Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fermilab”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Cavity Processing and Preparation of 650 MHz Elliptical Cell Cavities for PIP-II

The PIP-II project at Fermilab requires fifteen 650 MHz SRF cryomodules as part of the 800 MeV LINAC that will provide a high intensity proton beam to the Fermilab neutrino program. A total of fifty-seven high-performance SRF cavities will populate the cryomodules and will operate in both pulsed and continuous wave modes. These cavities will be processed and prepared for performance testing utilizing adapted cavity processing infrastructure already in place at Fermilab and Argonne. The processing recipes implemented for these structures will incorporate state-of-the art processing and cleaning techniques developed for 1.3 GHz SRF cavities for the ILC, XFEL, and LCLS-II projects. This paper describes the details of the processing recipes and associated chemistry, heat treatment, and cleanroom processes at the Fermilab and Argonne cavity processing facilities. This paper also presents single and multi-cell cavity test results with quality factors above 5·10¹⁰ and accelerating gradients above 30 MV/m.

43 PARTICLE ACCELERATORS↗

Project X: Accelerator Reference Design

Project X is a high-intensity proton facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Project X is an integral part of the U.S. Intensity Frontier Roadmap as described in the P5 report of May 2008 [1] and within the Fermilab Strategic Plan of November 2011 [2]. This document represents Part I of the “Project X Book” describing the Project X accelerator facility and the broad range of physics research opportunities enabled by Project X. Parts II and III provide in-depth descriptions of the physics research program, both within and beyond particle physics [3]. The primary elements of the U.S. program to be supported by Project X include: Neutrino Experiments: Experimental studies of neutrino oscillations and neutrino interaction physics with ultra-intense neutrino beams provided by a high-power proton source with energies up to 120 GeV, utilizing near detectors at the Fermilab site and massive detectors at distant underground laboratories. Goal: At least 2 MW of proton beam power at any energy between 60 to 120 GeV; several hundred kW of proton beam power on target at 8 GeV. Kaon, Muon, Nucleon, and Neutron Precision Experiments: World-leading experiments studying ultra-rare kaon decays, searching for muon-to-electron conversion and nuclear electron dipole moments (EDMs), and exploring neutron properties at very high precision. Goal: MW-class proton beams supporting multiple experiments at 1 and 3 GeV, with flexible capability for providing distinct beam formats to concurrent users while allowing simultaneous operations with the neutrino program. Material Science and Nuclear Energy Applications: High-intensity accelerator, spallation, target and transmutation technology demonstrations will provide critical input into the design of future energy systems, including next generation fission reactors, nuclear waste transmutation systems and future thorium fuel-cycle power systems. Possible applications of muon spin rotation techniques provide sensitive probes of the magnetic structure of materials. Goal: Provide MW-class proton beams at 1 GeV, coupled with novel targets required to support a broad range of materials science and energy applications. Platform for Evolution to Future Frontier Facilities: A high-intensity proton source will strengthen and modernize the Fermilab injector complex, providing a robust platform upon which to build future frontier facilities. The Neutrino Factory and Muon Collider are examples that would provide world-leading capabilities at the Intensity and Energy Frontiers for many decades to come. Goal: Provide a straightforward upgrade path for a 4 MW, low-duty-factor source of protons at energies between 5 and 15 GeV. These four elements are expected to form the basis of the Mission Need statement required for the Department of Energy (DOE) Critical Decision 0 (CD-0), and represent the fundamental design criteria for Project X. The following chapters present the Reference Design for the Project X accelerator facility. The Reference Design is based on a continuous wave (CW) superconducting (SC) linac providing up to 1 and 3 MW of beam power at 1 and 3 GeV respectively. A pulsed linac provides acceleration of roughly 4% of the beam delivered from the CW linac to the 8 GeV injection energy of the existing Recycler/Main Injector complex. Upgrades to the Recycler and Main Injector support a factor of three increase, beyond current capabilities, in proton beam power at 60 to 120 GeV. The Reference Design represents a facility that will be unique in the world with unmatched capabilities for the delivery of very high beam power, with flexible beam formats, to multiple users at multiple energies. The utilization of linacs within the Project X facility enables capabilities beyond what is achievable with circular accelerators. It is anticipated that the final configuration and operating parameters of the complex will be further refined through the R&D program in advance of CD-2.

Holmes, Stephen D.↗

Tests of a high rate pixel detector for CMS upgrade

This is a Technical Scope of Work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of the CMS Pixel group, which consists of individuals from the Bristol University, CERN, Fermilab, Rutherford Laboratory (UK), and National Taiwan University who have committed to participate in beam tests to be carried out during the 2013 - 2014 Fermilab Test Beam Facility program. The TSW is intended solely for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this TSW to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. This TSW fulfills Article 1 (facilities and scope of work) of the User Agreements signed (or still

43 PARTICLE ACCELERATORS↗

Optimization of Helium Vessel Design for ILC Cavities

The ILC (International Linear Collider) is a proposed new major particle accelerator. It consists of two 20 km long linear accelerators colliding electrons and positrons at an energy exceeding 500 GeV, Achieving this collision energy while keeping reasonable accelerator dimensions requires the use of high electric field superconducting cavities as the main acceleration element. These cavities are operated at l.3 GHz inside an appropriate container (He vessel) at temperatures as low as 1.4 K using superfluid Helium as the refrigerating medium. The purpose of this thesis, in the context of the ILC R&D activities currently in progress at Fermilab (Fermi National Accelerator Laboratory), is the mechanical study of an ILC superconducting cavity and Helium vessel prototype. The main goals of these studies are the determination of the limiting working conditions of the whole He vessel assembly, the simulation of the manufacturing process of the cavity end-caps and the assessment of the Helium vessel's efficiency. In addition this thesis studies the requirements to certify the compliance with the ASME Code of the whole cavity/vessel assembly. Several Finite Elements Analyses were performed by the candidate himself in order to perform the studies listed above and described in detail in Chapters 4 through 8. ln particular the candidate has developed an improved procedure to obtain more accurate results with lower computational times. These procedures will be accurately described in the following chapters. After an introduction that briefly describes the Fennilab and in particular the Technical Division (where all the activities concerning with this thesis were developed), the first part of this thesis (Chapters 2 and 3) explains some of the main aspects of modem particle accelerators. Moreover it describes the most important particle accelerators working at the moment and the basic features of the ILC project. Chapter 4 describes all the activities that were done to certify the compliance of the Helium vessel and the cavity to the ASME code standard. After briefly recalling to the main contents of the the ASME Code (Sections II and Vlll - Division ll), the procedure used for finding all relevant stresses and comparing the obtained results with the maximum values allowed are explained. This part also includes the buckling verification of the cavity. In Chapter 5 the manufacturing process of the cavity end-caps, whose function is to link the Helium vessel with the cavity, is studied. The present configuration of the dies is described and the manufacturing process is simulated in order to explain the origin of some defects fol.llld on real parts. Finally a new design of the dies is proposed and the resulting deformed piece is compared with the design requirements. Chapter 6 describes a finite elements analysis to assess the efficiency and the stiffness of the Helium vessel. Furthermore the results of the optimization of the Helium vessel (in order to increase the value of the efficiency) are reported. The same stiffness analysis is used in Chapter 7 for the Blade-Tuner study. After a description of this tuner and of its function, the preliminary analyses done to confirm the results provided by the vendor are described and then its limiting load conditions are found. Chapter 8 shows a study of the resistance of all the welds present in between the cavity and the end-cap and between the end-caps and the He vessel for a smaller superconducting cavity operating at 3.9 GHz. Finally Chapter 9 briefly describes some R&D activities in progress at INFN (Section of Pisa) and Fermilab that could produce significant cost reductions of the Helium vessel design. All the finite elements analyses contained and described in this thesis made possible the certification of the whole superconducting cavity-Helium vessel assembly at Fermilab. Furthermore they gave several useful indications to the Fermilab staff to improve the performance of the Helium vessel by modifying some design parameters or refining the manufacturing processes.

43 PARTICLE ACCELERATORS↗

Magnetic field map for T977 tertiary beam

This note describes the final magnetic field model and a simplified momentum reconstruction and its uncertainties being used for the analysis of the 2010 data for T977 (MINERvA test beam ex- periment) at the Fermilab Test Beam Facility. The results from analysis of those data are published in “MINERvA neutrino detector response measured with test beam data,” [Aliaga et al.(2015)] which has open access availability, and is also available as arXiv:1501.06431. The beamline used for this experiment was designed by MINERvA in collaboration with experts at the Fermilab Test Beam Facility. Support for constructing the beamline was provided by Fermilab, including support to MINERvA personnel and also a wide range of technical help from across Fermilab.

43 PARTICLE ACCELERATORS↗

SNOLAB Deep Underground Scientific Research Operations

Investigations at the frontiers of particle physics are driving key experiments deep underground to escape cosmic-rays and other backgrounds that overwhelm sensitive searches for dark matter, exotic particles, and neutrino properties. The international neutrino physics community has come together to develop the Deep Underground Neutrino Experiment (DUNE), a leading-edge experiment for neutrino science and proton decay studies. This experiment, together with the facility that will support it, the Long Baseline Neutrino Facility (LBNF), will be an internationally designed, coordinated and funded program, hosted at Fermilab in Batavia, Illinois. The DUNE experimental facility will be sited deep underground (1.5km) at Sanford Underground Research Facility (SURF) in Lead, SD, and will become the deepest experimental facility operated by Fermilab. SNOLAB is a unique world-class international facility for deep underground scientific research. Located 2 km underground near Sudbury, Ontario, SNOLAB hosts a suite of surface facilities and laboratories. The science program at SNOLAB is primarily focused on subatomic and astroparticle physics, specifically the search for dark matter and neutrino studies. As the second-deepest underground lab facility, SNOLAB has gained considerable experience in deep underground scientific research operations. The purpose of this agreement is to leverage the unique capabilities of both Fermilab and SNOLAB to accomplish the following: Provide Fermilab with additional, direct experience in deep underground scientific research operations at SNOLAB to help improve the operational support for SURF. Provide SNOLAB with an experienced leader to serve as Interim Associate Director for Program Integration & Operations, while SNOLAB conducts its search for a permanent hire.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

QuarkNet Center Summer Programs

The purpose of this CRADA is to provide the contractual vehicle for Fermilab to receive funds from Notre Dame in support of the QuarkNet Local Programs that are managed by Fermilab. Local QuarkNet Centers provide professional development programs to high school teachers and high energy physics research opportunities to high school teachers and students who participate in the local programs. Fermilab administers a local program that combines two QuarkNet Centers, for Fermilab and the University of Chicago.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

AASC Coated Cavities

The price of niobium is a significant part of the cost of superconducting RF cavity production. One route to significant cost reduction is to use cavities that have a thin layer of niobium deposited on a less expensive substrate. However, to date, all attempts to use thin films of niobium in superconducting RF cavities have resulted in cavity performance that does not meet the requirements for modern linear accelerators. Fermilab will provide two (2) cavities to AASC. AASC will coat the two (2) cavities with niobium using its high-purity deposition method. AASC will return the coated cavities to Fermilab for Quality Assurance (QA) testing. If the coatings pass preliminary QA tests performed at Fermilab, they will be subjected to RF testing at Fermilab and their performance will be evaluated relative to solid niobium cavities.

43 PARTICLE ACCELERATORS↗

Vertical Testing of Eco-Friendly Bipolar Electromechanical Bulk Processing of SRF Cavities

Fermilab will provide a single-cell 1.3 GHz RF cavity and niobium coupons for Faraday Technology to use to develop the bulk bi-polar electropolishing process. The RF cavity will remain Fermilab property. Phase I will first demonstrate the feasibility of the process on coupons to optimize Bipolar EP process parameters to achieve niobium removal rates that are compatible with bulk processing throughput rates, while maintaining desired surface finishes. Subsequently in Phase I, we will transition the Bipolar EP process from coupons to bulk processing of single-cell cavities, while maintaining the desired removal rates. The project team will determine the performance effect of the Bipolar EP Bulk Process via cavity testing, and develop a preliminary economic analysis showing the commercial viability of the technology as compared to conventional practice. Under this CRADA, Fermilab provided a 1.3 GHz RF cavity to Faraday Technology to use for acid-free electropolishing studies. The original scope of work provided for up to two tests of the electropolished cavity in Fermilab’s Vertical Test Stand (VTS).

43 PARTICLE ACCELERATORS↗

The Mu2e Experiment (Final Technical Report)

This is the final technical report for the initial two year funding period to start a new collaboration group at the University of California Davis for the Mu2e Experiment at Fermilab. The goal if the Mu2e Experiment is to search for the conversion to an electron of a muon that has been captured by an aluminum nucleus. While this process is effectively forbidden in the Standard Model, it is a virtually universal feature of models beyond the Standard Model. Mu2e will probe the reaction with a sensitivity that is roughly four orders of magnitude better than the best previous measurement. This range of sensitivity probes most of the parameters space of supersymmetry, and any signal will be unambigious proof of physics beyond the Standard Model. Professor Prebys was one of the founding members and first spokespersons of the Mu2e Experiment during his time af Fermilab. He came to UC Davis in 2017 with the goal of starting a Mu2e collaborating group here, and this grant has funded that effort. Specifically, in addition to summer salary, it has supported a graduate student and a postdoc, both of whom are now permanently stationed at Fermilab. During this time, their work has focused primarily on the understanding to the formation of the proton bunches in Fermilab Recycler, as this is critical to the experiment. This has included both measurements and simulations.

43 PARTICLE ACCELERATORS↗

Physics Opportunities at a Beam Dump Facility at PIP-II and Beyond

The accelerator complex at Fermilab is currently undergoing improvements which will increase the available beam power to the complex and is known as Proton Improvement Plan-II (PIP-II). The PIP-II Linac is slated for operation near the end of this decade and will be the main proton driver for Fermilab experiments moving forward and provide the beam to LBNF/DUNE. However, the DUNE physics program requires only ~1% of the available protons provided by PIP-II. The Accelerator Complex Enhancement, or ACE, will provide further up grades in the 2030s in the form of increased power to LBNF along with a replacement for the Fermilab Booster which could also include an accumulator ring. A workshop was recently held at Fermilab in order to explore the physics possible when PIP-II is coupled with a fixed target or beam dump. The beam dump scenario pro vides an exciting opportunity to search for dark sector physics across detector threshold energy scales with examples being accelerator-produced dark matter, active-to-sterile neutrino oscillations, millicharged parti cles, and axion-like particles, which can be produced in the proton collisions with a fixed target. Additionally, experiments located at a PIP-II facility that is coupled to an accumulator ring would also be able to study coherent elastic neutrino-nucleus scattering, or CEvNS. In this talk, I will summarize the physics possible at a PIP-II beam dump facility and sensitivities to different dark sector physics and other beyond the Standard Model searches with detector concepts spanning from an eV-scale to MeV-scale detection threshold.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Degradation of Poly- and Perfluoroalkyl Substances (PFAS) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of the 2-year workplan was to see if electron beam (EB) could be used to break down a sub-set of the larger chemical family of per and polyfluoroalkylated substances (PFAS) in an energy efficient and economical manner when compared to conventional water treatment technologies. Year one (Y1) work focused on sample EB treatment work in the Fermi National Accelerator Laboratory’s (FNALs) Accelerator Applications Demonstration and Development (A2D2) EB accelerator. While there are reportedly thousands of types of PFAS, for the point of most of the work herein, a small subset was examined, typically perfluorooctane sulfonate (PFOS) and perfluorooctanoate (PFOA). PFOA and PFOS are two of the most well studied PFAS and are studied for baseline evaluations and are considered most useful. The work from Y1 provided information about the optimal operating parameters and additives to use when treating PFOS and PFOA via EB. The data were then used to see where in a water treatment system an EB accelerator would be best suited to treat PFAS. A conventional water treatment technology, GAC, was then compared to e-beam treatment technology with respect to energy and costs for treatment. In year two (Y2), several conventional e-beam accelerator designs, and FNAL’s developmental compact SRF accelerator design, were evaluated for their suitability in PFAS treatment, from an energy efficiency and cost standpoint. Several EB parameters were evaluated and optimized for the removal of PFOA and PFOS from water at normal pressure and temperature, measured as total PFAS removal. Under the optimized test conditions both PFOA showed complete destruction to inorganic fluoride, and PFOS to inorganic fluoride and sulfate, with mass balance. The effect on PFAS removal relative to solution pH, total EB dose, EB dose rate, dissolved oxygen concentration (DO), temperature, and initial PFAS concentration were evaluated. In general, PFOA was easier to destroy than PFOS. Degradation products, typically observed under less-than-optimal EB conditions, provided insight to degradation mechanisms. Products were identified to rule out possible deleterious biproduct formation. The water radiolysis radical reaction kinetics with PFOS and PFOA were not dependent on the initial concentration over 5-orders of magnitude from 2 μg/L to 20 mg/L. This is thought to be because there was an overabundance of the reactive water radiolysis radicals relative to PFAS molecules and largely attributed to aqueous electrons. The reaction rates appeared to be diffusion limited. Testing at higher concentrations (100-200 mg/L) showed a decrease in removal efficiency, suggesting alternative kinetics, possibly second order rates, at higher concentrations. In all, we successfully defined a set of optimal EB parameters to treat PFOA and PFOS at concentrations of 20 mg/L in water with destruction efficiencies near 100%. We further tested the optimized EB parameters with other types of PFAS, including shorter and longer fluorocarbon chain homologs of PFOA and PFOS, and PFAS with alternative functional groups such as sulfonamides. Based on our results EB can be optimized as an effective destructive technology for removing PFAS from water. The conditions optimized for PFOA and PFOS were less effective with ultra-short fluorocarbon compounds like TFMS, PFES, PFPS and PFBS, and likely require re-optimization of parameters to them. In all, it was determined that from a cost and energy efficiency standpoint, EB would be best applied to waste streams with relatively high concentrations of PFOS and PFOA and is not as cost effective as GAC treatment for removing low concentrations of PFAS from water. Higher concentrations of PFAS can be found in the wastewater of conventional treatment processes such as RO and IE and therefore EB may be used to supplement such treatment technologies. Some real-world IE regeneration wash water and RO reject water containing higher concentrations of PFAS and obtained from pilot scale industrial wastewater treatment system at a fluorochemical manufacturing facility, showed that EB could remove PFAS from such types of wastewaters. The IE regenerant wash water appeared to be the most efficient of the two types of wastewaters tested. However, some further optimization of the EB parameters for the specific PFAS types present in those wastewaters may be required. Also, the effects of co-present TOC and mineral salts should be considered during such optimization efforts. From the experimental Y1 results it was seen that the aqueous electron drives degradation of the PFAS. In a hypothetical water treatment skid using EB for PFAS destruction the parameters of the system should be optimized to promote aqueous electron production. Before EB treatment, the PFAS should be preconcentrated when possible, the pH should be raised to pH 10 or higher to enhance aqueous electron production, and the water should be nitrogen purged to remove dissolved oxygen to minimize aqueous electron scavenging. An excel spreadsheet was created that calculates optimal conditions based on inlet PFAS concentration and desired outlet concentration, by optimizing the accelerator power, dose rate, water treatment rate, pH and dissolved oxygen levels to reach the desired endpoint. Given this information on accelerator operating conditions five different EB accelerator systems were compared. One EB system was a continuous-wave, linear superconducting accelerator being designed at Fermilab. Three other EB systems (IMPELA at 5% and 25% duty factor and the ILU-14) were normal conducting pulsed linear accelerators. The fifth system was an IBA Rhodotron which is a normal conducting, circular, continuous-wave accelerator. The accelerator efficiency (% of the incoming power that is used in water treatment) was the dominating factor in accelerator choice. The radio frequency (RF) power supply and the accelerator design (superconducting versus warm technology) drive the accelerator efficiency. The IBA Rhodotron was seen to be the most energy efficient commercially available technology with a wall-plug (total) power efficiency of 43% at 400 kW. The Fermilab design, with a prototype for a different application currently being fabricated, was the most energy efficient at 55% when driven by a Klystron RF power supply and as high as 77% when powered by a magnetron. As the Fermilab design was the most energy efficient by approximately 10-30%, further design work was done on the accelerator and beam delivery system specific to the destruction of PFAS in water. The Fermilab design is unique from industrial accelerators in that is superconducting. Superconducting technology allows for the acceleration of electrons without losses. The accelerator must be cooled to below the point where it is superconducting and is operated around 4 degrees Kelvin. The bulk of the design work for the accelerator is on making the accelerator as energy efficient as possible so that it does not require liquid helium and can be cooled with conduction cooling via cryocoolers. Final design work resulted in an EB accelerator that would operate at minimally 200 kW and 10 MeV. Prototype construction would cost $\$ $7.8 million dollars when driven by a Klystron power supply. A second version of the same accelerator would cost $\$ $5.5 million dollars when driven by a magnetron that is still under development. The commercially available 300 kW IBA Rhodotron cost was estimated at approximately $\$ $9 million. While it is hard to directly compare, an operational GAC system used by 3M for groundwater treatment capital cost (2022 dollars) was estimated to cost $\$ $3.3 million. While the capital expense of the EB accelerator systems was higher than GAC, the accelerator EB treatment would result in destruction of the PFAS and not just sequestration of PFAS to form a new waste stream that requires further treatment or disposal. The operating cost to destroy the PFAS via 400 kw EB system was less than $\$ $1000/kg of PFAS destroyed when treating at a 20 mg/L PFAS concentration, compared to GAC with operating costs that calculated at $\$ $27,530 per kg of PFAS sequestered when treating 100 μg/L PFOA and PFOS combined concentration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Technology Transfer from Fermi Research Alliance to Itasca Plastics for the purpose of Commercializing Scintillator Material

Researchers at the Fermi National Accelerator Laboratory (Fermilab) developed extruded plastic scintillator in the late 1990s, which was first used in the D-Zero experiment. Extruded plastic scintillator is currently produced at Fermilab and is used in particle detectors worldwide. The purpose of this CRADA is to transfer the knowledge related to the Fermilab extrusion process to Itasca Plastics, Inc. (Itasca Plastics). Much of this knowledge is contained in documentation that is in the public domain, although it is distributed over several communications (papers, conference records, etc.) and over several years. Under this CRADA Fermilab will assemble the information, provide it to Itasca Plastics and provide limited consulting to complete the knowledge transfer. If the transfer is successful, Itasca Plastics will be able to establish a U.S. commercial manufacturing capability for extruded scintillator material that can be used for high energy physics and commercial applications.

36 MATERIALS SCIENCE↗

Memorandum of Understanding for the 2010 Meson Test Beam Program T-995: Muon Detector / Tail Catcher R&D

This is a memorandum of understanding between the Fermi National Accelerator Laboratory and experimenters from Fermilab, Indiana University, Northern Illinois University, University of Notre Dame, Wayne State University, INFN (Trieste / Udine, Roma I, Padova, Ferrara) who have committed to participate in beam tests to be carried out during the 2010 MTBF pro gram. The memorandum is intended solely for the purpose of providing a budget estimate and a work allocation for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties. However, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to negotiate amendments to this memorandum which will reflect such required adjustments. The test objectives are to continue the development of extruded scintillator-based muon counters begun in T-956 with emphasis on the use of Si Pixelated Photon Detectors (PPDs). The R&D program outlined here continues the T-956 studies using particle beams to test long strip counters, up to 6m, and new prototype TB4 electronics developed at Fermilab which the experimenters expect will lead to the assembly of future large-scale integrated systems that may be the subject for a future proposal. For the purpose of this work, T-995 will require limited space and resources which may be compatible with other users' equipment in the testing area. The T-995 experimenters may not always require control of the beam. The T-995 experimenters will use some of the same apparatus that is to be used by the experimenters who will study total absorption dual readout calorimetry at MTest (experiment T-1004). The T-995 and T-I004 experimenters both use newly designed Fermilab electronics to digitize the shape of the PPD pulse corresponding to the scintillator output. Both projects will share most of the data acquisition software and typically they will share the same beam instrumentation (beam defining counters and coincidence circuits). Both sets of experimenters will share some of the same counting house logic and analysis software for on-line data analysis. Some of the T-995 and T-I004 manpower available to the two projects will work on both projects although many of the studies will not run concurrently.

43 PARTICLE ACCELERATORS↗

Long Baseline Neutrino Facility (LBNF) Corrector Magnets

The Long Baseline Neutrino Facility (LBNF) includes at the Fermi National Accelerator Laboratory (Fermilab) site a Beamline which will aim neutrinos towards massive detectors at the Sanford Underground Research Facility (SURF) at South Dakota. The neutrinos will be created by a beam of 60-120 GeV protons extracted from Fermilab’s Main Injector interacting with a target located in the end of the LBNF proton beamline. The design of the proton beamline involves 79 conventional magnets; 23 are corrector magnets. These correctors are of a new design which evolved from those built for the Fermilab Main Injector. Following the production of a prototype corrector magnet by the Institute of High Energy Physics (IHEP) and its testing by both IHEP and Fermilab, IHEP will procure the materials for the 24 (including one spare) corrector magnets needed by the LBNF proton beamline; then, will build, test and certify them

43 PARTICLE ACCELERATORS↗

T-1073: 2016 Precision Beam Timing Monitor

This is a technical scope of work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of Fermilab, Northern Illinois University (NIU), Lewis University, and Purdue University, who have committed to participate in beam tests to be carried out during the 2015-2016 Fermilab Test Beam Facility program. The TSW is intended primarily for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this scope of work to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. This TSW fulfills Article 1 (facilities and scope of work) of the User Agreements signed (or still to be signed) by an authorized representative of each institution collaborating on this experiment.

43 PARTICLE ACCELERATORS↗

High Precision Magnetic Field Measurement for the Muon g-2 Experiment

The Muon g-2 experiment at Fermilab will measure the anomalous magnetic moment of the muon, aµ with a precision of 140 ppb, a four-fold improvement over the former BNL E821 result. If the current discrepancy of about 3.5σ between the Standard Model value for aµ and the former experiments was real, then the new experiment would verify the deviation with >7σ significance. The experiment uses muons with the magic momentum of 3.09 GeV/c stored in a very homogeneous magnetic field of a 45 m long storage ring. The determination of aµ requires the precise knowledge of both the anomalous muon spin precession, ωa, and the magnetic field, ωp, expressed in terms of the free-proton Larmor frequency. The field measurement uses the high precision tool of pulsed Nuclear Magnetic Resonance (pNMR) and requires cross-calibrating a set of probes: a very accurate NMR probe calibrates the 17 probes on the in-vacuum field mapping system (the so-called trolley). This trolley in turn is used to map the field over the full azimuth of the storage ring. The trolley measurement also provides the calibration of the 378 fixed probes around the ring that constantly monitor the field drift. This article presents the summary of the entire field measurement system needed to determine ωp. This work was supported in part by the US DOE, Fermilab and US DOE OHEP under contract No. KA2201020.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Radiation Damage Studies on Titanium Alloys as High Intensity Proton Accelerator Beam Window Materials

A high-strength dual a+ß phase titanium alloy Ti–6Al–4V is utilized as a material for beam windows in several accelerator target facilities. However, relatively little is known about how material properties of this alloy are affected by high-intensity proton beam irradiation. With plans to upgrade neutrino facilities at J-PARC and Fermilab to over 1 MW beam power, the radiation damage in the window material will reach a few displacements per atom (dpa) per year, significantly above the ~0.3 dpa level of existing data. The international RaDIATE collaboration, Radiation Damage In Accelerator Target Environments, has conducted a high intensity proton beam irradiation of various target and window material specimens at Brookhaven Linac Isotope Producer (BLIP) facility, including a variety of titanium alloys. Post-Irradiation Examination (PIE) of the specimens in the 1st capsule, irradiated at up to 0.25 dpa, is in progress. Tensile tests in a hot cell at Pacific Northwest National Laboratory (PNNL) exhibited a clear signature of radiation hardening and loss of ductility for Ti–6Al–4V, while Ti–3Al–2.5V, with less ß phase, exhibited less severe hardening. Microstructural investigations will follow to study the cause of the difference in tensile behavior between these alloys. High-cycle fatigue (HCF) performance is critical to the lifetime estimation of beam windows exposed to a periodic thermal stress from a pulsed proton beam. The first HCF data on irradiated titanium alloys are to be obtained by a conventional bend fatigue test at Fermilab and by an ultrasonic mesoscale fatigue test at Culham Laboratory. Specimens in the 2nd capsule, irradiated at up to ~1 dpa, cover typical titanium alloy grades, including possible radiation-resistant candidates. These systematic studies on the effects of radiation damage of titanium alloy materials are intended to enable us not only to predict realistic lifetimes of current beam windows made of Ti–6Al–4V, but also to extend the lifetime by choosing a more radiation and thermal shock tolerant alloy with a preferable heat treatment, or even by developing new materials.

Titanium Alloy, Beam Window, Proton Beam, Radiatio↗