Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Geothermal Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Dixie Valley Bottoming Binary Unit

This binary plant is the first air cooled, high-output refrigeration based waste heat recovery cycle in the industry. Its working fluid is environmentally friendly and as such, the permits that would be required with a hydrocarbon based cycle are not necessary. The unit is largely modularized, meaning that the unit’s individual skids were assembled in another location and were shipped via truck to the plant site. The Air Cooled Condensers (ACC), equipment piping, and Balance of Plant (BOP) piping were constructed at site. This project further demonstrates the technical feasibility of using low temperature brine for geothermal power utilization. The development of the unit led to the realization of low temperature, high output, and environmentally friendly heat recovery systems through domestic research and engineering. The project generates additional renewable energy, resulting in cleaner air and reduced carbon dioxide emissions. Royalty and tax payments to governmental agencies will increase, resulting in reduced financial pressure on local entities. The major components of the unit were sourced from American companies, resulting in increased economic activity throughout the country.

15 GEOTHERMAL ENERGY↗

West Flank Coso FORGE: MT Station Locations

This data includes the locations of the MT data collected in and around the Coso Geothermal field that covered the West Flank area. These are the data that the 3D MT models were created from that were discussed in Phase 1 of the West Flank FORGE project. The projected coordinate system is NAD 1927 State Plane California IV FIPS 0404 and the Projection is Lambert Conformal Conic. Units are in feet.

15 GEOTHERMAL ENERGY↗

Utah FORGE 1-2409: PetroQuip Energy Services Zonal Isolation Solution for Geothermal Wells - 2024 Annual Workshop Presentation

This is a presentation on the Zonal Isolation Solution for Geothermal Wells by PetroQuip Energy Services, presented by Robert Coon. This video slide presentation discusses the proposed design and development of a multi-stage system consisting of an Open-Hole Packer (OHP), a Locking Bridge Plug (LBP), and a corresponding Locating Profile (LP). This presentation was featured in the Utah FORGE R&D Annual Workshop on August 14, 2024.

15 GEOTHERMAL ENERGY↗

Desalination of Impaired Water Using Geothermal Energy

Membrane distillation (MD) and nanofiltration (NF) are explored as a means to provide high quality water for on-site use at the Tuscarora geothermal power plant in northern Nevada. The plant uses a wet cooling tower, but decreasing flow from the wells providing makeup water necessitates exploration for alternative water or alternative cooling sources. Scenarios are explored to extend cooling water by (1) extracting fresh water from the geothermal brine, (2) upgrading the makeup-water quality to allow for increased cycles of concentration in the cooling tower, or (3) recovering water from the cooling tower blowdown. The preliminary cost analysis indicates that applying NF to extract water from the injection brine is the most attractive option of the scenarios examined. This approach may be useful for other plants as well. The estimated cost for the NF treatment of the injection brine ranges from $0.63/m3 to $0.45/m3 and provides a reduction in the current makeup well flows of 35% to 71%. Savings from the reduction in makeup well pumping and chemical treatment do not fully offset the estimated cost of the proposed treatment systems; the site will have to weigh the cost of these water treatment options versus alternatives in light of the diminishing flows from the existing cooling-water wells. Testing is planned to quantify the performance of the proposed NF and MD technologies and help refine the estimated system costs.

15 GEOTHERMAL ENERGY↗

Thermal Energy Storage for Dispatchable Geothermal Power

Dispatchable generation refers to sources of electricity that can be turned on or off, or can adjust their power output accordingly to an order. Geothermal plants are usually used for base-load power rather than dispatchable power. Flexibility is a challenge for a geothermal plant because the heat source does not naturally respond quickly to changes in demand. The current state-of-the-art approach to address this challenge is to maintain the geothermal fluid flows at relatively steady rates while providing a bypass around the generation equipment as needed. Under part load, some of the geothermal fluid is pumped to the surface, bypasses the generation equipment, and is re-injected to the ground without extracting any useful enthalpy. This approach is robust but necessarily incurs high parasitic power draws at part load due to the constant, full-flow pumping power requirements. There are even more challenges and unknowns for steam and flash geothermal plants, which were the focus for this project. As a process improvement to this existing configuration of a dispatchable geothermal plant, we examined the use of a phase-change thermal-energy storage (TES) unit that will provide some “inertia” against temperature fluctuations. The TES phase change material (PCM) could be in the form of eutectic molten nitrate salts, organic sugar alcohols, or the like based on the required temperature. This configuration allowed the power plant to meet the ramp rate requirements while allowing the geothermal resource to drawn down at the duty-cycle-averaged extraction rate rather than the full-rated-output extraction rate. The project team performed an experimental and computational evaluation of a peak shaving technical approach that used thermal storage to switch between two nominal operating points: full rated power and 50% power. In the initial requirements definition phase, the team decided to examine the PCM/TES-enhanced geothermal plant in the context of a 40-MW two-stage flash plant operating in mid-Southern California. Steady-state process simulations were used to understand the equipment sizing and the energetics. Dynamic process simulations were used to understand the response rate of the system to changes in requested power output from the utility. The technical approach was also guided by a techno-economic analysis (TEA) and a high-level analysis of the reservoir. Recognizing that performance of the thermal storage was a key risk element, high-fidelity finite-element simulations of the PCM-TES heat exchanger were performed to better understand its performance and temporal response. These simulations were validated with a subscale PCM-TES experimental apparatus that mimicked the geometry of the full-scale system. The key outcomes of this Phase I project were that: 1) the PCM-TES heat exchanger met the target for gravimetric energy storage density, 2) the dispatchable geothermal plant met its target for response rate, 3) the peak shaving approach reduces the number of production wells and does not disturb the wellfield, and 4) the incentives for properly remunerating dispatchable operation were identified.

15 GEOTHERMAL ENERGY↗

Renewable electricity capacity planning with uncertainty at multiple scales

Abstract We formulate and compare optimization models of investment in renewable generation using a suite of social planning models that compute optimal generation capacity investments for a hydro-dominated electricity system where inflow uncertainty results in a risk of energy shortage. The models optimize the expected cost of capacity expansion and operation allowing for investments in hydro, geothermal, solar, wind, and thermal plant, as well as battery storage for smoothing load profiles. A novel feature is the integration of uncertain seasonal hydroelectric energy supply and short-term variability in renewable supply in a two-stage stochastic programming framework. The models are applied to data from the New Zealand electricity system and used to estimate the costs of moving to a 100% renewable electricity system by 2035. We also explore the outcomes obtained when applying different forms of CO 2 constraint that limit respectively non-renewable capacity, non-renewable generation, and CO 2 emissions on average, almost surely, or in a chance-constrained setting, and show how our models can be used to investigate the merits of a proposed pumped-hydro scheme in New Zealand’s South Island.

Ferris, Michael C.↗

Laser-Mechanical Drilling for Geothermal Energy: Low-Contact Drilling Technology to Enable Economical EGS Wells

Broad Funding Opportunity Announcement Project: Foro Energy is developing a unique capability and hardware system to transmit high power lasers over long distances via fiber optic cables. This laser power is integrated with a mechanical drilling bit to enable rapid and sustained penetration of hard rock formations too costly to drill with mechanical drilling bits alone. The laser energy that is directed at the rock basically softens the rock, allowing the mechanical bit to more easily remove it. Foro Energy’s laser-assisted drill bits have the potential to be up to 10 times more economical than conventional hard-rock drilling technologies, making them an effective way to access the U.S. energy resources currently locked under hard rock formations.

ARPA-E↗

Big Data Meets Geothermal Exploration (CRADA Final Report)

As part of the Cyclotron Road program, Zanskar Geothermal & Minerals, Inc. investigated the application of micro-earthquake and ambient noise seismology methods to imaging and characterizing the structural characteristics and hydrothermal flux of subsurface faults. Significant advances in what could be resolved were enabled by two major developments in seismology: 1) the availability of large-n arrays of low-cost seismometers, and 2) the availability of increased computational power and semi-automated data reduction algorithms. In tandem, these advances may improve the signal-to-noise ratio and spatial precision of the data collected and enable higher-resolution characterization of subsurface fracture systems and their spatio-temporal evolution. These tools supported efforts to reduce dry-hole risk and to improve wellfield productivity for geothermal resource development. In particular, two applications of these advances were evaluated: 1) fracture-seismic imaging, which was used to detect ambient emissions from fluid-filled fractures, and 2) reservoir tomography, which used information about travel paths, source locations, and source parameters of micro-earthquakes to identify areas of enhanced permeability. Integration of these methods provided guidance for siting wells and served as prior constraints for reservoir models, informing forecasts of power potential and production and injection strategies aimed at minimizing temperature decline and improving overall resource productivity.

15 GEOTHERMAL ENERGY↗

Flexible Geothermal Power Generation utilizing Geologic Thermal Energy Storage (Final Seedling Project Report)

This report concludes that there is a cost-effective strategy for seasonal storage of heat that will provide firm, but dispatchable, electrical generating capacity in times when other renewable energy is not available to meet demand. Deployment of the technology appears to require no new technology, but instead combines solar, geothermal, and conventional oil and gas drilling technologies in a novel way. The study basis is the use of sedimentary geologic formations as a medium for thermal energy storage (TES), specifically for heat collected in concentrating solar collectors. The study identifies methodologies that could be used to transport this heat into and out of the subsurface in order to produce dispatchable electrical power, and reports on initial optimization results. The GeoTES system (heat input, storage, heat recovery, and heat to electric conversion) described in this analysis has the potential to provide a unique pathway for increasing the grid penetration of renewable energy in large blocks of power and across many states and regions. Further, the system can be used both to meet the nation’s flexible energy needs while also improving grid stability and reliability. The present study evaluated the use of a large number of dedicated wells to store and recover the heat, essentially creating a synthetic geothermal reservoir. The use of sedimentary geology allows the wells to be drilled at low cost. Dedicated hot and cold wells are used, arranged in a five-spot well pattern with each hot or cold well surrounded at an appropriate distance by the opposite type of well. In large numbers this becomes alternating rows of hot and cold wells. Each hot and cold well is operated using a push-pull strategy. This configuration provides the ability to immediately recover stored hot fluid from a GeoTES reservoir, or to store the heat over many months for recovery at low loss when needed. This is a practical approach for managing the system’s fluid inventory and reducing parasitic load. The production and injection power requirements are reduced because the rows of wells operating in “push” mode provide help to the wells operating in “pull” mode, and vice-versa. Initial charging of a GeoTES system increases the heat recovery temperature. Increasing the duration of the charging period decreases the magnitude of the temperature fluctuations that occur following prolonged system operation. Because of direct contact of the heated water with the reservoir formation, the production of both hot water and steam from the TES, and the temperature ranges of the recovered fluid (190 – 230°C or 375 – 445°F), conventional geothermal power cycles were used to convert the stored heat to electricity. A power cycle configuration for the GeoTES system was selected following a screening study of a number of flash, and flash/binary hybrid options. This analysis concluded that, of the configurations evaluated, a dual-stage flash steam cycle provides the lowest capital costs per unit net power generation with an acceptable hot brine inlet fluid flow rate. The evaluation included the power plant cost estimate, the cost and number of wells and the associated parasitic loads. Annual power generation performance was simulated to evaluate capacity factor and LCOE. The LCOE calculated for the inherently high capacity GeoTES system was $\$$0.13/kWhe. This value was calculated for the case where the solar thermal collector was sized in such a way that the solar collectors permitted an annual power plant capacity factor of up to 97%. The power cycle was able to provide power to the grid every night of the year, and flexible base-load power during the winter, if needed. This LCOE value compares favorably with reported values for solar photovoltaic plus battery energy storage (PV+BES) systems in the open literature, i.e. $\$$0.148/kWhe for a PV+BES system with 4 hours of electrochemical battery energy storage capacity. Addition of battery energy storage with more hours of storage would further increase PV+BES system LCOE and increase the separation between GeoTES and PV+BES. A GeoTES system would therefore provide superior economics for high capacity and long duration solar energy storage.

14 SOLAR ENERGY↗

On High-Temperature Dynamometer Test Stand Development

RePED is a novel prototype alternator that has been designed and built to operate at 35 kW under 250 degrees C ambient temperature conditions. The operating efficiency will be measured using a 225-kW motor to drive the machine in a back-to-back configuration. The goal is to determine if the RePED alternator can deliver 35 kW at a rotational speed of 1,000 rpm while operating in 250 degrees C ambient temperature and have a minimum efficiency of 60%. Dynamometer testing of a high-temperature alternator for geothermal drilling presents several unique challenges, especially around maintaining and managing the various sources and types of energy passing through the system without impacting data quality. The objectives of this report are to (1) describe the test stand in detail, the relative orientation of each major component, and the data acquisition system and (2) discuss the behavior of the test stand components such that this report can serve as a reference document for future projects.

15 GEOTHERMAL ENERGY↗

SDOM (Storage Deployment Optimization Model) [SWR-21-73]

SDOM is designed to accurately represent the operation of energy storage across different timescales, including long-duration and seasonal applications, and the spatiotemporal diversity and complementarity among VRE sources. SDOM uses an hourly temporal resolution, a fine spatial resolution for VRE sources, and a 1-year optimization window. SDOM assumes that all builds of VRE are accompanied by sufficient additional transmission capacity to allow full utilization of these additional resources. Nuclear, hydropower, and other renewable generation (e.g., biomass and geothermal energy sources) are fixed based on operational data (time series) for a given year; thus, SDOM minimizes total system cost using conventional generators as balancing units and using VRE and storage technologies to achieve a user-defined carbon-free or renewable energy target. The total system cost includes capital costs, fixed operation-and-maintenance (FO&M) costs, variable operation-and-maintenance (VO&M) costs, and fuel cost for power generation and storage technologies.

Guerra Fernandez, Omar Jose↗

Hybrid Uses of High-Temperature Reservoir Thermal Energy Storage: Lessons Learned from Previous Projects

One of the critical challenges of the green energy transition is resolving the mismatch between energy generation provided by intermittent renewable energy sources such as solar and wind and the demand for energy. There is a need for large amounts of energy storage over a range of time scales (diurnal to seasonal) to better balance energy supply and demand. Subsurface geologic reservoirs provide the potential for storage of hot water that can be retrieved when needed and used for power generation or direct-use applications, such as district heating. It is important to identify potential issues associated with high-temperature reservoir thermal energy storage (HT-RTES) systems so that they can be mitigated, thus reducing the risks of these systems. This paper reviews past experiences from moderate and high-temperature reservoir thermal energy storage (RTES) projects, along with hot water and steam flood enhanced oil recovery (EOR) operations, to identify technical challenges encountered and evaluate possible ways to address them. Some of the identified technical problems that have impacted system performance include: 1) insufficient site characterization that failed to identify reservoir heterogeneity; 2) scaling resulting from precipitation of minerals having retrograde solubility that form with heating of formation brines; 3) corrosion from low pH or high salinity brines; 4) thermal breakthrough between hot and cold wells due to insufficient spacing. Proper design, characterization, construction, and operational practices can help reduce the risk of technical problems that could lead to reduced performance of these thermal energy storage systems.

energy storage↗

National Certification Standard for Ground Source Heat Pump Personnel

The National Certification Standard for the Geothermal Heat Pump Industry adds to the understanding of the barriers to rapid growth of the geothermal heat pump (GHP) industry by bringing together for the first time an analysis of the roles and responsibilities of each of the individual job tasks involved in the design and installation of GHP systems. The standard addresses applicable qualifications for all primary personnel involved in the design, installation, commissioning, operation and maintenance of GHP systems, including their knowledge, skills and abilities. The resulting standard serves as a foundation for subsequent development of curriculum, training and certification programs, which are not included in the scope of this project, but are briefly addressed in the standard to describe ways in which the standard developed in this project may form a foundation to support further progress in accomplishing those other efforts. Follow-on efforts may use the standard developed in this project to improve the technical effectiveness and economic feasibility of curriculum development and training programs for GHP industry personnel, by providing a more complete and objective assessment of the individual job tasks necessary for successful implementation of GHP systems. When incorporated into future certification programs for GHP personnel, the standard will facilitate increased consumer confidence in GHP technology, reduce the potential for improperly installed GHP systems, and assure GHP system quality and performance, all of which benefit the public through improved energy efficiency and mitigated environmental impacts of the heating and cooling of homes and businesses.

15 GEOTHERMAL ENERGY↗

REopt Lite Geothermal Heat Pump Design Requirements

This document describes the design requirements for the geothermal heat pump (GHP) module being added to the existing REopt Lite web tool. This document describes the purpose, users, and functional requirements to which the modified web tool shall conform. This document will be revised, as required, throughout the development phase with consensus between the Department of Energy (DOE) Geothermal Technologies Office (GTO) and NREL. The GHP module will expand existing REopt Lite capabilities to include techno-economic optimization of GHP systems, either stand alone, or integrated with the other existing technology types, namely solar photovoltaics (PV), wind power, battery energy storage, thermal energy storage, combined hear and power (CHP), and absorption chiller. Included in this submission are links to the REopt Lite web tool and open-source Git-Hub page. The REopt Lite tool can also be accessed directly via the NREL Developer Network. A link is also provided for the REopt report that overviews the module's capabilities.

15 GEOTHERMAL ENERGY↗

Utah FORGE: Seismic Event Catalogue from the April, 2022 Stimulation of Well 16A(78)-32

This dataset includes earthquake catalogues for the three stages of the 2022 well 16A(78)-32 stimulation provided by Geo Energie Suisse. Events in these catalogues have been visually inspected. There are additional events of lower signal to noise that were automatically detected. Those events will require additional analysis and processing. Times are recorded in UTC (Coordinate Universal Time), and the coordinate reference system is UTM Zone 12N, NAD83.

15 GEOTHERMAL ENERGY↗

Utah FORGE: Updated Seismic Event Catalogue from the April, 2022 Stimulation of Well 16A(78)-32

These are revised catalogs, related to the April, 2022 well 16A(78)-32 stimulation (phases 1,2, & 3), provided by Geo Energie Suisse (GES) that include additional events at the start of Stage 1 and some tidying up of some locations. These catalogs also include events for additional events that were auto-located to provide a larger dataset for statistical analyses, like b-value calculations. The actual auto-locations have been removed to prevent spurious location plots being created. Times are recorded in UTC (Coordinate Universal Time), and the coordinate reference system is UTM Zone 12N, NAD83.

15 GEOTHERMAL ENERGY↗

Crump Geyser Exploration and Drilling Project. High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling

The Crump Geyser Exploration and Drilling Project – High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling ran from January 29, 2010 to September 30, 2013. During Phase 1 of the project, collection of all geophysical surveys was completed as outlined in the Statement of Project Objectives. In addition, a 5000-foot full sized exploration well was drilled by Ormat, and preexisting drilling data was discovered for multiple temperature gradient wells within the project area. Three dimensional modeling and interpretation of results from the geophysical surveys and drilling data gave confidence to move to the project into Phase 2 drilling. Geological and geophysical survey interpretations combined with existing downhole temperature data provided an ideal target for the first slim-hole drilled as the first task in Phase 2. Slim-hole 35-34 was drilled in September 2011 and tested temperature, lithology, and permeability along the primary range-bounding fault zone near its intersection with buried northwest-trending faults that have been identified using geophysical methods. Following analysis of the results of the first slim-hole 35-34, the second slim hole was not drilled and subsequent project tasks, including flowing differential self-potential (FDSP) surveys that were designed to detail the affect of production and injection on water flow in the shallow aquifer, were not completed. NGP sold the Crump project to Ormat in August 2014, afterwards, there was insufficient time and interest from Ormat available to complete the project objectives. NGP was unable to continue managing the award for a project they did not own due to liability issues and Novation of the award was not a viable option due to federal award timelines. NGP submitted a request to mutually terminate the award on February 18, 2015. The results of all of the technical surveys and drilling are included in this report. Fault interpretations from surface geology, aeromag, seismic, and gravity data sets are in good agreement, illustrating two or more major range-bounding faults and buried northwest trending faults. The intersections of these fault systems provide the primary targets for drilling.

15 GEOTHERMAL ENERGY↗