Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “utility distribution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Advances in parameter estimation techniques applied to flexible structures

In this work, various parameter estimation techniques are investigated in the context of structural system identification utilizing distributed parameter models and 'measured' time-domain data. Distributed parameter models are formulated using the PDEMOD software developed by Taylor. Enhancements made to PDEMOD for this work include the following: (1) a Wittrick-Williams based root solving algorithm; (2) a time simulation capability; and (3) various parameter estimation algorithms. The parameter estimations schemes will be contrasted using the NASA Mini-Mast as the focus structure.

Maben, Egbert↗

Hypersonic Boundary-Layer Trip Development for Hyper-X

Boundary layer trip devices for the Hper-X forebody have been experimentally examined in several wind tunnels. Five different trip configurations were compared in three hypersonic facilities, the LaRC 20-Inch Mach 6 Air Tunnel, the LaRC 31 -Inch Mach 10 Air Tunnel, and in the HYPULSE Reflected Shock Tunnel at GASL. Heat transfer distributions, utilizing the phosphor thermography and thin-film techniques, shock system details, and surface streamline patterns were measured on a 0.333-scale model of the Hyper-X forebody. Parametric variations include angles-of-attack of 0-deg, 2-deg, and 4-deg; Reynolds numbers based on model length of 1.2 to 15.4 million: and inlet cowl door simulated in both open and closed positions. Comparisons of transition due to discrete roughness elements have led to the selection of a trip configuration for the Hyper-X Mach 7 flight vehicle.

Berry, Scott A.↗

An Advanced Buffet Load Alleviation System

This paper describes the development of an advanced buffet load alleviation (BLA) system that utilizes distributed piezoelectric actuators in conjunction with an active rudder to reduce the structural dynamic response of the F/A-18 aircraft vertical tails to buffet loads. The BLA system was defined analytically with a detailed finite-element-model of the tail structure and piezoelectric actuators. Oscillatory aerodynamics were included along with a buffet forcing function to complete the aeroservoelastic model of the tail with rudder control surface. Two single-input-single-output (SISO) controllers were designed, one for the active rudder and one for the active piezoelectric actuators. The results from the analytical open and closed loop simulations were used to predict the system performance. The objective of this BLA system is to extend the life of vertical tail structures and decrease their life-cycle costs. This system can be applied to other aircraft designs to address suppression of structural vibrations on military and commercial aircraft.

Burnham, Jay K.↗

Contingency Planning for Planetary Rovers

There has been considerable work in AI on planning under uncertainty. But this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the power required, the data storage necessary, along with its position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

Dearden, Richard↗

Incremental Contingency Planning

There has been considerable work in AI on planning under uncertainty. However, this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the energy required, the data storage necessary, and its current position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

Dearden, Richard↗

Microbial Anomalies Encountered on the International Space Station

Microorganisms in our living environments are unavoidable. A community of microbes arrived in space with the delivery of the first element of the International Space Station (ISS), attached to hardware and on the bodies of the humans tasked with the initial assembly missions. The risk that microorganisms could cause adverse effects in the health of both the human occupants of the ISS as well as the physical integrity of the station environment and life support systems has been both a driver and a function of engineering and operational controls. Scientists and engineers at NASA have gone to extensive measures to control microbial growth at levels safe for the crewmembers and the spacecraft environment. Many of these measures were initiated with the design of the spacecraft and its systems. Materials used in the ISS were tested for resistance to fungi, such as mold and a paint with a fungus-killing chemical was also used. Controlling the humidity of the air in the Station is also an effective way of discouraging microbe growth. The breathing air is reconditioned by the Environmental Control Life Support System (ECLSS) prior to distribution, utilizing High Efficiency Particulate Air (HEPA) filtration. Requirements restricting the accumulation of water condensate in the air handlers and habitable volume of the ISS were other safeguards added. Water for drinking and food rehydration is disinfected or filtered. A robust in-flight housekeeping regimen for the ISS significantly reduces inappropriate growth of microorganisms and includes a regular cleaning of accessible surfaces with disinfectant wipes. Most of these requirements were suggested by microbiologists to mitigate and possibly prevent many microbiological risks. In addition to these controls, before flight monitoring and analyses of the cabin air, exposed surfaces, water and food, consumables, and crew members are conducted to mitigate microbial risk to the crew and spacecraft. Many microbial risks are much easier to identify and resolve before launch than during space flight. Although the focus has been on prevention of microbiologically related, not all problems can be anticipated. A number of microbial anomalies have occurred on ISS. This paper will discuss the occurrences, root-cause investigations, and mitigation steps taken to remediate the contamination.

Bruce, Rebekah J.↗

Moving Aerospace Structural Design Practice to a Load and Resistance Factor Approach

Aerospace structures are traditionally designed using the factor of safety (FOS) approach. The limit load on the structure is determined and the structure is then designed for FOS times the limit load - the ultimate load. Probabilistic approaches utilize distributions for loads and strengths. Failures are predicted to occur in the region of intersection of the two distributions. The load and resistance factor design (LRFD) approach judiciously combines these two approaches by intensive calibration studies on loads and strength to result in structures that are efficient and reliable. This paper discusses these three approaches.

Larsen, Curtis E.↗

Shape Sensing for Wings with Spars and Ribs Using Simulated Strain

Active trim shape control can be used to minimize error between target and actual aircraft trim shape during flight. Trim shape sensing for aircraft during flight is not only important for highly flexible aircraft, such as the National Aeronautics and Space Administration (NASA) Helios Prototype remotely piloted flying wing aircraft, but also for a delta-wing type aircraft, such as a supersonic commercial transport aircraft. A two-step theory utilizing distributed strain for a real-time shape sensing of a full three-dimensional structure has been introduced previously. This study focuses on the application of the two-step theory to finite element models of a wing with spars and ribs such as the X-59 QueSST aircraft (Lockheed Martin Corporation, Bethesda, Maryland), a tapered wing, a dihedral/anhedral wing, and a stiffened dihedral/anhedral wing. A finely meshed finite element structural model is desired to capture accurate curvature distributions along the neutral axes of the wing cross sections during pre-test analysis for shape sensing of a wing with ribs and spars. The two-step theory used in this study gives excellent deformation correlation with the MSC/NASTRAN (MSC Software, Newport Beach, California) results along the neutral axis for all test cases used in this study except the X-59 QueSST aircraft.

strain↗

Development of an Aeroservoelastic Model for Gust Load Alleviation of the NASA Common Research Model Wind Tunnel Experiment

As aircraft move to using composite materials as their primary structure they become lighter and more flexible as well. This presents some significant challenges in association with gust load alleviation. In this paper we develop an aeroservoelastic model for use in developing controllers that utilize distributed control surfaces for active gust load alleviation in a set of wind tunnel experiments. The model is based on an preexisting aeroelastic wing tunnel model and compares the baseline functionality to it. We also provide simple full state feedback simulations for the model.

Cramer, Nick↗

Acoustic Flight Test of the Joby Aviation Advanced Air Mobility Prototype Vehicle

An extensive acoustic flight test was performed on the Joby Aviation pre-production all-electric vertical takeoff and landing prototype. With the design intent of carrying a pilot and four passengers a maximum range of 150 miles, this vehicle utilizes distributed propulsion and vectored thrust via six tilting propellers. As part of the Advanced Air Mobility (AAM) National Campaign, this is the first full-scale AAM aircraft tested by NASA over representative conditions for all phases of a typical mission profile. A 58- channel distributed microphone array was used to acquire acoustic measurements on more than 100 test points (31 unique conditions). The measurements were postprocessed with synchronously sampled vehicle position and state data to form ground noise contours of departures and approaches at various flight path angles and accelerations. Comparing ground areas of 75 dBA isolines, approaches consistently exhibit higher noise levels rela- tive to departures. Directivity maps were generated for constant airspeed level flyovers. Examples comparing the differences in a semi-thrust borne and full wing-borne mode are given, with full wing-borne mode representing the quietest phase of the flight envelope tested. Measurements for hover in and out of ground effect are given and found to have 2 to 5 dB variation over a single run, and more significant variation between back-to-back runs. Finally, initial analysis of acoustic symmetry about the longitudinal vehicle axis and repeatability over several test days are presented.

Acoustics↗

Performance and usability enhancements for continuous subgraph matching queries on graph-structured data

A query graph, which includes vertices and edges, represents a query on graph-structured data. The query graph is decomposed into query subgraphs. A network analysis tool performs continuous subgraph matching queries to facilitate analysis of computer network traffic, social media events, or other streams of data represented as a dynamic data graph (graph-structured data). This can help identify emerging trends in the data. Some features of the network analysis tool enhance performance by effectively utilizing distributed computing resources (including processing cores and memory at different nodes of a cluster) to speed up the process of updating the dynamic data graph and detecting matches of query subgraphs. Features of a query graph building tool enhance usability by providing intuitive ways to specify query graphs and their subgraphs. Features of a results visualization tool enhance usability by providing an intuitive way to present the results of continuous subgraph matching queries.

Choudhury, Sutanay↗

South Asia Group for Energy - Bhutan

Bhutan's electricity system is already low-carbon through the use of hydropower. However, generation from hydroelectric plants is reduced during the dry winter months and will be impacted by climate change and other extreme weather events. Bhutan is mitigating these risks by diversifying their energy mix with clean energy resources. Bhutan is exploring photovoltaic (PV) solar energy development to enhance its energy system's overall resilience. To ensure efficient grid planning and solar integration, Bhutan's power generator, Druk Green Power Corporation, and the transmission and distribution utility, Bhutan Power Corporation, are partnering with the South Asia Group for Energy (SAGE) to develop their solar capabilities, integrate solar energy into the grid, and strengthen Bhutan's energy infrastructure and efficiency.

Bhutan↗

A Fast Dynamic Internal Predictive Power Scheduling Approach for Power Management in Microgrids: Preprint

This paper presents a Dynamic Internal Predictive Power Scheduling (DIPPS) approach for optimizing power management in microgrids, particularly focusing on external power exchanges among diverse prosumers. DIPPS utilizes a dynamic objective function with a time-varying binary parameter to control the timing of power transfers to the external grid, facilitated by efficient usage of energy storage for surplus renewable power. The microgrid power scheduling problem is modeled as a mixed-integer nonlinear programming (MINLP-PS) and subsequently transformed into a mixed-integer linear programming (MILPPS) optimization through McCormick's relaxation to reduce computational complexity. A predictive window window with 6 data points is solved at an average of 0.92s, a 97.6% improvement over the 38.27s required for the MINLP-PS formulation, implying the numerical feasibility of the DIPPS approach for real-time implementation. Finally, the approach is validated against a static objective using real-world load data across three case studies with different time-varying parameters, demonstrating the ability of DIPPS to optimize power exchanges and efficiently utilize distributed resources while shifting the external power transfers to specified time durations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimization of distributed compute resources utilization in the CMS Global Pool

The CMS Submission Infrastructure is the primary system for managing computing resources for CMS workflows, including data processing, simulation, and analysis. It integrates geographically distributed resources from Grid, HPC, and cloud providers into federated pools managed by HTCondor and Glidein- WMS, for a total of around 500k CPU cores. This system dynamically manages workloads based on priorities defined by the collaboration. Additionally, CMS scheduling strategies must be flexible to handle multiple concurrent workloads while considering changing processing demands and resource availability from various providers.Efficient utilization of vast amounts of distributed compute resources is a key element for the success of the scientific programs of the LHC experiments. Optimizing the system is essential to maximize resource efficiency and fully utilize the distributed computing power. The CMS Submission Infrastructure team thus systematically investigates sources of inefficiency in workload scheduling to reduce their impact. In addition, a strategy of pilot overloading has been introduced to compensate for other inefficiency sources, thereby optimizing resource utilization and enhancing computational throughput.

Mascheroni, Marco [UC, San Diego (main)]↗

National Laboratory of the Rockies: Pennsylvania Public Utility Commission/ Technical Utility Services Bureau Distribution System Resilience Deep Dive 2025

The following is a summary of the National Laboratory of the Rockies (NLR) - Pennsylvania PUC/ Technical Utility Services Bureau (TUS) Distribution System Resiliency Deep-Dive project. This is work that NLR performed to provide the support that the TUS requested under the Resources and Support for State Energy Offices & Regulators (RASOR) program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Opportunities and Challenges to Capturing Distributed Battery Value via Retail Utility Rates and Programs

Distributed battery deployment is increasing with advanced metering, control, and communication technologies, leaving electric utilities with an under-utilized, flexible grid resource in aggregate. Rates can reflect locational and temporal prices while utility incentive-based programs allow DERs to provide direct grid services. However, utilities must balance accurately reflecting dynamic grid conditions versus simple and feasible design that encourages customer participation. Currently, most rates and incentive-based programs are simple, but as penetration of DER and advanced controls increase, dynamic designs could become prevalent. Utilities could encourage providing multiple services to optimize distributed battery dispatch and value streams, however, challenges persist when stacking services across distribution and bulk systems. A DER committed to multiple discrete services concurrently necessitates coordination between operators and a clear hierarchy of commitments. One way to address this is to separate commitments by time or capacity. For services that follow cyclic, predictable patterns, or those that are peak driven with predictability, an operator could ensure sufficient state of charge for participation, leaving time where a distributed battery could otherwise provide different services by segmenting participation temporally. To provide continuous or unexpected services, a battery operator may use state of charge management to reserve some percentage of the battery and segment participation by capacity. Macroeconomic trends, load patterns, generation profiles, and grid configurations drive variation in value and the subsequent implications for utility offerings and how a customer might participate. As distributed battery adoption increases, both regulators and utilities will need to ensure no adverse grid impacts and encourage provision of societal value beyond the customer domain.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Distribution of U.S. Electric Utility Revenue Decoupling Rate Impacts from 2005 to 2017

Investments in energy efficiency and distributed generation reduce electric utility retail sales. Since electric utilities have historically collected a large portion of revenues from volumetric energy rates (¢/kWh), such reductions in sales can impact the utility’s ability to sufficiently recover non-production costs. Regulatory mechanisms that “decouple” utility revenues from sales were implemented to help make the utility indifferent to energy efficiency and distributed generation by ensuring the utility is able to collect an allowed level of revenue each year regardless of its sales. However, noticeable and consistent surcharges over time may create the perception of an incorrectly designed or implemented decoupling mechanism. To date, there are limited quantitative analyses of the rate adjustments due to decoupling mechanisms implemented among U.S. electric utilities (see Morgan, 2013). Given the recent rapid increase in distributed energy resource (DER) adoption in some states and utility service territories, consumers may be facing more prevalent and ongoing decoupling surcharges. This, in turn, may undermine stakeholder support for implementation of decoupling mechanisms and the associated utility support for energy efficiency and DERs. To determine the size of retail rate adjustments associated with decoupling mechanisms and whether they have a tendency towards bill surcharges or credits, we analyzed a large dataset of historical annual decoupling rate adjustments for 21 electric utilities in 11 states between 2005 and 2017. We found that decoupling mechanisms adjusted rates, both up and down, between rate cases, and the majority of those adjustments (54 percent) are small (within a range of -1 to 1 percent). However, we also found that 64 percent of the rate adjustment observations in our sample showed a positive rate adjustment. Importantly, once a surcharge is applied there is an 86 percent chance that there will be a surcharge in the next year as well. While our analysis did not seek to understand the root causes for such results, some possible factors include the accuracy of revenue requirement forecasts, emerging structural changes in customer use and production of energy, misaligned financial motivation, and other factors that influence sales (e.g., economic recession).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State Requirements for Electric Distribution System Planning

Utilities have conducted distribution planning since they first began building and operating electricity systems. But filing these plans for regulatory and stakeholder review is a relatively recent phenomenon. This report summarizes legislative and regulatory requirements for regulated electric utilities to file some type of distribution system plan in 20 U.S. jurisdictions. Some plans focus on expedited cost recovery for certain types of distribution system improvements; other plans focus on investments for grid modernization or distributed energy resources. Increasingly, states are adopting requirements for Integrated Distribution Plans. Such plans provide holistic grid investment strategies that address state and local policies and increasing complexity at the grid edge. The report covers the following topics for distribution system plans, highlighting advanced practices: -State goals and objectives -Procedural requirements -Forecasting loads and distributed energy resources -Hosting capacity analysis -Baseline information requirements -Grid modernization strategy -Grid needs assessment -Non-wires solutions -Reliability and resilience analyses -Stakeholder engagement -Equity -Pilots -Coordination with other planning processes The report includes links to legislation; regulatory requirements, proceedings, and orders; and filed utility plans. The U.S. Department of Energy’s Office of Electricity provided funding support.

24 POWER TRANSMISSION AND DISTRIBUTION↗