Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIOACTIVE WASTES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

BAM challenges for design testing of waste containers for the final repository KONRAD

Up to the end of this decade, corresponding to the planned date of starting operation in the final disposal KONRAD for non-heat generating waste in Germany, a lot of efforts are needed to condition and package the radioactive waste in containers certified by BfS (Federal Institute for Radiation Protection). This waste is produced by public sector and industry as well as nuclear energy facilities, which result in more than a half of the actually declared quantity growing especially after the phase out decision of nuclear power production in Germany and the subsequent decommissioning of nuclear power plants. BAM (Federal Institute for Materials Research and Testing) acts as responsible authority on behalf of BfS for design testing under consideration of the KONRAD requirements. Within the assessment procedure of containers, BAM has to verify the application documents, including material qualification, container geometry, corrosion protection, leakage rate and operational and accidental loading, and to evaluate quality assurance measures. Besides the previous completed approvals for various containers such as steel sheet and cast iron box-shaped containers and concrete cylindrical ones, BAM is actually carrying assessments for other types such as cast iron cylindrical containers and 'old' steel sheet box shaped ones. The so called 'old' containers present already loaded containers without any KONRAD certification, currently stored at licensed interim storages. In the benefit of the container assessment, BAM operates design testing facilities for drop and fire tests which are also used for research objectives to improve and expand the evaluation methods such as research project ConDrop. The latter deals with numerical simulations and analyses tools for further precise predictions about unfavorable drop test scenarios, safety margins, and design sensitivities for steel sheet containers. Furthermore, during the assessment procedure, several specifications about the containers, the inventory to be disposed and the required safety level have been intensely debated by authorities and applicants. Based on its experience in qualifying containers, BAM has been commissioned to identify insufficiently specified aspects in the waste acceptance criteria and to propose clearer definitions with regard to the secondary regulations in the planning approval notice. This paper focuses on aspects of the contribution of BAM in certifying KONRAD waste containers. This will include the current state of design testing procedures, evaluation methods that are available or are being developed and the main topics within the KONRAD requirements being actually specified by BAM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Application of Materials for Sequestration and Immobilization of 99 Tc

99 Technetium ( 99 Tc) is a hazardous radionuclide generated by the nuclear industry that poses a serious environmental threat. The wide variation and complex chemistries of nuclear waste streams containing 99 Tc often create unique, site specific challenges when sequestering and immobilizing the waste in a matrix suitable for long-term storage and disposal. Therefore, an effective management plan for 99 Tc containing radioactive waste will likely require a variety of suitable materials/matrices capable of adapting to and addressing these challenges. In this review, we discuss and highlight the key developments for effective removal and immobilization of 99 Tc in inorganic waste forms. Specifically, we review the synthesis, characterization, and application of materials for targeted removal of 99 Tc from (simulated) waste solutions under various experimental conditions. These materials include: i) layered double hydroxides (LDHs), ii) metal-organic frameworks (MOFs), iii) ion-exchange resins (IERs) as well as cationic organic polymers (COPs), and iv) surface modified natural clay materials (SMCMs). Secondly, we discuss some of the major and recent developments towards 99 Tc immobilization in i) glass, ii) cement, and iii) iron mineral waste forms. Finally, we present future challenges that need to be addressed for the design, synthesis, and selection of suitable matrices for the efficient sequestration and immobilization of 99 Tc from targeted wastes. Finally, the purpose of this review is to inspire the researches on the design and application of various suitable materials/matrices for selective removal of 99 Tc present globally in different radioactive wastes and its immobilization in stable/durable waste forms.

36 MATERIALS SCIENCE↗

New binders, new trends, new potentialities in waste cementation - 15095

It has long been common practice to solidify and stabilize low- and intermediate-level radioactive wastes with calcium silicate cements (ordinary Portland cement, or composite cement). However, wastes produced by nuclear activities are very diverse and some of their components may chemically react with cement phases or mixing water, reducing in some cases the quality of the product. This paper reviews the potential of three kinds of alternative inorganic binders to treat problematic wastes: (i) calcium aluminate and sulpho-aluminate cements, (ii) magnesium and calcium phosphate cements, and (iii) alkali-activated binders. Their setting and hardening process is briefly presented, and their potential for waste conditioning is discussed and illustrated. The opportunity offered by these new binders opens a wide field of research which should be attractive and stimulating both for physico-chemists and nuclear industry in the years to come. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wireless Transmission of Monitoring Data out of an Underground Repository: Results of Field Demonstrations Performed at the HADES Underground Laboratory - 13589

As part of the European 7. framework project MoDeRn, Nuclear Research and Consultancy Group (NRG) performed experiments in order to demonstrate the feasibility of wireless data transmission through the subsurface over large distances by low frequency magnetic fields in the framework of the geological disposal of radioactive waste. The main objective of NRG's contribution is to characterize and optimize the energy use of this technique within the specific context of post-closure monitoring of a repository. For that, measurements have been performed in the HADES Underground Research Laboratory (URL) located at Mol, Belgium, at 225 m depth. The experimental set-up utilizes a loop antenna for the transmitter that has been matched to the existing infrastructure of the HADES. Between 2010 and 2012 NRG carried out several experiments at the HADES URL in order to test the technical set-up and to characterize the propagation behavior of the geological medium and the local background noise pattern. Transmission channels have been identified and data transmission has been demonstrated at several frequencies, with data rates up to 10 bit/s and bit error rates <1%. A mathematical model description that includes the most relevant characteristics of the transmitter, transmission path, and receiver has been developed and applied to analyze possible options to optimize the set-up. With respect to the energy-efficiency, results so far have shown that data transmission over larger distances through the subsurface is a feasible option. To support the conclusions on the energy need per bit of transmitted data, additional experiments are foreseen. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterisation of Specimens from a Former Soviet Thorium Processing Facility to Support Site Remediation

The former Prydniprovski Chemical Plant (PChP) is a large ex-soviet nuclear materials processing site of roughly 260 hectares, located in central Ukraine. PcHP was in operation between 1948 and 1991 for the purposes of processing uranium and thorium ore into ore concentrate. During its operational lifetime, tens of millions of tonnes of radioactive waste was generated on the site. A consequence of these activities, coupled with the mismanagement of the resulting radioactive materials and by-products, is that approximately 45% of the southern part of the site has become radioactively contaminated. This area comprises some 100-200 buildings and structures, many of which are in a state of disrepair and dereliction. Around 20 of these buildings are heavily radioactively contaminated, with radiation levels from a few μSv/hr to a maximum of 4 mSv/hr reported. The European Commission is currently working with the Ukraine Ministry of Energy and Coal Use and the Nuclear Regulator to improve radiological safety and security at the site. In order for these remediation works to proceed, the site management needs to characterise the radioactive materials that are held there. As part of this activity, the team from the University of Bristol have undertaken a survey of one of the most heavily contaminated buildings, collecting a selection of in situ material samples. A suite of complimentary materials characterisation techniques (e.g. X-ray Fluorescence, Raman Spectroscopy, etc) have been deployed in order to determine the radionuclides and composition of the compounds present. Characterisation of these samples will allow the operators of the chemical plant to go forward with remediation works within the building.

07 ISOTOPE AND RADIATION SOURCES↗

Determining the Release of Radionuclides from SRS Tank 12H Waste Residual Solids Following Tank Closure

Eight High Level Waste (HLW) tanks used to store radioactive waste slurries have been emptied and closed at the Savannah River Site (SRS). Performance Analyses (PA) modeling of the release of radionuclides from residual waste solids in these tanks into the environment over extended time periods indicated the most likely risk drivers for environmental contamination. Radionuclide leaching studies were desired to provide additional information regarding the residual waste solubility assumptions used in the models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving high level waste solids mobilization and transfer through Hanford double-shell tanks - 15099

The Hanford Tank Operations Contractor (TOC) and the Hanford Waste Treatment and Immobilization Plant (WTP) contractor are both engaged in demonstrating mixing, sampling, and transfer system capabilities using simulated Hanford High-Level Waste (HLW) formulations. Efficient and effective handling of solid radioactive waste is essential to the successful completion of River Protection Project (RPP) mission and the Department of Energy's Hanford site. The TOC ust transfer over 416 million liters (110 million gallons) of HLW slurry through a complex system of 28 double shell tanks (DSTs) of approximately 3.8 million liters (1 million gallons) each as it is staged and delivered to the WTP. Through the use of scaled tanks and non-radioactive simulants, the TOC has identified operational methodologies for mixer pumps that enhance the movement of the solids through the DST system which will minimize the amount of solids remaining for final tank closeout. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LL/ILW: Post-Qualification of Old Waste through Non-Destructive Extraction of Barrels from Cement Shields - 13535

Currently there is a large number of radioactive waste drums entombed in cement shields at German nuclear power plants. These concrete containers used in the past for the waste are not approved for the final repository. Compliance with current acceptance criteria of the final repository has to be proven by qualification measures on the waste. To meet these criteria, a new declaration and new packing is necessary. A simple non-destructive extraction of about 2000 drums from their concrete shields is not possible. So different methods were tested to find a way of non-destructive extraction of old waste drums from cement shields and therefore reduce the final repository volume and final repository costs by using a container accepted and approved for Konrad. The main objective was to build a mobile system to offer this service to nuclear plant stations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geo-polymer Solidification of Intermediate Level Waste - 17078

To reduce the amount of hydrogen generated due to water radiolysis in stored intermediate-level waste, geo-polymer solidification, followed by drying, was studied. From the viewpoints of high thermal stability and low processing cost, geo-polymer solidification is an excellent method for conditioning intermediate level waste. In this study, in order to determine if radioactive waste could be treated using geo-polymer solidification, tests were conducted by using a simulated slurry generated from contaminated water treatment. The uniaxial compressive strength of the geo-polymer solidified waste containing 50 wt.% of the slurry was more than 10 MPa. To reduce the amount of hydrogen generated, the geo-polymer-solidified waste was dehydrated, and the water content of the remaining solid was less than 1 wt.%. Moreover, the value of the uniaxial compressive strength of dehydrated geo-polymer-solidified waste was similar to that of the untreated one. The volume reduction rate of the slurry solidification was obtained at the applicability limit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of Models for the Hanford Integrated Disposal Facility Performance Assessment - 18541

The Department of Energy Office of River Protection and its contractors have performed a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Integrated Disposal Facility. The long-term performance of the Hanford Integrated Disposal Facility to be protective of human health and the environment was evaluated under the requirements of United States Department of Energy Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the disposal facility would comply with the performance objectives specified in the order. The evaluation was performed using numerical models to simulate source term releases from vitrified and cement-based waste forms. Source term releases were subsequently transported through the facility into the natural system beneath the facility (comprised of an 85-meter thick vadose zone and thinner but highly conductive saturated zone overlying basalt) to a point of compliance 100-meters downstream from the disposed waste. Due to the differing scales in the finite difference models developed for the source terms and those developed for the natural system, numerical models for source term release and natural system flow and transport were not directly coupled. Instead, the output from the source term simulations were used as input to the natural system flow and transport simulations. The decoupling of the modeled systems makes it difficult to explore synergies and investigate the impact of parameter uncertainties. In order to explore system synergies and evaluate parameter uncertainty, an integrated system model was developed that includes source term release models, natural system transport models, and dose calculations. This paper will describe how the numerical models were used to develop abstractions that could be incorporated into the integrated system level model that was then used to explore system synergies and parameter uncertainties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Application of the Stakeholder Tool for Assessing Radioactive Transportation (START) - 16516

The U.S. Department of Energy, Office of Nuclear Energy is laying the groundwork for implementing interim storage of spent nuclear fuel (SNF) pursuant to the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste. This effort includes planning to address technical and logistical aspects of transporting SNF to an interim storage facility. A key project component is the development and utilization of a decision-support tool to evaluate transportation routing options and emergency preparedness. START (Stakeholder Tool for Assessing Radioactive Transportation) is a web-based application that utilizes geographic information systems (GIS) technology to represent transportation network operations as well as proximate features, such as tribal lands, emergency response capability, schools and environmentally-sensitive areas. Modes and routes between shipment origins and destinations designated by the user can be evaluated according to multiple routing criteria, and users can impose constraints that require the route to pass through or avoid specified locations. Considerable information is produced describing route efficiency, safety, security and environmental exposure that enable stakeholders to understand the implications of alternative route options. This paper describes START's capabilities and illustrates its use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Volume Change from Solidification Correlation for Hanford Tank Waste.

The U.S. Department of Energy (DOE), Hanford Field Office’s primary mission is to safely and effectively treat Hanford’s tank waste and deliver environmental remediation. Mixed radioactive waste is stored in the underground tanks at the Hanford Site. It was recently estimated that retrieval of the waste in the 200 West Area underground tanks in the SY, S, SX, and U Tank Farms will result in about 41 million gallons of mixed low-level waste (MLLW) (RPP-RPT-65147, Rev. 1). The current plan is to retrieve at least 22 S, SX, and U Farm tanks and pretreat1 to produce pretreated tank waste (PTW) which will be further treated (including solidification /immobilization) for Resource Conservation and Recovery Act (RCRA) Land Disposal Restriction (LDR) organics and inorganics before being transferred to an offsite out-of-state facility for disposal (RPP-PLAN-66135, Rev. 2). In addition, solidified PTW from the 200 East Area may also be transferred to an offsite out-of-state facility for disposal to ensure availability of critical Double-Shell Tank space, meet retrieval obligations, and optimize 200 East Area operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a U.S. Rail Transport Capability for Spent Nuclear Fuel and High-Level Waste - 16623

The U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) is laying the groundwork for implementing an integrated nuclear waste management system. This includes preparing for future large-scale transport of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) since transport will be a necessary component of an integrated waste management system. DOE continues to plan and develop options for the design of an integrated nuclear waste management disposition system. A significant destination-independent component of this integrated system is a rail transport capability for SNF and HLW. This paper provides an overview of the current DOE-NE effort related to designing and fabricating prototype rail cars. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Acceptance and Disposal at the Nevada National Security Site

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) relies on the Performance Assessment (PA) and the PA model of the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site (NNSS) to make disposal decisions on waste stream profiles submitted by waste generators. Disposal decisions are made following a formal process called the PA review process. This paper presents the PA review process, which is a part of the NNSA/NFO’s Waste Generator Documentation Approval Process. The review process includes three major steps and employs quantitative tools such as the PA-derived factors and probabilistic inventory and PA models developed in GoldSim. The PA-derived radionuclide action levels for waste characterization and reporting are included in the NNSS Waste Acceptance Criteria. Each year, NNSA/NFO reviews approximately 100 to 150 new or revised waste stream profiles. The PA review group ensures that, with the disposal of approved waste streams, the Area 5 RWMS will remain in compliance with the performance objectives of DOE O 435.1, “Radioactive Waste Management.” Examples of the PA review process are given that demonstrate how waste streams with special characteristics are evaluated and disposal decisions are made. The most rigorous profile evaluation is done with the PA model, run with the proposed profile inventory added and results compared to the PA results. Additional analysis and process-modeling are performed for those waste streams with unique features not addressed with the PA model. The results of these analyses and modeling are documented in special analysis reports, reviewed and approved by NNSA/NFO. The examples include (1) profiles with radionuclides not in the PA, (2) profiles including radionuclides with high radon-generation potential, and (3) profiles with high-heat generating radionuclides.

Yucel, Vefa↗

Monitoring Plan for the Idaho National Laboratory Remote Handled Low Level Waste Disposal Facility

This monitoring plan for Idaho National Laboratory’s Remote-Handled Low Level Waste Disposal Facility was developed to meet the requirements for monitoring low-level waste disposal facilities according to the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management,” and the guidance provided in the associated technical standard “Disposal Authorization Statement and Tank Closure Documentation” (DOE-STD-5002-2017). The purpose of this monitoring plan is to document a monitoring strategy that includes (1) compliance monitoring activities to demonstrate compliance with regulatory standards/limits and (2) performance monitoring to build confidence the facility is performing as demonstrated in the facility performance assessment (PA) (DOE-ID 2018a), composite analysis (CA) (DOE ID 2012), and CA addendum (DOE-ID 2018b). The de minimus impact to the aquifer predicted by the PA suggests that aquifer compliance monitoring should be augmented with performance monitoring of the drainage course materials and sedimentary interbeds in the vadose zone beneath the facility to provide a more effective means of identifying performance deviations. The monitoring approach delineated in this document was informed by the systems evaluation of natural and engineered facility features presented in the PA, an assessment of aquifer baseline conditions (INL 2017d), the dose analysis conducted in support of the PA and CA, and monitoring data collected during the first four years of facility operations (baseline monitoring phase) (INL 2023b). This plan provides monitoring locations, sampling frequencies, and sampling methods; recommendations for data evaluation; and a description of the monitoring plan implementation. Collected data will be used to demonstrate facility compliance and to identify conditions that are not consistent with the key assumptions made by the PA and CA.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Update on Development of a U.S. Rail Transport Capability for Spent Nuclear Fuel and High-Level Waste - 17138

The U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) is laying the groundwork for implementing an integrated nuclear waste management system. This includes preparing for future large-scale transport of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) since transport will be a necessary component of an integrated waste management system. This paper provides an overview of the progress to date, and discussion of the path forward, for the current DOE-NE effort related to designing and fabricating prototype rail-cars for rail transport of SNF from commercial nuclear power reactor sites when a receiving site becomes operational. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Facility Improvements and Modifications to Extend the Operational Life of the Modular Caustic-Side Solvent Extraction Process - 16082

Savannah River Remediation, LLC (SRR) is working to remove, stabilize, and dispose of approximately 36.7 million gallons (138.9 million liters) of liquid radioactive waste currently stored in 43 underground waste tanks, and ultimately close waste tanks. In 2008, as an interim salt treatment system to remove cesium from high level waste salt solutions prior to the Salt Waste Processing Facility start up, the Modular Caustic-Side Solvent Extraction Unit (MCU) initiated the removal of cesium from liquid radioactive salt waste prior to disposal. The MCU was designed and built for an expected three-year operational life and five-year design life. The first MCU cold runs began in June 2007 and hot startup was completed in April 2008. MCU remains in hot operation to this day, aiding in multiple, high-level tank closures. In an effort to continue liquid waste disposition at the Savannah River Site (SRS), equipment upgrades and operational improvements have been made to extend the life of the MCU beyond the original three years. Several pieces of fixed equipment have been converted into removable equipment which reduces the downtime associated with equipment change-outs and thereby reduces the dose to workers and processing impacts. Multiple pumps and filters have been upgraded to more robust designs. Process monitoring and controls have been upgraded to improve process performance. Redundant centrifugal contactor vibration equipment has been installed on each contactor in order to better assess the reliability, processing performance, and lifetime of the contactors. A new Solvent Hold Tank (SHT) Sampler has been installed to minimize the organic cross-contamination within the sampler, dose to workers, and sample analysis time. To increase processing availability and aid in visually obtained data, camera port has been added to the Salt Solution Feed Tank (SSFT). In order to decrease the overall background dose to the workers, the Process Vessel Ventilation (PVV) duct work now has the capability to be flushed to remove contamination. The caustic wash addition system has been modified to be a once-through system to improve equipment reliability, decrease downtime, and decrease dose to workers. In addition, the solvent that MCU utilizes to extract Cesium out of salt waste has been upgraded to Next Generation Solvent (NGS) which is based on MaxCalix extractant instead of a BobCalix extractant. Further, these upgrades and improvements have allowed MCU to be able to process at higher flow rates (up to 8.5 GPM) and with increased throughput (as high as 1.3 million gallons in FY13 and 5.3 million gallons since hot operations initiated) that have allowed SRR to continue the disposition of nuclear salt waste. The continued operation of MCU ensures more curies are stabilized into a glass matrix at SRS's Defense Waste Processing Facility (DWPF) and less curies are retained within South Carolina at SRS's Saltstone Disposal Facility (SDF). Unique challenges associated with modifying and improving a demonstration plant that is in hot operations and was designed to be temporary with a limited plant footprint have been successfully overcome. Further, creative strategies for removing old equipment have been utilized given the limited decontamination agents available for use that will not interfere with the organic solvent. This paper presents and discusses the deployment of these upgrades and operational improvements to MCU in order to allow continued, increased salt waste processing beyond the initial design life. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗