Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transmissive”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Determinants of synapse diversity revealed by super-resolution quantal transmission and active zone imaging

Neural circuit function depends on the pattern of synaptic connections between neurons and the strength of those connections. Synaptic strength is determined by both postsynaptic sensitivity to neurotransmitter and the presynaptic probability of action potential evoked transmitter release (P r ). Whereas morphology and neurotransmitter receptor number indicate postsynaptic sensitivity, presynaptic indicators and the mechanism that sets P r remain to be defined. To address this, we developed QuaSOR, a super-resolution method for determining P r from quantal synaptic transmission imaging at hundreds of glutamatergic synapses at a time. We mapped the P r onto super-resolution 3D molecular reconstructions of the presynaptic active zones (AZs) of the same synapses at the Drosophila larval neuromuscular junction (NMJ). We find that P r varies greatly between synapses made by a single axon, quantify the contribution of key AZ proteins to P r diversity and find that one of these, Complexin, suppresses spontaneous and evoked transmission differentially, thereby generating a spatial and quantitative mismatch between release modes. Transmission is thus regulated by the balance and nanoscale distribution of release-enhancing and suppressing presynaptic proteins to generate high signal-to-noise evoked transmission.

59 BASIC BIOLOGICAL SCIENCES↗

Characterizing HVDC Transmission Flexibility under Extreme Operating Conditions

System operators rely on system flexibility, traditionally mainly from generation, to handle unexpected reliability and resilience events, ranging from excessive resource forecast errors to extreme events like heatwaves, earthquakes, and cyberattacks. Flexible transmission, such as controllable high voltage direct current (HVDC) transmission systems present an opportunity to increase overall system flexibility to accommodate operational challenges. This paper provides a methodology to study contributions to system flexibility by controllable, power electronics based transmission. The Western Electricity Coordinating Council (WECC) system is used as an example to study contributions from existing and future HVDC lines. Under extreme system conditions, it is identified that HVDC transmission flexibility can contribute with 24.8 to 28% of avoided unserved energy, and in some areas, the benefits amount to 50 to 70%.

HVDC transmission, PCM, Balancing authorities↗

An Integrated Transmission-Distribution Co-Simulation for a Distribution System with High Renewable Penetration

Traditionally, transmission and distribution system dynamic simulations are performed independently. However, dynamic co-simulation of transmission-distribution systems can be beneficial in analyzing distribution systems with high penetration of distributed renewable resources. The authors describe a framework for conducting transmission-distribution dynamic co-simulation (TDDS). A model of a real network including detailed models of solar photovoltaic units in the distribution system is constructed. The initial operating point of the network is validated against field measurements. The TDDS tool is used to simulate a single line-to-ground fault on the distribution system, highlighting the need for conducting transmission-distribution co-simulations.

14 SOLAR ENERGY↗

Joint Planning of Electricity Transmission and Hydrogen Transportation Networks

The abundance and uneven distribution of renewable energy might cause congestion and curtailment in electric power systems. Transmission expansions can potentially alleviate transmission congestion and reduce renewable energy curtailment. On the other hand, with the substantial cost reduction of electrolyzer technology and the continuing rise of hydrogen demand, converting surplus renewable energy to hydrogen provides synergistic benefits to power and hydrogen systems, but consequently requires joint planning of the two systems. To this end, we propose a joint planning approach for power transmission and hydrogen transportation networks to coordinately optimize the investment and operation of power and hydrogen infrastructure. In our proposed model, detailed truck routing, pipeline, and hydrogen storage are formulated to quantify the flexibility of hydrogen transportation system. A robust joint planning approach is also proposed to address various uncertainties from renewable energy, electric load, and hydrogen demand. Furthermore, our numerical simulations show that the proposed joint planning model can save the total system cost, reduce renewable energy curtailment, and increase the utilization level of transmission lines.

08 HYDROGEN↗

Noncontact Monitoring of Overhead Transmission Lines Using Space Potential Phasor Measurements

Power system reliability requirements necessitate the development of measurement systems to monitor the operational state of critical transmission lines. Here in this article, a novel noncontact method for monitoring overhead transmission lines is proposed. The method is based on measuring the amplitude and relative phase of the transmission line's space potential at two or more strategically located points in space along with the use of passive phase shifters to enhance the sensitivity of the measurements. Applications of voltage unbalance and conductor sag measurements are demonstrated along with the results of conductor sag measurements on an operating 230-kV transmission line. It is shown that using enhanced relative phase measurements can significantly improve the sensitivity of the measurements.

47 OTHER INSTRUMENTATION↗

Transmission Innovation Symposium: Modernizing the U.S. Electrical Grid

The foundation of the United States Department of Energy (DOE) Transmission Reliability research program was established 20 years ago by a series of commissioned white papers. Those white papers described the dramatic institutional and regulatory changes that the U.S. electricity transmission grid was undergoing at the time and articulated the technical challenges that these changes created. The challenges outlined in the white papers were the basis for the initial research goals of the DOE Transmission Reliability program. To a large extent, the reliability research needs outlined in the original white papers have now been met. As a result, now is an appropriate time to step back and review the technical challenges that the industry currently faces and to use those challenges as the basis for identifying the next set of targets for DOE’s transmission-related research and development (R&D) programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Alternatives for California North Coast Offshore Wind, Volume 4: Cost-Benefit Analysis Report

The purpose of this report is to compare the costs and benefits of installing offshore wind power plants with capacities up to 500 megawatts (MW) in the Humboldt Wind Energy Area offshore California, focusing on identifying the costs related to transmission upgrades and possible alternatives such as energy storage. We identify several options that result in lower costs than upgrading transmission to provide full deliverability. Our estimates of the levelized cost of energy (LCOE) assuming full deliverability range from $80/MWh for a 144-MW plant to $73/MWh for a 480-MW plant with a 2030 commercial operation date; however, the additional cost of transmission upgrades increases these values to between $86/MWh and $98/MWh. Based on curtailment and revenue estimates developed using a production cost model, the LCOEs for plant capacities of 144 MW and 168 MW with Energy Only deliverability are lower than the combined cost of energy and transmission upgrades for full deliverability. The addition of a 4-hour, 15-MW battery energy storage system increases revenue for both plant sizes, with the 144 MW + storage scenario producing the most revenue relative to LCOE.

17 WIND ENERGY↗

Northern California and Southern Oregon Offshore Wind Transmission Study: Volume 1 (Revised)

Offshore wind (OSW) power based on floating technology in the coastal waters of the U.S. Pacific Ocean has great potential to contribute to climate mitigation and renewable energy goals in California, Oregon, and other parts of the western U.S. To achieve development of OSW at scale, investments in transmission infrastructure are needed to deliver this power to major metropolitan areas because these are the primary electricity load centers. Currently the transmission infrastructure serving coastal regions where OSW is most likely to be developed has limited capacity and is designed to bring power from the east to serve modest coastal loads. The development of OSW generation and the interconnection of this resource to the bulk power grid will require major investments in new transmission infrastructure and upgrades to existing infrastructure. This study investigated the development of up to 25.8 GW of OSW energy on the northern coast of California and the southern coast of Oregon. The focus of the study was to assess various transmission alternatives that could deliver OSW power to distant load centers while also providing energy benefits to rural coastal communities near to where OSW power may be developed.

17 WIND ENERGY↗

Collaborative Enhancements to Unlock Interregional Transmission

Multiple recent studies highlight significant benefits associated with expansion of interregional transfer capabilities for efficiently adapting to these changes. Despite these proposed benefits, few, if any, interregional transmission projects have been built in recent memory . The objective of this report is to confront the barriers to interregional transmission that exist today and address them with potential reforms and collaborative solutions. This report identifies solutions with the potential for immediate beneficial impact on interregional transmission with the ultimate goal of allowing more effective identification and advancement of interregional transmission projects that create the most positive net value to the participating systems . It distinguishes between states, federal government, and planning regions as key actors in implementing solutions designed to be flexible to accommodate regional differences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financing Storage as a Transmission Asset: Initial Considerations for an Emerging Use Case

Deploying energy storage as an electric transmission system asset is a unique use case that, despite a body of policy and regulatory support, has received little attention or investment in the United States. The benefits of using storage on the transmission system—and the remaining barriers to that use—have been explored elsewhere. This paper complements that body of research by exploring the finance implications of using energy storage as a transmission asset (SATA). Because transmission infrastructure in the U.S. is generally subject to rate-of-return regulation, in which asset owners receive both a return of their invested capital and a return on that capital, storage assets deployed for that use are not subject to market volatility and have a much lower risk profile overall. That lower risk profile would, in theory, correspond to lower interest rates and other more favorable financing terms relative to a storage project deployed in a market setting. This paper draws from corollaries in other markets to estimate the expected finance impacts of SATA projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Studying the Impact of Momentary Cessation of IBRs Compliant With IEEE Std. 2800-2022 on Transmission Line Protection Elements

This paper examines the impact of inverter-based resource (IBR) momentary cessation timing on transmission system protection relays. IEEE Std. 2800 mandates voltage ride-through, requiring IBRs to remain online during voltage disturbances. However, for severe voltage dips (|V| = 0.1 p.u.), the standard permits current blocking. In practice, vendors implement momentary cessation with varying delays, potentially affecting relay operation if IBRs cease too early. This article studies the impact of the time IBRs enter momentary cessation on transmission line protective relays. Using an electromagnetic transient (EMT) simulation, this study models IBR momentary cessation with tunable delays in a realistic transmission network. COMTRADE files generated from EMT simulations are analyzed in MATLAB using detailed protective relay models. Results indicate that IBRs must sustain operation for at least one cycle to ensure proper relay response; otherwise, relays may fail to oper- ate. These findings guide IBR vendors in optimizing momentary cessation settings to enhance transmission line protection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

National Transmission Planning Study - Long-Term Modeling Results

The National Transmission Planning Study (NTP Study) analyzed the transformation needed to ensure the U.S. transmission system continues to reliably meet electricity demand as the power sector evolves. The study linked several long- and short-term power systems models to test numerous interregional and regional transmission buildout scenarios. The results included in this dataset are from the long-term capacity expansion modeling, completed with NREL's ReEDS model. This includes nearly 100 future transmission scenarios with a wide range of economic, reliability, and resilience conditions. The dataset includes all the results visualized in the Tableau Public site, as linked below.

Array↗

Updated Parameters and a New Transmission Spectrum of HD 97658b

Recent years have seen increasing interest in the characterization of sub-Neptune-sized planets because of their prevalence in the Galaxy, contrasted with their absence in our solar system. HD 97658 is one of the brightest stars hosting a planet of this kind, and we present the transmission spectrum of this planet by combining four Hubble Space Telescope transits, 12 Spitzer/IRAC transits, and eight MOST transits of this system. Our transmission spectrum has a higher signal-to-noise ratio than those from previous works, and the result suggests that the slight increase in transit depth from wavelength 1.1–1.7 μm reported in previous works on the transmission spectrum of this planet is likely systematic. Nonetheless, our atmospheric modeling results are inconclusive, as no model provides an excellent match to our data. Nonetheless, we find that atmospheres with high C/O ratios (C/O ≳ 0.8) and metallicities of ≳100× solar metallicity are favored. We combine the mid-transit times from all of the new Spitzer and MOST observations and obtain an updated orbital period of P = 9.489295 ± 0.000005, with a best-fit transit time center at T {sub 0} = 2456361.80690 ± 0.00038 (BJD). No transit timing variations are found in this system. We also present new measurements of the stellar rotation period (34 ± 2 days) and stellar activity cycle (9.6 yr) of the host star HD 97658. Finally, we calculate and rank the Transmission Spectroscopy Metric of all confirmed planets cooler than 1000 K and with sizes between 1 R {sub ⊕} and 4 R {sub ⊕}. We find that at least a third of small planets cooler than 1000 K can be well characterized using James Webb Space Telescope, and of those, HD 97658b is ranked fifth, meaning that it remains a high-priority target for atmospheric characterization.

79 ASTRONOMY AND ASTROPHYSICS↗

Combining Spectroscopic Ellipsometry with Transmission Spectroscopy to Derive Accurate Optical Constants for Organic Materials

A method for deriving the optical constants of organic powdered materials in the mid-infrared spectral range is introduced using variable angle spectroscopic ellipsometry and transmission spectroscopy. The approach uses pressed pellets of the powder and is applied to organic solids, which have both strong and weak infrared absorption features. Many powders have significant voids and do not press into smooth, homogenous pellets. To account for pellet non-idealities and to accurately measure both n and k, three different forms of pellets were pressed and measured: A pure analyte pellet, a mixed analyte/KBr pellet with a large analyte percentage, and a KBr transmission pellet with only a small analyte percentage. Using all three pellets in a multi-sample analysis involving both ellipsometric and transmission data, the complex refractive index (n/k) values can be derived for many organic compounds. This method is illustrated to calculate the optical constants for anhydrous lactose from 6000-400 cm-1. The transmission measurements improve the spectral fitting of weak absorption features, and the multi-sample analysis enables a better determination of the significant void space that is present in the pure pellet, leading to lower values for both n and k if not properly accounted for in the multi-oscillator model used to fit the ellipsometric data.

Optical constants, refractive index, extinction co↗

The oversized role of transmission in renewable integration and national security

This is a presentation for the June 1 Road to Resilience Week webinar focused on "Transmission: A National Security and Energy Resilience Imperative." Today’s electric grid cannot adequately address the national security threats it faces. Interregional HVDC transmission is a core solution to address these vulnerabilities. This webinar will focus on why we need to think about transmission as not only key for the clean energy transformation but as essential to strengthening the resilience of our electric grid. Emma Stewart, in her first speaking engagement as Chief Power Grid Scientist and Research Strategist for Idaho National Laboratory, will provide her perspective on how transmission plays an oversized role in enhancing national security and unlocking clean energy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Transmission Technologies (ATTs) Supplier Cohort Workshops Cohort Summary [Slides]

This Summary slide deck summarizes the key outcomes of the Advanced Transmission Technologies (ATTs) supplier cohort, part of Idaho National Laboratory’s (INL) Technical Assistance for Digital Assurance (TADA) program. The program aimed to strengthen grid resilience through cybersecurity controls, supply-chain security, and Cyber-Informed Engineering (CIE) for advanced transmission technologies. The cohort brought together vendors representing the full range of Grid-Enhancing Technologies (GETs), including providers of Dynamic Line Ratings (DLR), Advanced Power Flow Control (APFC), Transmission Topology Optimization (TTO), and High-Performance Conductors (HPCs). Discussions focused on institutional, integration, and operational barriers limiting GET adoption; cybersecurity risks at EMS/SCADA, cloud, and network integration points; and supply-chain transparency issues such as semiconductor dependence and SBOM/HBOM expectations. Participants also addressed operator trust, human-in-the-loop requirements, and challenges with utility adoption, while exploring how CIE can support secure deployment of GETs. This deck represents a consolidated summary of challenges and risks identified by vendors, cross-cutting themes and technology-specific insights from three cohort workshops, and actionable mitigations to guide utilities, vendors, and the Department of Energy in advancing secure, trusted deployment of GETs.

24 - POWER TRANSMISSION AND DISTRIBUTION↗