Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “continuous operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

High Efficiency Powertrain for Heavy Duty Trucks Using Silicon Carbide (SiC) Inverter

The objective of the High Efficiency Propulsion (HEP) project is to research, develop, and demonstrate life cycle cost-effective Class 8 battery electric vehicles utilizing an 800 V high efficiency and compact 250 kW continuous power SiC inverter designed to support the commercial operations of the high continuous loads and challenging shock/vibration environment of heavy-duty trucks with an electrified axle specifically designed for high performance and efficiency in battery-electric Class 8 trucks used in medium range (~250 miles) distribution, and compared to the baseline Peterbilt 579 electric truck fleet performance using an IGBT inverter. The project was split into 3 budget periods, with the first two being design and development focused, and the final one is an on-vehicle demonstration phase of the high efficiency SiC traction drive inverter with daily mileage accumulation.

33 ADVANCED PROPULSION SYSTEMS↗

High-brightness electron injectors for high-duty cycle X-ray free electron lasers

The successful development in the last two decades of X-ray free electron lasers (FELs) with their revolutionary brightness performance has been tightly dependent on the parallel development of electron guns and injectors capable of providing the high-brightness electron beams required by FELs lasing at these short wavelengths. The ultimate brightness delivered by a linear accelerator (linac) is already set at its injector and the remaining part of the accelerator can be only designed to preserve the injector performance. The technology to be used for the accelerator part of an X-Ray FEL strongly depends on the duty-cycle at which the FEL operates. Normal-conducting, room-temperature, copper-based radio frequency (RF) technology is typically used for low duty-cycles of up to approximately 10 −3 . For higher duty-cycles and up to continuous wave (CW) operation, the linac must rely on superconductive RF technology because, with the higher duty-cycle, the increasingly higher power dissipated in normal conducting RF structures becomes excessive for the warm technology. The situation changes in the lower energy part of the accelerator, where injector schemes, based on direct current, normal-conducting, and superconducting RF electron guns, are demonstrating the beam quality performance required by high-duty-cycle X-ray FELs. In this paper we start with a description of the requirements for such injectors, followed by an overview of the pursued technologies and schemes, and by a discussion on the main differences in terms of beam dynamics between low and high duty-cycle injectors.

Sannibale, Fernando↗

Operational Performance of Sensor Systems Used to Determine Atmospheric Boundary Layer Properties as Part of the NASA Aircraft Vortex Spacing System Project

There has been a renewed interest in the application of remote sensor technology to operational aviation and airport-related activities such as Aircraft Vortex Spacing System (AVOSS). Radio Acoustic Sounding Systems (RASS), Doppler-acoustic sodars, Ultrahigh Frequencies (UHF) profilers and lidars have many advantages in measuring wind and temperature profiles in the lower atmospheric boundary layer since they can operate more or less continuously and unattended; however, there are limitations in their operational use at airports. For example, profilers deteriorate (limited altitude coverage or missing) in moderate or greater rain and can be affected by airplane targets in their field of view. Sodars can handle precipitation better but are affected by the high noise environments of airports and strong winds. Morning temperature inversions typically limit performance of RASS, sodars and profilers. Fog affects sonic anemometers. Lidars can have difficulties in clouds, fog or heavy precipitation. Despite their limitations these sensors have proven useful to provide wind and temperature profiles for AVOSS. Capabilities and limitations of these and other sensors used in the AVOSS program are discussed, parameter settings for the sensor systems are documented, and recommendations are made for the most cost-effective group of sensors for the future. The potential use of specially tuned dynamic forecast models and measurements from landing and departing aircraft are addressed.

Zak, J. Allen↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

The ISS 2B PVTCS Ammonia Leak: An Operational History

In 2006, the Photovoltaic Thermal Control System (PVTCS) for the International Space Station's 2B power channel began leaking ammonia at a rate of approximately 1.5lbm/year (out of a starting approximately 53lbm system ammonia mass). Initially, the operations strategy was "feed the leak," a strategy successfully put into action via Extra Vehicular Activity during the STS‐134 mission. During this mission the system was topped off with ammonia piped over from a separate thermal control system. This recharge was to have allowed for continued power channel operation into 2014 or 2015, at which point another EVA would have been required. Without these periodic EVAs to refill the 2B coolant system, the channel would eventually leak enough fluid as to risk pump cavitation and system failure, resulting in the loss of the 2B power channel - the most critical of the Space Station's 8 power channels. In mid‐2012, the leak rate increased to approximately 5lbm/year. Once discovered, an EVA was planned and executed within a 5 week timeframe to drastically alter the architecture of the PVTCS via connection to a dormant thermal control system not intended to be utilized as anything other than spare components. The purpose of this rerouting of the TCS was to increase system volume and to isolate the photovoltaic radiator, thought to be the likely leak source. This EVA was successfully executed on November 1st, 2012 and left the 2B PVTCS in a configuration where the system was now being adequately cooled via a totally different radiator than what the system was designed to utilize. Unfortunately, data monitoring over the next several months showed that the isolated radiator was not leaking, and the system itself continued to leak steadily until May 9th, 2013. It was on this day that the ISS crew noticed the visible presence of ammonia crystals escaping from the 2B channel's truss segment, signifying a rapid acceleration of the leak from 5lbm/year to 5lbm/day. Within 48 hours of the crew noticing the leak, an EVA was in progress to replace the coolant pump - the only other replaceable leak source. This paper will explore the management of the 2B PVTCS leak from the operations perspective. It will discuss the methodology of performing the STS‐134 refill, the considerations and contingency plans which went into the architectural overhaul of the system in 2012, and the unprecedented effort which went into the EVA response to the visible leak of May 2013. In particular the paper will focus on the techniques utilized by flight controllers to monitor the system health and to respond to such instances as the rapid May 2013 leak by putting the electrical system in a safe configuration for loss of cooling, and will use recorded telemetry of these events to describe system response to EVA crew and ground actions. It will discuss the innovative design for redundancy of the integrated truss structure's cooling systems which allowed for this leak to be managed with minimal impact to other ISS operations and electrical services, contrasted against the real unintended operations consequences of utilizing the flexibility of the spacecraft's design in this manner. The paper will discuss how the training of the crew and flight controller personnel has adapted to the changing architecture of the power system and the unpredictable nature of the 2B leak.

Vareha, Anthony↗

Kivalina Biomass Reactor

This report summarizes work performed under DOE Award DE-EE00010149 to support the reliable operation of a community-scale biochar reactor system in Kivalina, Alaska. The project focused on improving sanitation and waste management in a remote community by assessing the installed system, identifying spare parts, defining key performance indicators (KPIs), preparing operator and maintenance manuals, and developing mobile reporting tools for operational data and KPI tracking. The team also produced training materials and recorded videos to support operator onboarding and continuity. The project demonstrated progress in system readiness, documentation, and digital reporting, while also identifying challenges common to remote deployments, including travel constraints, upstream system failures, and local resource limitations. This work provides a practical framework for improving the operation, monitoring, and future replication of biomass reactor systems in remote communities.

09 BIOMASS FUELS↗

Operator function modeling: An approach to cognitive task analysis in supervisory control systems

In a study of models of operators in complex, automated space systems, an operator function model (OFM) methodology was extended to represent cognitive as well as manual operator activities. Development continued on a software tool called OFMdraw, which facilitates construction of an OFM by permitting construction of a heterarchic network of nodes and arcs. Emphasis was placed on development of OFMspert, an expert system designed both to model human operation and to assist real human operators. The system uses a blackboard method of problem solving to make an on-line representation of operator intentions, called ACTIN (actions interpreter).

Mitchell, Christine M.↗

The evolving trend in spacecraft health analysis

The Space Flight Operations Center inaugurated the concept of a central data repository for spacecraft data and the distribution of computing power to the end users for that data's analysis at the Jet Propulsion Laboratory. The Advanced Multimission Operations System is continuing the evolution of this concept as new technologies emerge. Constant improvements in data management tools, data visualization, and hardware lead to ever expanding ideas for improving the analysis of spacecraft health in an era of budget constrained mission operations systems. The foundation of this evolution, its history, and its current plans will be discussed.

Kirkpatrick, Russell L.↗

Large area silicon sheet by EFG

Work carried out on the JPL Flat Plate Solar Array Project, for the purpose of developing a method for silicon ribbon production by Edge-defined Film-fed Growth (EEG) for use as low-cost substrate material in terrestrial solar cell manufacture, is described. A multiple ribbon furnace unit that is designed to operate on a continuous basis for periods of at least one week, with melt replenishment and automatic ribbon width control, and to produce silicon sheet at a rate of one square meter per hour, was constructed. Program milestones set for single ribbon furnace operation to demonstrate basic EEG system capabilities with respect to growth speed, thickness and cell performance were achieved for 10 cm wide ribbon: steady-state growth at 4 cm/min and 200 micron thickness over periods of an hour and longer was made routine, and a small area cell efficiency of 13+% demonstrated. Large area cells of average efficiency of 10 to 11%, with peak values of 11 to 12% were also achieved. The integration of these individual performance levels into multiple ribbon furnace operation was not accomplished.

Kalejs, J. P.↗

Thermodynamic Performance of the 3-Stage ADR for the Astro-H Soft X-Ray Spectrometer Instrument

The Soft X-ray Spectrometer (SXS) instrument[1] on Astro-H[2] will use a 3-stage ADR[3] to cool the microcalorimeter array to 50 mK. In the primary operating mode, two stages of the ADR cool the detectors using superfluid helium at ≤1.20 K as the heat sink[4]. In the secondary mode, which is activated when the liquid helium is depleted, the ADR uses a 4.5 K Joule-Thomson cooler as its heat sink. In this mode, all three stages operate together to continuously cool the (empty) helium tank and singleshot cool the detectors. The flight instrument - dewar, ADR, detectors and electronics - were integrated in 2014 and have since undergone extensive performance testing. This paper presents a thermodynamic analysis of the ADR's operation, including cooling capacity, heat rejection to the heat sinks, and various measures of efficiency.

adiabatic demagnetization refrigerator↗

Design of a 3-Stage ADR for the Soft X-Ray Spectrometer Instrument on the Astro-H Mission

The Japanese Astro-H mission will include the Soft X-ray Spectrometer (SXS) instrument, whose 36-pixel detector array of ultra-sensitive x-ray microcalorimeters requires cooling to 50 mK. This will be accomplished using a 3-stage adiabatic demagnetization refrigerator (ADR). The design is dictated by the need to operate with full redundancy with both a superfluid helium dewar at 1.3 K or below, and with a 4.5 K Joule-Thomson (JT) cooler. The ADR is configured as a 2-stage unit that is located in a well in the helium tank, and a third stage that is mounted to the top of the helium tank. The third stage is directly connected through two heat switches to the JT cooler and the helium tank, and manages heat flow between the two. When liquid helium is present, the 2-stage ADR operates in a single-shot manner using the superfluid helium as a heat sink. The third stage may be used independently to reduce the time-average heat load on the liquid to extend its lifetime. When the liquid is depleted, the 2nd and 3rd stages operate as a continuous ADR to maintain the helium tank at as low a temperature as possible - expected to be 1.2 K - and the 1st stage cools from that temperature as a single-stage, single-shot ADR. The ADR s design and operating modes are discussed, along with test results of the prototype 3-stage ADR.

Shirron, Peter J.↗

Continuation of research in software for space operations support

Software technologies relevant to workstation executives are discussed. Evaluations of problems, potential or otherwise, seen with IBM's Workstation Executive (WEX) 2.5 preliminary design and applicable portions of the 2.5 critical design are presented. Diverse graphics requirements of the Johnson Space Center's Mission Control Center Upgrade (MCCU) are also discussed. The key is to use tools that are portable, compatible with the X window system, and best suited to the requirements of the associated application. This will include a User Interface Language (UIL), an interactive display builder, and a graphic plotting/modeling system. Work sheets are provided for POSIX 1003.4 real-time extensions and the requirements for the Center's automated information systems security plan, referred to as POSIX 1003.6, are discussed.

Collier, Mark D.↗

Continuation of research into software for space operations support, volume 1

A prototype workstation executive called the Hardware Independent Software Development Environment (HISDE) was developed. Software technologies relevant to workstation executives were researched and evaluated and HISDE was used as a test bed for prototyping efforts. New X Windows software concepts and technology were introduced into workstation executives and related applications. The four research efforts performed included: (1) Research into the usability and efficiency of Motif (an X Windows based graphic user interface) which consisted of converting the existing Athena widget based HISDE user interface to Motif demonstrating the usability of Motif and providing insight into the level of effort required to translate an application from widget to another; (2) Prototype a real time data display widget which consisted of research methods for and prototyping the selected method of displaying textual values in an efficient manner; (3) X Windows performance evaluation which consisted of a series of performance measurements which demonstrated the ability of low level X Windows to display textural information; (4) Convert the Display Manager to X Window/Motif which is the application used by NASA for data display during operational mode.

Collier, Mark D.↗

Continuation of research into software for space operations support: Conversion of the display manager to X Windows/Motif, volume 2

NASA is currently using a set of applications called the Display Builder and Display Manager. They run on Concurrent systems and heavily depend on the Graphic Kernel System (GKS). At this time however, these two applications would more appropriately be developed in X Windows, in which a low X is used for all actual text and graphics display and a standard widget set (such as Motif) is used for the user interface. Use of the X Windows will increase performance, improve the user interface, enhance portability, and improve reliability. Prototype of X Window/Motif based Display Manager provides the following advantages over a GKS based application: improved performance by using a low level X Windows, display of graphic and text will be more efficient; improved user interface by using Motif; Improved portability by operating on both Concurrent and Sun workstations; and Improved reliability.

Collier, Mark D.↗

STS-99 Flight Day Highlights and Crew Activities Report

Live footage shows the Blue Team (second of the dual shift crew), Dominic L. Pudwill Gorie, Janice E. Voss and Mamoru Mohri, beginning the first mapping swath covering a 140-mile-wide path. While Mohri conducts mapping operations, Voss and Gorie are seen participating in a news conference with correspondents from NBC and CNN. The Red Team (first of the dual shift crew), Kevin R. Kregel, Janet L. Kavandi and Gerhard P.J. Thiele, relieves the Blue Team and are seen continuing the mapping operations for this around the clock Shuttle Radar Topography Mission (SRTM). Commander Kregel is shown performing boom (mass) durability tests, calibrating the EarthCam Payload, and speaking with the Launch Control Center (LCC) about trouble shooting a bracket for better camera angle.

Source record↗

In-situ optical monitoring of gas turbine blade coatings under operational extreme environments

High temperature material systems consisting of thermal barrier coatings and the underlying superalloys are key to achieving higher gas temperatures which in turn control engine efficiencies and reduce emissions. With engine temperatures in excess of the limits that metallic blades and vanes can endure, advanced monitoring techniques that ensure the integrity and durability of these coatings are paramount to continuous and safe operation. Optical methods have the benefit of being non-invasive and are able to capture data under limited access available for monitoring the hot-section of turbines. Addressing Topic 5 on Advanced Instrumentation, the research and development effort for this project titled “In situ optical monitoring of gas turbine blade coatings under operational extreme environments” was completed by University of Central Florida researchers, including Raghavan (PI) and Ghosh (co-PI). In this project, the research team leveraged intrinsic properties of coatings and rare-earth dopants as active and intelligent “sensors” through their optical properties. The outcomes of this project pave the way for diagnostics of turbine blade coatings, under operating environments, through the development of the sensing thermal barrier coating configurations, calibration and associated instrumentation while ensuring coating integrity and durability goals are concurrently met.

42 ENGINEERING↗

US Department of Energy, Office of Science High Performance Computing Facility Operational Assessment 2021: Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory’s (ORNL’s) Leadership Computing Facility (OLCF) continues to surpass its operational target goals of supporting users; delivering fast, reliable computational ecosystems; creating innovative solutions for high-performance computing (HPC) needs; contributing to the community to build the next generation HPC workforce, and managing risks, safety, and security associated with operating some of the most powerful computers in the world. The results can be seen in the cutting-edge science conducted by users and the praise from the research community. Calendar year (CY) 2021 saw continued excellence in research supported by the OLCF’s leadership-class computing resources, including Summit (the nation’s most powerful supercomputer), the global scratch file system Alpine, the Scalable Protected Infrastructure (SPI), the Exploratory Visualization Environment for Research in Science and Technology (EVEREST), and the archival mass-storage resource High-Performance Storage System (HPSS). While maintaining access and exceptional user support for Summit, the OLCF continued to make progress on the installation and deployment of Frontier, which will be the nation’s first exascale system when it comes online at the start of CY 2023. Users have already begun running and optimizing scientific codes on Crusher, the OLCF test and development system equipped with Frontier’s architecture. Throughout the year, the OLCF maintained a strong culture of operational excellence, including risk management, workplace safety, and cybersecurity. The OLCF’s rigorous risk management strategy anticipated and mitigated risks, and at this time there are no high-priority operational risks. Similarly, ORNL and the OLCF were committed to operating under the US Department of Energy’s (DOE’s) safety regulations that ensure a safe workplace. Technical staff tracked and monitored existing threats and vulnerabilities within the OLCF while continually developing tools and practices to enhance operations without increasing the facility’s risk. CY 2021 was filled with outstanding results and accomplishments, including a very high rating from users on overall satisfaction for the eighth consecutive year; a tremendous number of node hours delivered to 1,671 researchers on Summit; and the successful delivery of the allocation split of roughly 60%, 20%, and 20% of core-hours offered for the Innovative and Novel Computational Impact on Theory and Experiment (INCITE), Advanced Scientific Computing Research Leadership Computing Challenge (ALCC), and Director’s Discretionary (DD) programs, respectively (Section 2). COVID-19 research remained a focus in 2021, and the ALCC and DD programs allocated over 1 million Summit hours to the COVID-19 High Performance Computing Consortium. These accomplishments, coupled with the high utilization rates (i.e., overall and capability usage), represent the fulfillment of the promise of leadership class machines: efficient facilitation of leadership-class computational applications.

97 MATHEMATICS AND COMPUTING↗