Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “design space approximation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Evaluation of a Hybrid Elastic EVA Glove

The hybrid elastic design is based upon an American Society for Engineering Education (ASEE) glove designed by at the Space Systems Laboratory (SSL) in 1985. This design uses an elastic restraint layer instead of convolute joints to achieve greater dexterity and mobility during EVA (extravehicular activity). Two pilot studies and a main study were conducted using the hybrid elastic glove and 4000-series EMU (extravehicular activity unit) glove. Data on dexterity performance, joint range of motion, grip strength and perceived exertion was assessed for the EMU and hybrid elastic gloves with correlations to a barehanded condition. During this study, 30 test subjects performed multiple test sessions using a hybrid elastic glove and a 4000- series shuttle glove in a 4.3psid pressure environment. Test results to date indicate that the hybrid elastic glove performance is approximately similar to the performance of the 4000-series glove.

Korona, F. Adam↗

Preflight and In-Flight Exercise Conditions for Astronauts on the International Space Station

The physiological demands of spaceflight require astronauts to have certain physical abilities. They must be able to perform routine and off-nominal physical work during flight and upon re-entry into a gravity environment to ensure mission success, such as an Extra Vehicular Activity (EVA) or emergency egress. To prepare the astronauts for their mission, a Wyle Astronaut Strength Conditioning and Rehabilitation specialist (ASCR) works individually with the astronauts to prescribe preflight strength and conditioning programs and in-flight exercise, utilizing Countermeasure Systems (CMS) exercise hardware. PURPOSE: To describe the preflight and in-flight exercise programs for ISS crewmembers. METHODS: Approximately 2 years before a scheduled launch, an ASCR is assigned to each astronaut and physical training (PT) is routinely scheduled. Preflight PT of astronauts consists of carrying out strength, aerobic and general conditioning, employing the principles of periodization. Exercise programs are prescribed to the astronauts to account for their individual fitness levels, planned mission-specific tasks, areas of concern, and travel schedules. Additionally, astronauts receive instruction on how to operate CMS exercise hardware and receive training for microgravity-specific conditions. For example, astronauts are scheduled training sessions for the International Space Station (ISS) treadmill (TVIS) and cycle ergometer (CEVIS), as well as the Advanced Resistive Exercise Device (ARED). In-flight programs are designed to maintain or even improve the astronauts pre-flight levels of fitness, bone health, muscle strength, power and aerobic capacity. In-flight countermeasure sessions are scheduled in 2.5 h blocks, six days a week, which includes 1.5 h for resistive training and 1 h for aerobic exercise. CONCLUSIONS: Crewmembers reported the need for more scheduled time for preflight training. During flight, crewmembers have indicated that the in-flight exercise is sufficient, but would like more reliable and capable hardware.

Guilliams, Mark E.↗

Helicopter Field Testing of NASA's Autonomous Landing and Hazard Avoidance Technology (ALHAT) System fully integrated with the Morpheus Vertical Test Bed Avionics

The Autonomous Landing Hazard Avoidance Technology (ALHAT) Project was chartered to develop and mature to a Technology Readiness Level (TRL) of six an autonomous system combining guidance, navigation and control with real-time terrain sensing and recognition functions for crewed, cargo, and robotic planetary landing vehicles. The ALHAT System must be capable of identifying and avoiding surface hazards to enable a safe and accurate landing to within tens of meters of designated and certified landing sites anywhere on a planetary surface under any lighting conditions. This is accomplished with the core sensing functions of the ALHAT system: Terrain Relative Navigation (TRN), Hazard Detection and Avoidance (HDA), and Hazard Relative Navigation (HRN). The NASA plan for the ALHAT technology is to perform the TRL6 closed loop demonstration on the Morpheus Vertical Test Bed (VTB). The first Morpheus vehicle was lost in August of 2012 during free-flight testing at Kennedy Space Center (KSC), so the decision was made to perform a helicopter test of the integrated ALHAT System with the Morpheus avionics over the ALHAT planetary hazard field at KSC. The KSC helicopter tests included flight profiles approximating planetary approaches, with the entire ALHAT system interfaced with all appropriate Morpheus subsystems and operated in real-time. During these helicopter flights, the ALHAT system imaged the simulated lunar terrain constructed in FY2012 to support ALHAT/Morpheus testing at KSC. To the best of our knowledge, this represents the highest fidelity testing of a system of this kind to date. During this helicopter testing, two new Morpheus landers were under construction at the Johnson Space Center to support the objective of an integrated ALHAT/Morpheus free-flight demonstration. This paper provides an overview of this helicopter flight test activity, including results and lessons learned, and also provides an overview of recent integrated testing of ALHAT on the second Morpheus vehicle.

Rutishauser, David↗

Helicopter Field Testing of NASA's Autonomous Landing and Hazard Avoidance Technology (ALHAT) System fully Integrated with the Morpheus Vertical Test Bed Avionics

The Autonomous Landing and Hazard Avoidance Technology (ALHAT) Project was chartered to develop and mature to a Technology Readiness Level (TRL) of six an autonomous system combining guidance, navigation and control with real-time terrain sensing and recognition functions for crewed, cargo, and robotic planetary landing vehicles. The ALHAT System must be capable of identifying and avoiding surface hazards to enable a safe and accurate landing to within tens of meters of designated and certified landing sites anywhere on a planetary surface under any lighting conditions. This is accomplished with the core sensing functions of the ALHAT system: Terrain Relative Navigation (TRN), Hazard Detection and Avoidance (HDA), and Hazard Relative Navigation (HRN). The NASA plan for the ALHAT technology is to perform the TRL6 closed loop demonstration on the Morpheus Vertical Test Bed (VTB). The first Morpheus vehicle was lost in August of 2012 during free-flight testing at Kennedy Space Center (KSC), so the decision was made to perform a helicopter test of the integrated ALHAT System with the Morpheus avionics over the ALHAT planetary hazard field at KSC. The KSC helicopter tests included flight profiles approximating planetary approaches, with the entire ALHAT system interfaced with all appropriate Morpheus subsystems and operated in real-time. During these helicopter flights, the ALHAT system imaged the simulated lunar terrain constructed in FY2012 to support ALHAT/Morpheus testing at KSC. To the best of our knowledge, this represents the highest fidelity testing of a system of this kind to date. During this helicopter testing, two new Morpheus landers were under construction at the Johnson Space Center to support the objective of an integrated ALHAT/Morpheus free-flight demonstration. This paper provides an overview of this helicopter flight test activity, including results and lessons learned, and also provides an overview of recent integrated testing of ALHAT on the second Morpheus vehicle.

Epp, Chirold D.↗

Air Launch: Examining Performance Potential of Various Configurations and Growth Options

The Advanced Concepts Office at NASA's George C. Marshall Space Flight Center conducted a high-level analysis of various air launch vehicle configurations, objectively determining maximum launch vehicle payload while considering carrier aircraft capabilities and given dimensional constraints. With the renewed interest in aerial launch of low-earth orbit payloads, referenced by programs such as Stratolaunch and Spaceship2, there exists a need to qualify the boundaries of the trade space, identify performance envelopes, and understand advantages and limiting factors of designing for maximum payload capability. Using the NASA/DARPA Horizontal Launch Study (HLS) Point Design 2 (PD-2) as a pointof- departure configuration, two independent design actions were undertaken. Both designs utilized a Boeing 747-400F as the carrier aircraft, LOX/RP-1 first stage and LOX/LH2 second stage. Each design was sized to meet dimensional and mass constraints while optimizing propellant loads and stage delta V splits. All concepts, when fully loaded, exceeded the allowable Gross Takeoff Weight (GTOW) of the aircraft platform. This excess mass was evaluated as propellant/fuel offload available for a potential in-flight propellant loading scenario. Results indicate many advantages such as payload delivery of approximately 47,000 lbm and significant mission flexibility including variable launch site inclination and launch window. However, in-flight cryogenic fluid transfer and carrier aircraft platform integration are substantial technical hurdles to the realization of such a system configuration.

Waters, Eric D.↗

WEC-Sim Modeling of Laminar Scientific's Patented Seesaw Wave Energy Converter: Preprint

Laminar Scientific's patented seesaw wave energy converter was modeled in WEC-Sim to predict performance. The device operates by utilizing ocean surface waves to rotate a truss in pitch about a pivot. The pivot is located at the top of two pylons, which are embedded in the seafloor. The seesaw has a float on either end, and the buoyancy forces from each float cause the system to rise or fall with passing waves. Device performance relies upon seesaw length and ocean wavelength creating an antiphase effect. The seesaw truss has an adjustable length intended to achieve this effect. The operation method enforces a narrow band of wavelengths which induce the largest rotational motion from the device. The hydrodynamic analysis of the device was performed using Capytaine, and the results confirmed that the device operates best in a narrow frequency band. Four float-to-float spacing cases and three pylon radii were examined. The hydrodynamic results indicate a match between the model and the physical expectations for the device, and that varying the pylon radii by 0.1-m increments for three instances creates minimal changes in hydrodynamic properties. Power matrices for three float spacing cases of the device were simulated with Joint North Sea Wave Project spectra waves and optimal power take-off damping in WEC-Sim. The maximum average power production for the 15-m spacing case was 14.1 kW with a 5.0-s peak wave period and 4-m significant wave heights. Plots of capture-width ratios indicated that the device performance was linear and confirmed that the device is optimal in a narrow frequency band. The maximum percentage of the available wave power produced by the 15-m device was approximately 16%. Simulations of the device in regular waves were used to produce plots of average power compared to a ratio of float spacing to wavelength. These plots indicate that the power production is maximized at a ratio of 0.5, and further confirm that the device has a narrow frequency response. The device was simulated at an example field location, where the device produced an annual average power rating of 1.6 kW given an average omnidirectional wave climate of 10.3 kW m-1 and an optimal, linearized power take-off model. While the maximum predicted device performance is reliant upon a narrow band of wave frequencies, the conducted analysis provides an opportunity to improve device design prior to prototyping and testing. Modifying the design to respond to a broader frequency range would improve device performance.

numerical modeling↗

Computer-aided design analysis of 57-mm, angular-contact, cryogenic turbopump bearings

The Space Shuttle main engine high-pressure oxygen turbopumps have not experienced the sevice life required of them. This insufficiency has been due in part to the shortened life of the bearings. To improve the life of the existing turbopump bearings, an effort is under way to investigate bearing modifications that could be retrofitted into the present bearing cavity. Several bearing parameters were optimized using the computer program SHABERTH, which performs a thermomechanical simulation of a load support system. The computer analysis showed that improved bearing performance is feasible if low friction coefficients can be attained. Bearing geometries were optimized considering heat generation, equilibrium temperatures, and relative life. Thermal gradients through the bearings were found to be lower with liquid lubrication than with solid film lubrication, and a liquid oxygen coolant flowrate of approximately 4.0 kg/s was found to be optimal. This paper describes the analytical modeling used to determine these feasible modifications to improve bearing performance.

Armstrong, Elizabeth S.↗

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

The ISS 2B PVTCS Ammonia Leak: An Operational History

In 2006, the Photovoltaic Thermal Control System (PVTCS) for the International Space Station's 2B power channel began leaking ammonia at a rate of approximately 1.5lbm/year (out of a starting approximately 53lbm system ammonia mass). Initially, the operations strategy was "feed the leak," a strategy successfully put into action via Extra Vehicular Activity during the STS‐134 mission. During this mission the system was topped off with ammonia piped over from a separate thermal control system. This recharge was to have allowed for continued power channel operation into 2014 or 2015, at which point another EVA would have been required. Without these periodic EVAs to refill the 2B coolant system, the channel would eventually leak enough fluid as to risk pump cavitation and system failure, resulting in the loss of the 2B power channel - the most critical of the Space Station's 8 power channels. In mid‐2012, the leak rate increased to approximately 5lbm/year. Once discovered, an EVA was planned and executed within a 5 week timeframe to drastically alter the architecture of the PVTCS via connection to a dormant thermal control system not intended to be utilized as anything other than spare components. The purpose of this rerouting of the TCS was to increase system volume and to isolate the photovoltaic radiator, thought to be the likely leak source. This EVA was successfully executed on November 1st, 2012 and left the 2B PVTCS in a configuration where the system was now being adequately cooled via a totally different radiator than what the system was designed to utilize. Unfortunately, data monitoring over the next several months showed that the isolated radiator was not leaking, and the system itself continued to leak steadily until May 9th, 2013. It was on this day that the ISS crew noticed the visible presence of ammonia crystals escaping from the 2B channel's truss segment, signifying a rapid acceleration of the leak from 5lbm/year to 5lbm/day. Within 48 hours of the crew noticing the leak, an EVA was in progress to replace the coolant pump - the only other replaceable leak source. This paper will explore the management of the 2B PVTCS leak from the operations perspective. It will discuss the methodology of performing the STS‐134 refill, the considerations and contingency plans which went into the architectural overhaul of the system in 2012, and the unprecedented effort which went into the EVA response to the visible leak of May 2013. In particular the paper will focus on the techniques utilized by flight controllers to monitor the system health and to respond to such instances as the rapid May 2013 leak by putting the electrical system in a safe configuration for loss of cooling, and will use recorded telemetry of these events to describe system response to EVA crew and ground actions. It will discuss the innovative design for redundancy of the integrated truss structure's cooling systems which allowed for this leak to be managed with minimal impact to other ISS operations and electrical services, contrasted against the real unintended operations consequences of utilizing the flexibility of the spacecraft's design in this manner. The paper will discuss how the training of the crew and flight controller personnel has adapted to the changing architecture of the power system and the unpredictable nature of the 2B leak.

Vareha, Anthony↗

Pattern Recognition Control Design

Spacecraft control algorithms must know the expected vehicle response to any command to the available control effectors, such as reaction thrusters or torque devices. Spacecraft control system design approaches have traditionally relied on the estimated vehicle mass properties to determine the desired force and moment, as well as knowledge of the effector performance to efficiently control the spacecraft. A pattern recognition approach was used to investigate the relationship between the control effector commands and spacecraft responses. Instead of supplying the approximated vehicle properties and the thruster performance characteristics, a database of information relating the thruster ring commands and the desired vehicle response was used for closed-loop control. A Monte Carlo simulation data set of the spacecraft dynamic response to effector commands was analyzed to establish the influence a command has on the behavior of the spacecraft. A tool developed at NASA Johnson Space Center to analyze flight dynamics Monte Carlo data sets through pattern recognition methods was used to perform this analysis. Once a comprehensive data set relating spacecraft responses with commands was established, it was used in place of traditional control methods and gains set. This pattern recognition approach was compared with traditional control algorithms to determine the potential benefits and uses.

Gambone, Elisabeth A.↗

Toward a NASA Deep Space Optical Communications System

As discussed at SpaceOps in 2016, we expect the data rates from deep space missions to increase approximately one order of magnitude per decade for the next 50 years. The first order of magnitude improvement will come from existing plans for radio frequency (RF) communications including enhancements to both spacecraft and Deep Space Network (DSN) facilities. The next two orders of magnitude are predicted to come from the introduction of deep space optical communications. Studies indicate that optical receive apertures of between 8m12m are desired. The large cost of dedicated receive telescopes makes this method unrealistic – at least in the near-term. The cost of large optical ground terminals is driven primarily by the cost of the optics and by the cost of a stable structure for the telescope. We propose a novel hybrid design in which existing DSN 34m beam waveguide (BWG) radio antennas can be modified to include an 8m equivalent optical primary. By utilizing a low-cost segmented spherical mirror optical design, pioneered by the optical astronomical community, and by exploiting the already existing extremely stable large radio aperture structures in the DSN, we can minimize both of these cost drivers for implementing large optical communications ground terminals. Two collocated hybrid RF/optical antennas could be arrayed to synthesize the performance of an 11.3m receive aperture to support more capable or more distant space missions or used separately to communicate with two optical spacecraft simultaneously. NASA is in the midst of building six new 34m BWG antennas in the DSN. The final two are planned to be built at the DSN Goldstone, California and Canberra complexes. We are now investigating building these last two antennas as RF/optical hybrids. By delaying their operational dates by two years, we would be able to add the 8m optical receive capability for these two antennas while fitting within existing budgetary constraints. This paper describes the hybrid antenna design, the technical challenges being addressed, and plan for using this concept, together with ongoing work on optical flight terminals, to infuse operation optical communications into deep space missions.

Cornwell, Donald M.↗

Further Development Of Aperture: A Precise Extremely Large Reflective Telescope Using Re-Configurable Elements: NASA Innovative Advanced Concepts (NIAC) - Phase II

One of the pressing needs for space ultraviolet-visible astronomy is a design to allow larger mirrors than the James Webb Space Telescope primary. The diameter of the rocket fairing limits the mirror diameter such that all future missions calling for mirrors up to 16 meters in diameter or larger will require a mirror that is deployed post-launch. In response to the deployment requirement, we address the issues of this concept called "A Precise Extremely Large Reflective Telescope Using Reconfigurable Elements (APERTURE) with both hardware experiments and software simulations... We designed and built several fixtures with O-rings to hold a membrane. We established a coating process to make a membrane that was coated on one side with Cr and the other side with Cr-Terfenol-D-NiCo. The Terfenol-D (T-D hereafter) is the MSM (Magnetic Smart Memory) we use. We bought and established a procedure for measuring a deformation over time and purchased a Shack Hartmann system from Imagine Optic (https://www.imagine-optic.com). The first substrate we used was DuPont (TM) Kapton® polyimide film. Due to material creep, we found the stability over a 48-hour period with a Kapton substrate was not as good as desired (greater than 1 micron). We then switched to CP1 Polyimide. We found the CP1 much more stable to creep, being stable from about 3 hours to 48 hours to within a measurement error to below approximately 0.1 micron. We produced a 13 micron maximum deviation on a 50-millimeter-diameter piece of CP1 (25 microns thick). The T-D coating was about 2 microns, and the other layers, about 10 nanometers. The magnetic field at the base was about 0.1 teslas. We can make the T-D film at least 5 times thicker and the magnetic field at least 5 times stronger, and hence make deformations as much as 25 times larger. We have a formed a collaboration produced at the NIAC (NASA Innovative Advanced Concepts) mid-term review with Dr. Ron Shiri of Goddard Space Flight Center (GSFC) to explore making controlled deviations on lambda/14-lambda/20 scales which are required to bring a surface to the diffraction limit. We carried out only preliminary work on Si using a Coordinate Measuring Machine (CMM), which produced deviations on the 1 micron level. We are still working on a program to bring to GSFC a flat enough (radius of curvature greater than 10 microns) -coated a Si piece with Cr, T-D, NiCo. Then we plan to carry out tests with an interferometer. Further, we formed a new collaboration with Prof. Rajan Vaidyanathan of the University of Central Florida to replace the CP1 with a shape memory alloy (SMA). With his collaboration, we acquired new Federal funding outside of NASA to explore the use of SMAs (we use NiTi). Our preliminary results indicate that we can produce deformations greater than 1 micron on approximately 100 microns thick. Furthermore we have shown that the NiTi can deploy to better than 1 micron of its set original and then trained shape.

Re-Configurable Elements↗

Mission Systems Engineering (MSE) for the Cosmic Evolution Through UV Spectroscopy (CETUS) Space Telescope Concept

The basic objectives of the CETUS mission are to significantly improve our understanding of the evolution of galaxies at a redshift (z) of approximately 1 and to meet the cost constraints (1$B) for a NASA Probe-Class mission. What makes these galaxies so interesting is that their light, which has taken about 7 billion years to reach us, comes from a time when star-formation in the observable universe peaked, and the processes behind this peaking are far from well understood. To accomplish its science goals, CETUS needs to get UV spectra of 105 of these galaxies. To help meet its cost constraints, CETUS will only observe galaxies for which VIS spectra are already available, which means that CETUS has to survey a specific portion of the sky. The combination of the CETUS measurement goals and costs constraints strongly influence the design of virtually every aspect of the mission starting from the telescope and instruments, through to orbit and launch vehicle selection, and including the design of most of the SC Bus sub-systems, such as structure, ACS, power, communications, and thermal control.

Purves, Lloyd R.↗

Johnson Space Center's Regenerative Life Support Systems Test Bed

The Regenerative Life Support Systems (RLSS) Test Bed at NASA's Johnson Space Center is an atmospherically closed, controlled environment facility for human testing of regenerative life support systems using higher plants in conjunction with physicochemical life support systems. The facility supports NASA's Advanced Life Support (ALS) Program. The facility is comprised of two large scale plant growth chambers, each with approximately 11 m2 growing area. The root zone in each chamber is configurable for hydroponic or solid media plant culture systems. One of the two chambers, the Variable Pressure Growth Chamber (VPGC), is capable of operating at lower atmospheric pressures to evaluate a range of environments that may be used in a planetary surface habitat; the other chamber, the Ambient Pressure Growth Chamber (APGC) operates at ambient atmospheric pressure. The air lock of the VPGC is currently being outfitted for short duration (1 to 15 day) human habitation at ambient pressures. Testing with and without human subjects will focus on 1) integration of biological and physicochemical air and water revitalization systems; 2) effect of atmospheric pressure on system performance; 3) planetary resource utilization for ALS systems, in which solid substrates (simulated planetary soils or manufactured soils) are used in selected crop growth studies; 4) environmental microbiology and toxicology; 5) monitoring and control strategies; and 6) plant growth systems design. Included are descriptions of the overall design of the test facility, including discussions of the atmospheric conditioning, thermal control, lighting, and nutrient delivery systems.

NASA Discipline Number 61-10↗

DESIGN ISSUES AND QUALIFICATION OF HYDROFORMED DOUBLE WALLED EXPANSION JOINTS IN VACUUM SERVICE

The Vacuum Auxiliary System for ITER is devoted to pumping out, venting, and purging the vacuum volumes of the tokamak. Over 5000 clients including the cryostat and vacuum vessel, at 8500 m3 and 1400 m3 respectively, are serviced by approximately 150 pumping stations through 6 km of pipework. The piping and functions provided to the clients include component operation, routing of potentially tritiated gases, and timely leak localization. Expansion joints are used to reduce loadings on pumps and piping stresses but also to qualify in-line components having low allowable design loads. The ITER project utilizes vacuum valves that are not designed to withstand typical piping system loadings and require detailed design and evaluation. Loading scenarios prescribed by governing system specifications must be considered. To maintain allowable design loads for components and to keep piping stresses below code requirements, double walled hydroformed expansion joints have been employed in the design. These are not standard items and require custom fabrication. Installation space constraints and adjacent pipe support attachment location availability at ITER limit standard expansion joint installation guidelines provided by the Expasion Joint Manufacturers Association (EJMA). Careful consideration must be given to the analysis model to ensure proper function and life expectancy of the component. These considerations include accurate accounting of thrust forces, thermal movements, seismic accelerations, equipment and building differential displacements. In addition to displacements, the process internal, external, and interspace pressures affect the qualification and selection of the double walled expansion joints. The calculation results shall confirm that deflections, forces, and moments are reasonable for the size and type required for the system’s demands as evaluated against the manufacturer’s design.

Clark, Forrest [ORNL] (ORCID:0009000678106843)↗

Extended mission/lunar rover, executive summary

The design project selected to be undertaken by the 1991/92 Aerospace Design Group was that of conceptually designing an Extended Mission Rover for use on the Lunar Surface. This vehicle would serve the function as a mobile base of sorts, and be able to provide future astronauts with a mobile 'shirt-sleeve' self-sufficient living and working environment. Some of the proposed missions would be planetary surface exploration, construction and maintenance, hardware set-up and in-situ resource experimentation. The need for this type of vehicle has already been declared in the Stafford Group's report on the future of America's Space Program, entitled 'America at the Threshold: America's Space Exploration Initiative'. In the four architectures described within the report, the concept of a pressurized vehicle occurred multiple times. The approximate time frame that this vehicle would be put into use is 2010-2030.

Source record↗

Linear, multivariable robust control with a mu perspective

The structured singular value is a linear algebra tool developed to study a particular class of matrix perturbation problems arising in robust feedback control of multivariable systems. These perturbations are called linear fractional, and are a natural way to model many types of uncertainty in linear systems, including state-space parameter uncertainty, multiplicative and additive unmodeled dynamics uncertainty, and coprime factor and gap metric uncertainty. The structured singular value theory provides a natural extension of classical SISO robustness measures and concepts to MIMO systems. The structured singular value analysis, coupled with approximate synthesis methods, make it possible to study the tradeoff between performance and uncertainty that occurs in all feedback systems. In MIMO systems, the complexity of the spatial interactions in the loop gains make it difficult to heuristically quantify the tradeoffs that must occur. This paper examines the role played by the structured singular value (and its computable bounds) in answering these questions, as well as its role in the general robust, multivariable control analysis and design problem.

Packard, Andy↗

Thermal Protection System Evaluation Using Arc-jet Flows: Flight Simulation or Research Tool?

The arc-jet has been used to evaluate thermal protection systems (TPS) and materials for the past forty years. Systems that have been studied in this environmerd include ablators, active, and passive TPS concepts designed for vehicles entering planetary and Earth atmospheres. The question of whether arc-jet flow can simulate a flight environment or is it a research tool that provides an aero-thermodynamic heating environment to obtain critical material properties will be addressed. Stagnation point tests in arc-jets are commonly used to obtain material properties such as mass loss rates, thermal chemical stability data, optical properties, and surface catalytic efficiency. These properties are required in computational fluid dynamic codes to accurately predict the performance of a TPS during flight. Special facilities have been developed at NASA Ames Research Center to approximate the flow environment over the mid-fuselage and body flap regions of proposed space-planes type vehicles. This paper compares flow environments generated in flight over a vehicle with those created over an arc-jet test articles in terms of scale, chemistry, and fluid dynamic properties. Flight experiments are essential in order to validate the material properties obtained from arc-jet tests and used to predict flight performance of any TPS being considered for use on a vehicle entering the Earth atmosphere at hypersonic speed.

Stewart, David A.↗