Probing Signal Design for Power System Identification

This paper investigates the design of effective input signals for low-level probing of power systems. In 2005, 2006, and 2008 the Western Electricity Coordinating Council (WECC) conducted four large-scale system wide tests of the western interconnected power system where probing signals were injected by modulating the control signal at the Celilo end of the Pacific DC intertie. A major objective of these tests is the accurate estimation of the inter-area electromechanical modes. A key aspect of any such test is the design of an effective probing signal that leads to measured outputs rich in information about the modes. This paper specifically studies low-level probing signal design for power-system identification. The paper describes the design methodology and the advantages of this new probing signal which was successfully applied during these tests. This probing input is a multi-sine signal with its frequency content focused in the range of the inter-area modes. The period of the signal is over two minutes providing high-frequency resolution. Up to 15 cycles of the signal are injected resulting in a processing gain of 15. The resulting system response is studied in the time and frequency domains. Because of the new probing signal characteristics, these results show significant improvement in the output SNR compared to previous tests.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Microscale, printed LEDs for unusual lighting and display systems

Current technology development in light emitting diodes has enabled high efficiency operation, low energy consumption and lifetimes, thereby creating new possibilities in conventional display and lighting industry. Recent work is also creating more unusual uses in biomedicine and in sensing applications, where conformal contact over curvilinear surfaces is required. Here, ultrathin device geometries and optimized mechanical designs, including neutral mechanical plane layouts and serpentine interconnects, provide indicators and lighting modules with arbitrary shapes capable of integrated on nearly any type of substrates. Furthermore, biomedical devices such as light emitting suture threads, and glove-mounted optical proximity sensors demonstrate the versatility of this strategy and create great new opportunities.

42 ENGINEERING↗

Frontier (HPE Cray EX) Exascale Supercomputer at the Oak Ridge Leadership Computing Facility

Frontier is the HPE Cray EX exascale supercomputer deployed and operated by the Oak Ridge Leadership Computing Facility (OLCF) at Oak Ridge National Laboratory (ORNL). Frontier is designed for large-scale modeling, simulation, and AI workloads and is built from HPE Cray EX system architecture with AMD CPUs and AMD Instinct GPU accelerators connected by the HPE Slingshot interconnect. System composition (representative production configuration): Frontier is composed of approximately 74 cabinets with 128 compute nodes per cabinet (~9,400 compute nodes total). Each compute node contains one 64-core AMD EPYC CPU and four AMD Instinct MI250X GPUs. Nodes are connected using HPE Slingshot (Slingshot-200 class) networking with multiple NIC ports per node providing high injection bandwidth. Frontier is connected to the Orion parallel file system (multi-tier Lustre) providing a large, center-wide high-performance storage namespace. Operational context: Frontier entered public prominence as the first system to reach No. 1 on the TOP500 list in May 2022 (HPL benchmark), establishing the first widely recognized exascale-era performance milestone. The system supports DOE Office of Science mission workloads and enables leadership-class computational science and AI for open science users.

AMD EPYC↗

Final Scientific/Technical Report Solar America Initiative: Solar Outreach and Communications

The purpose of the Solar America Initiative: Solar Outreach and Communications grant was to promote better communications among stakeholders; address infrastructure barriers to solar energy; and coordinate with industry, the U.S. Department of Energy, national laboratories, states, cities and counties. The Interstate Renewable Energy Council (IREC), a non-profit organization formed in 1982, approached this grant project by establishing a wide range of communication and outreach activities including newsletters, workshops, webinars, model practices and publications; by advancing easy and fair hook-up rules to the utility grid; and by upgrading training based on industry competency standards. The Connecting to the Grid project and the Solar Codes and Standards Public Hearings project offered communication coupled with technical assistance to overcome interconnection, net metering and other regulatory and program barriers. The Workforce Development Project tackled building a strong workforce through quality training and competency assessment programs. IREC's web site, the semi-monthly state and stakeholder newsletter and the metrics report resulted in better communications among stakeholders. Workshops and phone seminars offered technical assistance and kept stakeholders up-to-date on key issues. All of these activities resulted in implementing sustainable solutions to institutional and market barriers to solar energy and getting the right information to the right people.

14 SOLAR ENERGY↗

Survey of Variable Generation Forecasting in the West: August 2011 - June 2012

This report surveyed Western Interconnection Balancing Authorities regarding their implementation of variable generation forecasting, the lessons learned to date, and recommendations they would offer to other Balancing Authorities who are considering variable generation forecasting. Our survey found that variable generation forecasting is at an early implementation stage in the West. Eight of theeleven Balancing Authorities interviewed began forecasting in 2008 or later. It also appears that less than one-half of the Balancing Authorities in the West are currently utilizing variable generation forecasting, suggesting that more Balancing Authorities in the West will engage in variable generation forecasting should more variable generation capacity be added.

17 WIND ENERGY↗

Eastern Frequency Response Study

This study was specifically designed to investigate the frequency response of the Eastern Interconnection that results from large loss-of-generation events of the type targeted by the North American Electric Reliability Corp. Standard BAL-003 Frequency Response and Frequency Bias Setting (NERC 2012a), under possible future system conditions with high levels of wind generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Western Wind and Solar Integration Study Phase 2

The electric grid is a highly complex, interconnected machine, and changing one part of the grid can have consequences elsewhere. Adding wind and solar affects the operation of the other power plants and adding high penetrations can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 of the Western Wind and Solar Integration Study(WWSIS-2) evaluated these costs and emissions and simulated grid operations for a year to investigate the detailed impact of wind and solar on the fossil-fueled fleet. This built on Phase 1, one of the largest wind and solar integration studies ever conducted, which examined operational impacts of high wind and solar penetrations in the West.

14 SOLAR ENERGY↗

Benchmarking Non-Hardware Balance-of-System (Soft) Costs for U.S. Photovoltaic Systems, Using a Bottom-Up Approach and Installer Survey – Second Edition

This report presents results from the second U.S. Department of Energy (DOE) sponsored, bottom-up data-collection and analysis of non-hardware balance-of-system costs -- often referred to as 'business process' or 'soft' costs -- for U.S. residential and commercial photovoltaic (PV) systems. In service to DOE's SunShot Initiative, annual expenditure and labor-hour-productivity data are analyzed to benchmark 2012 soft costs related to (1) customer acquisition and system design (2) permitting, inspection, and interconnection (PII). We also include an in-depth analysis of costs related to financing, overhead, and profit. Soft costs are both a major challenge and a major opportunity for reducing PV system prices and stimulating SunShot-level PV deployment in the United States. The data and analysis in this series of benchmarking reports are a step toward the more detailed understanding of PV soft costs required to track and accelerate these price reductions.

14 SOLAR ENERGY↗

NREL/SCE High Penetration PV Integration Project: FY13 Annual Report

In 2010, the National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed to analyze the impacts of high penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to benefit from the experience that SCE and the project team would gain during the installation of 500 megawatts (MW) of utility-scale PV systems (with 1-5 MW typical ratings) starting in 2010 and completing in 2015 within SCE's service territory through a program approved by the California Public Utility Commission (CPUC). This report provides the findings of the research completed under the project to date.

14 SOLAR ENERGY↗

Texas Solar Collaboration Action Plan

The Texas Solar Collaboration Action Plan outlines activity to improve the solar permitting and interconnection processes for cities of San Antonio, Austin and Houston.

14 SOLAR ENERGY↗

The Western Wind and Solar Integration Study Phase 2

The electric grid is a highly complex, interconnected machine, and changing one part of the grid can have consequences elsewhere. Adding wind and solar affects the operation of the other power plants and adding high penetrations can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 of the Western Wind and Solar Integration Study (WWSIS-2) evaluated these costs and emissions and simulated grid operations for a year to investigate the detailed impact of wind and solar on the fossil-fueled fleet. This built on Phase 1, one of the largest wind and solar integration studies ever conducted, which examined operational impacts of high wind and solar penetrations in the West(GE Energy 2010).

14 SOLAR ENERGY↗

The Western Wind and Solar Integration Study Phase 2 (Executive Summary)

The electric grid is a highly complex, interconnected machine, and changing one part of the grid can have consequences elsewhere. Adding wind and solar affects the operation of the other power plants and adding high penetrations can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 of the Western Wind and Solar Integration Study (WWSIS-2) evaluated these costs and emissions and simulated grid operations for a year to investigate the detailed impact of wind and solar on the fossil-fueled fleet. This built on Phase 1, one of the largest wind and solar integration studies ever conducted, which examined operational impacts of high wind and solar penetrations in the West(GE Energy 2010).

14 SOLAR ENERGY↗

Eastern Renewable Generation Integration Study

The Eastern Interconnection (EI) is one of the largest power systems in the world, and its size and complexity have historically made it difficult to study in high levels of detail in a modeling environment. In order to understand how this system might be impacted by high penetrations (30% of total annual generation) of wind and solar photovoltaic (PV) during steady state operations, the National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy (DOE) conducted the Eastern Renewable Generation Integration Study (ERGIS). This study investigates certain aspects of the reliability and economic efficiency problem faced by power system operators and planners. Specifically, the study models the ability to meet electricity demand at a 5-minute time interval by scheduling resources for known ramping events, while maintaining adequate reserves to meet random variation in supply and demand, and contingency events. To measure the ability to meet these requirements, a unit commitment and economic dispatch (UC&ED) model is employed to simulate power system operations. The economic costs of managing this system are presented using production costs, a traditional UC&ED metric that does not include any consideration of long-term fixed costs. ERGIS simulated one year of power system operations to understand regional and sub-hourly impacts of wind and PV by developing a comprehensive UC&ED model of the EI. In the analysis, it is shown that, under the study assumptions, generation from approximately 400 GW of combined wind and PV capacity can be balanced on the transmission system at a 5-minute level. In order to address the significant computational burdens associated with a model of this detail we apply novel computing techniques to dramatically reduce simulation solve time while simultaneously increasing the resolution and fidelity of the analysis. Our results also indicate that high penetrations of wind and PV (collectively variable generation (VG)), significantly impact the operation of traditional generating resources and cause these resources to be used less frequently and operate across a broader output range because wind and PV have lower operating costs and variable output levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mitigation of Chromium Impurity Effects and Degradation in Solid Oxide Fuel Cells: The Roles of Reactive Transport and Thermodynamics

The principal objectives of this project were to understand the combined role of transport and thermodynamics in chromium poisoning of solid oxide fuel cell (SOFC) cathodes. Specifically, the differences in the chromium poisoning phenomena in predominantly electronic conducting cathodes such as strontium-doped lanthanum manganite (LSM) and mixed conducting cathodes such as strontium-doped lanthanum ferrite (LSF) and lanthanum nickelate (LNO) have been experimentally elucidated. The voltage-current density curves obtained from single cells featuring these cathode materials in the presence of chromium impurity have been analyzed using a suitable electrochemical model. The results clearly show the higher chromium tolerance of LSF and LNO cathodes compared to LSM cathodes. Further, dense protective coatings of copper-manganese spinel oxide applied via electrophoretic deposition (EPD) conformally on ferritic stainless steel current collectors that simulate the interconnection in SOFC stacks have been applied to SOFCs featuring LSM cathodes. Operation over a period of ten days of SOFCs featuring bare and spinel–coated ferritic stainless steel mesh current collectors show that the coatings are highly effectiveto protect against chromium poisoning.

03 NATURAL GAS↗

Grid Ready, Flexible Large Power Transformer

GE Research and its partner Prolec GE have proposed a novel and breakthrough concept to improve the flexibility and interchangeability of large power transformers (LPTs). LPTs refer in this report to transformers with a power rating equal or greater than 100 MVA. The concept consists of a 3-phase autotransformer bank having one specified high voltage side (HV) voltage and three configurable low voltage side (LV) voltage taps. Moreover, the leakage impedance is adjustable offline using taps which allows to accommodate short-circuit requirements for a wide range of LPTs applications. The research performed aimed to develop and validate a cost-effective design of a flexible LPT and to demonstrate its competitiveness with the LPT fleet currently in operation in the U.S. The concept is intended for the long-term replacement of existing LPTs. In this project, the U.S based population of LPTs was analyzed to determine their commonality in power, voltage classes, and impedance range. Up to 9,700 units, currently deployed in the NERC’s Eastern and Western interconnection regions, were evaluated. This analysis yielded the specifications of two flexible LPTs to be designed to demonstrate the manufacturability and competitiveness of the concept: a 345 kV, 230 MVA and a 230 kV, 100 MVA LPTs. The two LPTs are both configurable to 161 kV, 138 kV, and 115 kV on the LV side and allow leakage impedance variation between 4% and 14%. The design output showed that the flexible LPT is manufacturable and competitive with conventional LPT. The proposed design has a power efficiency of 99.5% and a total active part weight increase ranging only between 15% and 28% relative to conventional LPTs it can be substituted with. Indeed, for the flexible LPT, the higher the LV side voltage is, the higher is its power rating. Hence, flexible LPTs are more competitive when compared with the largest conventional LPT they can replace. Power systems analyses were carried out to evaluate the performance of the flexible LPT when replacing an existing conventional LPT. These analyses showed that short-circuit and inrush currents will remain respectively within 15% and 9.4% of their original levels suggesting that no substations equipment is likely to be replaced due the installation of the flexible LPT. In addition, the analyses showed that the transient overvoltage anticipated at the impedance configuration switch will be manageable and will not pose any particular risk during lightning or switching events. This research proved that the deployment of flexible LPTs in the U.S power grid can greatly improve the grid reliability and its resiliency especially in the event of the loss of multiple LPTs. Moreover, the concept can significantly help reduce LPTs’ spare inventory by providing a high spare coverage level. The performed analysis showed that the designed 345 kV flexible LPT can serve as a spare for up to 34 units currently in operation in the U.S while the designed 230 kV flexible LPT can replace up to 101 units. Flexible LPTs offer new opportunities to U.S utilities to improve interchangeability of LPTs in the transmission system and to better strategize the upcoming renewal of about 70% of the population of LPTs anticipated to retire within the next two decades.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Clause-by-Clause Summary of Requirements in IEEE Standard 1547-2018

The revised IEEE 1547 standard (IEEE Std 1547-2018) contains eleven chapters (clauses) and eight annexes that comprise 136 pages. Each clause specifies information or requirements that apply to certain aspects important to the interconnection of distributed energy resources to the electric power system. Implementation of the requirements needs a careful study of the underlying technical concept and also needs the appropriate information that may be required to calculate various settings and configurations. This document aims to provide an introductory text to assist users of IEEE Std 1547-2018 in identifying the following questions: what is the primary audience of the clause/subclause? What knowledge is required to understand the technical subject matter? What information is required to apply/implement the requirements specified? What level of fluency with the subject matter is required to apply/implement the requirements?

24 POWER TRANSMISSION AND DISTRIBUTION↗