Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Training on Transport Security of Nuclear/Radioactive Materials for Key Audiences - 16149

Beginning in 2013, the U.S. Department of Energy (DOE) Packaging Certification Program, Office of Packaging and Transportation, Office of Environmental Management has sponsored a series of three training courses on Security of Nuclear and Other Radioactive Materials during Transport. These courses were developed and hosted by Argonne National Laboratory staff with guest lecturers from both the U.S. and international organizations and agencies including the U.S. Nuclear Regulatory Commission, the Federal Bureau of Investigation, DOE, the National Nuclear Security Administration, DOE national laboratories, the International Atomic Energy Agency, the World Nuclear Transport Institute, and the World Institute for Nuclear Security. Each of the three courses held to date were one week in length. Significant lessons were learned, and have been used to improve the courses as time progressed, along with inclusion of new materials, new exercises, and the use of an advanced electronic voting system that greatly enhanced class interactions. Two options are being considered for adapting the training materials for key audiences in the future: A two-week university credit training course and customized courses for key audiences who may have specific training needs. This paper highlights the lessons learned in previous one-week courses, and discusses the options for university-credit and customized courses/workshops for key audiences. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

What's in WIPP? Packaging TRU Waste to Enhance WIPP's Capacity - 16515

Beginning in 1999, and continuing for 15 years, the US DOE Waste Isolation Pilot Plant (WIPP) repository successfully disposed of defense Transuranic (TRU) waste. Six of the originally planned ten disposal panels were filled before two unrelated accidents temporarily halted disposal operations in February 2014. Based on counting the gross volume of all containers emplaced in WIPP to date, a little more than half of the legislated volume capacity has been subscribed (91,000 cubic meters). This paper describes the many different packaging configurations that have been used to ship TRU waste to WIPP, and makes observations that may enhance the repository capacity when shipments resume. The contents of shipments to WIPP are limited by many requirements of the repository waste acceptance criteria. These criteria derive from three primary sources; 1) the Certificate of Compliance (CoC), issued by the NRC for Type B shipping packaging used by WIPP; 2) The Hazardous Waste Facility Permit, issued by the New Mexico Environment Department; and 3) the WIPP facility's own Documented Safety Analysis (DSA), developed under DOE's regulation 10CFR830. To meet these criteria, various TRU waste forms have been packaged in different ways, with varying packaging efficiency. Of course, there is an overall upper limit on WIPP's volume capacity that was legislated as part of the WIPP Land Withdrawal Act. The volume counted against this limit has been calculated by simply summing the volumes of individual payload containers shipped to and emplaced at WIPP. This method counts significant non-waste volumes inside the containers due to over-packing inner containers and partially filled containers. Without some change to how disposal volumes are calculated, or how waste is packaged, the amount of TRU waste yet to be shipped to WIPP could exceed the legislated capacity. Concepts to enhance the packaging efficiency of future waste shipments to WIPP are presented. Approximate estimates of the waste versus non-waste volumes that have been emplaced to date are discussed. This paper only considers contact handled TRU waste (i.e., contact dose rates < 2 mSv/hr). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sealed Source Security Challenges and Solutions: The Impact of Increased Commercial Disposal Access - 16557

Several recent developments have transformed the sealed source disposal landscape in the United States in ways unimaginable just a few years ago, including the initiation of operations at the first new commercial LLRW facility to open in the United States in decades; publication by the Nuclear Regulatory Commission (NRC) of revised commercial low-level radioactive waste (LLRW) disposal guidance; and the development and certification by the Department of Energy National Nuclear Security Administration (DOE/NNSA) of new transportation package designs for high-activity sources/devices. These developments will likely enable LLRW generators to dispose of risk-significant radioactive sealed sources that for decades have been without a commercial disposal pathway. However, challenges remain with regard to ensuring that these new commercial disposal pathways are effective, and that sealed source licensees take advantage of the new options in a timely manner. These challenges include costs related to both transportation and disposal that are likely much higher than most generators expected when they purchased their sources. DOE/NNSA is actively engaged with Federal, State, regional, private sector partners to address these challenges, including measures to encourage financial planning for end-of-life management of radioactive sealed sources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposition of Chicago Pile 5 (CP-5) Converter Tubes in the 10-160B Cask - 16632

This paper will focus on the unique characterization, packaging, and transportation issues associated with the disposition of the two CP-5 Converter Tube assemblies from Argonne National Laboratory. The converter tubes were constructed of combinations of HEU and alloys of zirconium, and were part of the original research facilities attached to the CP-5 reactor during operating evolutions. These assemblies were heavily irradiated during their operational lifetime, and were segregated from the balance of irradiated test specimens when the reactor was deactivated and slated for Decontamination and Demolition (D and D). In addition, the substantial contribution of fissile material to the assemblies' inventory made the potential disposition pathways extremely challenging. As a result, these items became part of Argonne's legacy 'nuclear footprint', and were added to the Nuclear Footprint Reduction Project scope for disposition. The Project was responsible for the size reduction and characterization of these items, as well as the ultimate disposition. After negotiating a disposal pathway for these tubes, there were significant transportation issues that required a small team to overcome, in order to successfully ship these items to the Nevada National Security Site (NNSS). The Project team at Argonne, technical support from transportation specialists, licensing support from the 10-160B license owner, the Savannah River National Lab (SRNL) Packaging Certification Team (PCT, and the DOE EM-33 staff contributed to license and safety analysis report amendments that eventually authorized the shipment of the material. The paper will identify the organizations, and the specific actions, required to successfully make three 'one of a kind' shipments of irradiated test specimen material. This will include the unique packaging configurations, contents modification for the cask license (via the Amendment process), criticality evaluations, and associated review and approval processes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety analysis report for packaging shielding and nuclear criticality safety courses developed and conducted by Oak Ridge National Laboratory

The US Department of Energy (DOE) Packaging Certification Program, Office of Packaging and Transportation, is offering Safety Analysis Report for Packaging (SARP) Shielding and Nuclear Criticality Safety (NCS) courses for SARP generalists and analysts. The SARP generalist course is designed for project managers, supervisors, NCS/shielding subject matter experts (SME), and SMEs in non-NCS/shielding technical areas (e.g., structural, thermal, package design) who need to better understand how NCS/shielding analyses fit into the broader body of SARP documentation. The generalist course provides an overview of the regulations and guidelines for the criticality and shielding analyses for a SARP and illustrates how the NCS/shielding chapters integrate with the other parts of the SARP. After course material is presented, students in the generalist course will review an actual SARP document to examine key elements of the shielding and criticality analyses. The analyst course provides detailed instructions on the radioactive material package shielding analyses and NCS evaluation fundamentals needed by analysts/practitioners (i.e., safety analysts and/or technical reviewers) to prepare and/or review technical analyses for the SARP documentation. The analyst course also provides an overview of regulations and guidelines, in addition to detailed in-class exercises associated with package shielding and NCS analyses. Analysis teams will be faced with staged SARP examples in which several important decision processes in the generation of a SARP will be demonstrated and discussed. The courses are offered at Oak Ridge National Laboratory's National Transportation Research Center. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Panel reports session

This section brings together the reports of the 31 panel sessions listed below: - Avoiding the Human Capital Cliff in the DOE (PS22); - Implementing Technically-Based Cleanup; US DOE Balancing Regulatory and Fiscal Complexity (PS24); - United Kingdom - Remediation of Sellafield Legacy Ponds and Silos (PS25); - Aligning Decision-Making to Deliver Timely Results in Large Clean-up Programs (PS38); - Transition to Government Owned-Contractor Operated Site at Canadian Nuclear Laboratories (PS39); - Emerging Middle East Nuclear States' Status and Plans (PS40); - NPP Panel on Waste Management (PS41); - Robotics - International Innovations in Robotic Decommissioning Technology (PS43); - Fukushima Panel (1/2): Japan Fukushima Daiichi Decommissioning Update (PS54); - Fukushima Panel (2/2): Update on the Revitalization of Fukushima and the Surrounding Area (PS55); - US DOE LLW On-Site Disposal: LLW Disposal Facility Federal Review Group Review Process (PS56); - Challenges in DOE HLW Tank Management: Facility Start-up and Waste Disposition (PS57); - Waste Management Planning for Utility Small Modular Reactors (PS58); - US Nuclear Power Plant Waste Management - LLW Disposal Issues (PS59); - DOE-EM Robotics and Emerging Technologies Road-map (4/8) (PS60); - Graduating Students and New Scientists and Engineers - Wants and Needs - Are Companies Even Listening? (PS63); - U.S. Nuclear Robotics: Yesterday, Today, Tomorrow (5/8) (PS74); - US DOE Mixed Waste: Proposals for Dealing with Problematic Waste Streams and Policy Changes (PS76); - Current and Emerging US NRC LLW Regulatory Topics (PS77); - Agency Perspectives (US and International) on the Use of Risk and Dose Assessment Tools (PS80); - Progress on Deep Repository Programs Around the World (PS81); - US DOE Procurement and Contracting Opportunities (PS82); - Collaboration across Borders to Deliver Cleanup and Decommissioning Challenges (PS93a); - DOE Mission Success through Application of Practices and Solutions (PS94); - Challenges in Cask Certification - International Perspectives (PS96); - Robotics: Leveraging Innovations in Science and Technology to Benefit Safety Performance (PS98); - DOE Panel: DOE EM Featured Office - Portsmouth/Paducah Project Office (PS109); - Robotics: Lessons Learned from Industrial Robotics Deployment that can be Applied to the Nuclear Field (PS110a); - Roundtable: DOE Radioactive Management - Energy Facility Contractors Group - Waste Management Working Group (EFCOG WMWG) (PS118); - Thursday Topical Session 'Management of Used Nuclear Fuel: Will the United States Reengage and Align with International Efforts' (PS124); - Remotely Operated Vehicles for Emergency, Disaster, and Operational Upset Response (PS125)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Development of the R79: A new Type B and IP-1-2-3 Transportation Cask for Historic Waste - 18570

In October 2014, Robatel began the design and development of a new Type B and IP-1-2-3 transportation cask, the R79. This cask is designed to transport 'historical' waste from nuclear power plants, nuclear research labs, and nuclear medical isotope production facilities. This 'historical' waste may consist of activated and/or contaminated components including irradiated metal from decommissioning activities, fuel assembly containers, consumables, dried residues, etc. It may also include dewatered ion exchange resins, dried concentrates (salt, metal oxide, sludge, etc.), and hydrogenous materials. The main isotopes in this waste are Co-60 and Cs-137. The cask is not designed to transport fissile material but a trace quantity of up to 22.5 g is allowed. For ease of loading and unloading, the cask is designed to handle waste prepackaged into standard drums. With a loading capacity of 300 kg (661 lb) and a volume of 350 L (12.3 ft{sup 3}), the R79 cask is well suited to carry small to medium-sized waste shipments. The cask body is constructed of 304L stainless steel, its impact limiters are filled with Robatel's FENOSOL{sup TM} foam, and the shielding material includes Robatel's PNT7{sup TM} compound for its thermal and neutron absorbing properties. The cask is loaded in a dry environment and is designed for road transportation. Some novel features were integrated into the design of this cask. With its impact limiters installed, the cask may be treated as a Type B container. Depending on the result of the gas generation analysis, the cask can be treated as either Type B(U) (no limit of the transport duration) or Type B(M) (transport duration limited to 2 weeks). With the impact limiters removed, the R79 cask functions as an industrial-type package (either IP-1, IP-2, or IP-3 depending on the content classification). This can be advantageous for a number of reasons. First, it takes less time for loading and unloading operations when the impact limiters are not installed. Secondly and more importantly, three industrial-type packages can be transported on the same conveyance compared to two Type B packages. These options allow the shipper more flexibility: if the content meets the lower radiation limits for an industrial type package, more waste can be transported on one shipment. If the content must be classified as Type B, the user only must install the impact limiters prior to shipment. The design and development of this cask was performed in 2015, with the first drop testing beginning in July 2015. The complete design documents were first submitted September 2015. Robatel completed the foam for the impact limiters in October 2016, with the completed impact limiters finished in March 2017. The end of manufacturing, delivery of the cask to our customer, and receipt of the regulatory certificate of approval is scheduled before the end of 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Code Validation of a SBLOCA test in SMART Integral Test Loop

Integrated small modular reactors (iSMRs) are favored because of their unique characteristics, such as enhanced safety without any large break loss of coolant accidents (LBLOCAs), low initial construction costs, and multi-use of desalination and electricity generation. Many iSMRs have been developed thus far. In Korea, an iSMR called SMART was developed after a thorough validation of the components and systems, and finally received its design certificate in 2012 for the first time in the world. To ensure the performance of its safety systems, an integral test loop, SMART-ITL, is constructed. It contains the primary system, secondary system, passive safety systems, and an auxiliary system. The passive safety systems include a passive residual heat removal system (PRHRS), passive injection system with a core makeup tank (CMT) and a safety injection tank (SIT), and an automatic depressurization system (ADS). The height is preserved while the diameter is scaled down to 1:7. A series of SBLOCA tests have been performed with 4 trains of PRHRS, 1 train of CMT and SIT, and ADS. In parallel with the experiments, simulation of a representative test has been conducted to track the underlying thermal hydraulics. SMART-ITL is an integral test loop for SMART and a series of SBLOCA tests for confirming the performance of passive safety systems have been conducted. In this paper, a system code simulation on a SBLOCA test using SMART-ITL is presented. The reactor vessel water level, break flow rate, and CMT and SIT water levels are predicted well. (authors)

42 ENGINEERING↗

Corrosion of Candidate Materials in Molten FLiBe Salt for Fluoride-Salt-Cooled High-Temperature Reactor (FHR)

Molten fluoride salts have attracted considerable attention because of their desirable thermophysical properties that lead to superior heat transfer. Recently, fluoride salts are being considered as coolants in the fluoride salt-cooled high temperature reactors (FHRs). The successes of the molten salt reactor experiment (MSRE) program in 1950's-70's at Oak Ridge National Laboratory (ORNL) has also driven the pursuit of molten salt nuclear reactor as one of the lead next generation nuclear reactor concepts. Unlike MSRE where the uranium fuel was dissolved in the molten fluoride salt, the FHR concept is expected to use molten salt (2LiF-BeF{sub 2}, FLiBe) only as coolant in conjunction with solid TRISO fuel particles immersed in the molten salt. One of the important challenges in FHR development is corrosion of structural materials in high-temperature molten 2LiF-BeF{sub 2} (FLiBe) salt. Currently, 316 stainless steel (nominal composition: Fe-12Ni-17Cr-2.5Mo-1Si-2Mn-0.03C) and Hastelloy N (nominal composition: Ni-7Cr-16Mo-5Fe-1Si-0.8Mn) are deemed as promising candidate alloys for the construction of some of the structural components of FHR. 316 stainless steel is ASME code certified for high temperatures (up to 760 deg. C) applications. Hastelloy N has been shown to have outstanding corrosion resistance in molten FLiBe but present code certification data limit the use of this alloy to only about 704 deg. C. Modifications of Hastelloy N with higher creep strength are presently being developed at ORNL. Other materials such graphite, SiC/SiCf and C/Cf composites, are also considered for structural applications in the FHR. The presence of these multiple materials in a molten FLiBe salt medium can further exacerbate and complicate corrosion effects. Therefore, it is necessary to understand the corrosion behavior of these materials in molten FLiBe salt. The corrosion behavior of Hastelloy N, 316 stainless steel, and CVD SiC and two types of SiC-SiC{sub f} composites have been tested in molten FLiBe salt at 700 deg. C. When tested in metal-lined crucibles both Hastelloy N and 316 stainless steel showed very good corrosion resistance. Samples tested in graphite crucibles showed greater propensity for corrosion and carburization was observed in the near surface regions of the alloys. CVD SiC showed outstanding corrosion resistance. However, the two SiC-SiC{sub f} composites exhibited corrosion attack implying that the manufacturing process may play a role in the corrosion of these composites. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Alternate Packaging Options for Remote-Handled Transuranic Waste Disposal at WIPP - 19093

Sandia National Laboratories/New Mexico (Sandia) began a remote-handled (RH) transuranic (TRU) repackaging campaign two weeks before the Waste Isolation Pilot Plant (WIPP) shutdown in February 2014. Since a contract with Nuclear Waste Partnerships (NWP), the WIPP Management and Operation (M and O) contractor, was already in place for certified visual examination (VE) and dose-to-curie (DTC) support, repackaging continued and was completed in October 2015. Twenty-five 55-gallon drums of RH TRU waste were packaged, awaiting certification and shipment to WIPP. However, in February 2017 at the National TRU Program (NTP) Corporate Board meeting, Sandia learned that RH TRU waste normally transported in removable lid canisters (RLCs) and 72-B casks was not being accepted for disposal when WIPP re-opened after the shutdown. One option, shielded container assemblies (SCAs), was available and approved for RH TRU waste disposal at the WIPP. Sandia made the decision to pursue the use of SCAs. The use of SCAs allow RH TRU waste to be shipped as contact-handled (CH) in HalfPACTs, emplaced on the floor of the WIPP instead of in boreholes in the walls, if the dose rate is less than 200 millirem/hour on contact. The RH TRU waste remains on the WIPP inventory as RH. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Licensing and Operation of BEA Research Reactor Package for Fuel, Source and Target Payloads - 19198

The Battelle Energy Alliance (BEA) Research Reactor Package (BRR Package) is currently in use for a variety of payload types and operational scenarios. The BRR Package is licensed by the Nuclear Regulatory Commission (NRC), under Certificate of Compliance (CoC) number USA/9341/B(U)F-96. The original packaging design, testing, and safety analysis activities were conducted by Orano Federal Services (Orano FS, formerly AREVA Federal Services) for the Idaho National Laboratory (INL), operated by the Battelle Energy Alliance (BEA) for the U.S. Department of Energy (DOE). One package was built and delivered to the INL in 2009, and has seen routine use since that time, primarily by DOE University Research Reactor programs. This paper will provide a history and description of the original design and licensing of the package and subsequent amended applications for the addition of new payloads. Each additional payload type provided unique design, operational, and licensing challenges - these challenges will be discussed, and the results and lessons learned presented will be beneficial for application in other radioactive material packaging projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radon Considerations at Environmental Remediation Sites - 19469

Radon and how it is regulated poses many challenges to the U.S. Army Corps of Engineers (USACE) in executing the Formerly Utilized Sites Remedial Action Program (FUSRAP). These challenges include:, terminology; radon measurement methods and limitations; state certification and testing requirements; limited and potentially conflicting federal guidance; background considerations; and limited experience regarding application of guidance; among others. These challenges and others are discussed in detail. The FUSRAP Maywood Superfund Site (FMSS) is presented as a case study demonstrating these challenges and considerations to mitigate or address the challenges. The USACE, U.S. Environmental Protection Agency (USEPA), and the New Jersey Department of Environmental Protection (NJDEP) (NJDEP) have spent several years working on and continue to work through the radon issues at FMSS. The FMSS experience, information, and solutions presented in this paper will be helpful to other environmental sites with radium and thorium contamination. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Authentication Protocol for ICS without Encryption

Industrial control systems (ICS) describes the different types of control systems and associated instrumentation, which includes the devices, systems, networks, and controls used to operate and/or automate industrial processes. Depending on the industry, each ICS functions differently and are built to electronically manage tasks efficiently. Historically, industrial plants have included networking, and changes have been made over time without consideration for security. Many ICS devices currently have inadequate security features. Adding encryption in ICS is undesirable because many of the new detection method involves deep packet inspection. Therefore, we propose to develop a method of providing authentication between devices without encrypting the data. This testbed design will allow rapid development and experimentation with Cyber Physical Systems. Modbus connects to a supervisory computer with a Remote Terminal Unit (RTU) in Supervisory Control and Data Acquisition (SCADA) systems. Our project seeks to enhance security in the ICS environment by adding device authentication to the lower levels of the plant floor. This approach was selected as it allows verification of the sender of data from level 1/level 0 devices up to supervisory systems. This addition is desirable as it adds enhanced verification to the integrity of system data without obscuring (via encryption) the data being transmitted across the network. This is important because many ICS systems are real time critical (decryption adds to latency) and many other good security options require deep packet inspection (which encryption completely defeats). To accomplish this, a proof of concept of adding an authentication scheme was designed and will be tested with a common ICS protocol. The setup includes a single serial cable connecting the serial ports on two devices, a Master and a Minion. Authentication will occur in the following methods: - Data layer involving Transport Layer Security/Secure Socket Layer (TLS/SSL); - TCP/IP route implementation; - Key exchange algorithm; - Raspberry Pi programming for authentication. A portion of the setup includes adding Raspberry Pi into the system as the device is handling the authentication for the network traffic. Modbus is the chosen ICS protocol. It is used to transmit signals from instrumentation and control devices back to a main controller or data gathering system. Typically, the device identity is assumed but not verified. For verifying device identity, we constructed a digital signature architecture with TLS. A novel adaptation of this is to use only the digital signature that is provided and not the encryption capability. This allows ICS traffic to flow unobscured while still providing verification for the integrity of the data. Verification of this process will involve adding additional I/O level network devices with spoofed IP addresses and detecting the authenticated versus unauthenticated traffic. Our TLS implementation will have encryption disabled but should still allow for digital signing of data. This will enable our system to distinguish between real end devices and spoofed end devices. This experiment is presently building the test setup. It is focusing on a small setting to identify authenticated and unauthenticated devices on the network. This should allow for scaling to a larger network size after the initial proof of concept. One concern with this scheme is a certificate deployment has a large scale key management. Network size will thus increase the key management task for security. In addition, we believe that further research should be done on exploring the use of this method to defeat man-in-the-middle attacks.

42 ENGINEERING↗

Fabrication Lessons Learned of Transportation Packaging from the Perspective of a Design Authority - 20322

This paper presents lessons learned regarding fabricating packaging systems from the perspective of a design authority (DA). Capturing and implementing lessons learned is critical for an organization to reduce systematic project risk and thereby promote the likelihood of project success. This paper defines the design authority as the organization responsible for technical design, resolving technical design issues, quality assurance program, and maintenance of the packaging system license. A package system is defined as the packaging, its contents, and auxiliary equipment. Packages are certified by the NRC under 10 CFR 71[1] for transportation by ground. The following lessons learned subjects are presented in the paper: quality assurance, interpretation of drawing dimensional requirements, execution of manufacturing processes, hardware dimensional inspection, and leakage rate testing. All discrepancies presented in this paper have been resolved as described in the appropriate final data package. All described package systems are in compliance with their Safety Analysis Report (SAR) and certificate of conformance requirements. The intent of this paper is to identify opportunities for improving the outcome of future projects and to mitigate fabrication challenges proactively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AREVA Steam Cycle High Temperature Gas-Cooled Reactor Development and Deployment Plan - 18684

The development and deployment timeline for the AREVA SC-HTGR is among the shortest of all Generation IV reactor technologies. Once demonstrated, the SC-HTGR enters an expanding marketplace beyond electricity generation. This enables industrial growth that is today solely captive to fossil fuels, primarily natural gas supply. The SC-HTGR plant will be a hedge that insulates a wide range of process industries from fossil fuel price and supply volatility in coming decades when the SC-HTGR plant design is ready for deployment. Similar to existing light water reactors, the SC-HTGR is largely immune to fuel price swings for its expected 60 year operating life cycle. Approximately 70% of the SCHTGR plant energy cost is driven by the initial capital investment with fuel being less than 20%. This is entirely the opposite of natural gas fueled power plants where about 70% of the energy cost is directly tied to the cost and availability of fuel and the potential volatility this brings with it over a plant life cycle that could span several decades. This paper details the development and deployment strategy envisioned by AREVA for the SC-HTGR plant. The development phase includes completion of the full scale reactor module design and licensing, build and demonstrate the first commercial scale module, get design certification, and launch the commercial fleet deployment. The development plan takes full advantage of a) a large body of successful pre-application licensing interactions with the NRC under the DOE NGNP project, b) ongoing experiments and test results accumulated through the TRISO particle fuel qualification and nuclear grade graphite characterization R and D activities conducted in the U.S. and internationally, and c) operation of several small scale technology demonstration facilities and large scale commercial design projects. The abundance of the historic HTGR reactor technology demonstration projects provides a high degree of confidence that sufficient technical information is available to begin FOAK plant engineering and licensing followed by commercial demonstration of the first reactor module within a next decade. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Regulatory Basis for Dry Spent Nuclear Fuel Storage Canister Inspections

Nuclear power plants in the United States began moving Spent Nuclear Fuel (SNF) from wet storage to dry storage in Independent Spent Fuel Storage Installations (ISFSIs) in 1986 at Surry station in Virginia. Dry storage represented an innovative solution to the problem created by the U.S. government's failure to fulfill its obligation to begin removing SNF from power plant sites. Today, about 70 ISFSIs have been placed into operation on the sites of current, or former nuclear power plants. There are currently over 2,200 SNF dry storage systems (DSSs) in service at these locations. Thirteen of these ISFSIs are located at sites with no operating reactor, and this number is due to increase in the coming years. Operating nuclear power stations use ISFSI storage to maintain wet storage capacity for recently discharged SNF. Permanently shutdown nuclear power plants use ISFSI storage to allow decommissioning and dismantlement of the power plant structures, systems, and components. The U.S. Nuclear Regulatory Commission (NRC) regulates the licensing, construction, and operation of ISFSIs under Title 10 of the U.S. Code of Federal Regulations, Energy, Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class-C Waste (10 CFR 72). When the regulations in 10 CFR 72 were created around 1980, 20 years was chosen by the NRC as the license term for a specific ISFSI license and later, for a DSS Certificate of Compliance (CoC). Twenty years was, at the time, believed to be a sufficient time period for on-site interim dry storage of spent nuclear fuel before the U.S. government began moving the spent fuel away from the plant site for final disposal. Little, if any consideration was given to providing a regulatory framework for extending ISFSI licenses and DSS CoCs beyond 20 years at that time. However, shortly after the turn of the century, with still no federal program for removing SNF from reactor sites on the near-term horizon it became apparent that most DSSs would be required to remain in service at the ISFSIs beyond the initial 20-year license term. Operation beyond the original license term requires the specific license or the DSS CoC (used at a general license ISFSI) to be renewed. The requirements for renewal of a specific ISFSI license or a DSS CoC include addressing age-related degradation of structures, systems, and components that perform or support safety functions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗