Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROFITS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

EnergySolution's Clive Disposal Facility Operational Research Model - 13475

EnergySolutions owns and operates a licensed, commercial low-level radioactive waste disposal facility located in Clive, Utah. The Clive site receives low-level radioactive waste from various locations within the United States via bulk truck, containerised truck, enclosed truck, bulk rail-cars, rail boxcars, and rail inter-modals. Waste packages are unloaded, characterized, processed, and disposed of at the Clive site. Examples of low-level radioactive waste arriving at Clive include, but are not limited to, contaminated soil/debris, spent nuclear power plant components, and medical waste. Generators of low-level radioactive waste typically include nuclear power plants, hospitals, national laboratories, and various United States government operated waste sites. Over the past few years, poor economic conditions have significantly reduced the number of shipments to Clive. With less revenue coming in from processing shipments, Clive needed to keep its expenses down if it was going to maintain past levels of profitability. The Operational Research group of EnergySolutions were asked to develop a simulation model to help identify any improvement opportunities that would increase overall operating efficiency and reduce costs at the Clive Facility. The Clive operations research model simulates the receipt, movement, and processing requirements of shipments arriving at the facility. The model includes shipment schedules, processing times of various waste types, labor requirements, shift schedules, and site equipment availability. The Clive operations research model has been developed using the WITNESS{sup TM} process simulation software, which is developed by the Lanner Group. The major goals of this project were to: - identify processing bottlenecks that could reduce the turnaround time from shipment arrival to disposal; - evaluate the use (or idle time) of labor and equipment; - project future operational requirements under different forecasted scenarios. By identifying processing bottlenecks and unused equipment and/or labor, improvements to operating efficiency could be determined and appropriate cost saving measures implemented. Model runs forecasting various scenarios helped illustrate potential impacts of certain conditions (e.g. 20% decrease in shipments arrived), variables (e.g. 20% decrease in labor), or other possible situations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE Asset Revitalization: Sustainability and Waste Management Aspects - 12120

In February 2011 Secretary of Energy Steven Chu established a Task Force on Asset Revitalization to facilitate a discussion among the Department of Energy (DOE), communities around DOE sites, non-profits, tribal governments, the private sector, and other stakeholders to identify reuse approaches as environmental cleanup efforts at DOE sites reach completion. The Task Force was charged with exploring opportunities to reuse DOE site assets for beneficial purposes and making recommendations to the Under Secretaries of Energy, Science, and Nuclear Security on the formation of an Asset Revitalization Initiative (ARI). The ARI is a Department-wide effort to advance the beneficial reuse of the DOE's unique and diverse mix of assets including land, facilities, infrastructure, equipment, technologies, natural resources, and a highly skilled workforce. The ARI will encourage collaboration between the public and private sectors in order to achieve energy and environmental goals as well as to stimulate and diversify regional economies. The recommendations of the ARI Task Force are summarized below, focusing on the sustainability and waste management aspects. DOE's ongoing completion of cleanup efforts and modernization efforts is creating opportunities to transition under-used or excess assets to future beneficial use. The FY 2011 DOE ARI Task Force determined that DOE's assets could be reused for beneficial purposes such as clean energy production, industrial manufacturing, recreational and conversation use, and other economic development initiatives. Asset revitalization has the potential to both help achieve DOE's energy and environmental goals and diversify regional economies where the sites are located, including providing the support needed to implement large-scale projects that achieve green sustainability goals. Asset revitalization efforts could be accelerated by effectively incorporating future use plans into environmental management and remediation efforts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Construction and Design of a full size sTGC prototype for the ATLAS New Small Wheel upgrade

For the forthcoming Phase-I upgrade to the LHC (2018/19), the first station of the ATLAS muon end-cap system, Small Wheel, will need to be replaced. The New Small Wheel (NSW) will have to operate in a high background radiation region while reconstructing muon tracks with high precision as well as furnishing information for the Level-1 trigger. In particular, the precision reconstruction of tracks requires a spatial resolution of about 100 μm, and the Level-1 trigger track segments have to be reconstructed with an angular resolution of approximately 1 mrad. The NSW will have two chamber technologies, one primarily devoted to the Level-1 trigger function the small-strip Thin Gap Chambers (sTGC) and one dedicated to precision tracking, Micromegas detectors, (MM). The single sTGC planes of a quadruplet consists of an anode layer of 50 μm gold plated tungsten wire sandwiched between two resistive cathode layers. Behind one of the resistive cathode layers, a PCB with precise machined strips (thus the name sTGC's) spaced every 3.2 mm allows to achieve the position resolution that ranges from 70 to 150 μm, depending on the incident particle angle. Behind the second cathode, a PCB that contains an arrangement of pads, allows for a fast coincidence between successive sTGC layers to tag the passage of a track and reads only the corresponding strips for triggering. To be able to profit from the high accuracy of each of the sTGC planes for trigger purposes, their relative geometrical position between planes has to be controlled to within a precision of about 40 μm in their parallelism, as well (due to the various incident angles), to within a precision of 80 μm in the relative distance between the planes to achieve the overall angular resolution of 1 mrad. The needed accuracy in the position and parallelism of the strips is achieved by machining brass inserts together when machining the strip patterns into the cathode boards in a single step. The inserts can then be used as external references on a granite table. Precision methods are used to maintain high accuracy when combining four single detector gaps first into two doublets and then into a quadruplet. We will present results on the ongoing construction of full size (∼1 x 1 m) sTGC quadruplet prototypes before full construction starts in 2015. (authors)

43 PARTICLE ACCELERATORS↗

Intraoperative β{sup -} detecting probe for radio-guided surgery in tumour resection

The development of the β{sup -} based radio-guided surgery aims to extend the technique to those tumours where surgery is the only possible treatment and the assessment of the resection would most profit from the low background around the lesion, as for brain tumours. Feasibility studies on meningioma and gliomas already estimated the potentiality of this new treatment. To validate the technique, a prototype of the intraoperative probe detecting β{sup -} decays and specific phantoms simulating tumour remnant patterns embedded in healthy tissue have been realized. The response of the probe in this simulated environment is tested with dedicated procedures. This document discusses the innovative aspects of the method, the status of the developed intraoperative β{sup -} detecting probe and the results of the preclinical tests. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Building the Future Nuclear Workforce Through Regional Partnerships - 17219

Industries across the United States of America are competing for highly skilled talent at a time when worker retirements are increasing and fewer students are pursuing science, technology, engineering and math (STEM) related fields of study. This specialized workforce is necessary for many industries, and it is essential for the processing and management of nuclear materials and operations of the nuclear security enterprise. Competition for STEM talent impacts the region that includes the Savannah River Site (SRS), a Department of Energy complex that is responsible for environmental stewardship, environmental cleanup, waste management and disposition of nuclear materials. SRS employs nearly 11,000 people and anticipates significant workforce attrition due to retirements over the next several years. In the SRS region, nuclear industry workers are also needed for the growing nuclear power industry as construction of four new nuclear power plants is taking place within an 80-mile radius of SRS. To address growing nuclear workforce needs in this region of Georgia and South Carolina, the SRS Community Reuse Organization (SRSCRO) established the Nuclear Workforce Initiative (NWI{sup R}) during 2009. Through NWI{sup R}, the SRSCRO has developed a network of partnerships with nuclear employers and regional educators to expand nuclear workforce development capabilities. Most notably, through NWI{sup R}, the SRSCRO established a partnership with five local colleges and universities and the Department of Energy Office of Environmental Management. Together, they have produced significant results. Recently, the National Nuclear Security Administration joined the partnership to help build the future nuclear workforce that includes scientists and engineers, but also skilled technicians, production operators, welders, nuclear quality specialists and other highly skilled professionals prepared to work in a secure and procedure-oriented environment. This paper highlights results from a successful partnership between a non-profit organization, academic institutions and the United States Department of Energy designed to expand the nuclear industry talent pool. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vattenfall Decommissioning Planning in Sweden - 17544

A rapid decrease in the power prices in the Nordic market for the last three years has drastically reduced the profitability of the nuclear power plants in Sweden. This has resulted in a very quick re-evaluation of the optimal life-term of the older generation, from the 1970's, nuclear units in Sweden. Hence, it was decided last year to shut-down the Vattenfall Ringhals-1 BWR and the Ringhals-2 PWR by 2020 and 2019, respectively, for financial reasons. Before that decision, the planning had been to operate the units until 50 years life-time, i.e. 2024 and 2025. This decision resulted in a prompt start of the planning for decommissioning of the two units. The planning started with a project, called AVANS, to ensure that the overall planning and to-be-developed organisations had well defined requirements and a common platform. Another project, STURE, was started to ensure the continued operation and in some case movement of common site functions to the two younger units on the Ringhals site, i.e. the PWRs Ringhals-3 and Ringhals-4. This project also has the responsibility to optimise operation of Ringhals-1 and Ringhals-2 to EOL and the subsequent removal of the nuclear fuel from the units after necessary cool-down. A third project started is the actual decommissioning project, TYKO, benefiting from experience gained and staff involved in still ongoing decommissioning of a legacy materials reactor, i.e. the Studsvik R2/R2-0 reactor. The planning and experience to date for the three projects will be presented in the paper, as well as lessons-learned and future plans, including some critical items identified wrt dismantling and site function transfer. Half of the nuclear units in Sweden, six units, and one legacy power reactor, will be starting decommissioning within the next few years. Impacts on the back-end system; the financial situation, with respect to the state-controlled financial funding; and the supplier market are discussed in the paper. Furthermore, the planning process and the planned management of the interfaces between the involved organisations is described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Arizona's nuclear future 153192.doc10 - 15319

The Arizona Energy Education Fund (AEEF), now a 501(c) (3) non-profit entity, is an assembly of stakeholders from the private sector, government, education and energy industries dedicated to supporting K-12 (kindergarten through 12. grade), community colleges and universities through an enhanced program of smart nuclear generator expansion, isotope production, testing of breeder reactor power plants, recycling spent nuclear fuel in power generation facilities, and nuclear fuel cycle support. AEEF priorities are to collaborate with stakeholders in Arizona to develop safe plans that will make Arizona the most nuclear friendly state benefiting all stakeholders. Long-term plans include promoting: - education of K-12 students as well as the general Arizona population so that they fully understand the benefits and safe use of nuclear power; - reliable supply of medical and industrial radioisotopes; - Arizona as host of new reactor concepts which are being developed and demonstrated; - development of nuclear engineering programs in Arizona universities to drive the development of the next generation of nuclear power plants; and - supply of nuclear-generated electricity to California and Sonora, Mexico to power desalinisation plants in exchange for Colorado River water currently allocated to California and Sonora. The development described will generate significant long-term employment for Arizona while delivering a critical service to the nation. Arizona's location advantages include the lack of significant seismic activity, hurricanes, tsunamis, floods or frigid weather. Interstate highways and railroads are well developed and provide good, all-weather access to many potential development sites. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SURF: Advances in the Incorporation of Sustainability Into Remedial Approaches - 16451

The inclusion of sustainability considerations in remediation cleanup process (investigation through site closure) benefits site owners, including Federal agencies such as the Department of Defense (DOD) and Department of Energy (DOE), through development of more efficient and cost-effective remedies as well as communities by considering socio-economic impacts and redevelopment into remedial decisions. The incorporation of social, environmental, and economic considerations early in the remedial process often enables achievement of regulatory site closure sooner and with broader community acceptance. In order to achieve these objectives, stakeholders, including federal facilities, regulators, contractors, and consultants, have expressed the need for case studies demonstrating successful implementation of sustainable practices. The Sustainable Remediation Forum emerged in 2006 and was established as a non-profit organization in 2010. Through exploration of technical issues such as groundwater conservation and reuse at remediation sites to life cycle assessment approaches, subject matter experts have led discussions across the industry of how the incorporation of sustainability into the remediation process can provide benefits through: - Consideration of socioeconomic impacts and drivers for remediation and redevelopment; - Reduced environmental impacts of remedial actions; and - Enhanced economic value through partnerships and informed decision making. Incorporation of sustainable remediation concepts provides distinct and recognizable value, as demonstrated through the technical initiatives of the Sustainable Remediation Forum, remediation industry conferences and events, and the prevalence of government agency and corporate sustainable remediation programs, such as the DOE's Cross-Programmatic Work Group. Sustainable remediation has evolved from discussions of environmental impacts of cleanups (with considerable green-washing), to quantifying and minimizing the environmental footprint and subsequent long term global impacts of a remedy, and currently, incorporating strategies to address all three components of sustainability - environmental, social, and economic. However, the practice of sustainability must continue to advance and new approaches should be adopted to holistically evaluate beneficial and detrimental impacts from the remedial process and incorporate sustainability concepts throughout the project life cycle. A more holistic and comprehensive approach, beyond the traditional paradigm of sustainable remediation, will lead a project team to achieve social and economic sustainability objectives of the community while protecting human health and the environment. This 'advanced' approach is where the most significant benefits will be achieved. Practitioners need documented, peer-reviewed, technically sound concepts and examples of sustainable remediation as supporting material to gain acceptance and approval of incorporation of best management practices and evaluation techniques. Reviewing the advancements of sustainable remediation over the last 5-10 years and the identification of lessons learned has great merit. This discussion of case studies will highlight successful incorporation of social impacts, economic analysis, and site redevelopment into the remedial process to provide a roadmap for site owners in developing sustainable approaches for their sites. Specifically, benefits were achieved in these case studies through promotion of economic development, innovative financing, incorporation of risk-based approaches, and consideration of social value of a site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Validation of MVP code with HTC critical experiments

In the 1980's, a series of high burnups critical experiments (HTC) was conducted at the Apparatus B experimental facility in Valduc with the support of the IRSN and AREVA NC. Four series of experiments were designed to assess profit associated with actinide-only burn-up credit in the criticality safety analysis for fuel handling (Phases 1 and 2), pool storage (Phase 3) and spent fuel cask (Phase 4) conditions. The HTC rods, specifically fabricated for the experiments, were designed to simulate a typical pressurized water reactor uranium oxide spent fuel. In order to validate the MVP-2.0 code and relatively new nuclear data libraries for the criticality safety analysis, the HTC critical experiments were analyzed using the MVP-2.0 code with JENDL-4.0, ENDF/B-VII.1 or JEFF-3.2. The effective neutron multiplication factor k{sub eff} values were obtained through analyses of all phases of the HTC experiments. It was shown that averaged values of k{sub eff} using JENDL-4.0 and ENDF/B-VII.1 were in good agreement with experimental results for all the phases, while those using JEFF-3.2 showed slight underestimation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Economic Model of a Steam Accumulator Storage System for Nuclear Power Plants

The growth of non-dispatchable renewables benefits technologies with flexible load capabilities. Baseload technologies must accept low prices and revenues during low-demand periods that arise with increasing frequency as renewables deployment grows. For this reason, generators such as combined cycle gas turbines threaten to out-compete baseload, and nuclear power plants are facing early retirement. If utilities are to consider future nuclear power plants to be attractive investments they must excel at roles other than baseload generation. Energy storage offers a means to avoid times of low prices and capitalize on times of high prices, as well as for nuclear to participate in ancillary markets and provide grid stability and regulation services. This work explores the design of a steam accumulator system that can store energy from a nuclear plant. An economic model is created to determine the market conditions that will produce a profitable system. An energy storage capacity of 500 MWh is chosen as a base case, but the energy to power ratio (E/P ratio) is varied in sensitivity analyses while holding energy fixed. This paper first presents the proposed size and layout of the steam accumulator system. Next, it provides an overview of the thermodynamic model, which is used to determine the system size for base case conditions. An economic model is presented with sensitivity analyses, which show the effect of price volatility on net revenue. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear Fuel Cycle Simulator as a Means to Model a Nuclear Hybrid Energy System

With a growing concern for how greenhouse gas (GHG) emissions impact climate change, there is a clear value in minimizing reliance on fossil fuels. Fluctuating renewable energy sources continue to penetrate the grid at higher levels. One means of ensuring a reliable electricity supply, while maintaining low overall GHG emissions, is to couple a nuclear power plant to the fluctuating renewable electricity source. Nuclear hybrid energy systems (NHES) focus on combining renewable and nuclear generation with industrial processes to ensure reliable energy generation as well as profitability of the system as a whole. This paper analyzes the current state of NHES models, and suggests how a nuclear fuel cycle simulator (NFCS) could be used to quickly model a nuclear hybrid energy system to address long term policy concerns. NFCSs are used to model the nuclear fuel cycle, which consists of uranium mining, enrichment, the reactor, reprocessing, and long term storage of waste. The simulations can span over hundreds of years to demonstrate different approaches to managing costs, waste disposal, and proliferation concerns. Current NHES models, on the other hand, focus on shorter time periods, primarily on a daily to weekly scale, and answer questions surrounding feasibility and costs for both normal and extreme scenarios. First, this paper will discuss the different criterion that are important to modeling a NHES. Then, we will break down the characteristics of a NFCS, analyzing how the characteristics of NHES and the fuel cycle overlap. After discussing the current modeling approaches for NHES and NFCS, this paper will analyze the benefits of using a NFCS to model a NHES. This paper will conclude that a NFCS, if appropriately augmented to account for the dynamic aspects of a NHES, can produce a flexible, high level NHES model quickly.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Evaluation of Energy Storage Options for Nuclear Power

The dynamics of energy generation, delivery, and consumption in the United States continue to change as new energy sources come online and consumers purchase more energy-intensive devices. The percentage of electricity generation from variable renewable energy sources like wind and solar power has grown year after year. Meanwhile, the evolution of electric vehicles, smart devices, and consumer appliances is changing the way that electricity is used. As a result of these trends, nuclear power plants (NPPs) are being asked to operate more flexibly. Newly constructed, advanced nuclear power plants (A-NPPs) will likely need to adapt their business models with these market shifts in mind. In the future, A-NPPs might operate in an electricity system that values flexibility (e.g. fast ramping) more than stability (e.g. baseload supply). The current fleet of NPPs is struggling to remain economically viable in competitive markets that favor low natural gas prices and renewable energy sources with low marginal costs. Rising construction costs and ambiguous national policies have only added to the challenges facing plant operators. The industry as a whole is in decline, with 19 reactors in the process of being decommissioned and 5 of these plants retiring in the past decade. However, NPPs also provide several performance and environmental benefits by maintaining a high capacity factor and generating almost zero greenhouse gas (GHG) emissions over the life cycle of the plant. As more areas of energy consumption in the United States are electrified, NPPs could potentially replace coal and natural gas as a source of heat and power to help decarbonize the U.S. energy mix. Improving the flexibility of newly constructed A-NPPs to increase revenue through market hedging and reduce costs via stable operation was explored in this analysis. The increasing penetration of variable energy resources could contribute to the uncertainty of electricity demand, which could in turn increase the need for dispatchable electricity generating units. This role is currently filled by inexpensive natural gas combined cycle (NGCC) plants, whereas coal and NPPs have traditionally been called upon to provide baseload power by maintaining a constant power output. As wholesale electricity prices continue to fall due to low natural gas prices and federally subsidized renewable energy, this business model has begun to fail, resulting in incidences of NPPs selling electricity at a loss. Since it has not been economically favorable for NPPs to operate flexibly in this situation in the past, due to their low variable costs compared to fossil fuel power plants, NPPs in the United States were not built with this purpose in mind. Therefore, legacy NPPs have had difficulty adapting to these shifting dynamics due to regulatory and technical constraints, coupled with a lack of meaningful experience. NPPs in France have operated in this manner for years, due to a much higher percentage of baseload generators and a lower percentage of fast-ramping NGCC plants. The integration of energy storage technologies (ESTs) alongside newly constructed A-NPPs will be investigated in this analysis as an alternative method for helping NPPs resolve the economic challenges they currently face. Although the deregulation of energy markets in the United States is responsible for much of the increased competition from natural gas and renewable energy that has negatively impacted NPPs, this process has also led to the creation of ancillary service markets. ESTs can provide many of these services, so an integrated energy storage system could supplement both the reliability of the electricity grid and the economic performance of a NPP by bidding into these markets. However, many technical, financial, and regulatory barriers still prevent ESTs from operating profitably in this space. The purpose of this body of work is to compile a transparent database of metrics for available ESTs and identify barriers to widespread deployment. An analytical selection methodology was also developed to identify favorable technologies for integration with specific NPPs based on information supplied by an interested developer. These tools could help reduce the perceived risk surrounding investment in energy storage systems, which could help both NPPs in need of economic assistance and ESTs in need of further research and development.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Diverting steam from a nuclear power plant to thermal storage to increase economic efficiency of electricity production

In 2014, 30% of greenhouse gases that were emitted in the United States came from the production of electricity. These greenhouses gases are causing global warming, an environmental challenge affecting today's climate. Nuclear power plants provide the ability to produce electricity without creating the harmful greenhouse gases. However, in some markets nuclear power is not as economically competitive as other electricity generation methods. To increase the use of nuclear power, minimizing the production of greenhouse gases, nuclear power must become more profitable. A way to accomplish this, is by storing heat during times of low electricity prices to be used to produce electricity when the electricity price is greater. This can be done through the thermal storage of diverted steam from the secondary system of a light water pressurized water reactor (PWR) at times of low electricity prices. Six technologies for heat storage are being investigated: steam accumulators, sensible heat fluid systems, packed-beds, cryogenic air systems, hot rock, and geologic heat storage. There are multiple technologies to store electricity when prices are low to sell electricity when prices are high. These include hydro pumped storage, batteries and many other technologies. A nuclear reactor generates heat. Thus, the preferred storage option is to store heat. Heat storage is also much cheaper than electricity (work) storage; thus, has the potential for a competitive storage system. Many of these storage technologies are currently being installed in solar thermal plants to avoid selling electricity when electricity prices are low.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Estimating the Value of Nuclear Integrated Hydrogen Production and the Dependency of Electricity and Hydrogen Markets on Natural Gas

Producing low carbon Hydrogen at a competitive price is one of the challenges to hydrogen being part of the solution to reach net-zero emission targets set by the U.S. DOE by 2050. With projected near-term improvements in technology, hydrogen production via solid oxide electrolysis cell (SOEC) / high-temperature steam electrolysis (HTSE) integrated with existing light water reactor (LWR) Nuclear Power Plants (NPP-HTSE) can produce carbon-free hydrogen competitively. In the near term, a 10-year production tax credit (PTC) found in the Inflation Reduction Act (IRA) has been passed, which will catalyze the development and improvement of hydrogen production technology to be competitive. The “1-1-1” target set by the U.S. DOE is to reduce the cost of carbon-free hydrogen by 80% to $1 per kilogram in 1 decade. Several models are available to analyze the profitability, opportunity, and technical capability of NPP-HTSE systems. In order of complexity from most complex to least complex some of these models include: RAVEN/HERON, process models using Aspen HYSYS and capital expense estimations using Aspen Process Economic Analyzer (APEA) and levelized cost of hydrogen (LCOH) calculation using the H2A model (Hydrogen Analysis Model), and custom spread sheets built by the interested party. Though some of the more advanced existing models provide detailed analysis to complex grid integrated problems, they also can take considerable time to setup and run. These advanced models are well suited to complex grid integrated analysis and the consideration of flexibility and variability of regulated and de-regulated electricity price and advanced estimation of capital and operating expenses and heat and material balances.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Summary of a Workshop on Integrating Energy Equity into Power System Planning and Operation

On November 29 and 30, 2023, the Energy Systems Integration Group convened a one-and-a-half-day workshop in Arlington, Virginia, to improve knowledge and practices for integrating energy equity considerations into power system planning and operation. Workshop participants were invited to discuss approaches for integrating energy equity aspects into models and tools and to explore possible pathways for enhanced technical practices. Participants included utility planning and modeling practitioners, social science and energy justice academics, representatives from energy and environmental justice nongovernmental organizations, non-profits, consumer advocates, and representatives from the U.S. Department of Energy, national labs, and other government agencies. This report summarizes the discussion points and outcomes of the workshop, which prioritized the technical aspects of incorporating the challenges and solutions identified by electricity-futures stakeholders and communities. These technical activities include the fundamental grid structure and hardware, detailed modeling approaches that benchmark energy system performance and justify future investments, and engineering designs and limitations for potential solutions to meet energy equity goals in communities.

energy equity↗

Populating the Hydrogen Component Reliability Database (HYCRED) with Incident Data from Hydrogen Dispensing

Safety, risk, and reliability issues are vital to ensure the continuous and profitable operation of hydrogen technologies. Quantitative risk assessment (QRA) has been used to enable the safe deployment of engineering systems, especially hydrogen fueling stations. However, QRA studies require reliability data which are essential to collect to make the studies as realistic and relevant as possible. These data are currently lacking and data from other industries, such as oil and gas, are used in hydrogen system QRAs. This may lead to inaccurate results since hydrogen fueling stations have differences in physical properties, system design, and operational parameters when compared to other fueling stations, thus necessitating new data sources are necessary to capture the effects of these differences. To address this gap, we developed a structure for a hydrogen component reliability database, (HyCReD) [1], which could be used to generate reliability data to be used in QRA studies. In this paper, we demonstrate populating the HyCReD database with information extracted from new narrative reports on hydrogen fueling station incidents, specifically focused on the dispensing processes. We analyze five new events and demonstrate the feasibility of populating the database and types of meaningful insights that can be obtained at this stage.

component reliability↗

A Tool to Incorporate Non-Energy Impacts in Energy Efficiency Investment Decision Making for Firms

Energy efficiency is a key demand-side strategy for sustainability, recently identified by the United States Department of Energy as a pillar of industrial decarbonization. The increased focus on decarbonization and the requirement for efficiency to enable electrification, another decarbonization pillar, due to the spark spread between natural gas and electricity prices, make energy efficiency increasingly relevant. Still, industries face challenges in adopting energy efficiency measures. Researchers have long found a gap in adoption of even those measures with a profitable net present value, attributed to lack of strategic value among other barriers (see for rigorous exploration and taxonomy). One solution to facilitate energy efficiency projects is the inclusion of non-energy impacts, as this has been shown to double potential deployment of such projects at system level. Energy efficiency can provide valuable benefits outside of simple operating cost reductions, from decreased pollution to enhanced productivity. The inclusion of these benefits in decision making assessments faces hurdles due to inconsistency of ancillary benefits across projects, difficulties in quantifying impacts and the need for additional measurement to quantify them. The decision-making tools to support this have been designed primarily for the European context. We begin with a stakeholder engagement process to better characterize the U.S. decision making process surrounding adoption of energy efficiency investments. Characterization of non-energy impacts has developed substantially over recent decades. Cagno et al. provided a framework for studying the applicability of these impacts to energy efficiency projects, listing 120 key performance indicators focused mainly on reductions of costs/harms. Other researchers have included impacts on the strategic and revenue side that can be merged into this framework as well. We seek a tractable set of impacts that can be included in a decision-making tool in the US, and as such are well suited to US industry, management and decision making processes. We also seek to understand how to best quantify or characterize these impacts. This work will demonstrate the results of a survey conducted among US manufacturing industry decision makers to assess the decision making landscape of stakeholders as well as the most relevant performance indicators for energy efficiency projects.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION,↗

Bidding Curve Design for Hybrid Power Plants with Uncertain Solar Forecast: Preprint

This paper presents a novel bidding curve design algorithm tailored for hybrid power plants (HPPs) to participate in the wholesale electricity market. Utilizing forecasts for photovoltaic (PV) generation and available battery power, our algorithm strategically computes the bidding curve to maximize HPP profit while adeptly managing the inherent uncertainty associated with PV power generation. In addition, the introduction of the penalty cost in HPP bidding curves provides the system operator a tool to effectively manage the system-level uncertainty that caused by HPPs. Numerical analysis through Monte Carlo simulations confirms that our bidding curve methodology outperforms the benchmark across various scenarios.

bidding curve↗