Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Independent Verification and Validation of Complex User Interfaces: A Human Factors Approach

The Usability Testing and Analysis Facility (UTAF) at the NASA Johnson Space Center has identified and evaluated a potential automated software interface inspection tool capable of assessing the degree to which space-related critical and high-risk software system user interfaces meet objective human factors standards across each NASA program and project. Testing consisted of two distinct phases. Phase 1 compared analysis times and similarity of results for the automated tool and for human-computer interface (HCI) experts. In Phase 2, HCI experts critiqued the prototype tool's user interface. Based on this evaluation, it appears that a more fully developed version of the tool will be a promising complement to a human factors-oriented independent verification and validation (IV&V) process.

Whitmore, Mihriban↗

Risk Reduction on X-33/RLV Engines

Risk management has received considerable attention in the X-33 and Reusable Launch Vehicle (RLV) program due to aggressive schedules, limited funding. and planned private investment to develop the commercial VentureStar vehicle. As an X-33 and RLV team member and main propulsion supplier, Boeing Rocketdyn Propulsion and Power has addressed risk through a methodical application of systems engineering in identifying, assessing, and mitigating risks. The methods employed involve rigorous risk mitigation planning early in development, continuous risk monitoring and assessment during the course of development, and the systematic verification of compliance with technical requirements prior to delivery. In addition, an engine system reliability analysis was conducted to reduce risk. In July 1996, NASA selected Lockheed Martin's "Skunk Works" (LMSW) as the lead contractor for the X-33 and RLV program. The X-33 vehicle is a half-scale pathfinder for the full-scale RLV. The LMSW RLV design is a lifting body shaped vehicle employing linear aerospike engine provided propulsion. The initial X-33 flight is planned for the summer of 2000, and the initial VentureStar flight is planned for between 2005 and 2007.

Crowley, Tim↗

Bringing Together Users and Developers of Forest Biomass Maps

Forests store carbon and thus represent important sinks for atmospheric carbon dioxide. Reducing uncertainty in current estimates of the amount of carbon in standing forests will improve precision of estimates of anthropogenic contributions to carbon dioxide in the atmosphere due to deforestation. Although satellite remote sensing has long been an important tool for mapping land cover, until recently aboveground forest biomass estimates have relied mostly on systematic ground sampling of forests. In alignment with fiscal year 2010 congressional direction, NASA has initiated work toward a carbon monitoring system (CMS) that includes both maps of forest biomass and total carbon flux estimates. A goal of the project is to ensure that the products are useful to a wide community of scientists, managers, and policy makers, as well as to carbon cycle scientists. Understanding the needs and requirements of these data users is helpful not just to the NASA CMS program but also to the entire community working on carbon-related activities. To that end, this meeting brought together a small group of natural resource managers and policy makers who use information on forests in their work with NASA scientists who are working to create aboveground forest biomass maps. These maps, derived from combining remote sensing and ground plots, aim to be more accurate than current inventory approaches when applied at local and regional scales. Meeting participants agreed that users of biomass information will look to the CMS effort not only to provide basic data for carbon or biomass measurements but also to provide data to help serve a broad range of goals, such as forest watershed management for water quality, habitat management for biodiversity and ecosystem services, and potential use for developing payments for ecosystem service projects. Participants also reminded the CMS group that potential users include not only public sector agencies and nongovernmental organizations but also the private sector because much forest acreage in the United States is privately held and needs data for forest management. Additional key outcomes identified by meeting participants include the following: (1) Priority should be given to building into the biomass product ease of use and low costs (including costs of hardware, software, and analysis requirements), (2) CMS products should also be relevant to other biomass measures for forest watershed management, habitat protection for biodiversity, and assessment of markets for ecosystem services, (3) CMS leadership should engage with the Subsidiary Body for Scientific and Technological Advice of the United Nations Framework Convention on Climate Change as they establish measuring, reporting, and verification standards, and (4) CMS leadership should continue to keep sister agencies and other organizations informed as CMS develops, particularly via the agencies active in the U.S. Global Change Research Program Carbon Cycle Interagency Working Group (U.S. Geological Survey, U.S. Department of Agriculture, and National Oceanic and Atmospheric Administration) and nongovernmental organizations.

Forest↗

LCLS-II-HE Cryomodule Testing at Fermilab

22 Linac Coherent Light Source II (LCLS-II) cryomodules were successfully tested at the Cryomodule Test Facility (CMTF) at Fermilab. Following the completion of the LCLS-II testing program, CMTF has shifted to testing cryomodules for the LCLS-II High Energy upgrade (LCLS-II-HE). The first LCLS-II-HE cryomodule, the verification cryomodule (vCM), was successfully tested and verified the readiness of LCLS-II-HE cryomodule testing at CMTF, and production cryomodule testing has begun. Presented here are the production cryomodule test acceptance criteria, testing plan, and cryomodule test results so far.

43 PARTICLE ACCELERATORS↗

Reported Energy and Cost Savings from the DOE ESPC Program

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy's Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 134 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For 133 of the 134 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $\$$95.7 million, total reported cost savings were $\$$96.8 million, and total guaranteed cost savings were $\$$92.1 million. This means that on average: ESPC contractors guaranteed 96% of the estimated cost savings, projects reported achieving 101% of the estimated cost savings, and projects reported achieving 105% of the guaranteed cost savings. For 129 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 5.371 million MMBtu, and reported savings were 5.374 million MMBtu, just over 100% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 129 projects were 10.400 million MMBtu, and reported saving were 10.405 million MMBtu, again, just over 100.0% of the estimated energy savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2012

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 142 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

Slattery, Bob S.↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2013

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 152 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Specification Section 01065S ES&H for Service Contracts

Section Includes: Requirements and guidelines in performance of work concerning protection of environment and property, and the safety and health of Contractors, Sandia National Laboratories (SNL) and Department of Energy (DOE) employees, visitors to SNL, and members of the public. This Section is applicable only to Service Contracts that do not involve construction or construction-like activities. Construction and construction-like activities are covered by Section 01065, Environment, Safety and Health (ES&H) for Construction Contracts. The entire ES&H program shall focus on safe-by-design intent, understanding the technical basis for the work, identifying and controlling energy sources, unacceptable consequences, risk assessments, and positive verification.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2014

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 156 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For all 156 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $\$$210.6 million, total reported cost savings were $\$$215.1 million, and total guaranteed cost savings were $\$$$204.5 million. This means that on average: ESPC contractors guaranteed 97% of the estimated cost savings; projects reported achieving 102% of the estimated cost savings; and projects reported achieving 105% of the guaranteed cost savings. For 155 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 11.938 million MMBtu, and reported savings were 12.138 million MMBtu, 101.7% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 155 projects were 19.052 million MMBtu, and reported saving were 19.516 million MMBtu, 102.4% of the estimated energy savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2015

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 151 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

How To Maintain Effective IAEA Safeguards While Reducing Facility Impact

For almost twenty years, inspectors from the International Atomic Energy Agency have been visiting the K-Area Material Storage facility at the Savannah River Site where excess plutonium has been placed under IAEA safeguards as part of the United States Volunatary Offer Agreement. During that time, the mission of K-Area Complex has expanded from storage of nuclear matieral to glovebox operations in support of the National Nuclear Security Administration’s Plutonium Disposition program. With this change in mission, it is becoming increasingly challenging to manage facility staff radiation exposure and operating activities during the IAEA’s annual Physcial Inventory Verifications (PIV). This study has identified both near-term and long-term recommendations for IAEA monitoring protocols that would allow the IAEA to maintain effective safeguards of the material while decreasing the impact to the facility. A statisitical analysis has shown that reducing the number of containers measured during an annual PIV from 12 to 4 still ensures a high level of confidence in the confidence while reducing the inspector time in the facility amd with a corresponding significant reduction in personnel radiation exposure. A modified installation pattern of Remotely Monitored Sealing Arrays (RMSAs) is also proposed utilizing only the outer rows of arrays of stored material containers in the Stack Area (SA). The modified RMSA placement will provide equivalent protection, while significantly reducing personnel radiological exposure, manpower requirements and associated costs. With advances in technology, there are additional potential options in containment/surveillance and continuity of knowledge that would allow the agency to be outside of the facility during PIV measurements and have confidence in the accuracy and authencitity of the results.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY2021

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 193 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2020 and September 30, 2021, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2022

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 190 measurement and verification (M&V) reports covering 182 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2021 and September 30, 2022, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis of Radioactive 65 Zn Contamination using 3D Position Sensitive CdZnTe Detectors

SRNL NMG Goal: In collaboration with ORNL, the aim is to identify and explore innovative technology opportunities that accelerate disposition, reduce life cycle costs, minimize worker radiation exposure, and improve worker safety and minimize program risks. • This process will include 3 glovebox systems that require personnel to dilute and package the plutonium for safe storage at WIPP. • For holdup monitoring and verification, gamma ray spectroscopy and imaging are the methods employed to achieve real time analysis of the plutonium waste. 2

Nwadeyi, Valerie E.↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Flight instrument and telemetry response and its inversion

Mathematical models of rate gyros, servo accelerometers, pressure transducers, and telemetry systems were derived and their parameters were obtained from laboratory tests. Analog computer simulations were used extensively for verification of the validity for fast and large input signals. An optimal inversion method was derived to reconstruct input signals from noisy output signals and a computer program was prepared.

Weinberger, M. R.↗

Expert systems and imaging - NASA's start-up work in intelligent image management

The problem of image management for NASA's Space Shuttle program and the future role of expert systems are considered. The difficulties involved in the storage and retrieval of the estimated 100,000 color photographs used for verification of essential installation, test, and repair procedures for Space Shuttle prelaunch are discussed. It is noted that the collection, classification, storage, and retrieval of high-quality pictoral images is possible through the use of pixels and an expert systems-assisted relational data base management system. The development of a query by pictorial example process is discussed. The NASA Intelligent Interactive Visual Data Base Management Systems project is detailed. It aims to conduct a systems analysis of a large-scale traditional image processing operation, collect data on critical human performance factors in the areas of image creation, processing, classification, storage, and retreival, and validate the attributes identified through the creation and testing of prototype models.

Ragusa, James M.↗

Space Station Freedom ground systems program - A survey

The key facilities identified to support Space Station Freedom Program (SSFP) integrated operations and their SSFP roles are described in detail. The ground infrastructure, which must be able to support both assembly and long-term operations, will consist of ground facilities, support systems, and the associated planning and management procedures. During 1992 the SSFP is conducting a major program review of the ground infrastructure including the definition of all facility and support system functional capabilities, interfaces, and data-flow requirements. Operations functionality and interface verification tests are being identified, and operations readiness dates are being set.

Accola, A.↗