Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “KEYING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Variable Renewable Energy Participation in U.S. Ancillary Services Markets: Economic Evaluation and Key Issues

Variable renewable energy (VRE) is not yet meaningfully participating in U.S. ancillary services (AS) markets. VRE participation in AS markets could provide a new source of revenues for VRE resource owners to offset declining energy and capacity values and a new tool for power system operators to address emerging system constraints. This paper uses a price-taker dispatch model and historical prices to estimate the economic value of standalone and hybrid (battery-paired) VRE participation in AS markets, from resource owner and electricity system perspectives, in each of the seven U.S. independent system operator and regional transmission organization (ISO/RTO) markets. Across ISO/RTO markets, average (2015-2019) simulated incremental revenues from regulation market participation were $\$$0.0-2.9/MWh (+0-15% of revenue without participation) for standalone VRE owners and $\$$1-33/MWh (+1-69%) for hybrid VRE owners. However, ISO/RTO reserve markets are relatively thin and have the potential to become saturated by energy storage projects that are currently in ISO/RTO interconnection queues. In most markets, standalone and hybrid VRE were able to provide regulation reserves during periods with high regulation prices, suggesting that VRE participation in AS markets could have high system value. The analysis highlights the value of separate upward and downward regulation products and suggests that ISOs/RTOs might consider initially focusing on enabling hybrid VRE provision of AS.

14 SOLAR ENERGY↗

Planning is Key for Storm Water Regulatory Compliance [Slides]

Most construction projects at LANL are subject to a EPA regulated storm water discharge permit (NPDES Construction General Permit). Each identified non-compliance is a regulatory liability to both the subcontractor & Triad.

54 ENVIRONMENTAL SCIENCES↗

Assessing the Key Requirements for 450 GW of Renewable Capacity in India by 2030

In this policy brief, we assess the prerequisites for India to achieve 450 GW of solar and wind cumulative installed capacity by 2030. We examine requirements such as availability of land, new transmission buildout, financing and pace of deployment, as well as the impact on grid reliability and cost of generation. We also examine the impact of policies promoting domestic manufacturing. Deploying 307 GW of solar and 142 GW of wind capacity would use only about 1.25% of land that is categorized as barren or waste, which is equivalent to about 0.22% of the total land area in India. Because of the good solar resource across large swaths of India, the solar energy buildout—and thus the land use—potentially can be spread out. India would need about 280 GW of new interstate transmission capacity by 2030, a little over double the transmission expansion that has already been planned through 2025. However, most of the new transmission buildout is driven by the near doubling of electricity demand between 2020 and 2030. The total investment needed (in generation and storage resources) to realize this target is around USD 26.5 billion annually, which is 20% lower than the annual investment in India’s power sector across all generation resources between 2015 and 2019. We estimate that using domestically manufactured panels instead of imported panels may increase solar PPA prices by about 10%–15% in the medium term, but solar power would still be a cost-effective way to meet growing demand instead of building new fossil fuel-based power plants, because the price of electricity from solar plants has fallen below the variable cost of most existing coal units. To reach this target, India would need to build about 35–40 GW of solar and wind capacity every year in this decade. India’s power sector achieved a pace of capacity addition of 22 GW per year in the previous decade (including thermal and renewable). Policy and regulatory measures would be needed to increase the pace of deployment.

14 SOLAR ENERGY↗

Rooftop Solar PV Quality and Safety in Developing Countries - Key Issues and Potential Solutions

To scale solar photovoltaic (PV) deployment in developing countries, the technology must be safe and reliable, meeting both customer and utility expectations. However, challenges exist in achieving these goals. Because PV systems are novel and complex, the majority of consumers are unable to distinguish between low- and high-quality systems; many may invest based on price alone. Suboptimal PV system performance and safety incidents can have downstream impacts on the solar industry and customer adoption because of unmet expectations and negative publicity. Rooftop solar system components vary in quality, and inadequate training could lead to poor installation practices. And even if inspection checklists, certification procedures, and standards are available, they may not be widely used in countries if they are not mandatory, the workforce is not aware of them, or installers lack the technical capacity to comply. Despite the numerous solar quality and safety challenges developing countries may face, lessons learned and best practices from around the world can address them.

14 SOLAR ENERGY↗

Key Pandemic Response R&D Contributions by Los Alamos National Laboratory

New research goals, mitigation successes, and beneficial collaborations burgeoned from the early critical days of 2020 when LANL (Los Alamos National Laboratory) pivoted to help respond to the pandemic. By applying its considerable capabilities in the fields of science, technology, and engineering (STE), LANL responded to the coronavirus infectious disease (COVID-19) pandemic. This report documents representative examples of that response. Through significant investments in COVID-19 mitigations and ongoing research and development (R&D), important advancements were made to address the pandemic that not only benefited the global population affected by the pandemic, but also protected our staff and collaborators as we executed our Lab’s mission.

59 BASIC BIOLOGICAL SCIENCES↗

Climate Forcing & Feedbacks by Fires, Forests, Fossil Energy & Food Production: Observations are Key to Predictions [Slides]

Human emitted GHGs (long lived, cumulative) that trap more heat (IR) and aerosols (short lived, steady) that reflect sunlight (Vis) have altered Earth’s radiation budget and warmed our climate measurably and predictably. Our complex dynamic climate system has trapped 400 ZettaJ (10 21 ) and has many positive feedbacks. Regions are changing at unprecedented rates and crossing thresholds as BAU will lock us into 8.5 W m -2 in 2100.

54 ENVIRONMENTAL SCIENCES↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Toward an improved estimate of climate sensitivity and its application to key climate metrics (Final Report)

The tendency of climate models to overstate warming in the tropical troposphere has long been noted. Here we examine individual runs from 38 newly released Coupled Model Intercomparison Project Version 6 (CMIP6) models and show that the warm bias is now observable globally as well. We compare CMIP6 runs against observational series drawn from satellites, weather balloons, and reanalysis products. We focus on the 1979–2014 interval, the maximum span for which all observational products are available and for which models were run using historically observed forcings. For lower-troposphere and midtroposphere layers both globally and in the tropics, all 38 models overpredict warming in every target observational analog, in most cases significantly so, and the average differences between models and observations are statistically significant. We present evidence that consistency with observed warming would require lower model Equilibrium Climate Sensitivity (ECS) values.

54 ENVIRONMENTAL SCIENCES↗

Flue-Gas Desulfurization Effluent Management using an Innovative Low-Energy Biosorpotion Treatment System to Remove Key Contaminants

Among the most critical water contaminants of concern affecting wide geographical regions and a number of industries and natural systems is selenium. Selenium found in surface, ground and wastewater in originates from natural sources, as well as industrial sources such as petroleum refineries, electronics manufacturing, pesticides, and coal power plants and mining also contribute to selenium contamination in water in the US. At high concentrations, selenium is toxic to human and wildlife. There are a number of technologies that have been used to treat selenium and other similar contaminants in water. Biological treatment of selenium has been used in the past to reduce soluble SeVI and/or SeIV to insoluble Se0, which is then filtered in the same vessel. The insoluble selenium (Se0) is then backwashed from the system and solids are separated for subsequent disposal, if they meet the leaching and water content criteria. In order to promote biological reduction to insoluble Se0, heating of bioreactor is needed in some applications, and excess food source (electron donor) is added so that all selenium can be filtered. An additional disadvantage of these systems is the significant amount of water lost due to extensive and frequent backwash and rinse cycles. When comparing the advantages and energy requirements of the various treatment technologies, RO membrane filtration immediately stands out due to the excessive energy expenditure needed to pump water across the membrane although RO is an effective way to remove selenium. In addition, RO requires extensive pretreatment, such as MF membrane, and frequent maintenance, rendering it an expensive option that may be out of reach for certain applications. In fact, although the performance was good during the pilot testing by the NSMP Working Group for treatment naturally occurring selenium in the surface water, the high electricity requirements and significant reject water stream made it an infeasible alternative. While conventional ion exchange maybe an effective treatment option, it requires frequent regeneration of the resin when applied to highly contaminated water, which leads to several tons of contaminant-laden, high-salinity brine that needs to be disposed off-site each day. One of the water systems in the west coast currently uses ion exchange for selenium treatment and has been trucking selenium laden hazardous brine waste weekly in the last several years. Pneumatic pumping and rinse water pumping required for ion exchange also increase the energy usage. In comparison, adsorption process is a passive treatment system where contaminated water comes in contact with an adsorption media in a vessel. Typically, there is no mixing, backwash, or recycle pumping required, thus significantly reducing the energy usage. A passive single-use adsorption system does not require backwash, thereby generating small amount of process waste, and producing the highest water yield among the alternatives. The energy and water efficiencies, and applicability for SeVI and SeIV are summarized in Table 1. Despite these benefits though, adsorption typically does not work for the most oxidized form of selenium (SeVI). The innovative biosorption process integrates both process to increase the treatment efficiency while minimizing energy, chemical, and time required to treat both SeVI and SeIV. Additional advantages include simple partial biological reduction with reduced on-site waste generation, which lead to water and electricity savings, and less operational need compared to biological treatment alone. This makes biosorption especially suitable for remote areas, where liquid backwash and brine disposal may be cost prohibitive or infeasible.

20 FOSSIL-FUELED POWER PLANTS↗

Viruses in soils: Key modulators of microbiomes and nutrient cycling? (Final report)

Microbes play essential roles in keeping soils healthy, but it remains a mystery if the viruses that infect them are also impacting soil health. In soils, microbes drive local energy and vital biogeochemical cycles (e.g., nitrogen transformations), which become bioavailable nutrients for plants and other microscopic animals. Viruses of bacteria (called ‘phages’) are abundant in soils (a billion per gram!), and are a normal component of the soil microbiome. However, we have no clear models on what viruses do (e.g., are they actively infecting or dormant?) or what impacts they have at a system level (e.g., is carbon assimilation rates affected by virus infection?). Problematically, we do not yet have the tools to study viruses in soils – even being able to detect them is a challenge. Therefore, the core of the VirSoil project was to develop a toolkit to study soil viruses, and use it to derive a baseline ecological understanding of virus diversity and impacts in climate-critical soils.

54 ENVIRONMENTAL SCIENCES↗

Models for Incorporating Equity in Transportation Electrification Considerations for Public Utility Regulators, An addendum to the NARUC report, Electric Vehicles: Key Trends, Issues, and Considerations for State Regulators

Momentum for the electric vehicle (EV) transition is well underway, and the utility sector plays an important role in supporting its success. For frontline communities, the transition offers a promising solution to improve environmental and public health outcomes, economic development, affordability, and transit equity. However, the transition will need to involve care and intention to ensure that the needs of underserved communities are prioritized throughout the planning, decision-making, and implementation processes. States have taken the lead in some cases, as profiled in Box 6. Whether driven by state commissions or utilities themselves, utilities have a range of options available to ensure equity is central in their transportation electrification plans and programs by drawing from a variety of existing and emerging experiences, as summarized in Table 1.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electric Vehicles: Key Trends, Issues, and Considerations for State Regulators

Over the past few years, states across the country have seen increased consumer adoption of electric vehicles (i.e., vehicles with an electric motor, or EVs), thereby increasing electricity demand from the transportation sector. This change is quickly becoming a trend, which provides utilities with an opportunity to increase electricity sales while providing customers with the possibility of lowering emissions and overall vehicle ownership costs compared to traditional internal combustion engine (ICE) vehicles. Electric utilities are at different stages of exploring their role in both building EV charging infrastructure and managing grid impacts, including through rate design and managed charging. As a result, many Public Utility Commissions (PUCs), the state agencies tasked with regulating utilities, are being asked to make decisions in this unfamiliar industry, sometimes without direct legislative guidance. This issue brief provides data about the trends in EV adoption, a synopsis of the types of decisions Commissions are facing, and examples of recent State regulatory approaches to EV questions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Models for Incorporating Equity in Transportation Electrification Considerations for Public Utility Regulators, An addendum to the NARUC report, Electric Vehicles: Key Trends, Issues, and Considerations for State Regulators (2019)

Momentum for the electric vehicle (EV) transition is well underway, and the utility sector plays an important role in supporting its success. For frontline communities, the transition offers a promising solution to improve environmental and public health outcomes, economic development, affordability, and transit equity. However, the transition will need to involve care and intention to ensure that the needs of underserved communities are prioritized throughout the planning, decision-making, and implementation processes. States have taken the lead in some cases, as profiled in Box 6. Whether driven by state commissions or utilities themselves, utilities have a range of options available to ensure equity is central in their transportation electrification plans and programs by drawing from a variety of existing and emerging experiences, as summarized in Table 1.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Securing Critical Materials for the U.S. Electric Vehicle Industry: A Landscape Assessment of Domestic and International Supply Chains for Five Key Battery Materials

This study explores the prospective supply of upstream critical materials, providing insights into the U.S.'s capacity to meet its Electric Vehicle (EV) and Energy Storage System (ESS) deployment targets for 2035. It evaluates the proportion of critical materials demand that can be met by domestic upstream sources and the amount that will require non-U.S. sources. The analysis considers geological resources and current international development activities, contributing to the understanding of mineral supply security as the global community strives for net-zero emissions by 2050. The study focuses on five materials assessed in the 2023 DOE Critical Materials Assessment – Lithium, Nickel, Cobalt, Graphite, and Manganese.

33 ADVANCED PROPULSION SYSTEMS↗

First-generation college student forges ahead, now key to Lab's mission

Fatima Woody was just 17 and a student at Pojoaque Valley High School when she first started her career as a Los Alamos Neutron Science Center receptionist. Now she's in a crucial role that keeps plutonium pit production and other mission processes operating with as little interruption as possible. Over nearly four decades, Fatima has gradually advanced from her initial positions as a receptionist and administrative secretary to become a computer technician, then a computer system professional who specializes in project management. Today, she coordinates the workflow for nearly two dozen deployed information technology technicians who keep the computer systems and networks operating at the high-tech complex that houses the Lab's Plutonium Facility.

99 GENERAL AND MISCELLANEOUS↗