Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Fuels Characterization for National Research Council Canada 2-m Pool Fire Test Series

This report provides a detailed analysis of the physical and chemical properties of three liquid hydrocarbon fuels: heptane, Bakken crude, and a diluted bitumen, that were subsequently tested in a series of 2-m pool fire experiments at Sandia National Laboratories for the National Research Council Canada. Properties such as relative density, vapor pressure (VPCR x ), composition, and heat of combustion were evaluated. The heptane analysis, with relative density = 0.69 (at 15°C), confirmed that the material tested was consistent with high-purity (>99%) n-heptane. The Bakken crude, with a relative density = 0.81 (at 15°C), exhibited a vapor pressure by VPCR 0.2 (37.8°C) in the range 120-157 kPa. The dilbit, with a relative density = 0.92 (at 15°C) exhibited a vapor pressure by VPCR 0.2 (37.8°C) in the range 85-98 kPa. Solids remaining in the test pans after the pool fires were also collected and weighed. No detectable solids were left after the heptane burns. In contrast, the crude oils left some brittle, black solid residue. On average, dilbit pool fires left about 40 more residue by mass than Bakken pool fires for equivalent mass of fuel feed.

01 COAL, LIGNITE, AND PEAT↗

Evaluation of China Experimental Fast Reactor Startup Tests (Final Report)

This report documents the results and observations on the Coordinated Research Project (CRP) of the International Atomic Energy Agency (IAEA) on “Neutronics Benchmark of CEFR Start-Up Tests.” The China Experimental Fast Reactor (CEFR) is a 65MWt sodium-cooled fast reactor with highly enriched uranium oxide fuels. The reactor achieved the first criticality in 2010, and series of start-up tests were conducted to measure various reactor physics parameters. In 2018, IAEA has launched the CRP for validation and qualification of member states' computation capabilities in the field of fast reactor simulation utilizing the measured data in the CEFR start-up test. Twenty-nine international organizations from eighteen member countries, including Argonne National Laboratory, have participated in the CRP.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Northstar Mo99 Window Tests

Tests were completed for window to “first disk” (actually a steel plate for these expariments) gaps of 20 mil as per design gap as well as 10 mil and 30 mil gaps to span the range of possible variations. With possible disk distortion in beam, another test with 0 gap was performed. Based on deflections measured during the pressure test, the 0 gap was most likely very near 3 mil.

43 PARTICLE ACCELERATORS↗

The Optics of Deterrence: How Science Assures the Nuclear Stockpile's Reliability In Lieu of Testing

When designing a product intended to perform a certain function and satisfy some set of criteria, the standard engineering method to assess its ability to perform is to test it. This nearly universal concept works consistently, assuring proper function and generally avoiding or mitigating the consequence of failure to within acceptable limits. What would happen if the product developers were told that they must continue to certify and validate the performance without testing it, that the landscape in which the product must serve its purpose is constantly evolving, and that the product in question is the United States’ nuclear weapons stockpile? This is the position the National Nuclear Security Administration (NNSA) finds itself in; the reliability of the stockpile must be verified without actually testing it to see if it works as intended.

43 PARTICLE ACCELERATORS↗

RG217 V2-V2 Coaxial Cable Acceptance Test

The ECSE Solid State Pulsed Power unit is a high current, high power solid-state pulse modulator. The RG217 V2-V2 Coaxial Cable Assembly is the interface cable between the Solid State Pulser and the load. This document covers the testing procedure for the RG217 V2-V2 Coaxial Cable Assembly. This assembly is comprised of RG217 Coaxial Cable with a LRU Connector on either end. This test procedure verifies the cable is undamaged and assembled correctly, the correct cable connectors are installed properly onto the cable, and that the entire assembly meets conductivity and holdoff voltage requirements. This procedure will verify that the RG217 Coaxial Cable Assembly meets all assembly and functional requirements. In particular, this procedure verifies the Cable Shield and Center Conductor meet conductivity requirements by testing their resistances. Additionally, this procedure ensures the RG217 Coaxial Cable Assembly meets holdoff voltage requirements by applying high voltage and verifying the RG217 Coaxial Cable Assembly does not experience any breakdowns or arcing.

42 ENGINEERING↗

A Method for Evaluating and Tracking Production-Sample Test (PST) Delay Risk

This report describes a method for evaluating risk from delayed Production Sample Testing (PST), and strategies for reducing test backlogs. Risk contributions to overall risk from delayed PST include a Steady State Risk (SSR) contribution that is inherent in the qualified design and manufacturing processes, and a Non-Homogenous Production Risk (NHPR) contribution from production variation. Both definitions and evaluation techniques for these risk contributions are provided along with correlation to the standard Quality Assurance Process, QA001.2, risk ranking matrix. Methods for tracking test backlogs, and reducing backlogs are also discussed. The delayed PST evaluation method described here includes the merger of both slightly quantitative methods for tracking defect levels and the propensity for production variation with general risk management tracking tools like the likelihood vs. consequence risk ranking matrix. This merger is important because it allows more effective evaluation and communication with regards to delayed PST.

42 ENGINEERING↗

Software Testing – An Overview [Slides]

This report discusses the importance of software testing, referencing two examples that illustrate setbacks and losses without adequate testing. The report also highlights various levels of testing and provides guiding questions to help with the process.

97 MATHEMATICS AND COMPUTING↗

Initial testing of wave energy powered UV-C LED anti-biofouling system (CRADA 523)

3newable is requesting technical assistance for laboratory testing at the Marine and Coastal Research (MCRL) Laboratory of a UV-C LED anti-biofouling system. Ocean observing sensors provide critical data sources from deployed buoys and other platforms at sea. However, in addition to the availability of reliable power sources, biofouling of sensors and instruments is a limiting factor for operation and maintenance of deployed instruments. In collaboration with the Woods Hole Oceanographic Institute Ocean Observatories Initiative, 3newable has developed a novel solution to overcome these challenges and extend the deployment period of buoy-mounted sensors. The 3newable system co-locates wave energy converters to supply UV-C LED anti-biofouling units on powered buoy arrays. MCRL staff will implement an experiment to evaluate the efficacy of 3newable’s device under test for inhibiting growth of organisms on test coupons in a flow through seawater tank.

42 ENGINEERING↗

Pressurized Tube Creep Testing of Graded Transition Joints (GTJ) for G91 and 347H Base Metals

This report briefly describes part of the research activities dedicated to a DOE FE project, graded transition joints (GTJ) development for G91 and 347H steels. The task was focused on pressurized tube creep testing on the 3D-printed GTJ materials. A specimen with reduced gage section is developed that includes G91, GTJ, and 347H subsections. A tapered GTJ subsection is introduced to address the technical challenge of mechanical testing with mismatched rupture times of the base metals. The report provides the descriptions of basic considerations, specimen preparation, testing system, and experimental results along with main findings.

36 MATERIALS SCIENCE↗

Interim Mechanical Properties Data from FY2022 ORNL Testing of A709 with Precipitation Treatment for ASME Code Case Data Package

A collaborative research and development effort in support of the Alloy 709 Code Case qualification in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III, Division 5, High Temperature Reactors is being conducted at the US Department of Energy’s Oak Ridge National Laboratory, Idaho National Laboratory, and Argonne National Laboratory. A recent assessment on the Alloy 709 development and testing effort concluded that the mechanical properties of Alloy 709 with the precipitation treatment continued to outperform those of Type 316 stainless steel. The assessment also affirmed the recommendation for its Code qualification. This report provides the detailed integrated data generated to date on the two commercial heats of Alloy 709 in plate product form with precipitation treatment condition that were used as the basis for this assessment. Oak Ridge National Laboratory has continued to perform a subset of the Code Case testing for tensile properties, creep rupture, fatigue, and creep-fatigue. This report also updates the key Alloy 709 Code Case testing status and results in FY 2022 at Oak Ridge National Laboratory.

36 MATERIALS SCIENCE↗

Verification and Validation Tests of the Gamma Library of the ARC Software Package (Rev.1)

As part of the verification and validation (V&V) efforts of the Argonne Reactor Code (ARC) software system to support the Versatile Test Reactor (VTR) project of the U.S. Department of Energy (DOE), work has been performed to verify and validate the gamma (or photon) library of the multigroup cross section generation code MC 2 -3 of the ARC system, which is the essential part of the coupled neutron and gamma heating calculations to determine the heat generation rate or power distribution in the core. This V&V study was carried out in three steps: 1) review of the procedures and utility programs for generating the MC 2 -3 gamma library, 2) verification tests of cross sections and KERMA factors by comparing the total heat generation rate of coupled neutron and gamma calculation with that obtained with reaction Q values under the assumption of local gamma energy deposition and by comparing the prompt heat generation rate with that calculated with the MCNP6.2 code, and 3) validation tests of cross sections and KERMA factors by analyzing the ZPPR-15D gamma dose data measured with thermoluminescent dosimeters (TLD).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Impact Noise Monitoring for Gelled Water Mitigation Test Series - North Pad

This report represents the 1st shot (in a series of 8) conducted on September 15, 2022. One 10 lb C4 charge (along with ~200g of Potassium Bromide (KBr)) was detonated inside 9920 North Pad Boom Box. Noise sampling was performed at several points on Site 9920 to characterize the noise mitigation provided by the block structure. This data will help inform safe locations for Members of the Workforce (MOWs) to be located during future testing with similar net explosive weights. During the test, all MOW/site visitors were bunkered inside Building 9926/Mobile Firing Control Point (MFCP) to prevent personnel exposure to any hazards associated with the testing

42 ENGINEERING↗

Outdoor Test Bed Performance of a Power Line Sensor Using a Real-Time Event Simulator

This report summarizes the design and application of an outdoor power line sensor testbed (OPLST) with a real-time simulator and power meter to compare a potential transformer (PT) and current transformer (CT) versus an advanced line-post sensor. The OPLST was created to validate advanced medium-voltage (20/34.5 kV) outdoor power line sensors used in electrical distribution systems. Electrical utilities have installed metering and relay-protection transformers like PTs and CTs for several decades. The PTs/CTs are iron core measurement transformers based on the electromagnetic induction principle and provide reliable data in normal grid operation. However, new outdoor power line sensors (OPLS) using other technologies like voltage divider, Rogowski coil and optical principles have become available and may have favorable performance and costs compared to PTs/CTs. Therefore, the importance of testing these technologies with the PT/CT, to compare the measured phase voltage/current at different power grid scenarios is crucial to understand the performance of these new OPLS. For this study a G&W Electric Model CVS-36-O power line sensor was chosen as the OPLS to test with voltage/current signals. An OPAL-RT Technologies Model OP4510 real-time simulator and Schweitzer Engineering Laboratories Model SEL-735 power meter were installed with the 20/34.5 kV OPLST to compare the measured transient events collected from an advanced OPLS and the PT/CT. This system is installed at the Distributed Energy Communications and Control (DECC) lab, Oak Ridge National Laboratory (ORNL). The simulator generated different power grid scenarios (electrical faults, capacitor bank operation, service restoration, etc.), and its analog-output signals were connected to the voltage/current amplifiers that feed the 20/34.5 kV aerial cable loop through the PT/CT devices. Additional PT/CT devices were also wired with the medium voltage aerial cable loop to measure the phase current/voltage signals and server as references. After each test, common format for transient data exchange (COMTRADE) files were collected from the SEL-735 power meter and used to compare the performance of the OPLS with the PT/CT. The behavior of analog signals, harmonic components, total harmonic distortion and crest factors were assessed and found favorable for the G&W sensor as compared to the reference PT/CT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The 1958 Nuclear Test Moratorium

Against the backdrop of international concern about radioactive fallout, the United States, the Soviet Union, and Great Britain agreed to a moratorium on nuclear testing. Neither monitored nor enforceable, the moratorium was not much more than a gentleman’s agreement. Nonetheless, it proved remarkedly durable, beginning on October 31, 1958, and lasting until September 1961. After France began nuclear testing in 1960, followed by the shooting down of an American U-2 spy plane over Soviet air space, and a failed summit meeting of international leaders, the Soviet Union resumed testing. The United States followed shortly thereafter.

99 GENERAL AND MISCELLANEOUS↗

Evaluation of 3D Simulation Capabilities within xRAGE using a Suite of Test Problems

This presentation describes a 3D verification and validation suite for xRAGE. Three verification test problems for hydrodynamics are presented: the Kidder ball problem, the Verney shell problem, and a 5-material compression problem. There is excellent agreement between 2D and 3D XRAGE simulation results for these problems, and between the xRAGE results and the benchmark solutions. In addition, two 3D ICF test problems are presented, based on an OMEGA direct drive capsule experiment, and on a NIF indirect drive capsule experiment. These two ICF test problems are used to evaluate two hydrodynamic methods within xRAGE. In addition to hydrodynamics the simulations also include three temperature plasma physics, thermal conduction and radiation diffusion. When simulating either capsule in 3D the newer unsplit hydrodynamic method in xRAGE produces more vorticity relative to the older default method. For the indirect drive capsule the 3D simulations are in reasonable agreement with the experimental values of ion temperature and neutron production. Unstable 3D vortex rings are present near the DT ice/carbon interface which enhance the confinement of the DT ice.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

TEAMER: DAISY Flow-noise Testing (Abstract)

Evaluating impacts of marine energy devices is generally difficult given the dynamic environment where these devices need to be placed. The University of Washington’s (UW) DAISY (The Drifting Acoustic Instrumentation SYstem) is designed to measure radiated noise around marine energy converters operating in energetic waves and currents. In currents, a primary limitation for measurement fidelity at low frequencies (< 100 Hz) is the potential for non-propagating “flow-noise” to mask propagating sound and inflate estimates of the radiated noise from marine energy converters at frequencies that overlap with hearing sensitivities of fish and some marine mammals. While free-drifting measurements help to minimize the relative velocity that produces flow-noise, significant levels were still observed during initial DAISY tests. This motivated the development of a fabric “flow shield” around the hydrophone that disrupts both flow-noise generation mechanisms proposed by the initial tests. First, the flow shield is a source of substantial drag which keeps the hydrophone package moving with the approximate velocity of the surrounding water, compensating for differential wind or current forcing on the surface expression. By minimizing relative velocity around the hydrophone, turbulence shed by the hydrophone is also minimized. Second, the flow shield creates a largely quiescent pocket around the hydrophone, minimizing advection of free stream turbulence over the hydrophone element. Field data collected in these experiments will test effectiveness of these flow shields and provide quantitative data use and deployment.

16 TIDAL AND WAVE POWER↗

Volume 10: Flow Test Facilities

Adding additional flow testing facilities has been considered as part of the High Flux Isotope Reactor (HFIR) Sustaining and Enhancing Neutron Science (SENSe) Initiative at Oak Ridge National Laboratory (ORNL) to support HFIR operations and experiments. This prospect has prompted many ideas and discussions regarding potential features, configurations, locations, and applications for the facilities. A working group of ORNL staff members was formed in fiscal year 2022 to recommend one or more configurations to best support future HFIR operations and scientific capacities and to develop order-of magnitude cost estimates and timing. The ideas discussed in this report include options ranging from upgrading existing small-scale testing facilities to building a full-scale HFIR mockup for detailed thermohydraulic testing and fuel assessment.

07 ISOTOPE AND RADIATION SOURCES↗

Verification and validation testing and tools: comparison between MCNP code versions and nuclear data libraries [Slides]

This presentation discusses the primary goal of software testing which is to test the code for correctness. It also discusses the results for individual suites and the role of validation and verification also referred to in the presentation as V&V. In summation, the V&V framework enables easy comparison between calculations performed with different code versions and/or nuclear data libraries. This entire framework will be distributed with the upcoming MCNP6.3 release. V&V test suites shown and several that were not (Criticality, LAQGSM, Lockwood) will be distributed in the new framework.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗