Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Test and Evaluation of the Next Generation Blower for FBCO2 Scrubber

The four-bed carbon dioxide (FBCO2) scrubber was deployed on the ISS in late 2021 as a technology demonstration. The system was launched with a Honeywell blower that, while performing well, is no longer supported by the manufacturer with no available spares. Thus, NASA contracted with Calnetix Technologies to develop a next-generation, magnetic-bearing blower to meet FBCO2 demands and deliver the flowrates required for effective CO2 scrubbing. The first flight blower assembly was tested by Marshall Space Flight Center (MSFC) in the summer of 2022 and installed in FBCO2 in February 2023. This paper presents the blower performance ground testing results, with details on the test plan and test setup provided. The performance data is used not only to qualify the blower for use in F BCO2, but also to create a model for use in predictions of on-orbit performance based on available telemetry data. The paper concludes with discussions on test limitations and early FBCO2 performance data with the new blower installed.

Kaitlin Oliver-Butler↗

Measure Guideline: Combined Space and Water Heating Installation and Optimization

Combined space and water heater (combi or combo) systems are defined by their dual functionality. Combi systems provide both space heating and water heating capabilities with a single heat source. This guideline will focus on the installation and operation of residential systems with forced air heating and domestic hot water (DHW) functionality. Past NorthernSTAR research has used a combi system to replace a natural gas forced air distribution system furnace and tank type water heater (Schoenbauer et al. 2012; Schoenbauer, Bohac, and McAlpine 2014). The combi systems consisted of a water heater or boiler heating plant teamed with a hydronic air handler that included an air handler, water coil, and water pump to circulate water between the heating plant and coil. The combi water heater or boiler had a separate circuit for DHW. Past projects focused on laboratory testing, field characterization, and control optimization of combi systems. Laboratory testing was done to fully characterize and test combi system components; field testing was completed to characterize the installed performance of combi systems; and control methodologies were analyzed to understand the potential of controls to simplify installation and design and to improve system efficiency and occupant comfort. This past work was relied upon on to create this measure guideline.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measure Guideline: Combined Space and Water Heating Installation and Optimization

Combined space and water heater (combi or combo) systems are defined by their dual functionality. Combi systems provide both space heating and water heating capabilities with a single heat source. This guideline will focus on the installation and operation of residential systems with forced air heating and domestic hot water (DHW) functionality. Past NorthernSTAR research has used a combi system to replace a natural gas forced air distribution system furnace and tank type water heater (Schoenbauer et al. 2012; Schoenbauer, Bohac, and McAlpine 2014). The combi systems consisted of a water heater or boiler heating plant teamed with a hydronic air handler that included an air handler, water coil, and water pump to circulate water between the heating plant and coil. The combi water heater or boiler had a separate circuit for DHW. Past projects focused on laboratory testing, field characterization, and control optimization of combi systems. Laboratory testing was done to fully characterize and test combi system components; field testing was completed to characterize the installed performance of combi systems; and control methodologies were analyzed to understand the potential of controls to simplify installation and design and to improve system efficiency and occupant comfort. This past work was relied upon on to create this measure guideline.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a High-Efficiency Hot Gas Turbo-expander and Low-Cost Heat Exchangers for Optimized CSP Supercritical CO 2 Operation

Southwest Research Institute® (SwRI®) has developed a novel, high-efficiency, supercritical carbon dioxide (sCO 2 ), hot gas turbo-expander optimized for the highly-transient, solar-powerplant, duty-cycle profile. This MW-scale sCO 2 turbo-expander design advances the state-of-theart of sCO 2 turbo-expanders from a current Technology Readiness Level (TRL) of three (initial, small-scale, laboratory, size testing) to a full TRL6 (MW-scale prototype demonstration). A secondary objective of this project was to optimize novel compact heat exchangers for sCO 2 applications to drastically reduce their manufacturing costs. Significant learning was achieved on how to design and fabricate a more cost effective, high performance recuperator, at the MWt capacity. The sCO 2 turbo-expander and novel sCO 2 heat exchanger have been tested in a 1- MWe sCO 2 test loop, fabricated to demonstrate component performance and the performance of the optimized sCO 2 Brayton cycle over a wide range of part load conditions and during transient operations representative of a typical Concentrating Solar Power (CSP) duty cycle. The scalable sCO 2 expander design and improved heat exchanger address and close two critical technology gaps required for an optimized CSP sCO 2 power plant and provide a major stepping stone on the pathway to achieving CSP power at $\$ $0.06/kW-hr Levelized Cost of Electricity (LCOE), increasing energy conversion efficiency to greater than 50% and reducing total power block cost to below $\$ $1,200/kW installed. Construction of the facility and testing has been completed. Test targets of 1,320°F, 27,000 rpm, and 3,500 psi were reached during separate tests. Overall, the turbine saw 37.5 hours of operation with many other hours of testing and troubleshooting all of the loop components. All the test data and troubleshooting is useful and applicable for future tests and operations with not only this loop but in any sCO2 application.

14 SOLAR ENERGY↗

Icing tunnel tests of a glycol-exuding porous leading edge ice protection system on a general aviation airfoil

A glycol-exuding porous leading edge ice protection system was tested. Results show that the system is very effective in preventing ice accretion (anti-ice mode) or removing ice from an airfoil. Minimum glycol flow rates required for anti-icing are a function of velocity, liquid water content in the air, ambient temperature, and droplet size. Large ice caps were removed in only a few minutes using anti-ice flow rates. It was found that the shed time is a function of the type of ice, size of the ice cap, angle of attack, and glycol flow rate. Wake survey measurements show that there is no significant drag penalty for the installation or operation of the system tested.

Kohlman, D. L.↗

MELDI2 Do No Harm Test Series

Mars 2020 will fly the Mars Entry, Descent, and Landing Instrumentation II (MEDLI2) sensor suite consisting of a total of seventeen instrumented thermal sensor plugs, eight pressure transducers, two heat flux sensors, and one radiometer embedded in the thermal protection system (TPS). Of the MEDLI2 instrumentation, eleven instrumented thermal plugs and seven pressure transducers will be installed on the heatshield of the Mars 2020 vehicle while the rest will be installed on the backshell. The goal of the MEDLI2 instrumentation is to directly inform the large performance uncertainties that contribute to the design and validation of a Mars entry system. A better understanding of the entry environment and TPS performance could lead to reduced design margins enabling a greater payload mass-fraction and smaller landing ellipses. To prove that the MEDLI2 system will not degrade the performance of the Mars 2020 TPS, an Aerothermal Do No Harm (DNH) test series was designed and conducted. Like Mars 2020's predecessor, Mars Science Laboratory (MSL), the heatshield material will be Phenolic Impregnated Carbon Ablator (PICA); the Mars 2020 entry conditions are enveloped by the MSL design environments, therefore the development and qualification testing performed during MEDLI is sufficient to show that the similar MEDLI2 heatshield instrumentation will not degrade PICA performance. However, given that MEDLI did not include any backshell instrumentation, the MEDLI2 team was required to design and execute a DNH test series utilizing the backshell TPS material (SLA-561V) with the intended flight sensor suite. To meet the requirements handed down from Mars 2020, the MEDLI2 DNH test series emphasized the interaction between the MEDLI2 sensors and sensing locations with the surrounding backshell TPS and substrucutre. These interactions were characterized by performing environmental testing of four 12" by 12" test panels, which mimicked the construction of the backshell TPS and the integration of the MEDLI2 sensors as seen in Figure 1. The testing included thermal vacuum/ cycling, random vibration, shock, and arc jet testing. The test panels were fabricated by Lockheed Martin, establishing techniques that will be utilized during the Mars 2020 vehicle installation. Each test panel included one thermal sensor plug (two embedded thermocouples), one heat flux sensor, and multiple pressure port holes for evaluation. This presentation will discuss the planning and execution of the MEDLI2 DNH test series. Selected highlights and results of each environmental test will be presented, and lessons learned will be addressed that will feed forward into the planning for the MEDLI2 flight system certification testing.

Heatshield↗

Solid Oxide Fuel Cell Systems PVL Line

In July 2010, Stark State College (SSC), received Grant DE-EE0003229 from the U.S. Department of Energy (DOE), Golden Field Office, for the development of the electrical and control systems, and mechanical commissioning of a unique 20kW scale high-pressure, high temperature, natural gas fueled Stack Block Test System (SBTS). SSC worked closely with subcontractor, Rolls-Royce Fuel Cell Systems (US) Inc. (RRFCS) over a 13 month period to successfully complete the project activities. This system will be utilized by RRFCS for pre-commercial technology development and training of SSC student interns. In the longer term, when RRFCS is producing commercial products, SSC will utilize the equipment for workforce training. In addition to DOE Hydrogen, Fuel Cells, and Infrastructure Technologies program funding, RRFCS internal funds, funds from the state of Ohio, and funding from the DOE Solid State Energy Conversion Alliance (SECA) program have been utilized to design, develop and commission this equipment. Construction of the SBTS (mechanical components) was performed under a Grant from the State of Ohio through Ohio's Third Frontier program (Grant TECH 08-053). This Ohio program supported development of a system that uses natural gas as a fuel. Funding was provided under the Department of Energy (DOE) Solid-state Energy Conversion Alliance (SECA) program for modifications required to test on coal synthesis gas. The subject DOE program provided funding for the electrical build, control system development and mechanical commissioning. Performance testing, which includes electrical commissioning, was subsequently performed under the DOE SECA program. Rolls-Royce Fuel Cell Systems is developing a megawatt-scale solid oxide fuel cell (SOFC) stationary power generation system. This system, based on RRFCS proprietary technology, is fueled with natural gas, and operates at elevated pressure. A critical success factor for development of the full scale system is the capability to test fuel cell components at a scale and under conditions that can be accurately extrapolated to full system performance. This requires specially designed equipment that replicates the pressure (up to 6.5 bara), temperature (about 910 C), anode and cathode gas compositions, flows and power generation density of the full scale design. The SBTS fuel cell anode gas is produced through the reaction of pipeline natural gas with a mixture of steam, CO2, and O2 in a catalytic partial oxidation (CPOX) reactor. Production of the fuel cell anode gas in this manner provides the capability to test a fuel cell with varying anode gas compositions ranging from traditional reformed natural gas to a coal-syngas surrogate fuel. Stark State College and RRFCS have a history of collaboration. This is based upon SSCAs commitment to provide students with skills for advanced energy industries, and RRFCS need for a workforce that is skilled in high temperature fuel cell development and testing. A key to this approach is the access of students to unique SOFC test and evaluation equipment. This equipment is designed and developed by RRFCS, with the participation of SSC interns. In the near-term, the equipment will be used by RRFCS for technology development. When this stage is completed, and RRFCS has moved to commercial products, SSC will utilize this equipment for workforce training. The RRFCS fuel cell design is based upon a unique ceramic substrate architecture in which a porous, flat substrate (tube) provides the support structure for a network of solid oxide fuel cells that are electrically connected in series. These tubes are grouped into a {approx}350-tube repeat configuration, called a stack/block. Stack/block testing, performed at system conditions, provides data that can be confidently scaled to full scale performance. This is the basis for the specially designed and developed test equipment that is required for advancing and accelerating the RRFCS SOFC power system development program. All contract DE-EE0003229 objectives were achieved and deliverables completed during the period from March 1, 2010 through March 31, 2011. As a result of program completion, the Stack Block Test System was ready to support installation and electrical operation of a RRFCS solid oxide fuel cell (SOFC) stack block in the second quarter of 2011.

01 COAL, LIGNITE, AND PEAT↗

EASE/ACCESS ground processing at Kennedy Space Center

The Kennedy Space Center (KSC) Payload Management and Operations Directorate is responsible for the processing of Space Shuttle payloads. The KSC responsibilities begin prior to hardware arrival at the launch site and extend until the experiments are returned to the investigators after the flight. The KSC involvement with the integration and checkout of payloads begins with participation in experiment, Mission Peculiar Equipment (MPE), and integrated payload design reviews. This involvement also includes participation in assembly and testing of flight hardware at the appropriate design center, university, or private corporation. Once the hardware arrives at the launch site, KSC personnel install the experiments and MPE onto a carrier in the Operations and Checkout (O & C) building. Following integration, the payload is functionally tested and then installed into the orbiter. After the mission, the payload is removed from the orbiter, deintegrated in the O & C building, and the experiments are turned over to the mission manager. One of the many payloads process at KSC consisted of two space construction experiments: the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). The details of EASE/ACCESS integration, testing, and deintegration are addressed and how this mission can serve as a guide for future space construction payloads is discussed.

Moates, Deborah J.↗

Integrated system modeling analysis of a cryogenic multi-cell deflecting-mode cavity resonator

A deflecting mode cavity is the integral element for six-dimensional phase-space beam control in bunch compressors and emittance transformers at high energy beam test facilities. RF performance of a high-Q device is, however, highly sensitive to operational conditions, in particular in a cryo-cooling environment. Using analytic calculations and RF simulations, we examined cavity parameters and deflecting characteristics of TM{sub 110,π} mode of a 5 cell resonator in a liquid nitrogen cryostat, which has long been used at the Fermilab A0 Photoinjector (A0PI). The sensitivity analysis indicated that the cavity could lose 30%–40% of deflecting force due to defective input power coupling accompanying non-uniform field distribution across the cells with 40 ∼ 50 MeV electron beam and 70–80 kW klystron power. Vacuum-cryomodules of the 5 cell cavity are planned to be installed at the Fermilab Advanced Superconducting Test Accelerator facility. Comprehensive modeling analysis integrated with multi-physics simulation tools showed that RF loading of 1 ms can cause a ∼5 K maximum temperature increase, corresponding to a ∼4.3 μm/ms deformation and a 1.32 MHz/K maximum frequency shift. The integrated system modeling analysis will improve design process of a high-Q cavity with more accurate prediction of cryogenic RF performance under a high power pulse operation.

43 PARTICLE ACCELERATORS↗

Camera assembly design proposal for SRF cavity image collection

This project seeks to collect images from the inside of a superconducting radio frequency (SRF) large grain niobium cavity during vertical testing. These images will provide information on multipacting and other phenomena occurring in the SRF cavity during these tests. Multipacting, a process that involves an electron buildup in the cavity and concurrent loss of RF power, is thought to be occurring near the cathode in the SRF structure. Images of electron emission in the structure will help diagnose the source of multipacting in the cavity. Multipacting sources may be eliminated with an alteration of geometric or resonant conditions in the SRF structure. Other phenomena, including unexplained light emissions previously discovered at SLAC, may be present in the cavity. In order to effectively capture images of these events during testing, a camera assembly needs to be installed to the bottom of the RF structure. The SRF assembly operates under extreme environmental conditions: it is kept in a dewar in a bath of 2K liquid helium during these tests, is pumped down to ultra-high vacuum, and is subjected to RF voltages. Because of this, the camera needs to exist as a separate assembly attached to the bottom of the cavity. The design of the camera is constrained by a number of factors that are discussed.

43 PARTICLE ACCELERATORS↗

Camera Assembly Design Proposal for SRF Cavity Image Collection

This project seeks to collect images from the inside of a superconducting radio frequency (SRF) large grain niobium cavity during vertical testing. These images will provide information on multipacting and other phenomena occurring in the SRF cavity during these tests. Multipacting, a process that involves an electron buildup in the cavity and concurrent loss of RF power, is thought to be occurring near the cathode in the SRF structure (see Figure 1). Images of electron emission in the structure will help diagnose the source of multipacting in the cavity. Multipacting sources may be eliminated with an alteration of geometric or resonant conditions in the SRF structure. Other phenomena, including unexplained light emissions previously discovered at SLAC, may be present in the cavity. In order to effectively capture images of these events during testing, a camera assembly needs to be installed to the bottom of the RF structure. The SRF assembly operates under extreme environmental conditions: it is kept in a dewar in a bath of 2K liquid helium during these tests, is pumped down to ultra-high vacuum, and is subjected to RF voltages. Because of this, the camera needs to exist as a separate assembly attached to the bottom of the cavity. The design of the camera is constrained by a number of factors that are discussed below.

43 PARTICLE ACCELERATORS↗

Mars2020 Entry, Descent, and Landing Instrumentation 2 (MEDLI2) Do No Harm Test Series

A total of seventeen instrumented thermal sensor plugs, eight pressure transducers, two heat flux sensors, and one radiometer are planned to be utilized on the Mars 2020 missions thermal protection system (TPS) as part of the Mars Entry, Descent, and Landing Instrumentation II (MEDLI2) project. Of the MEDLI2 instrumentation, eleven instrumented thermal plugs and seven pressure transducers will be installed on the heatshield of the Mars 2020 vehicle while the rest will be installed on the backshell. The goal of the MEDLI2 instrumentation is to directly inform the large performance uncertainties that contribute to the design and validation of a Mars entry system. A better understanding of the entry environment and TPS performance could lead to reduced design margins enabling a greater payload mass-fraction and smaller landing ellipses. To prove that the MEDLI2 system will not degrade the performance of the Mars 2020 TPS, an Aerothermal Do No Harm (DNH) test series was designed and conducted. Like Mars 2020s predecessor, Mars Science Laboratory (MSL), the heatshield material will be Phenolic Impregnated Carbon Ablator (PICA); the Mars 2020 entry conditions are enveloped by the MSL design environments, therefore the development and qualification testing performed during MEDLI is sufficient to show that the similar MEDLI2 heatshield instrumentation will not degrade PICA performance. However, given that MEDLI did not include any backshell instrumentation, the MEDLI2 team was required to design and execute a DNH test series utilizing the backshell TPS material (SLA-561V) with the intended flight sensor suite. To meet the requirements handed down from Mars 2020, the MEDLI2 DNH test series emphasized the interaction between the MEDLI2 sensors and sensing locations with the surrounding backshell TPS and substrucutre. These interactions were characterized by performing environmental testing of four 12 by 12 test panels, which mimicked the construction of the backshell TPS and the integration of the MEDLI2 sensors as seen in Figure 1. The testing included thermal vacuumcycling, random vibration, shock, and arc jet testing. The test panels were fabricated by Lockheed Martin, establishing techniques that will be utilized during the Mars 2020 vehicle installation. Each test panel included one thermal sensor plug (two embedded thermocouples), one heat flux sensor, and multiple pressure port holes for evaluation.This presentation will discuss the planning and execution of the MEDLI2 DNH test series. Selected highlights and results of each environmental test will be presented, and lessons learned will be addressed that will feed forward into the planning for the MEDLI2 flight system certification testing.

backshell↗

In-Containment Signal Acquisition and Data Transmission via Power Lines within High Dose Areas of Nuclear Power Plants

Signal acquisition and data transmission for innovative sensor systems and networks inside the containment of nuclear power plants (NPPs) is still a challenge with respect to safety, performance, reliability, availability, and costs. This especially applies to equipment upgrades for existing plants, special measurements, but also for new builds. This paper presents a novel method for efficient and cost-effective sensor signal acquisition and data transmission via power lines, in order to cope with the disadvantages of common system architectures that often suffer from poor signal integrity due to raw data transmissions via long cables, huge efforts and costs for installation, and low flexibility with respect to maintenance and upgrades. A transmitter-receiver architecture is proposed that allows multiplexing of multiple sensor inputs for unidirectional point-to-point transmission by superimposing information signals on existing AC or DC supply lines, but also on active and inactive sensor wires, or spare cables, using power line communication (PLC) technology. Based on commercial off-the-shelf (COTS) electronic parts, a radiation hard transmitter hardware is designed to operate in harsh environment within the containment during full plant operation. The system's modular approach allows application specific trade-offs between redundancy and throughput regarding data transmission, as well as various sensor input front-ends which are compatible with state of the art systems. PLC technology eliminates the need for costly installation of additional cables and wall penetrations, while providing a complementary and diverse communication technology for upgrades of existing systems. At the receiver side in low dose areas, signals are extracted from the power line, demodulated, and de-multiplexed, in order to regain the original sensor signal information and provide it either in analog or digital output format. Successful laboratory qualification tests, field trails, and a demonstrator setup installation within a NPP verify the overall performance of the proposed system. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A distributed data acquisition system for aeronautics test facilities

The NASA Lewis Research Center is in the process of installing a new data acquisition and display system. This new system will provide small and medium sized aeronautics test facilities with a state-of-the-art real-time data acquisition and display system. The new data system will provide for the acquisition of signals from a variety of instrumentation sources. They include analog measurements of temperatures, pressures, and other steady state voltage inputs; frequency inputs to measure speed and flow; discrete I/O for significant events, and modular instrument systems such as multiplexed pressure modules or electronic instrumentation with a IEEE 488 interface. The data system is designed to acquire data, convert it to engineering units, compute test dependent performance calculations, limit check selected channels or calculations, and display the information in alphanumeric or graphical form with a cycle time of one second for the alphanumeric data. This paper describes the system configuration, its salient features, and the expected impact on testing.

Fronek, Dennis L.↗

A distributed data acquisition system for aeronautics test facilities

The NASA Lewis Research Center is in the process of installing a new data acquisition and display system. This new system will provide small and medium sized aeronautics test facilities with a state-of-the-art real-time data acquisition and display system. The new data system will provide for the acquisition of signals from a variety of instrumentation sources. They include analog measurements of temperatures, pressures, and other steady state voltage inputs; frequency inputs to measure speed and flow; discrete I/O for significant events, and modular instrument systems such as multiplexed pressure modules or electronic instrumentation with a IEEE 488 interface. The data system is designed to acquire data, convert it to engineering units, compute test dependent performance calculations, limit check selected channels or calculations, and display the information in alphanumeric or graphical form with a cycle time of one second for the alphanumeric data. This paper describes the system configuration, its salient features, and the expected impact on testing.

Fronek, Dennis L.↗

Cold Test Facility for the ITER Central Solenoid Coils

The United States, along with the European Union, Russia, Japan, China. South Korea and India, is a collaborative partner in the design, construction and operation of the ITER International Tokamak which will be located a Cadarache, France. One component of the US in kind contribution to the project is the Central Solenoid System for the tokamak magnet system. The Central Solenoid System is a massive assembly 4.4 meters outside diameter, 18.8 meters high and weighing ~ 1,000 tons. Operating conditions (not simultaneous) are 45kA and 13 T with a maximum field ramp rate of 1.3 T/s producing a maximum flux swing of 277 V s. This combination of performance parameters make the ITER Central Solenoid one the most challenging magnet system ever built Using CICC provide by Japan, the US will deliver the final CS System by fabricating the magnet from six (6) separate 100 ton coils supported and restrained by an external structure. Part of the US responsibilities in delivering this magnet system to the ITER International Organization is to acceptance test each Central Solenoid Coil separately at operating (4K) temperature. The principal acceptance test objectives are coil leak tightness, insulation integrity and overall coil joint quality. Peak test field and test current are reduced without field contributions from adjacent coils and practical installation considerations. This paper will describe an ITER Central Solenoid Cold Test Facility study undertaken by the National High Magnetic Field Laboratory at Florida State University and the United States ITER Project Office at Oak Ridge, TN.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Hybrid Solar System (Final Scientific/Technical Report)

GTI Energy (GTI) teamed with the University of California at Merced (UCM) to scaleup the hybrid solar system (HSS) technology for demonstrating its performance at the US Gypsum (USG) plant in Plaster City, California. The technology integrates two-stage concentrating solar collector with matching particle thermal transport and storage (TSS) system to deliver cost-effective, and on-demand distributed high temperature industrial process heat up to 600°C with solar thermal, in this case to a gypsum kettle, to reduce its fuel use and carbon footprint. Current solar technologies, which reach these temperatures, are not distributable (towers) or cost-effective (dish). The research team developed a conceptual system design for host site retrofit, including preliminary heat balance, process flow diagram, particle to process heat exchanger and equipment placements at the site. Subsequently, parallel efforts were carried out at UCM to design, build and test a 12 m long commercial scale prototype concentrating thermal-only collector system and at GTI to design, build and test a matching 650°C capable particle TTS system. The nominal 50 kWth collector consists of a parabolic trough and three 4 m long two-stage receivers in series. Prior to on-sun testing, a 4 m long receiver was fabricated and successfully tested at 650 °C in a laboratory setting for 100 hrs of continuous operation showing less than 15% radiation loss. A 7 m wide x 17 m long parabolic trough was then installed at UCM for on-sun testing of the 12 m long receiver, and concurrently several 4 m long receivers were built. The optics of the parabolic trough were calibrated, and on-sun test were carried out on 12 m long receivers. During tests, the intense solar radiation (53x) caused the absorber tubes in the receivers to bend, reducing the overall optical efficiency. To address the bending issue, a self-consistent algorithm that includes ray tracing, thermal and deformation models was developed to perform thermal stress analysis on absorbers for parabolic solar collectors. Results obtained with this algorithm showed a dramatic rise in deformation as absorber tube length increases. A combined efficiency parameter that includes the occluded area for the mounts was developed to obtain an optimized tube length obtained. Based on the results, a length of 2.7 m for the absorber + 0.2 m for the coupler was chosen to minimize any bending and optimize optical efficiency while maintaining ease of mounting. The associated particle TTS system was designed, built and successfully tested at GTI. It includes storage, receiving and lock hoppers and piping that simulates the transfer of captured solar energy to an actual industrial furnace. Tests over 77 charge-discharge cycles demonstrated <2% particle degradation, with no problematic particle accumulations and no flow interruptions. The piping pressure drop was about 5 psi. The team also worked with Stanley Consultants (Stanley) to prepare conceptual and preliminary engineering packages to facilitate follow-on development and commercialization efforts. These include process and instrumentation diagram’s (P&ID’s), general arrangements, electrical one-line, project definitions document, equipment data sheets, schedule, and construction cost estimate for 2 MWth system. Updated HSS technology commercialization and customer engagement plans and detailed costs and evaluated market trade-offs and manufacturing.

03 NATURAL GAS↗

Economic trade-offs between the performance of collector thermal performance tests on a Solar Simulator as opposed to outdoor testing

In 1976 a large Solar Simulator was designed and installed at Marshall Space Flight Center. This Solar Simulator is the largest of its type in the country and has a 'working' area of 4 ft x 8 ft. Recently completed comparison tests show excellent correlation with data collected in the natural sun. The Solar Simulator has been in operation since September 1976 and the costs of operation are now determinable together with the cost of design and construction. The authors compare the total operational costs of obtaining test data using the simulator with analogous costs of testing in the natural sun. In addition, productivity is compared.

Reily, J. C.↗