Achieving Operability via the Mission System Paradigm

In the past, flight and ground systems have been developed largely-independently, with the flight system taking the lead, and dominating the development process. Operability issues have been addressed poorly in planning, requirements, design, I&T, and system-contracting activities. In many cases, as documented in lessons-learned, this has resulted in significant avoidable increases in cost and risk. With complex missions and systems, operability is being recognized as an important end-to-end design issue. Never-the-less, lessons-learned and operability concepts remain, in many cases, poorly understood and sporadically applied. A key to effective application of operability concepts is adopting a 'mission system' paradigm. In this paradigm, flight and ground systems are treated, from an engineering and management perspective, as inter-related elements of a larger mission system. The mission system consists of flight hardware, flight software, telecom services, ground data system, testbeds, flight teams, science teams, flight operations processes, procedures, and facilities. The system is designed in functional layers, which span flight and ground. It is designed in response to project-level requirements, mission design and an operations concept, and is developed incrementally, with early and frequent integration of flight and ground components.

ground systems↗

Practical Applications of Cables and Ropes in the ISS Countermeasures System

As spaceflight durations have increased over the last four decades, the effects of weightlessness on the human body are far better understood, as are the countermeasures. A combination of aerobic and resistive exercise devices contribute to countering the losses in muscle strength, aerobic fitness, and bone strength of today's astronauts and cosmonauts that occur during their missions on the International Space Station. Creation of these systems has been a dynamically educational experience for designers and engineers. The ropes and cables in particular have experienced a wide range of challenges, providing a full set of lessons learned that have already enabled improvements in on-orbit reliability by initiating system design improvements. This paper examines the on-orbit experience of ropes and cables in several exercise devices and discusses the lessons learned from these hardware items, with the goal of informing future system design.

Moore, Cherice↗

Photonics for Space Flight Instruments

For the past 25 years, the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center’s Photonics Group in the Engineering Directorate has been substantially contributing to the flight design, development, production, testing and integration of many science and navigational instruments. The group has an extensive background in screening, qualifying, development and integration of commercial components for spaceflight applications. They have been willing to communicate lessons learned in packaging, part construction, materials selection, testing, and other facets of the design and production process critical to implementation for high-reliability systems. Summarized here is the last ten years of instrumentation development lessons learned and data collected from the subsystems down to the optoelectronic component level.

Spaceflight↗

NASA/MOD Operations Impacts from Shuttle Program

Operations plays a pivotal role in the success of any human spaceflight program. This paper will highlight some of the core tenets of spaceflight operations from a systems perspective and use several examples from the Space Shuttle Program to highlight where the success and safety of a mission can hinge upon the preparedness and competency of the operations team. Further, awareness of the types of operations scenarios and impacts that can arise during human crewed space missions can help inform design and mission planning decisions long before a vehicle gets into orbit. A strong operations team is crucial to the development of future programs; capturing the lessons learned from the successes and failures of a past program will allow for safer, more efficient, and better designed programs in the future. No matter how well a vehicle is designed and constructed, there are always unexpected events or failures that occur during space flight missions. Preparation, training, real-time execution, and troubleshooting are skills and values of the Mission Operations Directorate (MOD) flight controller; these operational standards have proven invaluable to the Space Shuttle Program. Understanding and mastery of these same skills will be required of any operations team as technology advances and new vehicles are developed. This paper will focus on individual Space Shuttle mission case studies where specific operational skills, techniques, and preparedness allowed for mission safety and success. It will detail the events leading up to the scenario or failure, how the operations team identified and dealt with the failure and its downstream impacts. The various options for real-time troubleshooting will be discussed along with the operations team final recommendation, execution, and outcome. Finally, the lessons learned will be summarized along with an explanation of how these lessons were used to improve the operational preparedness of future flight control teams.

Fitzpatrick, Michael↗

Challenges with Electrical, Electronics, and Electromechanical Parts for James Webb Space Telescope

James Webb Space Telescope (JWST) is the space-based observatory that will extend the knowledge gained by the Hubble Space Telescope (HST). Hubble focuses on optical and ultraviolet wavelengths while JWST focuses on the infrared portion of the electromagnetic spectrum, to see the earliest stars and galaxies that formed in the Universe and to look deep into nearby dust clouds to study the formation of stars and planets. JWST, which commenced creation in 1996, is scheduled to launch in 2018. It includes a suite of four instruments, the spacecraft bus, optical telescope element, Integrated Science Instrument Module (ISIM, the platform to hold the instruments), and a sunshield. The mass of JWST is approximately 6200 kg, including observatory, on-orbit consumables and launch vehicle adaptor. Many challenges were overcome while providing the electrical and electronic components for the Goddard Space Flight Center hardware builds. Other difficulties encountered included developing components to work at cryogenic temperatures, failures of electronic components during development and flight builds, Integration and Test electronic parts problems, and managing technical issues with international partners. This paper will present the context of JWST from a EEE (electrical, electronic, and electromechanical) perspective with examples of challenges and lessons learned throughout the design, development, and fabrication of JWST in cooperation with our associated partners including the Canadian Space Agency (CSA), the European Space Agency (ESA), Lockheed Martin and their respective associated partners. Technical challenges and lessons learned will be discussed.

EEE Parts↗

Toward the Instrumentation and Data Acquisition of a Tidal Turbine in Real Site Conditions

The National Renewable Energy Laboratory manufactured, instrumented, and deployed thermoplastic composite blades and a data acquisition system (NDAQ) on one of Verdant Power’s Gen5d 5 m diameter tidal turbines in New York’s East River. The thermoplastic blades had internal strain gages, and the NDAQ was a stand-alone system for monitoring and recording the strain and angular position of the blades. The turbine with thermoplastic blades operated and produced power successfully for 3 months, contributing energy to the New York City electric grid. The NDAQ hardware, instrumentation, and structure all survived the deployment and were still functional upon retrieval of the system, but no data were collected. Even though the data retrieval was not a success, data acquisition for deployed subsea marine renewable structures is a new undertaking, and it is critical to share lessons learned from national laboratory experiences. The successful deployment of thermoplastic composite blades marks a significant advancement toward improved materials for subsea components, as well as an advancement in recyclable composite materials. This article outlines the methodology and lessons learned for the instrumentation and data acquisition system.

16 TIDAL AND WAVE POWER↗

Overview of the Main Propulsion System for the NASA Ares I Upper Stage

A functional overview of the Main Propulsion System (MPS) of the NASA Ares I Upper Stage is provided. In addition to a simple overview of the key MPS functions and design philosophies, major lessons learned are discussed. The intent is to provide a technical overview with enough detail to allow engineers outside of the MPS Integrated Product Team (IPT) to develop a rough understanding of MPS operations, components, design philosophy, and lessons learned.

Quinn, Jason E.↗

A Survey of the Spacecraft Line-Of-Sight Jitter Problem

Predicting, managing, controlling, and testing spacecraft Line-of-Sight (LoS) jit- ter due to on-board internal disturbance sources is a challenging multi- disciplinary systems engineering problem, especially for those observatories hosting extremely sensitive optical sensor payloads with stringent requirements on allowable LoS jitter. Some specific spacecraft jitter engineering challenges will be introduced and described in this survey paper. Illustrative examples of missions where dynamic interactions have to be addressed to satisfy demanding payload instrument LoS jitter requirements will be provided. Some lessons learned and a set of recommended rules of thumb are also presented to provide guidance for analysts on where to initiate and how to approach a new spacecraft jitter design problem. These experience-based spacecraft jitter lessons learned and rules of thumb are provided in the hope they can be leveraged on new space system development projects to help overcome unfamiliarity with previously identified jitter technical pitfalls and challenges.

Dennehy, Cornelius J.↗

Introduction of an Agile Systems Engineering Process to the NASA Armstrong Flight Research Center

This paper will provide background on the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) ARMD Test Data Portal (ATDP) effort along with the rationale that motivated the ATDP team to consider implementing an agile systems engineering (SE) process. The primary motivation for using this new SE process was based on the desire to mitigate a major risk to project success. Since the agile SE process had never been used before at the NASA Armstrong Flight Research Center (AFRC), utilizing this new SE process required a trailblazing effort to introduce it to NASA AFRC leadership. As a result, the ATDP team chose to adhere to the agile SE process in addition to the trusted classical waterfall SE process on ATDP. Through successful execution of this hybrid SE process during Phase I, along with demonstrating the value and rigor of the agile SE process, NASA AFRC leadership ultimately permitted the ATDP project to solely use the agile SE process for developments beyond Phase I. While it is the opinion of the authors that the classical SE process is more effective for most projects at NASA AFRC, some projects may deem that the agile SE process is more advantageous. Although this paper is focused on introducing the agile SE process to NASA AFRC, lessons learned will be valuable to other organizations as well. Details of how the ATDP team implemented the agile SE process during Phase I will be summarized, along with how the team met all required classical SE milestones. Lessons learned throughout Phase I of this effort will also be highlighted.

Daniel S. Jones↗

SOFIA: Flying the Telescope

The primary focus of this paper is how the flight test team for the Stratospheric Observatory For Infrared Astronomy (SOFIA) re-cast an extensive developmental test program to meet key milestones while simultaneously ensuring safe certification of the airframe and delivery of an operationally relevant platform, ultimately saving the overall program from financial demise. Following a brief introduction to the observatory and what it is designed to do, SOFIAs planned developmental test program is summarized, including analysis and design philosophy, envelope expansion, model validation and airframe certification. How NASA used lessons learned from other aircraft that employed open cavities in flight is explained as well as how and why the chosen design was selected. The approach to aerodynamic analysis, including bare airframe testing, wind tunnel testing, computational fluid dynamics and finite element modeling proved absolutely critical. Despite a solid analytical foundation, many unknowns remained. History provides several examples of disastrous effects on both systems and flight safety if cavity design is not approached properly. For these reasons, an extensive test plan was developed to ensure a safe and thorough build-up for envelope expansion, airframe certification and early science missions. Unfortunately, as is often the case, because of chronic delays in overall program execution, severe schedule and funding pressures were present. If critical milestones were not met, domestic as well as international funding was in serious jeopardy, and the demise of the entire program loomed large. Concentrating on rigorous model validation, the test team challenged certification requirements, increased test efficiency and streamlined engineering analysis. This resulted in the safe reduction of test point count by 72%, meeting all program milestones and a platform that soundly satisfied all operational science requirements. Results from early science missions are shown and a proof of concept mission for which SOFIA was opportunely positioned is showcased. Success on this time-critical mission to observe a rare astronomical event proved the usefulness of an airborne observatory and the value in waiting for the capability provided by SOFIA. Finally, lessons learned in the test program are presented with emphasis on how lessons from previous aircraft and successful test programs were applied to SOFIA. Effective application of these lessons was crucial to the success of the SOFIA flight test program. SOFIA is an international cooperative program between NASA and the German Space Agency, DLR. It is a 2.5 meter (100-inch) telescope mounted in a Boeing 747SP aircraft used for astronomical observations at altitudes above 35,000 feet. SOFIA will accommodate a host of scientific instruments from the international science community and has a planned operational lifespan of more than 20 years.

Asher, Troy A.↗

ISS Regenerative Life Support: Challenges and Success in the Quest for Long-Term Habitability in Space

This presentation will discuss the International Space Station s (ISS) Regenerative Environmental Control and Life Support System (ECLSS) operations with discussion of the on-orbit lessons learned, specifically regarding the challenges that have been faced as the system has expanded with a growing ISS crew. Over the 10 year history of the ISS, there have been numerous challenges, failures, and triumphs in the quest to keep the crew alive and comfortable. Successful operation of the ECLSS not only requires maintenance of the hardware, but also management of the station resources in case of hardware failure or missed re-supply. This involves effective communication between the primary International Partners (NASA and Roskosmos) and the secondary partners (JAXA and ESA) in order to keep a reserve of the contingency consumables and allow for re-supply of failed hardware. The ISS ECLSS utilizes consumables storage for contingency usage as well as longer-term regenerative systems, which allow for conservation of the expensive resources brought up by re-supply vehicles. This long-term hardware, and the interactions with software, was a challenge for Systems Engineers when they were designed and require multiple operational workarounds in order to function continuously. On a day-to-day basis, the ECLSS provides big challenges to the on console controllers. Main challenges involve the utilization of the resources that have been brought up by the visiting vehicles prior to undocking, balance of contributions between the International Partners for both systems and resources, and maintaining balance between the many interdependent systems, which includes providing the resources they need when they need it. The current biggest challenge for ECLSS is the Regenerative ECLSS system, which continuously recycles urine and condensate water into drinking water and oxygen. These systems were brought to full functionality on STS-126 (ULF-2) mission. Through system failures and recovery, the ECLSS console has learned how to balance the water within the systems, store and use water for contingencies, and continue to work with the International Partners for short-term failures. Through these challenges and the system failures, the most important lesson learned has been the importance of redundancy and operational workarounds. It is only because of the flexibility of the hardware and the software that flight controllers have the opportunity to continue operating the system as a whole for mission success.

Bazley, Jesse A.↗

Model-Based Systems Engineering Pathfinder: Informing the Next Steps

In 2016, the NASA Engineering and Safety Center established a model-based systems engineering (MBSE) Pathfinder. The primary motivations for establishing the MBSE Pathfinder were to advance the Agency's applications of MBSE and capture lessons-learned to inform the next steps. The MBSE Pathfinder had four teams working in parallel for eight months on different topics of interest to NASA. The teams were encouraged to learn, and use creativity and innovation in their system modeling. The results were captured via reports, webinars, and a knowledge capture meeting. The approach taken for the MBSE Pathfinder was very successful in providing a number of lessons-learned for NASA and for other organizations considering MBSE or pathfinder efforts, and in building a very strong and collaborative user community.

Weiland, Karen J.↗

Panel Session 46: Final Closure of Unlined LLW Disposal Facilities Worldwide (R3.5)

This panel discussed the on-going and emerging issues with the design and construction of final cover system of unlined disposal facilities (e.g., material disposal areas (MDAs), subsurface disposal areas (SDAs), burial grounds, and similar historical waste trenches, pits and vaults). The discussion focused on key technical and regulatory issues as well as lessons learned from years of engineering and construction in US and non-US locations. Panelists with presentations: Closure of Unlined LLW Disposal Sites (Craig Benson); Closure of LLW Facilities (Paul Pointon); Final Closure of Unlined LLW Disposal Facilities - Lessons Learned (Kevin Foye)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

G254: USU student payload flown on STS-64 in September, 1994

G254 is the culmination of USU Get Away Special (GAS) students' efforts to get back into space. After a hiatus of a decade, the USU GAS program flew its sixth canister on STS-64 in September 1994. Like its predecessor payloads, this one contained a diverse set of experiments, six in all. Each experiment has its own lessons learned, which hopefully can be passed on to the next generation of GAS students. This presentation will give a balanced view of the successes and failures of G254. Emphasis will be placed on describing the stumbling blocks and the many lessons learned that come from experience rather than academic training. G254 has once again taken a team of about fifteen USU students, plus about one hundred fourth and fifth graders, and given them an immeasurable education.

Raghuram, Tumkur↗

The Evolution of Exercise Hardware on ISS: Past, Present, and Future

During 16 years in low-Earth orbit, the suite of exercise hardware aboard the International Space Station (ISS) has matured significantly. Today, the countermeasure system supports an array of physical-training protocols and serves as an extensive research platform. Future hardware designs are required to have smaller operational envelopes and must also mitigate known physiologic issues observed in long-duration spaceflight. Taking lessons learned from the long history of space exercise will be important to successful development and implementation of future, compact exercise hardware. The evolution of exercise hardware as deployed on the ISS has implications for future exercise hardware and operations. Key lessons learned from the early days of ISS have helped to: 1. Enhance hardware performance (increased speed and loads). 2. Mature software interfaces. 3. Compare inflight exercise workloads to pre-, in-, and post-flight musculoskeletal and aerobic conditions. 4. Improve exercise comfort. 5. Develop complimentary hardware for research and operations. Current ISS exercise hardware includes both custom and commercial-off-the-shelf (COTS) hardware. Benefits and challenges to this approach have prepared engineering teams to take a hybrid approach when designing and implementing future exercise hardware. Significant effort has gone into consideration of hardware instrumentation and wearable devices that provide important data to monitor crew health and performance.

Buxton, R. E.↗

History and Archives Contribute to the Success of Space Flight Programs

Final Paper, not the Abstract, is attached: This report discusses how history can be used by management, engineering, and operations personnel within space flight programs. Works by professional historians and sociologists inform key decision makers and policy specialists on lessons learned from space flight program management successes and failures, as well as from legislative affairs, policy making, and commercial space efforts. Vehicle engineering history written by engineers for an engineering or operations audience informs project management and technical personnel on lessons learned, best practices, and the rationale behind the design and operation of flight vehicles and supporting ground systems. Archives play a critical role in supporting the efforts of both professional historians and flight program personnel. Suggestions are made concerning how professional historians could leverage the interests and knowledge of flight program personnel to obtain more insight that is needed to support historical research efforts.

Archive↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the development of an expert system for wheelchair selection

The presentation of wheelchairs for the Multiple Sclerosis (MS) patients involves the examination of a number of complicated factors including ambulation status, length of diagnosis, and funding sources, to name a few. Consequently, only a few experts exist in this area. To aid medical therapists with the wheelchair selection decision, a prototype medical expert system (ES) was developed. This paper describes and discusses the steps of designing and developing the system, the experiences of the authors, and the lessons learned from working on this project. Wheelchair Advisor, programmed in CLIPS, serves as diagnosis, classification, prescription, and training tool in the MS field. Interviews, insurance letters, forms, and prototyping were used to gain knowledge regarding the wheelchair selection problem. Among the lessons learned are that evolutionary prototyping is superior to the conventional system development life-cycle (SDLC), the wheelchair selection is a good candidate for ES applications, and that ES can be applied to other similar medical subdomains.

Madey, Gregory R.↗