Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OPERATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

UNH TDP - Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary

This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time frame. The priority for this measurement campaign was to collect data while the turbine was electrically connected to the grid by means of a rectifier and inverter. The Fall_2021_UNH_Measurement_Timeline.png highlights when each instrument was functioning and the Fall_2021_UNH_Test_Log.jpg indicates the four main regions for analysis available from this measurement campaign. The TDP is a floating structure moored on the Portsmouth facing side of Memorial Bridge pier #2, which spans the Piscataqua River between Portsmouth, NH and Kittery, ME. The Piscataqua River connects the Great Bay Estuary to the Gulf of Maine and the river currents are dominated by tidal forcing with water velocities exceeding 2.5 m/s during spring ebb tides at this site which were previously characterized by Kaelin Chancey (Assessment Of The Localized Flow And Tidal Energy Conversion System At An Estuarine Bridge - UNH MS Thesis 2019). The turbine under test was a modified New Energy Corporation (Calgary, CA) model EVG-025 4-blade H-Darrius type vertical axis cross flow turbine that rotates in the clockwise direction with a rotor diameter of 3.2m and blade length of 1.7m. The hydro-foil profile was a NACA 0021 with a 10 inch chord length and a blade preset pitch angle of +4deg with a positive angle corresponding with the toe in direction. The standard EVG-025 has a rotor diameter of 3.4m and its rated power output is 25kW at 3 m/s. The rotor diameter was reduced to accommodate the size of the existing TDP moon-pool. This project was pursued to quantify device performance for cross flow turbines operating in a marine environment. Accurate physical models, to characterize cross flow turbine performance, require real operational data sets due to the complexity of blade fluid interactions. This data can help support model development which will help predict turbine performance when analyzing perspective project locations in the future. Instrumentation was deployed to measure; water speed/direction, electrical power output, turbine shaft speed, turbine thrust force, and platform motion. Concurrent measurements of these parameters allow for correlations (cause and affect) to be inferred, allowing for characterization of device performance over a range of operating conditions. Water currents were measured using Acoustic Doppler Current Profilers (ADCP's) and Acoustic Doppler Velocimeters (ADV's) directly upstream and downstream of the turbine for inflow, wake and turbulence measurements. Electrical power output was measured using the Voltsys rectifier and the Shark power meter. Shaft speed was calculated based on the Voltsys measurements of the permanent magnet three phase generator AC generation frequency, coupled directly to the cross flow turbine under test (i.e., no gear box). Platform motions were captured using a Yost IMU (inertial measurement unit). Turbine thrust loading was measured using a reaction arm about the turbine deployment platform spanning beam, where two bi-directional load cells were connected to the system via a pinned connection. This submission includes zipped folders for each instrument containing quality controlled (QC'd) data in daily .csv files for the relevant duration specific to each instrument, along with separate .csv file that contains the units for each variable. Some instrument daily files are quite large and can pose a challenge for a visual spreadsheet editor to open. A processing software like MATLAB or Python is recommended. Note the degree of QC varied between each instrument due to time constraints. Particular time and attention was given to perform quality control tests on the acoustic based instruments that are particularly suscep...

16 TIDAL AND WAVE POWER↗

Effects of Reservoir Operations on Hatchery Coastal Rainbow Trout in Lake Roosevelt, Washington

Abstract It is suspected that reservoir operations limit the mitigation fishery for coastal rainbow trout Oncorhynchus mykiss irideus in Lake Roosevelt, Washington. Entrainment through Grand Coulee Dam has been suggested as the primary impact of reservoir operations. However, the causal mechanisms and effects of entrainment have been difficult to quantify. A logistic regression model was used to examine the effect of reservoir operations on the coastal rainbow trout tag return probability. Eight independent variables were studied: release location, presence–absence of a tag reward, minimum reservoir elevation (m above mean sea level (msl)) during a sample year, reservoir elevation on the fish release date, mean daily water retention time (d) 2 weeks postrelease, mean daily retention time 4 weeks postrelease, mean annual water retention time, and water year type (associated with shallow, average, or deep drawdown events). Models were selected on the basis of likelihood ratio tests, odds ratio confidence intervals (CIs), and predictive ability. Analyses indicated that the significant independent variables were release location, water year, release elevation, and mean water retention time at 4 weeks postrelease. Angler return of tagged fish was 1.86 times more likely after a shallow drawdown event than after a deep drawdown event (95% profile likelihood CI = 1.15–3.03). The effect of mean water retention time was dependent on reservoir elevation at the time of release. When release elevation was low (366–381 m above msl), increasing mean water retention time increased the probability of tag return. However, when release elevation was high (381–393 m above msl), increasing mean water retention time did not increase the probability of tag return. The logistic regression model can be used by fisheries managers to predict the impacts of hydropower operations on the coastal rainbow trout fishery in Lake Roosevelt, thereby allowing for annual adjustments to release strategies that would maximize harvest potential.

McLellan, Holly J.↗

Five-year summary and evaluation of operations and performance of the Utica aquifer and North Lake Basin Wetlands restoration project in 2004-2009.

This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.

54 ENVIRONMENTAL SCIENCES↗

SPECTR System Operational Test Report

This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

42 ENGINEERING↗

Initial operating experience of the 12-MW La Ola photovoltaic system.

The 1.2-MW La Ola photovoltaic (PV) power plant in Lanai, Hawaii, has been in operation since December 2009. The host system is a small island microgrid with peak load of 5 MW. Simulations conducted as part of the interconnection study concluded that unmitigated PV output ramps had the potential to negatively affect system frequency. Based on that study, the PV system was initially allowed to operate with output power limited to 50% of nameplate to reduce the potential for frequency instability due to PV variability. Based on the analysis of historical voltage, frequency, and power output data at 50% output level, the PV system has not significantly affected grid performance. However, it should be noted that the impact of PV variability on active and reactive power output of the nearby diesel generators was not evaluated. In summer 2011, an energy storage system was installed to counteract high ramp rates and allow the PV system to operate at rated output. The energy storage system was not fully operational at the time this report was written; therefore, analysis results do not address system performance with the battery system in place.

25 ENERGY STORAGE↗

Evaluating Operating System Vulnerability to Memory Errors

Reliability is of great concern to the scalability of extreme-scale systems. Of particular concern are soft errors in main memory, which are a leading cause of failures on current systems and are predicted to be the leading cause on future systems. While great effort has gone into designing algorithms and applications that can continue to make progress in the presence of these errors without restarting, the most critical software running on a node, the operating system (OS), is currently left relatively unprotected. OS resiliency is of particular importance because, though this software typically represents a small footprint of a compute node's physical memory, recent studies show more memory errors in this region of memory than the remainder of the system. In this paper, we investigate the soft error vulnerability of two operating systems used in current and future high-performance computing systems: Kitten, the lightweight kernel developed at Sandia National Laboratories, and CLE, a high-performance Linux-based operating system developed by Cray. For each of these platforms, we outline major structures and subsystems that are vulnerable to soft errors and describe methods that could be used to reconstruct damaged state. Our results show the Kitten lightweight operating system may be an easier target to harden against memory errors due to its smaller memory footprint, largely deterministic state, and simpler system structure.

99 GENERAL AND MISCELLANEOUS↗

Support Operators Method for the Diffusion Equation in Multiple Materials

A second-order finite difference scheme for the solution of the diffusion equation on non-uniform meshes is implemented. The method allows the heat conductivity to be discontinuous. The algorithm is formulated on a one dimensional mesh and is derived using the support operators method. A key component of the derivation is that the discrete analog of the flux operator is constructed to be the negative adjoint of the discrete divergence, in an inner product that is a discrete analog of the continuum inner product. The resultant discrete operators in the fully discretized diffusion equation are symmetric and positive definite. The algorithm is generalized to operate on meshes with cells which have mixed material properties. A mechanism to recover intermediate temperature values in mixed cells using a limited linear reconstruction is introduced. The implementation of the algorithm is verified and the linear reconstruction mechanism is compared to previous results for obtaining new material temperatures.

97 MATHEMATICS AND COMPUTING↗

Energy Saving Melting and Revert Reduction Technology: Melting Efficiency in Die Casting Operations

This project addressed multiple aspects of the aluminum melting and handling in die casting operations, with the objective of increasing the energy efficiency while improving the quality of the molten metal. The efficiency of melting has always played an important role in the profitability of aluminum die casting operations. Consequently, die casters need to make careful choices in selecting and operating melting equipment and procedures. The capital cost of new melting equipment with higher efficiency can sometimes be recovered relatively fast when it replaces old melting equipment with lower efficiency. Upgrades designed to improve energy efficiency of existing equipment may be well justified. Energy efficiency is however not the only factor in optimizing melting operations. Melt losses and metal quality are also very important. Selection of melting equipment has to take into consideration the specific conditions at the die casting shop such as availability of floor space, average quantity of metal used as well as the ability to supply more metal during peaks in demand. In all these cases, it is essential to make informed decisions based on the best available data.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced, Integrated Control for Building Operations to Achieve 40% Energy Saving

We developed and demonstrated a software based integrated advanced building control platform called Smart Energy Box (SEB), which can coordinate building subsystem controls, integrate variety of energy optimization algorithms and provide proactive and collaborative energy management and control for building operations using weather and occupancy information. The integrated control system is a low cost solution and also features: Scalable component based architecture allows to build a solution for different building control system configurations with needed components; Open Architecture with a central data repository for data exchange among runtime components; Extendible to accommodate variety of communication protocols. Optimal building control for central loads, distributed loads and onsite energy resource; uses web server as a loosely coupled way to engage both building operators and building occupants in collaboration for energy conservation. Based on the open platform of SEB, we have investigated and evaluated a variety of operation and energy saving control strategies on Carnegie Mellon University Intelligent Work place which is equipped with alternative cooling/heating/ventilation/lighting methods, including radiant mullions, radiant cooling/heating ceiling panels, cool waves, dedicated ventilation unit, motorized window and blinds, and external louvers. Based on the validation results of these control strategies, they were integrated in SEB in a collaborative and dynamic way. This advanced control system was programmed and computer tested with a model of the Intelligent Workplace's northern section (IW n ). The advanced control program was then installed in the IW n control system; the performance was measured and compared with that of the state of the art control system to verify the overall energy savings great than 40%. In addition advanced human machine interfaces (HMI's) were developed to communicate both with building occupants and the building operator. Lifecycle cost analyses of the advanced building control were performed, and a Building Control System Guide was prepared and published to inform owners, architects, and engineers dealing with new construction or renovation of buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Turbine Reliability and Operability Optimization through the use of Direct Detection Lidar (Final Technical Report)

The goal of this Department of Energy (DOE) project is to increase wind turbine efficiency and reliability with the use of a Light Detection and Ranging (LIDAR) system. The LIDAR provides wind speed and direction data that can be used to help mitigate the fatigue stress on the turbine blades and internal components caused by wind gusts, sub-optimal pointing and reactionary speed or RPM changes. This effort will have a significant impact on the operation and maintenance costs of turbines across the industry. During the course of the project, Michigan Aerospace Corporation (MAC) modified and tested a prototype direct detection wind LIDAR instrument; the resulting LIDAR design considered all aspects of wind turbine LIDAR operation from mounting, assembly, and environmental operating conditions to laser safety. Additionally, in co-operation with our partners, the National Renewable Energy Lab and the Colorado School of Mines, progress was made in LIDAR performance modeling as well as LIDAR feed forward control system modeling and simulation. The results of this investigation showed that using LIDAR measurements to change between baseline and extreme event controllers in a switching architecture can reduce damage equivalent loads on blades and tower, and produce higher mean power output due to fewer overspeed events. This DOE project has led to continued venture capital investment and engagement with leading turbine OEMs, wind farm developers, and wind farm owner/operators.

17 WIND ENERGY↗

SWEIS Yearbook 2011: Comparison of 2011 Data to Projections of the Site-Wide Environmental Impact Statement for Continued Operation of the Los Alamos National Laboratory

Los Alamos National Laboratory (LANL) operations data for CY 2011 mostly fell within the 2008 SWEIS projections. Operation levels for four LANL facilities exceeded the 2008 SWEIS capability projections – Los Alamos Neutron Science Center (LANSCE), Solid Radioactive and Chemical Waste (SRCW), Materials Science Laboratory (MSL) and Radiochemistry Facilities. However, none of these capability increases caused exceedances in waste generation, radioactive air emissions, or NPDES discharge. Several facilities exceeded the SWEIS levels for waste generation quantities; however, all were one-time, non-routine events that do not reflect the day-to-day operations of the Laboratory. In addition, total site-wide waste generation quantities were below SWEIS projections for all waste types, reflecting the overall levels of operations at both the Key and Non-Key Facilities. Although gas and electricity consumption have remained within the 2008 SWEIS limits for utilities, water consumption exceeded the 2008 SWEIS projections by 10 million gallons in CY 2011.

Energy Conservation, Consumption, & Utilization(32↗

Second Line of Defense Megaports Initiative Operational Testing and Evaluation Plan - Kingston Container Terminal, Port of Kingston, Jamaica

Operational Testing and Evaluation Plan - Kingston Container Terminal, Port of Kingston, Jamaica was written for the Second Line of Defense Megaports Initiative. The purpose of the Operational Testing and Evaluation (OT&E) phase of the project is to prepare for turnover of the Megaports system supplied by U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) located at the Kingston Container Terminal (KCT) of the Port of Kingston, Jamaica to the Government of Jamaica (GOJ). Activities conducted during the OT&E phase must demonstrate that the Megaports system can be operated effectively in real time by Jamaica Customs and KCT personnel to the satisfaction of the DOE/NNSA. These activities will also determine if the Megaports system, as installed and accepted, is performing according to the Megaports Program objectives such that the system is capable of executing the mission of the Second Line of Defense Megaports Initiative. The OT&E phase of the project also provides an opportunity to consider potential improvements to the system and to take remedial action if performance deficiencies are identified during the course of evaluation. Changes to the system should be considered under an appropriate change-control process. DOE/NNSA will determine that OT&E is complete by examining whether the Megaports system is performing as intended and that the GOJ is fully capable of operating the system independently without continued onsite support from the U.S. team.

Deforest, Thomas J.↗

IBS for RHIC operation below transition energy and various RF systems

Following first successful runs in RHIC at low energies for physics (Beam Energy Scan I) there is a strong interest in further low-energy RHIC operation in the range of γ=4-10 but with higher luminosity (Beam Energy Scan II). An electron cooling was proposed to increase luminosity at these low energies. Both transverse and longitudinal Intra-beam Scattering (IBS) can be counteracted with electron cooling. In addition, the phase-space density of the hadron beams can be further increased by providing stronger cooling. Unfortunately, the defining intensity limitation for low energies in RHIC is expected to be the space charge. Experimental studies of the space-charge effects and beam lifetime in RHIC were reported. Additional limitations at low energies and their possible mitigations were discussed. It was suggested that better luminosity performance may be expected by using lower frequency RF system and longer bunches compared to the baseline 28 MHz RF, which is being used for RHIC operation with heavy ions. Recently, even lower frequency RF of 4.5 MHz was proposed for future low-energy RHIC operation. Although low-frequency RF systems in RHIC (either 9 or 4.5 MHz) seem to address possible limitations of beam lifetime observed at low energies, the resulting ion beam temperatures in beam rest frame get further from an equilibrium which lead to a much stronger longitudinal IBS. This would put stronger requirement on electron cooling system under consideration. However, operation below transition energy allows us to exploit an IBS feature that drives the transverse and longitudinal beam temperatures towards equilibrium by minimizing the longitudinal diffusion rate using larger longitudinal beam emittance and larger RF voltage. Such studies were performed before to explore IBS redistribution at low energies for the 28 and 56 MHz RHIC RF systems. This Note presents results of similar studies for newly proposed 4.5 and 9 MHz RF systems.

43 PARTICLE ACCELERATORS↗

BioWatch Sample Management System (SMS) Field Operator Guide

The BioWatch Sample Management System is software developed by Los Alamos National Laboratory to support the Department of Homeland Security BioWatch program. Field Operators use the software to keep track of samples and to provide information on the sample management process to other users and software programs within BioWatch. The information tracked about a sample includes the date and time the filter media is assembled in a filter holder, deployed to the field, placed in and removed from a collector, and received from the field, and identifies who performs each task. Field Operators can also use the software to prepare and print forms to document the chain-of-custody transfer of the samples. The BioWatch SMS Field Operator Guide provides easy-to-understand procedures for each task a Field Operator performs. This guide gives basic information about using the computer and other equipment, instructions about checking and editing data, and provides reference information, including appendices of error messages and solutions, words used interchangeably, and safety warnings plus a glossary and an index.

99 GENERAL AND MISCELLANEOUS↗

Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SWEIS Yearbook-2012 Comparison of 2012 Data to Projections of the 2008 Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory

Los Alamos National Laboratory (LANL or the Laboratory) operations data for Calendar Year (CY) 2012 mostly fell within the 2008 Site-Wide Environmental Impact Statement (SWEIS) projections. Operation levels for one LANL facility exceeded the 2008 SWEIS capability projections—Radiochemistry Facility; however, none of the capability increases caused exceedances in radioactive air emissions, waste generation, or National Pollutant Discharge Elimination System (NPDES) discharge. Several facilities exceeded the2008 SWEIS levels for waste generation quantities; however, all were one-time, non-routine events that do not reflect the day-to-day operations of the Laboratory. In addition, total site-wide waste generation quantities were below SWEIS projections for all waste types, reflecting the overall levels of operations at both the Key and Non-Key Facilities. Although gas and electricity consumption have remained within the 2008 SWEIS limits for utilities, water consumption exceeded the 2008 SWEIS projections by 27 million gallons in CY 2012.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of Optimal Catalyst Designs and Operating Strategies for Lean NOx Reduction in Coupled LNT-SCR Systems

Oxides of nitrogen in the form of nitric oxide (NO) and nitrogen dioxide (NO 2 ) commonly referred to as NO x , is one of the two chemical precursors that lead to ground-level ozone, a ubiquitous air pollutant in urban areas. A major source of NO x } is generated by equipment and vehicles powered by diesel engines, which have a combustion exhaust that contains NO x in the presence of excess O 2 . Catalytic abatement measures that are effective for gasoline-fueled engines such as the precious metal containing three-way catalytic converter (TWC) cannot be used to treat O 2 -laden exhaust containing NO x . Two catalytic technologies that have emerged as effective for NO x abatement are NO x storage and reduction (NSR) and selective catalytic reduction (SCR). NSR is similar to TWC but requires much larger quantities of expensive precious metals and sophisticated periodic switching operation, while SCR requires an on-board source of ammonia which serves as the chemical reductant of the NO x . The fact that NSR produces ammonia as a byproduct while SCR requires ammonia to work has led to interest in combining the two together to avoid the need for the cumbersome ammonia generation system. In this project a comprehensive study was carried out of the fundamental aspects and application feasibility of combined NSR/SCR. The project team, which included university, industry, and national lab researchers, investigated the kinetics and mechanistic features of the underlying chemistry in the lean NOx trap (LNT) wherein NSR was carried out, with particular focus on identifying the operating conditions such as temperature and catalytic properties which lead to the production of ammonia in the LNT. The performance features of SCR on both model and commercial catalysts focused on the synergy between the LNT and SCR converters in terms of utilizing the upstream-generated ammonia and alternative reductants such as propylene, representing the hydrocarbon component of diesel exhaust. First-principle models of the LNT and SCR converters, which utilized the mechanistic-based kinetics and realistic treatments of the flow and transport processes, in combination with bench-scale reactor experiments helped to identify the best designs for combining the NSR and SCR catalysts over a range of operating conditions encountered in practice. This included catalysts having multiple zones and layers and additives with the focus on determining the minimal precious metal component needed to meet emission abatement targets over a wide range of operating conditions. The findings from this study provide diesel vehicle and catalyst companies valuable information to develop more cost effective diesel emissions catalysts which helps to expand the use of more fuel efficient diesel power. The fundamental modeling and experimental tools and findings from this project can be applied to catalyst technologies used in the energy and chemical industries. Finally, the project also led to training of several doctoral students who were placed in research jobs in industry and academia.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

LiveWall Operational Evaluation: Seattle Law Enforcement Pilot

The LiveWall concept envisioned as an outgrowth of the Precision Information Environment (PIE) project allows communications between separate groups using interactive video, audio, and a shared desktop environment; this allows everyone to participate and collaborate in real time, regardless of location. The LiveWall concept provides a virtual window to other locations, where all parties can interact and collaboratively work with each other. This functionality is intended to improve multi-site coordination amongst emergency operations centers (EOC), field operations sites and across organizations and jurisdictions to accommodate communications during routine and emergency events. For the initial LiveWall operational evaluation PNNL partnered with the Seattle Police Department (SPD). This partnership allowed for the creation of an excellent LiveWall test bed specific to law enforcement. This partnership made it possible to test the LiveWall concept with scenarios involving the many facets of the law enforcement work done by SPD. PNNL and SPD agreed that integrating the systems into operations for a real event would be the best test of the technology and give SPD staff greater visibility into the functionality and benefits offered by the LiveWall concept.

Communications↗