Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mission Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Lawrence Berkeley National Laboratory 2016 Annual Financial Report

FY2016 was a year of significant change and progress at Berkeley Lab. In March, Laboratory Director Michael Witherell assumed his new role when former Lab Director Paul Alivisatos became Vice Chancellor for Research at UC Berkeley. Dr. Witherell has solidified the Lab’s strategy, with a focus on long term science and technology priorities. Large-scale science efforts continued to expand at the Lab, including the Dark Energy Spectroscopic Instrument now heading towards construction, and the LUX-ZEPLIN dark matter detector to be built underground in South Dakota. Another proposed project, the Advanced Light Source-Upgrade, was given preliminary approval and will be the Lab’s largest scientific investment in years. Construction of the Integrative Genomics Building began, and will bring together researchers from the Lab’s Joint Genome Institute, now based in Walnut Creek, and the Systems Biology Knowledgebase (K-Base) under one roof. Investment in the Lab’s infrastructure also continues, informed by the Lab’s Infrastructure Strategic Plan. Another important focus is on developing the next generation of scientists with the talent and diversity needed to sustain Berkeley Lab’s scientific leadership and mission contributions to DOE and the Nation. Berkeley Lab received $897.5M in new FY2016 funding, a 12.5% increase over FY2015, for both programmatic and infrastructure activities. While the Laboratory experienced a substantial increase in funding, it was accompanied by only a modest increase in spending, as areas of growth were partially offset by the completion of several major efforts in FY2015. FY2016 costs were $826.9M, an increase of 1.9% over FY2015. Similar to the prior year, the indirect-funded Operations units worked with generally flat budgets to yield more funding for strategic needs. A key challenge for Berkeley Lab continues to be achieving the best balance to fund essential investments, deliver highly effective operational mission support and remain cost-competitive. Through a comprehensive approach to prioritize competing needs, the Lab ended the year in a favorable financial position. The Office of the Chief Financial Officer (OCFO) played a key role in providing analysis and decision support to Executive Leadership, enabling the Lab to enhance its financial management strategies. In FY2016, the OCFO updated its analytic approaches and models to enhance long term financial projections under various funding and investment scenarios, and to assess total cost of ownership for major proposed investments. These improvements provided the new Lab Director and Senior Leadership with more comprehensive information and analytic support for planning and prioritization efforts. Within the OCFO, we focused on core operations and key initiatives defined in our OCFO Strategic Roadmap. The Lab’s Financial System transitioned from stabilization to optimization, with a focus on expanding the financial reporting capabilities considerably. We completed implementation of the eCommerce platform, achieving a notable outcome for the Lab in close partnership with DOE’s Office of Science. In other accomplishments, we launched a financial literacy program to enable Lab managers and staff to understand and execute their financial management and stewardship responsibilities more effectively; made substantial progress in enhancing our Field Finance model that provides financial support to client divisions and areas; developed a business process governance model to define OCFO business processes, clarify roles, and strengthen service delivery; and implemented a Partners in Leadership training program to build leadership capacity among our staff. We completed a ‘refresh’ of our Strategic Roadmap, which now defines our priorities for FY2017-FY2019. As a part of this effort, we made a subtle but important change to the OCFO mission statement to call out the Lab’s research and stewardship mission to sustain the Lab’s science and technology capabilities now and into the future. Berkeley Lab’s FY2016 progress on all fronts - scientific, operations, and financial management – position the Lab to continue bringing science solutions to the world as we charge into the 21st Century.

Source record↗

Incorporating Equipment Condition Assessment in Risk Monitors for Advanced Small Modular Reactors

Advanced small modular reactors (aSMRs) can complement the current fleet of large light-water reactors in the USA for baseload and peak demand power production and process heat applications (e.g., water desalination, shale oil extraction, hydrogen production). The day-to-day costs of aSMRs are expected to be dominated by operations and maintenance (O&M); however, the effect of diverse operating missions and unit modularity on O&M is not fully understood. These costs could potentially be reduced by optimized scheduling, with risk-informed scheduling of maintenance, repair, and replacement of equipment. Currently, most nuclear power plants have a “living” probabilistic risk assessment (PRA), which reflects the as-operated, as-modified plant and combine event probabilities with population-based probability of failure (POF) for key components. “Risk monitors” extend the PRA by incorporating the actual and dynamic plant configuration (equipment availability, operating regime, environmental conditions, etc.) into risk assessment. In fact, PRAs are more integrated into plant management in today’s nuclear power plants than at any other time in the history of nuclear power. However, population-based POF curves are still used to populate fault trees; this approach neglects the time-varying condition of equipment that is relied on during standard and non-standard configurations. Equipment condition monitoring techniques can be used to estimate the component POF. Incorporating this unit-specific estimate of POF in the risk monitor can provide a more accurate estimate of risk in different operating and maintenance configurations. This enhanced risk assessment will be especially important for aSMRs that have advanced component designs, which don’t have an available operating history to draw from, and often use passive design features, which present challenges to PRA. This paper presents the requirements and technical gaps for developing a framework to integrate unit-specific estimates of POF into risk monitors, resulting in enhanced risk monitors that support optimized operation and maintenance of aSMRs.

Advanced Small Modular Reactors↗

The prevention of electronical breakdown and electrostatic voltage problems in the space shuttle and its payloads. Part 2: Design guides and operations considerations

The specific electrical discharge problems that can directly affect the shuttle vehicle and its payloads are addressed. General design guidelines are provided to assist flight hardware managers in minimizing these kinds of problems. Specific data are included on workmanship practices and system testing while in low pressure environments. Certain electrical discharge problems that may be unique to the design of the shuttle vehicle itself and to its various mission operational models are discussed.

Whitson, D. W.↗

Intelligent Systems and Advanced User Interfaces for Design, Operation, and Maintenance of Command Management Systems

Historically Command Management Systems (CMS) have been large, expensive, spacecraft-specific software systems that were costly to build, operate, and maintain. Current and emerging hardware, software, and user interface technologies may offer an opportunity to facilitate the initial formulation and design of a spacecraft-specific CMS as well as a to develop a more generic or a set of core components for CMS systems. Current MOC (mission operations center) hardware and software include Unix workstations, the C/C++ and Java programming languages, and X and Java window interfaces representations. This configuration provides the power and flexibility to support sophisticated systems and intelligent user interfaces that exploit state-of-the-art technologies in human-machine systems engineering, decision making, artificial intelligence, and software engineering. One of the goals of this research is to explore the extent to which technologies developed in the research laboratory can be productively applied in a complex system such as spacecraft command management. Initial examination of some of the issues in CMS design and operation suggests that application of technologies such as intelligent planning, case-based reasoning, design and analysis tools from a human-machine systems engineering point of view (e.g., operator and designer models) and human-computer interaction tools, (e.g., graphics, visualization, and animation), may provide significant savings in the design, operation, and maintenance of a spacecraft-specific CMS as well as continuity for CMS design and development across spacecraft with varying needs. The savings in this case is in software reuse at all stages of the software engineering process.

Mitchell, Christine M.↗

Impact of interference on the receiving systems of the Deep-Space Network (DSN) Earth stations operated by NASA due to adjacent band emissions from Earth exploration satellites operating in the 8025-

This paper will first describe the characteristics of interference from a typical EESS satellite, including the intensity, frequency and duration of such interference. The paper will then discuss the DSN interference susceptibility, including the various components in the receiving systems that are susceptible to interference and the recovery time after a strong interference. Finally, the paper will discuss the impact of interference on science data and missions operations.

space research↗

Dawn Spacecraft Performance at Ceres: Results of Hybrid Control for Ceres Mapping

Dawn is a low-thrust interplanetary spacecraft currently orbiting the dwarf planet Ceres, to better understand the early creation of the solar system. Launched in September 2007, Dawn arrived at Vesta in July 2011. After a 16-month successful science campaign at Vesta, Dawn departed for Ceres, arriving in early 2015. The Dawn spacecraft uses both reaction wheel assemblies (RWA) and a reaction control system (RCS) to provide 3-axis attitude control for the spacecraft. Reaction wheels were designed to be the primary system for attitude control, however two wheels have shown high friction anomalies and have been removed from service. The project has implemented a hybrid control algorithm using two reaction wheels and RCS thrusters. This hybrid control capability enabled Dawn to achieve very high science return, while significantly conserving remaining hydrazine propellant. With only two remaining healthy RWA’s, hybrid control became part of the baseline plan for Ceres science operations. The Dawn team developed specific operational approaches in which sequences were developed with careful consideration of science versus resource trades. Commanding and sequence planning also incorporated contingency planning, in the event that another reaction wheel may fail. Despite the differences in operational approach between Vesta and Ceres, both campaigns achieved very rich scientific data return. This paper highlights Dawn’s recent flight experience with hybrid attitude control during Ceres orbit operations. The discussion includes the approaches utilized by the Dawn team to address unique operational challenges presented by the hybrid approach, and reviews spacecraft performance under hybrid control in low orbit at Ceres. Additionally, methods used to optimize hydrazine use and thereby extend the science campaign will be presented. Finally, a preliminary assessment of an orbit transfer with two reaction wheels, during extended mission operations, is discussed.

Smith, Brett A.↗

Optimization of the Multi-Spectral Euclidean Distance Calculation for FPGA-based Spaceborne Systems

Due to the high quantity of operations that spaceborne processing systems must carry out in space, new methodologies and techniques are being presented as good alternatives in order to free the main processor from work and improve the overall performance. These include the development of ancillary dedicated hardware circuits that carry out the more redundant and computationally expensive operations in a faster way, leaving the main processor free to carry out other tasks while waiting for the result. One of these devices is SpaceCube, a FPGA-based system designed by NASA. The opportunity to use FPGA reconfigurable architectures in space allows not only the optimization of the mission operations with hardware-level solutions, but also the ability to create new and improved versions of the circuits, including error corrections, once the satellite is already in orbit. In this work, we propose the optimization of a common operation in remote sensing: the Multi-Spectral Euclidean Distance calculation. For that, two different hardware architectures have been designed and implemented in a Xilinx Virtex-5 FPGA, the same model of FPGAs used by SpaceCube. Previous results have shown that the communications between the embedded processor and the circuit create a bottleneck that affects the overall performance in a negative way. In order to avoid this, advanced methods including memory sharing, Native Port Interface (NPI) connections and Data Burst Transfers have been used.

Cristo, Alejandro↗

Development of Large-Scale Spacecraft Fire Safety Experiments

The status is presented of a spacecraft fire safety research project that is under development to reduce the uncertainty and risk in the design of spacecraft fire safety systems by testing at nearly full scale in low-gravity. Future crewed missions are expected to be more complex and longer in duration than previous exploration missions outside of low-earth orbit. This will increase the challenge of ensuring a fire-safe environment for the crew throughout the mission. Based on our fundamental uncertainty of the behavior of fires in low-gravity, the need for realistic scale testing at reduced gravity has been demonstrated. To address this gap in knowledge, a project has been established under the NASA Advanced Exploration Systems Program under the Human Exploration and Operations Mission directorate with the goal of substantially advancing our understanding of the spacecraft fire safety risk. Associated with the project is an international topical team of fire experts from other space agencies who conduct research that is integrated into the overall experiment design. The experiments are under development to be conducted in an Orbital Science Corporation Cygnus vehicle after it has undocked from the ISS. Although the experiment will need to meet rigorous safety requirements to ensure the carrier vehicle does not sustain damage, the absence of a crew removes the need for strict containment of combustion products. The tests will be fully automated with the data downlinked at the conclusion of the test before the Cygnus vehicle reenters the atmosphere. A computer modeling effort will complement the experimental effort. The international topical team is collaborating with the NASA team in the definition of the experiment requirements and performing supporting analysis, experimentation and technology development. The status of the overall experiment and the associated international technology development efforts are summarized.

Life Support↗

Using an Integrated Distributed Test Architecture to Develop an Architecture for Mars

The creation of a crew-rated spacecraft architecture capable of sending humans to Mars requires the development and integration of multiple vehicle systems and subsystems. Important new technologies will be identified and matured within each technical discipline to support the mission. Architecture maturity also requires coordination with mission operations elements and ground infrastructure. During early architecture formulation, many of these assets will not be co-located and will required integrated, distributed test to show that the technologies and systems are being developed in a coordinated way. When complete, technologies must be shown to function together to achieve mission goals. In this presentation, an architecture will be described that promotes and advances integration of disparate systems within JSC and across NASA centers.

Othon, William L.↗

PL&HA and SPLICE Overview

Guidance, Navigation and Control (GN&C) technologies for precise and safe landing are essential for future robotic science and human exploration missions to solar system destinations with targeted surface locations that pose a significant risk to successful landing and subsequent mission operations. These Entry, Descent and Landing (EDL) technologies are a part of the NASA domain called PL&HA (Precision Landing and Hazard Avoidance) and are considered high priority capabilities within the space technology roadmaps from NASA and the National Research Council (NRC). The PL&HA technologies promote and enable new missions concepts to solar system destinations.

Precision Landing and Hazard Avoidance (PL&HA)↗

Modeling to Improve the Risk Reduction Process for Command File Errors

The Jet Propulsion Laboratory has learned that even innocuous errors in the spacecraft command process can have significantly detrimental effects on a space mission. Consequently, such Command File Errors (CFE), regardless of their effect on the spacecraft, are treated as significant events for which a root cause is identified and corrected. A CFE during space mission operations is often the symptom of imbalance or inadequacy within the system that encompasses the hardware and software used for command generation as well as the human experts and processes involved in this endeavor. As we move into an era of increased collaboration with other NASA centers and commercial partners, these systems become more and more complex. Consequently, the ability to thoroughly model and analyze CFEs formally in order to reduce the risk they pose is increasingly important. In this paper, we summarize the results of applying modeling techniques previously developed to the DAWN flight project. The original models were built with the input of subject matter experts from several flight projects. We have now customized these models to address specific questions for the DAWN flight project and formulating use cases to address their unique mission needs. The goal of this effort is to enhance the project's ability to meet commanding reliability requirements for operations and to assist them in managing their Command File Errors.

spacecraft↗

NTP Demonstration Vehicles and Mission Concepts for Generation 1

Nuclear thermal propulsion (NTP) maintains continued interest in support of NASA’s goal to produce a human rated spacecraft for Mars exploration. The NASA/DARPA DRACO effort aims to demonstrate the first nuclear thermal rocket through a flight in 2027. This paper considers the option of a follow-on in-space demonstration supported by a more extensive pre-flight ground test campaign. A concept of operations to accomplish the objectives is outlined and figures of merit for selection of a spacecraft concept are defined. Conceptual designs of various nuclear thermal propulsion demonstration vehicles are presented, spanning a wide trade space. Each concept differently balances performance capability and extensibility to operational missions with schedule, risk, cost of the ground and flight demonstration. Key attributes of notable concepts are provided, with these demonstrating the degree to which each concept can accomplish the objectives considered.

NTP↗

Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of highvalue data from targets such as Titan and Enceladus. This paper will outline the critical role that CIMS has played for Cassini in the distributed ops paradigm throughout operations. This paper will also examine the evolution that CIMS has undergone in the face of new science discoveries and fluctuating operational needs. And finally, this paper will conclude with theoretical adaptation of CIMS for other projects and the potential savings in cost and risk reduction that could potentially be tapped into by future missions.

Equils, Douglas J.↗

Intelligent Command and Control Systems for Satellite Ground Operations

This grant, Intelligent Command and Control Systems for Satellite Ground Operations, funded by NASA Goddard Space Flight Center, has spanned almost a decade. During this time, it has supported a broad range of research addressing the changing needs of NASA operations. It is important to note that many of NASA's evolving needs, for example, use of automation to drastically reduce (e.g., 70%) operations costs, are similar requirements in both government and private sectors. Initially the research addressed the appropriate use of emerging and inexpensive computational technologies, such as X Windows, graphics, and color, together with COTS (commercial-off-the-shelf) hardware and software such as standard Unix workstations to re-engineer satellite operations centers. The first phase of research supported by this grant explored the development of principled design methodologies to make effective use of emerging and inexpensive technologies. The ultimate performance measures for new designs were whether or not they increased system effectiveness while decreasing costs. GT-MOCA (The Georgia Tech Mission Operations Cooperative Associate) and GT-VITA (Georgia Tech Visual and Inspectable Tutor and Assistant), whose latter stages were supported by this research, explored model-based design of collaborative operations teams and the design of intelligent tutoring systems, respectively. Implemented in proof-of-concept form for satellite operations, empirical evaluations of both, using satellite operators for the former and personnel involved in satellite control operations for the latter, demonstrated unequivocally the feasibility and effectiveness of the proposed modeling and design strategy underlying both research efforts. The proof-of-concept implementation of GT-MOCA showed that the methodology could specify software requirements that enabled a human-computer operations team to perform without any significant performance differences from the standard two-person satellite operations team. GT-VITA, using the same underlying methodology, the operator function model (OFM), and its computational implementation, OFMspert, successfully taught satellite control knowledge required by flight operations team members. The tutor structured knowledge in three ways: declarative knowledge (e.g., What is this? What does it do?), procedural knowledge, and operational skill. Operational skill is essential in real-time operations. It combines the two former knowledge types, assisting a student to use them effectively in a dynamic, multi-tasking, real-time operations environment. A high-fidelity simulator of the operator interface to the ground control system, including an almost full replication of both the human-computer interface and human interaction with the dynamic system, was used in the GT-MOCA and GT-VITA evaluations. The GT-VITA empirical evaluation, conducted with a range of'novices' that included GSFC operations management, GSFC operations software developers, and new flight operations team members, demonstrated that GT-VITA effectively taught a wide range of knowledge in a succinct and engaging manner.

Mitchell, Christine M.↗

Climbing the Extravehicular Activity (EVA) Wall - Safely

The success of the EVA team, that includes the EVA project office, Crew Office, Mission Operations, Engineering and Safety, is assured by the full integration of all necessary disciplines. Safety participation in all activities from hardware development concepts, certification and crew training, provides for a strong partnership within the team. Early involvement of Safety on the EVA team has mitigated risk and produced a high degree of mission success.

Fuentes, Jose↗

The Mars Pathfinder Mission and Science Results

Mars Pathfinder, the first low-cost, quick Discovery class mission to be completed, successfully landed on the surface of Mars on July 4, 1997, deployed and navigated a small rover, and collected data from 3 science instruments and 10 technology experiments. The mission operated on Mars for 3 months and returned 2.3 Gbits of new data, including over 16,500 lander and 550 rover images, 16 chemical analyses of rocks and soil, and 8.5 million individual temperature, pressure and wind measurements. The rover traversed 100 m clockwise around the lander, exploring about 200 square meters of the surface. The mission captured the imagination of the public, and garnered front page headlines during the first week. A total of about 566 million internet "hits" were registered during the first month of the mission, with 47 million "hits" on July 8th alone, making the Pathfinder landing by far the largest internet event in history at the time. Pathfinder was the first mission to deploy a rover on Mars. It carried a chemical analysis instrument, to characterize the rocks and soils in a landing area over hundreds of square meters on Mars, which provided a calibration point or "ground truth" for orbital remote sensing observations. The combination of spectral imaging of the landing area by the lander camera, chemical analyses aboard the rover, and close-up imaging of colors, textures and fabrics with the rover cameras offered the potential of identifying rocks (petrology and mineralogy). With this payload, a landing site in Ares Vallis was selected because it appeared acceptably safe and offered the prospect of analyzing a variety of rock types expected to be deposited by catastrophic floods, which enabled addressing first-order scientific questions such as differentiation of the crust, the development of weathering products, and the nature of the early Martian environment and its subsequent evolution. The 3 instruments and rover allowed seven areas of scientific investigation: the geology and geomorphology of the surface, mineralogy and geochemistry of rocks and soils, physical properties of surface materials, magnetic properties of airborne dust, atmospheric science including aerosols, and rotational and orbital dynamics of Mars. Scientists were assembled into 7 Science Operations Groups that were responsible for requesting measurements by the 3 instruments, rover and engineering subsystems for carrying out their scientific investigations and for analyzing the data and reporting on their findings. The spacecraft was launched on December 4, 1996 and had a 7 month cruise to Mars, with four trajectory correction maneuvers. The vehicle entered the atmosphere directly following cruise stage separation. Parachute deployment, heatshield and lander separation, radar ground acquisition, airbag inflation and rocket ignition all occurred before landing at 2:58 AM true local solar time (9:56:55 AM PDT). The lander bounced at least 15 times up to 12 in high without airbag rupture, demonstrating the robustness of this landing system. Reconstruction of the final landing sequence indicates that the parachute/backshel1/1ander was tilted due to a northwest directed wind and wind shear, which resulted in the lander bouncing about I km to the northwest and initially downhill about 20 m from where the solid rockets fired. Two anomalously bright spots located in the lander scene are likely the heatshield, which continued in a ballistic trajectory about 2 km downrange (west southwest), and the backshell/parachute, which stayed nearer to where the rockets fired. Unconnected disturbed soil patches in the scene indicate that the final few bounces of the lander were from the east-southeast and were followed by a gentle roll to the west before coming to rest on the base petal. The location of the lander away from where the solid rockets fired and considerations of the exhaust products used to inflate the airbags and their fate, indicate that the Pathfinder landing system is one of the cleanest designed leaving the local area essentially contaminant free. The radio signal from the low-=gain antenna was received at 11:34 AM PDT indicating a successful landing.

Golombek, M. P.↗

Manned space platforms, payloads and tending

A concept has been developed for providing for a permanent manned presence in space for science, applications, and technology plus growth potential to support major future operational missions. An initial crew of two to four is accommodated along with installations for interior, exterior and tended payloads. Tended payloads support includes servicing of remote free-flying spacecraft, basing of reusable orbital transfer vehicles and basing of teleoperator-mounted payloads for near-station excursions. Candidate payloads, plus configuration, flight operation, subsystem and ground logistics aspects are described, as are Shuttle interactions.

Runge, F. C.↗

Ascent Guidance Comparisons

This paper contains results from ascent guidance studies conducted at the NASA Marshall Space Flight Center. The studies include investigation of different guidance schemes for a variety of potential launch vehicles. Criteria of a successful ascent guidance scheme are low operations cost, satisfaction of load indicator constraints, and maximization of performance. Results show that open-loop designs as a function of altitude or velocity are preferable to designs that are functions of time. Optimized open-loop trajectories can increase performance while maintaining load indicators within limits. Closed-loop atmospheric schemes that involve linear tangent steering or feedback of velocity terms for trajectory modification did not yield any improvement. Early release of vacuum closed-loop guidance, including use during solid rocket booster operation, yields some improvements. Evaluation of a closed-loop optimization scheme for flying through the atmosphere shows no advantages over open-loop optimization. Dispersion study results for several potential guidance schemes and launch vehicles are included in the paper and are not a discriminator between guidance schemes. The primary cost driver is mission operations philosophy, not choice of guidance scheme. More autonomous guidance schemes can help in movement towards a philosophy that would reduce operations costs.

Hanson, John M.↗