Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program overview”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Thermal/Structural Tailoring of Engine Blades (T/STAEBL) User's manual

The Thermal/Structural Tailoring of Engine Blades (T/STAEBL) system is a computer code that is able to perform numerical optimizations of cooled jet engine turbine blades and vanes. These optimizations seek an airfoil design of minimum operating cost that satisfies realistic design constraints. This report documents the organization of the T/STAEBL computer program, its design and analysis procedure, its optimization procedure, and provides an overview of the input required to run the program, as well as the computer resources required for its effective use. Additionally, usage of the program is demonstrated through a validation test case.

Brown, K. W.↗

Overview of NASA's Space Solar Power Technology Advanced Research and Development Program

Large solar power satellite (SPS) systems that might provide base load power into terrestrial markets were examined extensively in the 1970s by the US Department of Energy (DOE) and the National Aeronautics and Space Administration (NASA). Following a hiatus of about 15 years, the subject of space solar power (SSP) was reexamined by NASA from 1995-1997 in the 'fresh look' study, and during 1998 in an SSP 'concept definition study', and during 1999-2000 in the SSP Exploratory Research and Technology (SERT) program. As a result of these efforts, during 2001, NASA has initiated the SSP Technology Advanced Research and Development (STAR-Dev) program based on informed decisions. The goal of the STAR-Dev program is to conduct preliminary strategic technology research and development to enable large, multi-megawatt to gigawatt-class space solar power (SSP) systems and wireless power transmission (WPT) for government missions and commercial markets (in-space and terrestrial). Specific objectives include: (1) Release a NASA Research Announcement (NRA) for SSP Projects; (2) Conduct systems studies; (3) Develop Component Technologies; (4) Develop Ground and Flight demonstration systems; and (5) Assess and/or Initiate Partnerships. Accomplishing these objectives will allow informed future decisions regarding further SSP and related research and development investments by both NASA management and prospective external partners. In particular, accomplishing these objectives will also guide further definition of SSP and related technology roadmaps including performance objectives, resources and schedules; including 'multi-purpose' applications (commercial, science, and other government).

Howell, Joe↗

KB3D Reference Manual

This paper is a reference manual describing the implementation of the KB3D conflict detection and resolution algorithm. The algorithm has been implemented in the Java and C++ programming languages. The reference manual gives a short overview of the detection and resolution functions, the structural implementation of the program, inputs and outputs to the program, and describes how the program is used. Inputs to the program can be rectangular coordinates or geodesic coordinates. The reference manual also gives examples of conflict scenarios and the resolution outputs the program produces.

Munoz, Cesar↗

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS&M) of remediated FUSRAP sites. DOE LTS&M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS&M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS&M.

Radiological contamination, Grand Junction, Colora↗

An Overview of the United States Department of Energy's Nuclear Criticality Safety Program and Future Challenges

The United States (US) Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Criticality Safety Program (NCSP) was formally established in January 1998 as part of the Defense Nuclear Facility Safety Board (DNFSB) Recommendation 97-2 implementation plan. The NCSP was initially focused on seven NCSP tasks: Critical Experiments, Benchmarking, Analytical Methods, Nuclear Data, Training and Qualification, Information Preservation and Dissemination, and Applicable Ranges of Bounding Curves and Data. The first NCSP 5-year plan was published in August 1999. Now, more than 20 years later, NCSP continues to serve the United States and the nuclear criticality safety (NCS) community around five technical program elements (TPEs): Analytical Methods, Information Preservation and Dissemination, Integral Experiments, Nuclear Data, and Training and Education. NCSP has three chartered support groups, the Criticality Safety Support Group, the Nuclear Data Advisory Group, and the DOE Criticality Safety Coordinating Team, all of which provide technical advisement to the NCS community, to DOE, and to the NCSP manager. NCSP has a comprehensive mission and vision document that provides technical and budget priorities for TPE attributes and goals to ensure that the needs of the NCS community and DOE NCS are prioritized appropriately to meet the goals defined by the 1998 DNFSB recommendation. Like any DOE/NNSA program, NCSP faces significant challenges in the future that involves program funding, rising nuclear facility costs, aging critical assembly infrastructure, knowledge retention, and other issues. This paper discusses NCSP and provides some insights into these and other challenges moving into the future.

Bowen, Douglas G.↗

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS and M) of remediated FUSRAP sites. DOE LTS and M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS and M. Over the life of the FUSRAP program from 1974 to the present, DOE's primary mission and responsibility has been to ensure that FUSRAP sites remain protective of human health and the environment. In fulfilling this mission, the DOE program includes the following key elements: eligibility determinations, transition of remediated sites from USACE to DOE, LTS and M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close communication stakeholders as well as state and federal regulators. DOE programs are designed to preserve and present the information that future stewards and stakeholders will need to maintain site remedies and knowledge. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

R&D Program for HEP High-Power Targets at Fermilab

A high-power target system is a key beam element to complete future High Energy Physics (HEP) experiments. In the recent past, major accelerator facilities have been limited in beam power not by their accelerators, but by the beam intercepting device survivability. The target must then endure high power pulsed beam, leading to high cycle thermal stresses/pressures and thermal shocks. The increased beam power will also create significant challenges such as corrosion and radiation damage that can cause harmful effects on the material and degrade their mechanical and thermal properties during irradiation. This can eventually lead to the failure of the material and drastically reduce the lifetime of targets and beam intercepting devices. In order to operate reliable beam-intercepting devices in the framework of energy and intensity increase projects of the future, it is essential to develop a strong R&D program and have synergy with various expertise. After presenting the high power targetry challenges facing next generation multi-MW accelerators, we will give an overview of Fermilab’s R&D program in support of High Power Targetry development. The RaDIATE collaboration (Radiation Damage In Accelerator Target Environment), managed by Fermilab, also draws on existing expertise in related fields to execute a coordinated strategy for high power targetry R&D between the 14 international member institutions.

Pellemoine, Frederique [Fermilab]↗

Remediation Residential Properties Contaminated with LLRW as Part of the Port Hope Area Initiative - The Importance of Effective Community Consultation - 18591

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Municipality of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. Within the community of Port Hope, surveys are being conducted at approximately 4800 individual properties to identify the presence of LLRW resulting from fugitive emissions from the refinery and/or the use of refinery residue as construction backfill within the community. Identification of the presence of LLRW is based on multiple lines of evidence including reviews of historical information, gamma radiation surveys and physical sampling of soil for the presence of four signature contaminants. Of the 4800 properties being surveyed, it is expected that approximately 10% will contain some degree of LLRW requiring physical remediation. Many of the residences requiring remediation will require extensive soil removal, removal and restoration of outbuildings, fences and other structures, and the removal of mature trees, hedges and decorative gardens. For the property owners involved this phase represents the final and most intrusive aspect of the program. As such, the remedial designs must be sensitive to the needs of the community and individual property owners taking into consideration factors such as the need to minimize the disturbance to the neighborhood; maintaining geotechnical and structural stability of homes during excavations; removal and restoration of outbuildings affected by LLRW; removal and replacement of landscaping features (decks, fences, pools etc) and mature trees; radiation protection during earthworks; control of dust and noise; and maintaining safe access by residents. As Community satisfaction is a key metric for the success of the project, constant and effective communication at all stages of the project is necessary to ensure the residents understand the nature and extent of work to be undertaken; any and all inconveniences they can expect during the work; contingencies to deal with those inconveniences (e.g. parking, garbage collection etc); measures to protect their health and safety; scheduling; and what their property will look like at the completion of works. This paper provides an overview of the residential remediation program in Port Hope and describes the consultation efforts with property owners that are integral to the development of final designs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The International Space Station: Operations and Assembly - Learning From Experiences - Past, Present, and Future

As the Space Shuttle continues flight, construction and assembly of the International Space Station (ISS) carries on as the United States and our International Partners resume the building, and continue to carry on the daily operations, of this impressive and historical Earth-orbiting research facility. In his January 14, 2004, speech announcing a new vision for America s space program, President Bush ratified the United States commitment to completing construction of the ISS by 2010. Since the launch and joining of the first two elements in 1998, the ISS and the partnership have experienced and overcome many challenges to assembly and operations, along with accomplishing many impressive achievements and historical firsts. These experiences and achievements over time have shaped our strategy, planning, and expectations. The continual operation and assembly of ISS leads to new knowledge about the design, development and operation of systems and hardware that will be utilized in the development of new deep-space vehicles needed to fulfill the Vision for Exploration and to generate the data and information that will enable our programs to return to the Moon and continue on to Mars. This paper will provide an overview of the complexity of the ISS Program, including a historical review of the major assembly events and operational milestones of the program, along with the upcoming assembly plans and scheduled missions of the space shuttle flights and ISS Assembly sequence.

Fuller, Sean↗

SU-E-T-153: Establish a Comprehensive Patient-Specific Plan QA Database for Instituitional Quality Control Program

Purpose: Since the publication of TG-119, several new treatment techniques requiring new QA devices have been implemented in the clinic. To monitor and analyze our institutional QA performance, we have created a comprehensive QA database using Research Electronic Data Capture (REDCap). The database will also assist us in creating IMRT QA Analysis practice guidelines. Methods: Since Oct. 2013, 336 patient plan QA results were entered into the database. Plan parameters such as plan ID, treatment site, technique, energy, optimization constraints, modulation factor, leaf speed, leaf opening.etc were automatically extracted from the Varian Eclipse database to allow us to refine our evaluation and analysis method. Specific QA device, LINAC-related information, and measurement and analysis results were manually entered by the QA team. IMRT plans were measured using MapCHECK2 while RapidArc plans were measured using ArcCHECK. Distance-To-Agreement 3%/3mm without global maximum normalization was used. Results: The data indicates that different treatment techniques might benefit from a different site-specific action level(AL) depending on the complexity of the plan and optimization parameter used (e.g., breast IMRT QA= 97.8% and pelvis IMRT QA=93.1%). Different QA devices may also benefit from a different AL (MapCHECK2 = 94.1% while ArcCHECK = 83.0%). The relationship between the parameters and passing rate suggests that the complexity of each plan, characterized by leaf travel, leaf opening and modulation factor, affect the passing rate significantly. The database is reviewed regularly, and any abnormal point of the QA result or a trend of lower QA passing rate on a specific LINAC is further investigated. Conclusion: Establishing a comprehensive QA database provides an overview of the quality assurance program. It not only helps in answering the question “what is a reasonable and achievable standard for each institution”, but also saves time in monitoring and investigating the daily machine and QA performance.

07 ISOTOPE AND RADIATION SOURCES↗

Space Shuttle Operations and Infrastructure: A Systems Analysis of Design Root Causes and Effects

This NASA Technical Publication explores and documents the nature of Space Shuttle operations and its supporting infrastructure and addresses fundamental questions often asked of the Space Shuttle program why does it take so long to turnaround the Space Shuttle for flight and why does it cost so much? Further, the report provides an overview of the cause-and effect relationships between generic flight and ground system design characteristics and resulting operations by using actual cumulative maintenance task times as a relative measure of direct work content. In addition, this NASA TP provides an overview of how the Space Shuttle program's operational infrastructure extends and accumulates from these design characteristics. Finally, and most important, the report derives a set of generic needs from which designers can revolutionize space travel from the inside out by developing and maturing more operable and supportable systems.

McCleskey, Carey M.↗

From Paper to Production: An Update on NASA's Upper Stage Engine for Exploration

In 2006, NASA selected an evolved variant of the proven Saturn/Apollo J-2 upper stage engine to power the Ares I crew launch vehicle upper stage and the Ares V cargo launch vehicle Earth departure stage (EDS) for the Constellation Program. Any design changes needed by the new engine would be based where possible on proven hardware from the Space Shuttle, commercial launchers, and other programs. In addition to the thrust and efficiency requirements needed for the Constellation reference missions, it would be an order of magnitude safer than past engines. It required the J-2X government/industry team to develop the highest performance engine of its type in history and develop it for use in two vehicles for two different missions. In the attempt to achieve these goals in the past five years, the Upper Stage Engine team has made significant progress, successfully passing System Requirements Review (SRR), System Design Review (SDR), Preliminary Design Review (PDR), and Critical Design Review (CDR). As of spring 2010, more than 100,000 experimental and development engine parts have been completed or are in various stages of manufacture. Approximately 1,300 of more than 1,600 engine drawings have been released for manufacturing. This progress has been due to a combination of factors: the heritage hardware starting point, advanced computer analysis, and early heritage and development component testing to understand performance, validate computer modeling, and inform design trades. This work will increase the odds of success as engine team prepares for powerpack and development engine hot fire testing in calendar 2011. This paper will provide an overview of the engine development program and progress to date.

Kynard, Mike↗

Legacy of Biomedical Research During the Space Shuttle Program

The Space Shuttle Program provided many opportunities to study the role of spaceflight on human life for over 30 years and represented the longest and largest US human spaceflight program. Outcomes of the research were understanding the effect of spaceflight on human physiology and performance, countermeasures, operational protocols, and hardware. The Shuttle flights were relatively short, < 16 days and routinely had 4 to 6 crewmembers for a total of 135 flights. Biomedical research was conducted on the Space Shuttle using various vehicle resources. Specially constructed pressurized laboratories called Spacelab and SPACEHAB housed many laboratory instruments to accomplish experiments in the Shuttle s large payload bay. In addition to these laboratory flights, nearly every mission had dedicated human life science research experiments conducted in the Shuttle middeck. Most Shuttle astronauts participated in some life sciences research experiments either as test subjects or test operators. While middeck experiments resulted in a low sample per mission compared to many Earth-based studies, this participation allowed investigators to have repetition of tests over the years on successive Shuttle flights. In addition, as a prelude to the International Space Station (ISS), NASA used the Space Shuttle as a platform for assessing future ISS hardware systems and procedures. The purpose of this panel is to provide an understanding of science integration activities required to implement Shuttle research, review biomedical research, characterize countermeasures developed for Shuttle and ISS as well as discuss lessons learned that may support commercial crew endeavors. Panel topics include research integration, cardiovascular physiology, neurosciences, skeletal muscle, and exercise physiology. Learning Objective: The panel provides an overview from the Space Shuttle Program regarding research integration, scientific results, lessons learned from biomedical research and countermeasure development.

Hayes, Judith C.↗

TA-IV Sub-Area Plan: Overview & Summary

The Plan seeks to: Sustain programs and activities, and safeguard opportunities to grow mission through redevelopment and infill; Maintain existing land use designations; Construct a multi-modal corridor that connects TA-I, TA-II, and TA-IV; Implement minor adjustments to the site’s security boundaries; Implement an incremental development strategy that enhances the many positive features of the area; Replace temporary buildings with permanent (GPP-size) structures.

99 GENERAL AND MISCELLANEOUS↗

Emergency Management Overview [Slides]

Introdution: LANL's Emergency Management Program is designed and managed in accordance with standards and requirements mandated by the DOE. LANL's primary driver and foundation of this course is DOE O 151.1D, Comprehensive Emergency Management System ; Established the requirements for emergency preparedness, response, and recovery for DOE facilities; Implemented by Emergency Management Division (EMD) on behalf of the Laboratory.

99 GENERAL AND MISCELLANEOUS↗