit and cabin crews: the historical background of aviation, the physical separation of the two crews, psychosocial issues, regulatory factors, and organizational factors. By examining these areas of division we can identify possible bridges and address the implications of deficient cockpit/cabin communication on flight safety. Flight attendant operational knowledge may provide some mitigation of these barriers. The present study explored both flight attendant technical knowledge and flight attendant and pilot expectations of flight attendant technical knowledge. To assess the technical knowledge of cabin crewmembers, 177 current flight attendants from two U.S. carriers voluntarily completed a 13-item technical quiz. To investigate expectations of flight attendant technical knowledge, 181 pilots and a second sample of 96 flight attendants, from the same two airlines, completed surveys designed to capture each group's expectations of operational knowledge required of flight attendants. Analyses revealed several discrepancies between the present level of flight attendant operational knowledge and pilots' and flight attendants' expected and desired levels of technical knowledge. Implications for training will be discussed.

Dunbar, Melisa G.↗

First NASA/Industry High Speed Research Program Nozzle Symposium

The First High Speed Research (HSR) Nozzle Symposium was hosted by NASA Lewis Research Center on November 17-19, 1992 in Cleveland, Ohio, and was sponsored by the HSR Source Noise Working Group. The purpose of this symposium was to provide a national forum for the government, industry, and university participants in the program to present and discuss important low noise nozzle research results and technology issues related to the development of appropriate nozzles for a commercially viable, environmentally compatible, U.S. High-Speed Civil Transport. The HSR Phase I research program was initiated in FY90 and is approaching the first major milestone (end of FY92) relative to an initial FAR 36 Stage 3 nozzle noise assessment. Significant research results relative to that milestone were presented. The opening session provided a brief overview of the Program and status of the Phase H plan. The next five sessions were technically oriented and highlighted recent significant analytical and experimental accomplishments. The last Session included a panel discussion by the Session Chairs, summarizing the progress seen to date and discussing issues relative to further advances in technology necessary to achieve the Program Goals. Attendance at the Symposium was by invitation only and included only industry, academic, and government participants who are actively involved in the High-Speed Research Program. The technology presented in this meeting is considered commercially sensitive.

Long-Davis, Mary Jo↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Area of Interest 1. Interregional Electricity Reliability Issue and Assessment Analysis

In 2010, the U.S. Department of Energy (DOE) tasked Lawrence Berkeley National Laboratory (LBNL) and the Pacific Northwest National Laboratory (PNNL), in separate contracts, to provide coordinated technical support to the electricity industry for two national electricity reliability initiatives. The first initiative focused on improving the frequency response of each of the three North American interconnections. The second initiative focused on improving industry understanding of the causes and consequences of fault-induced delayed voltage recovery, which has been observed in all three interconnections. Both initiatives were conducted in close coordination with the North American Electric Reliability Corporation (NERC) and the Western Electric Coordination Council (WECC) and involved the participation of leading utilities from across the United States. This is the final report on LBNL’s activities. It consists of summaries of each activity, including references to published documents that were prepared through the course of the project. (Activities under taken by PNNL are reported on in a separate report.)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Below-the-ankle Angioplasty and Stenting for Limb Salvage: Anatomical Considerations and Long-term Outcomes

PurposeTo report the long-term angiographic and clinical results in a series of below-the-ankle (BTA) angioplasty procedures and to present some biomechanical issues related to the unique anatomical geometry of the ankle.MethodsWe performed a retrospective analysis of BTA angioplasty procedures. Clinical end points included technical success, patient mortality, salvage of the treated foot, and repeat target lesion revascularization. Imaging end points included primary patency, binary restenosis of the target lesion at the 50 % threshold, and stent integrity (stent fracture, deformation, or collapse). Univariate subgroup analysis was performed.ResultsIn total, 40 limbs in 37 patients (age 73.5 {+-} 8.2 years) with critical limb ischemia were included and 42 inframalleolar lesions (4.2 {+-} 1.4 cm) were analyzed. Technical success was achieved in 95.2 % (40 of 42). Provisional stent placement was performed in 45.2 % (19 of 42). Two patients died, and two major amputations occurred up to 3 years. At 1 year, overall primary vessel patency was 50.4 {+-} 9.1 %, lesion binary restenosis rate was 64.1 {+-} 8.3 %, and repeat intervention-free survival was 93.6 {+-} 4.3 % according to life table analysis of all treated lesions. Pairwise subgroup analysis showed that BTA self-expanding stents were associated with significantly higher restenosis and poorer primary patency compared to plain balloon angioplasty or sirolimus-eluting balloon-expandable stents. Significant deformation and/or fracture of balloon-expandable stents placed BTA were identified in five of 11. Dynamic imaging showed that the dorsalis pedis artery is kinked during foot dorsiflexion, whereas the distal posterior tibial artery is kinked during plantar flexion of the foot.ConclusionBTA angioplasty for critical limb ischemia treatment is safe and feasible with satisfactory long-term results. BTA stent placement must be reserved for bailout indications.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Update on Evaluation of Steam Cycle Upgrades to Improve the Competitiveness of U.S. Coal Power Plants

Under an award issued by the U.S. Department of Energy (DE-FE0031535), the Electric Power Research Institute (EPRI) is leading project to examine the technical and economic feasibility of a series of steam cycle upgrades to the two most prevalent types of U.S. coal power plants (including both subcritical and supercritical cycle configurations). The retrofit upgrade options are focused on evaluating increasing main steam and reheat steam temperatures from 1000°F (538°C) to hotter temperatures, ranging from ultra-supercritical (USC) (i.e., 1100°F or 593°C) to advanced USC (AUSC) conditions (≥1300° or 704°C) while maintaining steam pressures at their original values. By maintaining the original operating steam pressures as well as the original boiler and furnace enclosure envelopes, we aim to minimize the modifications required to the existing power plant, while still providing a significant improvement in heat rate. A unique aspect of this study is that the economic value of the heat rate improvement of each technically feasible option will be determined by detailed modeling of unit dispatch, over the remaining future plant life, in several regional power markets, using EPRI’s US-REGEN model. The capital cost estimates will be compared to the increased revenue estimated by the dispatch modeling to determine the overall economic attractiveness of each upgrade option. The results of this study have the potential to be applicable at up to 80% of the existing U.S. coal-fired power generation fleet. The project team, led by the Electric Power Research Institute, has completed the technical feasibility evaluation, and is currently executing the unit dispatch and capital cost evaluation portions of the work scope. This will describe the motivation for the project, explain the project’s structure and schedule, and provide details on the work scope and preliminary results of the technical feasibility evaluation.

01 COAL, LIGNITE, AND PEAT↗

Renewable Energy Integration in Remote Alaska Communities

This guide was developed through the U.S. Department of Energy (DOE) Energy Transitions Initiative Partnership Project (ETIPP) technical assistance (TA) projects for Nikolski and St. George. Both communities had wind turbine projects that failed due to integration and maintenance issues. Due to these failures, Nikolski and St. George sought help to investigate renewable energy alternatives and associated integration strategies, with a focus on technologies that could be easily maintained within the community. The primary objective of this guide was to interview subject matter experts and document lessons learned to address potential renewable energy and storage integration issues in remote Alaskan communities. This guide is intended to provide information to rural Alaskan communities considering renewables with the purpose of sharing best practices and case studies to facilitate the successful implementation of future renewable energy projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Microwave power transmission system studies. Volume 3, section 8: Mechanical systems and flight operations

The efforts and recommendations associated with preliminary design and concept definition for mechanical systems and flight operations are presented. Technical discussion in the areas of mission analysis, antenna structural concept, configuration analysis, assembly and packaging with associated costs are presented. Technology issues for the control system, structural system, thermal system and assembly including cost and man's role in assembly and maintenance are identified. Background and desired outputs for future efforts are discussed.

Maynard, O. E.↗

Operator Performance Support System (OPSS)

In the complex and fast reaction world of military operations, present technologies, combined with tactical situations, have flooded the operator with assorted information that he is expected to process instantly. As technologies progress, this flow of data and information have both guided and overwhelmed the operator. However, the technologies that have confounded many operators today can be used to assist him -- thus the Operator Performance Support Team. In this paper we propose an operator support station that incorporates the elements of Video and Image Databases, productivity Software, Interactive Computer Based Training, Hypertext/Hypermedia Databases, Expert Programs, and Human Factors Engineering. The Operator Performance Support System will provide the operator with an integrating on-line information/knowledge system that will guide expert or novice to correct systems operations. Although the OPSS is being developed for the Navy, the performance of the workforce in today's competitive industry is of major concern. The concepts presented in this paper which address ASW systems software design issues are also directly applicable to industry. the OPSS will propose practical applications in how to more closely align the relationships between technical knowledge and equipment operator performance.

Conklin, Marlen Z.↗

The systems engineering overview and process (from the Systems Engineering Management Guide, 1990)

The past several decades have seen the rise of large, highly interactive systems that are on the forward edge of technology. As a result of this growth and the increased usage of digital systems (computers and software), the concept of systems engineering has gained increasing attention. Some of this attention is no doubt due to large program failures which possibly could have been avoided, or at least mitigated, through the use of systems engineering principles. The complexity of modern day weapon systems requires conscious application of systems engineering concepts to ensure producible, operable and supportable systems that satisfy mission requirements. Although many authors have traced the roots of systems engineering to earlier dates, the initial formalization of the systems engineering process for military development began to surface in the mid-1950s on the ballistic missile programs. These early ballistic missile development programs marked the emergence of engineering discipline 'specialists' which has since continued to grow. Each of these specialties not only has a need to take data from the overall development process, but also to supply data, in the form of requirements and analysis results, to the process. A number of technical instructions, military standards and specifications, and manuals were developed as a result of these development programs. In particular, MILSTD-499 was issued in 1969 to assist both government and contractor personnel in defining the systems engineering effort in support of defense acquisition programs. This standard was updated to MIL-STD499A in 1974, and formed the foundation for current application of systems engineering principles to military development programs.

Source record↗

Analysis of Parallel Burn Without Crossfeed TSTO RLV Architectures and Comparison to Parallel Burn With Crossfeed and Series Burn Architectures

There are currently three dominant TSTO class architectures. These are Series Burn (SB), Parallel Burn with crossfeed (PBw/cf), and Parallel Burn without crossfeed (PBncf). The goal of this study was to determine what factors uniquely affect PBncf architectures, how each of these factors interact, and to determine from a performance perspective whether a PBncf vehicle could be competitive with a PBw/cf or SB vehicle using equivalent technology and assumptions. In all cases, performance was evaluated on a relative basis for a fixed payload and mission by comparing gross and dry vehicle masses of a closed vehicle. Propellant combinations studied were LOX: LH2 propelled orbiter and booster (HH) and LOX: Kerosene booster with LOX: LH2 orbiter (KH). The study conclusions were: 1) a PBncf orbiter should be throttled as deeply as possible after launch until the staging point. 2) a detailed structural model is essential to accurate architecture analysis and evaluation. 3) a PBncf TSTO architecture is feasible for systems that stage at mach 7. 3a) HH architectures can achieve a mass growth relative to PBw/cf of < 20%. 3b) KH architectures can achieve a mass growth relative to Series Burn of < 20%. 4) center of gravity (CG) control will be a major issue for a PBncf vehicle, due to the low orbiter specific thrust to weight ratio and to the position of the orbiter required to align the nozzle heights at liftoff. 5 ) thrust to weight ratios of 1.3 at liftoff and between 1.0 and 0.9 when staging at mach 7 appear to be close to ideal for PBncf vehicles. 6) performance for all vehicles studied is better when staged at mach 7 instead of mach 5. The study showed that a Series Burn architecture has the lowest gross mass for HH cases, and has the lowest dry mass for KH cases. The potential disadvantages of SB are the required use of an air-start for the orbiter engines and potential CG control issues. A Parallel Burn with crossfeed architecture solves both these problems, but the mechanics of a large bipropellant crossfeed system pose significant technical difficulties. Parallel Burn without crossfeed vehicles start both booster and orbiter engines on the ground and thus avoid both the risk of orbiter air-start and the complexity of a crossfeed system. The drawback is that the orbiter must use 20% to 35% of its propellant before reaching the staging point. This induces a weight penalty in the orbiter in order to carry additional propellant, which causes a further weight penalty in the booster to achieve the same staging point. One way to reduce the orbiter propellant consumption during the first stage is to throttle down the orbiter engines as much as possible. Another possibility is to use smaller or fewer engines. Throttling the orbiter engines soon after liftoff minimizes CG control problems due to a low orbiter liftoff thrust, but may result in an unnecessarily high orbiter thrust after staging. Reducing the number or size of engines size may cause CG control problems and drift at launch. The study suggested possible methods to maximize performance of PBncf vehicle architectures in order to meet mission design requirements.

Smith, Garrett↗