Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power consistency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Development of High Power Hall Thruster Systems to Enable the NASA Exploration Vision

The next phase of space exploration missions requires high power Solar Electric Propulsion (SEP) systems for large-scale science missions and cargo transportation. Development is underway at Aerojet Rocketdyne on Hall thruster systems that are intended to bracket the needs of future NASA SEP missions in support of space exploration. The Advanced Electric Propulsion System (AEPS) program is developing and qualifying a 13.3kW Hall thruster system to be demonstrated on the Power and Propulsion Element (PPE), which is intended to be the first element of a Lunar Outpost Platform - Gateway (LOP-G). The NextSTEP program is integrating a nested Hall thruster into a 100kW system and testing it for 100 hours. These two programs will provide a path to efficient in-space propulsion that will allow NASA to transfer the large amounts of cargo that is needed to support human missions - first to the moon and then on to Mars. The Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS system includes a magnetically shielded long-life Hall thruster, Power Processing Unit (PPU) and a Xenon Flow Controller (XFC). The Hall thruster, developed and demonstrated by NASA, operates at input powers up to 12.5kW while providing a specific impulse over an estimated 2800s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95-140V, consistent with operation beyond the orbit of Mars. The integrated system input power is continuously throttleable between 3 and 13.3kW. Component level testing of the EP String has begun with prototype hardware. The NextSTEP program is developing a 100kW Electric Propulsion (EP) system using a nested Hall thruster designed for powers up to 250kW, a modular power processor and a modular mass flow controller. While the program objective is to operate the integrated EP system continuously at 100kW for 100hrs to demonstrate thermal stability and support the development of system life time models, it builds on decades of experience with long-life Hall thrusters and the design is evolvable to a capability of 250kW. Design upgrades that demonstrate the 100kW EP system have been completed and tested. Aerojet Rocketdyne (AR) is excited to support NASA as it extends human reach into deep space and believes that these programs will provide the propulsion to make such missions affordable and sustainable. These systems provide NASA with a range of options to power its deep space transport vehicles. This paper presents the mission requirements for supporting the NASA exploration vision, as well as the status for the high power Hall thruster systems in development.

Jackson, Jerry↗

Development of High Power Hall Thruster Systems to Enable the NASA Exploration Vision

The next phase of space exploration missions requires high power Solar Electric Propulsion (SEP) systems for large-scale science missions and cargo transportation. Development is underway at Aerojet Rocketdyne on Hall thruster systems that are intended to bracket the needs of future NASA SEP missions in support of space exploration. The Advanced Electric Propulsion System (AEPS) program is developing and qualifying a 13.3kW Hall thruster system to be demonstrated on the Power and Propulsion Element (PPE), which is intended to be the first element of a Lunar Outpost Platform - Gateway (LOP-G). The NextSTEP program is integrating a nested Hall thruster into a 100 kW system and testing it for 100 hours. These two programs will provide a path to efficient in-space propulsion that will allow NASA to transfer the large amounts of cargo that is needed to support human missions - first to the moon and then on to Mars. The Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS system includes a magnetically shielded long-life Hall thruster, Power Processing Unit (PPU) and a Xenon Flow Controller (XFC). The Hall thruster, developed and demonstrated by NASA, operates at input powers up to 12.5 kW while providing a specific impulse over an estimated 2800s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95-140V, consistent with operation beyond the orbit of Mars. The integrated system input power is continuously throttleable between 3 and 13.3kW. Component level testing of the EP String has begun with prototype hardware. The NextSTEP program is developing a 100kW Electric Propulsion (EP) system using a nested Hall thruster designed for powers up to 250kW, a modular power processor and a modular mass flow controller. While the program objective is to operate the integrated EP system continuously at 100kW for 100 hours to demonstrate thermal stability and support the development of system life time models, it builds on decades of experience with long-life Hall thrusters and the design is evolvable to a capability of 250kW. Design upgrades that demonstrate the 100kW EP system have been completed and tested. Aerojet Rocketdyne is excited to support NASA as it extends human reach into deep space and believes that these programs will provide the propulsion to make such missions affordable and sustainable. These systems provide NASA with a range of options to power its deep space transport vehicles. This paper presents the mission requirements for supporting the NASA exploration vision, as well as the status for the high power Hall thruster systems in development.

Jackson, Jerry↗

Transmitter experiment package for the communications technology satellite

The operating requirements, system design characteristics, high voltage packaging considerations, nonstandard components development, and test results for the transmitter experiment package (TEP) are described. The TEP is used for broadcasting power transmission from the Communications Technology Satellite. The TEP consists of a 12 GHz, 200-watt output stage tube (OST), a high voltage processing system that converts the unregulated spacecraft solar array power to the regulated voltages required for OST operation, and a variable conductance heat pipe system that is used to cool the OST body.

Farber, B.↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase II Pre-Front End Engineering Design Study)

GTI Energy (GTI) and team members Southern Company Services (SCS), Pacific Gas & Electric (PG&E) and the Electric Power Research Institute (EPRI) performed a Phase II Pre-Feed Study under contract DE-FE0032008 for Hydrogen Storage for Load-Following and Clean Power. The configuration of the proposed system consists of subsystems for on-site H 2 production, on-site H 2 storage (up to 54 MWth in commercial vessels) and H 2 combustion in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with an existing fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load and H 2 production is relatively constant by storing H 2 . The proposed system is an improvement over alternate low carbon dispatchable power options. Technoeconomic analyses show H 2 produced with GTI’s patented Compact Hydrogen Generator (CHG) with inherent carbon capture will be lower cost (Levelized Cost of Hydrogen, LCOH) relative to hydrogen produced with a Steam Methane Reformer (SMR) with an amine system for carbon capture. This lower cost hydrogen enables our integrated system to deliver electricity (Levelized Cost of Electricity, LCOE) at 17.4% lower cost relative to a SMR sourced H 2 -fired HRSG (with an amine system for carbon capture) – Steam Turbine Generator (STG). Our analysis using EPRI’s US REGEN macroeconomic model shows our system will have significant demand in the power market and therefore require significant capacity expansion (CHG plants built to deliver hydrogen) to deliver low cost, low carbon power. In Phase II, our Team has completed a detailed system definition including the development of process models, definition of battery limits, Process Flow Diagrams (PFDs), Piping and Instrumentation Drawings (P&IDs), and a plant layout. A preliminary design for the key components of the CHG was developed including component lists & specifications. An evaluation of environmental and permitting considerations was completed and included the development of an Environmental Information Volume (EIV). The duct burners, which are flexible and can burn hydrogen and/or natural gas, were defined and initial CFD analyses were completed.

03 NATURAL GAS↗

Measured Thermal and Fast Neutron Fluence Rates for ATF-1 Holders During ATR Cycle 157D

This report contains the thermal (2200 m/s) and fast (E>1MeV) neutron fluence rate data for the ATF-1 holders located in core for ATR Cycle 157D which were measured by the Radiation Measurements Laboratory (RML) as requested by the Power Reactor Programs (ATR Experiments) Radiation Measurements Work Order. This report contains measurements of the fluence rates corresponding to the particular elevations relative to the 80-ft. core elevation. The data in this report consist of (1) a table of the ATR power history and distribution, (2) a hard copy listing of all thermal and fast neutron fluence rates, and (3) plots of both the thermal and fast neutron fluence rates. The fluence rates reported are for the average power levels given in the table of power history and distribution.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Measured thermal and fast neutron fluence rates for ATF-1 holders during ATR cycle 164B. Revision 1

This report contains the thermal (2200 m/s) and fast (E> lMeV) neutron fluence rate data for the ATF-1 holders located in core for ATR Cycle 162B which were measured by the Radiation Measurements Laboratory (RML) as requested by the Power Reactor Programs (ATR Experiments) Radiation Measurements Work Order. This report contains measurements of the fluence rates corresponding to the particular elevations relative to the 80-ft. core elevation. The data in this report consist of ( 1) a table of the ATR power history and distribution, (2) a hard copy listing of all thermal and fast neutron fluence rates, and (3) plots of both the thermal and fast neutron fluence rates.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Measured Thermal and Fast Neutrons Fluence Rates for ATF-1 Holders During ATR Cycle 166B

This report contains the thermal (2200 m/s) and fast (E>lMeV) neutron fluence rate data for the ATF-1 holders located in core for ATR Cycle 166B which were measured by the Radiation Measurements Laboratory (RML) as requested by the Power Reactor Programs (ATR Experiments) Radiation Measurements Work Order. This report contains measurements of the fluence rates corresponding to the particular elevations relative to the 80-ft. core elevation. The data in this report consist of (1) a table of the ATR power history and distribution, (2) a hard copy listing of all thermal and fast neutron fluence rates, and (3) plots of both the thermal and fast neutron fluence rates. All "BR" holder monitor wires for this cycle are 56.375 inches long. This length allows measurements from 31.17 inches above core midplane to 19.81 inches below core midplane. The distance from the end of the wires to the first count position was 4.25 inches for all wires counted from this cycle. The monitors were located in an outward small I-holes,1-22 and 1-23. Thermal neutron fluence was determined based on the activation of the CoAl wires and resonance corrections determined in the irradiation of Cycle 152A when the RML measured cadmium-covered as well as bare neutron monitors in the Southwest, Southeast, and H positions at the Center lobe to determine the division in neutron energy between epithermal and thermal neutrons. For more information please refer to letter “Radiation Measurements Laboratory measurements of in core ATR physics testing during cycle 152A. The measured values documented in RML procedure, “ACMM-3600, Flux Monitoring,” will be used indefinitely until further measurements supersede the current values. Fast neutron fluence was determined using the activation of nickel wires. Typically, a fission spectrum averaged cross section (E>1 MeV) is used as determined in detailed measurements described in “ATR Neutron Spectral Characterization,” which gives an effective cross section of 97 mb for the small I-holes. However, those measurements were performed with unfueled experiments. The fast fluence values reported here use a perturbed 114 mb effective>1 MeV spectrum averaged cross section for the small I-holes based on MCNP simulations for a previous fueled experiment in the1-24 position. Refer to “LWR- ATR Irradiation Measured Thermal and Fast Neutron Fluence Rates ATR CYCLE 133A 04/19/04 thru 05/17/04” for more information.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Measured Thermal and Fast Neutron Fluence Rates for aLEU Holders During Cycle 169A

This report contains the thermal (2200 mis) and fast (E> IMeV) neutron fluence rate data for the aLEU holders located in core for ATR Cycle 169A which were measured by the Radiation Measurements Laboratory (RML) as requested by the Power Reactor Programs (ATR Experiments) Radiation Measurements Work Order. This report contains measurements of the fluence rates corresponding to the particular elevations relative to the 80-ft. core elevation. The data in this report consist of (1) a table of the ATR power history and distribution, (2) a hard copy listing of all thermal and fast neutron fluence rates, and (3) plots of both the thermal and fast neutron fluence rates. All "BR" holder monitor wires for this cycle are 56.375 inches long. This length allows measurements from 31.17 inches above core midplane to 19.81 inches below core midplane. The distance from the end of the wires to the first count position was 4.25 inches for all wires counted from this cycle.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Measured Thermal and Fact Neutron Fluence Rates for AFC Holders During Cycle 169A

This report contains the thermal (2200 m/s) and fast (E>1MeV) neutron fluence rate data for the AFC holders located in core for ATR Cycle 169A which were measured by the Radiation Measurements Laboratory (RML) as requested by the Power Reactor Programs (ATR Experiments) Radiation Measurements Work Order. This report contains measurements of the fluence rates corresponding to the particular elevations relative to the 80-ft. core elevation. The data in this report consist of (1) a table of the ATR power history and distribution, (2) a hard copy listing of all thermal and fast neutron fluence rates, and (3) plots of both the thermal and fast neutron fluence rates. All "BR" holder monitor wires for this cycle are 56.375 inches long. This length allows measurements from 31.17 inches above core midplane to 19.81 inches below core midplane. The distance from the end of the wires to the first count position was 4.25 inches for all wires counted from this cycle.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The First Pulse of the Extremely Bright GRB 130427A: A Test Lab for Synchrotron Shocks

Gamma-ray burst (GRB) 130427A is one of the most energetic GRBs ever observed. The initial pulse up to 2.5 seconds is possibly the brightest well-isolated pulse observed to date. A fine time resolution spectral analysis shows power-law decays of the peak energy from the onset of the pulse, consistent with models of internal synchrotron shock pulses. But, a strongly correlated power-law behavior is observed between the luminosity and the spectral peak energy that is inconsistent with curvature effects arising in the relativistic outflow. We found it difficult for any of the existing models to account for all of the observed spectral and temporal behaviors simultaneously.

79 ASTRONOMY AND ASTROPHYSICS↗

The First Pulse of the Extremely Bright GRB 130427A: A Test Lab for Synchrotron Shocks

Gamma-ray burst (GRB) 130427A is one of the most energetic GRBs ever observed. The initial pulse up to 2.5 s is possibly the brightest well-isolated pulse observed to date. A fine time resolution spectral analysis shows power-law decays of the peak energy from the onset of the pulse, consistent with models of internal synchrotron shock pulses. However, a strongly correlated power-law behavior is observed between the luminosity and the spectral peak energy that is inconsistent with curvature effects arising in the relativistic outflow. It is difficult for any of the existing models to account for all of the observed spectral and temporal behaviors simultaneously.

Pulse↗

Performance Testing of an Integrated Magnetic Power Take-Off

A wave energy converter (WEC) and the power take-off (PTO) generator system can be represented by using a mass-spring-dampener model. By incorporating a negative stiffness spring within the PTO, the overall stiffness of the PTO can be lowered allowing the impedance of the PTO to be more closely matched with the WEC. By designing for impedance matching the WEC can greatly enhance its power generation capability. This project has involved the design, fabrication and testing of a new type of linear-stroke length and rotary stroke length adjustable negative stiffness magnetic springs for use within a wave energy converter (WEC). The magnetic springs were studied by using 3-D finite element analysis with the objective of creating high energy density and a long linear stroke length. After the construction and testing of both a proof-of-principle adjustable linear and rotary magnetic spring prototype the rotary (torsional) magnetic spring was selected for scaling up analysis. The selected scaled-up proof-of-principle magnetic spring had a peak torque of 850 Nm with a ±45 degree stroke length. By translating the inner rotor relative to the outer rotor, the stiffness could be adjusted to be either negative or positive stiffness. During this project a magnetic lead screw was also studied, and it was shown that by combining the magnetic lead screw with a linearly translating magnetic spring a very long rotary stroke length could be attained. However, as the magnetic lead screw increased complexity and reduced overall energy density relative to a rotary (torsional) spring, this design approach was not further pursed. Dynamometer testing of the variable stiffness magnetic springs was first completed by Portland State University and following this the magnetic spring performance was independently verified by Sandia National Laboratory (Sandia). A WEC analysis when using a variable stiffness magnetic spring was completed by using the WecOptTool. WecOptTool is an open-source WEC optimization software developed by Sandia that supports efficient power take-off (PTO) and control optimization. Wave condition data from the Oregon PacWave test-site was used in this study. The analysis showed that a WEC with a tunable stiffness value could consistently achieve about 80% of its maximum theoretical power production. The use of a tunable stiffness WEC, rather than zero-stiffness or a constant stiffness WEC was also shown to lead to a smaller maximum PTO force requirement. The variable stiffness magnetic spring was integrated into an experimental WEC developed by Sandia, called a Wave-Bot. Sandia successfully completed water-tank testing of the Wave-Bot at the Navy’s Carderock, Maryland, wave-basin test site. The wave-basin testing helped to experimentally demonstrate the operating capabilities and increased power generation capability of a WEC containing an integrated variable stiffness magnetic spring. A WEC capacity factor analysis was also completed. The capacity factor was defined as the ratio of annual average WEC generator power to the maximum (RMS) generated power. This capacity factor provided a means of identifying the ratio of potential revenue to cost. It was calculated that if a tunable variable stiffness magnetic spring has RMS constraints it could operate with a capacity factor above 30%. This is comparable to a wind turbine’s capacity factor.

16 TIDAL AND WAVE POWER↗

A comparison of two types of velocity models for the lunar crust: Smooth continuous and stepwise layered

The data from the Apollo-14 and Apollo-16 Active Seismic Experiments were reanalyzed and show that a power-law velocity variation with depth is consistent with both the traveltimes and amplitudes of the first arrivals for source-to-geophone separations up to 32m. The data were improved by removing spurious glithches, flickering and stacking. While this improved the signal-to-noise ratios, it was not possible to measure the arrivals beyond 32m. The physical evidence that the shallow lunar regolith is made up of fine particles adds weight to the 1/6-power velocity model. The 1/6-power law predicts the traveltime t(x), varies with separation, x, as t(x) = t sub 0 (x/x sub 0) to the 5/6 power and, using a first-order theory, the amplitude, A(x), varies as A(x) = A sub 0 (x/x sub 0) to the (13-m)/12, M 1; the layer-velocity model predicts t(x) = t sub 0 (x/xsub 0) and A(x) = A sub 0 (x/x sub 0) to the 2nd power.

Gangi, A. F.↗

Payloads minimum EIRP formulations

The effective isotropic radiated power (EIRP) of the payloads is formulated. The EIRP consists of three components; EIRP = P sub T + G sub T + L sub TX, where P sub T is the transmitter total RF output power, G sub T is the transmitting antenna gain, and L sub TX is all transmitter circuit losses.

Source record↗

Extended Investigation into Fault-Tolerant Integrated Motor Drive for a Quadrotor Urban Air Mobility (UAM) Aircraft

Electric propulsor machines and their associated power electronics have been identified in past studies as low-reliability components in emerging Urban Air Mobility (UAM) Vertical Takeoff and Landing (VTOL) vehicles that raise their predicted catastrophic failure rates. This research effort extends previously presented work investigating the use of fault-tolerant (FT) motor drives in quadrotor aircraft as a promising approach to significantly increase their mean-time-to-failure (MTTF). In particular, fault-tolerant modular motor drives (FT-MMDs) are identified as strong candidates for closing the electric propulsor reliability gap. These FT-MMDs divide a machine drive into multiple redundant modules, each consisting of three phase stator windings and power electronics units, enabling continued machine operation after a module failure. Achieving the highest possible isolation between modules (physical, magnetic, thermal, electrical) is critically important in FT-MMDs to prevent the propagation of any failure between modules. Key additional requirements for achieving the highest possible reliability characteristics with FT-MMDs are high repair rates and aggressive suppression of all single-point failures.

quadrotor↗

Multiredshift limits on the 21 cm power spectrum from paper

The epoch of the reionization (EoR) power spectrum is expected to evolve strongly with redshift, and it is this variation with cosmic history that will allow us to begin to place constraints on the physics of reionization. The primary obstacle to the measurement of the EoR power spectrum is bright foreground emission. We present an analysis of observations from the Donald C. Backer Precision Array for Probing the Epoch of Reionization (PAPER) telescope, which place new limits on the H i power spectrum over the redshift range of 7.5<z<10.5, extending previously published single-redshift results to cover the full range accessible to the instrument. To suppress foregrounds, we use filtering techniques that take advantage of the large instrumental bandwidth to isolate and suppress foreground leakage into the interesting regions of k-space. Our 500 hr integration is the longest such yet recorded and demonstrates this method to a dynamic range of 10{sup 4}. Power spectra at different points across the redshift range reveal the variable efficacy of the foreground isolation. Noise-limited measurements of Δ{sup 2} at k = 0.2 hr Mpc{sup −1} and z = 7.55 reach as low as (48 mK){sup 2} (1σ). We demonstrate that the size of the error bars in our power spectrum measurement as generated by a bootstrap method is consistent with the fluctuations due to thermal noise. Relative to this thermal noise, most spectra exhibit an excess of power at a few sigma. The likely sources of this excess include residual foreground leakage, particularly at the highest redshift, unflagged radio frequency interference, and calibration errors. We conclude by discussing data reduction improvements that promise to remove much of this excess.

79 ASTRONOMY AND ASTROPHYSICS↗

The Plug-and-Play Electricity Era: Interoperability to Integrate Anything, Anywhere, Anytime

The advent of the information age continues to transform the mechanics of integrating electric power devices and systems from coordinated operations based purely on the physics of electric power engineering to an increasing blend of power with information and communications technology engineering. Integrating electric system components is not just about attaching electric power wires but requires the connection of computer-based automation systems and their associated sensing and communications equipment. The architectural impacts are significant. Well-considered and commonly held concepts, principles, and organizational structures have been emerging to address the complexity of the integrated operational challenges that drives our society to expect more flexibility in configuring the electric power system, while simultaneously achieving greater efficiency, reliability, and resilience. Architectural concepts such as modularity and composability contribute to forming structures that enable the connection of power system equipment characterized by clearly-defined interfaces that consist of physical connections and cyber connections. Overall, the result of successful integration of the components of the electric power system is interoperation; the discipline that drives the integration to be simple and reliable is the topic of interoperability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal Hydraulic Modeling of an Advanced Nuclear Reactor using open-source MOOSE tools

The aim of this study is to develop model of a small High Temperature Gas cooled Reactor (HTGR) including the balance of plant. This microreactor produces electricity using the thermal power of the nuclear reaction. This work utilizes the MOOSE Multiphysics simulation tools, which are mainly developed at Idaho National Laboratory (INL, Idaho, United States of America). Its thermal-hydraulics and Heat conduction Modules are used to study the fluids behavior in the primary loop and power conversion system and their interactions with the heating structures. More specifically, one verifies that the temperatures, pressures and mass flow rates of the fluids in both loops are consistent and that, at the same time, all the power transfers occur as expected. Moreover, the various mechanical components characteristics (turbine, compressor, pump) are adapted to the reactor operating conditions. This first analysis is conducted using simplified and one-dimensional model for the core. Ultimately, the obtained results are used to build a higher fidelity core model. This step aims to verify that the initial simplified simulation is consistent with the three-dimensional core modeling. In addition, the calculated material temperatures are checked. This study provides a fairly complete model of the thermal hydraulic phenomena for a particular design of High Temperature Gas cooled Reactor.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗