At least 145 records · Page 8

Transmission and Distribution Coordination

This webinar explores planning the future grid and interconnected energy system while examining balancing generation (G), transmission (T), distribution (D), & customer (C) resources all while also increasingly capturing engineering details in planning.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Commercial Building Planning and Retrofitting Strategy for Grid Services

The increasing integration of distributed energy resources (DERs) plays an important role in improving energy consumption efficiency. In September 2020, the Federal Energy Regulatory Commission (FERC) approved Order 2222 which opens wholesale electricity markets to small capacity DERs. The benefit of this new FERC Order 2222 is that DERs, such as rooftop solar panels and batteries, will be able to participate in regional electricity markets and provide grid services. Meanwhile, the planning and operation strategies of DERs are facing new challenges to account for the impact of the wholesale market with numerous uncertainty factors. Therefore, in this paper, we propose a new planning and retrofitting model for long-term commercial buildings that considers both DER investment and market participation. Specifically, we explore the capability of implementing DERs for grid services. The effectiveness of the proposed model is validated using real-world data. Simulation results also validate that participating in grid services can significantly increase revenues through appropriate building energy management and shorten the payback period of DER investments.

building energy management↗

Design and characterization of the time-resolved opacity spectrometer (OpSpecTR) for the NIF iron opacity campaign

A new time-resolved opacity spectrometer (OpSpecTR) is currently under development for the National Ignition Facility (NIF) opacity campaign. Here, the spectrometer utilizes Icarus version 2 (IV2) hybridized complementary metal–oxide–semiconductor sensors to collect gated data at the time of the opacity transmission signal, unlocking the ability to collect higher-temperature measurements on NIF. Experimental conditions to achieve higher temperatures are feasible; however, backgrounds will dominate the data collected by the current time-integrating opacity spectrometer. The shortest available OpSpecTR integration time of ~2 ns is predicted to reduce self-emission and other late-time backgrounds by up to 80%. Initially, three Icarus sensors will be used to collect data in the self-emission, backlighter, and absorption regions of the transmission spectrum, with plans to upgrade to five Daedalus sensors in future implementations with integration times of ~1.3 ns. We present the details of the diagnostic design along with recent characterization results of the IV2 sensors.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The North American Renewable Integration Study (NARIS): A U.S. Perspective

The North American electric power system is undergoing significant change, with renewable resources now contributing more generation than ever before. This transformation is poised to continue given decreasing technology costs and ambitious decarbonization goals at the federal, state, local, corporate, and consumer levels. The North American Renewable Integration Study (NARIS) aims to inform grid planners, utilities, industry, policymakers, and other stakeholders about challenges and opportunities for continental system integration of large amounts of wind, solar, and hydropower to support a low-carbon future grid. The National Renewable Energy Laboratory (NREL) conducted a detailed, continent-wide analysis with planning scenarios of transmission, generation, and demand to reach 80%–92% carbon reductions (from 2005) for the Canadian electric power system, and up to 80% reductions continent-wide. We used a suite of models to study future scenarios and gain insights, including potential impacts on costs, emissions, resource adequacy, and the specific technologies that help enable the transition to a low-carbon grid. Our analysis had a particular focus on the potential role of cooperation among the three North American countries and between regions within each country, and how transmission can support sharing of supply and demand diversity. The NARIS project began in 2016. This report describes a U.S. perspective in coordination with the U.S. Department of Energy, and a companion report describes a Canadian perspective in coordination with the Natural Resources Canada. NARIS was an extension of a previous body of work, including the Western Wind and Solar Integration Study, the Eastern Renewable Generation Integration Study, Interconnections Seam Study, and the Pan Canadian Wind Integration Study. NARIS analyzed the entire continent in detail while studying higher renewable generation than previous studies. The scenarios in NARIS were informed by the goals in the Mid-Century Strategies for the Paris Agreement in each country.

14 SOLAR ENERGY↗

The North American Renewable Integration Study (NARIS): A Canadian Perspective

The North American electric power system is undergoing significant change, with renewable resources now contributing more generation than ever before. This transformation is poised to continue given decreasing technology costs and ambitious decarbonization goals at the federal, state, local, corporate, and consumer levels. The North American Renewable Integration Study (NARIS) aims to inform grid planners, utilities, industry, policymakers, and other stakeholders about challenges and opportunities for continental system integration of large amounts of wind, solar, and hydropower to support a low-carbon future grid. The National Renewable Energy Laboratory (NREL) conducted a detailed, continent-wide analysis with planning scenarios of transmission, generation, and demand to reach 80%–92% carbon reductions (from 2005) for the Canadian electric power system, and up to 80% reductions continent-wide. We used a suite of models to study future scenarios and gain insights, including potential impacts on costs, emissions, resource adequacy, and the specific technologies that help enable the transition to a low-carbon grid. Our analysis had a particular focus on the potential role of cooperation among the three North American countries and between regions within each country, and how transmission can support sharing of supply and demand diversity. The NARIS project began in 2016. This report describes a Canadian perspective in coordination with the Natural Resources Canada, and a companion report describes a U.S. perspective in coordination with the U.S. Department of Energy. NARIS was an extension of a previous body of work, including the Western Wind and Solar Integration Study, the Eastern Renewable Generation Integration Study, Interconnections Seam Study, and the Pan Canadian Wind Integration Study. NARIS analyzed the entire continent in detail while studying higher renewable generation than previous studies. The scenarios in NARIS were informed by the goals in the Mid-Century Strategies for the Paris Agreement in each country.

14 SOLAR ENERGY↗

Transmission grating spectroscopy and the Advanced X-ray Astrophysics Facility (AXAF)

The use of transmission gratings with grazing-incidence telescopes in celestial X-ray astrononmy is reviewed. The basic properties of transmission grating spectrometers and the use of 'phased' gratings to enhance the diffraction efficiency are outlined. The fabrication of the gratings is examined, giving special attention to the AXAF High Energy Transmission Grating. The performance of finite-period thick gratings is briefly discussed, and the performance of the transmission grating spectrometers planned for SPECTROSAT and AXAF are examined.

Schattenburg, M. L.↗

Advanced communications technology satellite high burst rate link evaluation terminal communication protocol software user's guide, version 1.0

The Communication Protocol Software was developed at the NASA Lewis Research Center to support the Advanced Communications Technology Satellite High Burst Rate Link Evaluation Terminal (ACTS HBR-LET). The HBR-LET is an experimenters terminal to communicate with the ACTS for various experiments by government, university, and industry agencies. The Communication Protocol Software is one segment of the Control and Performance Monitor (C&PM) Software system of the HBR-LET. The Communication Protocol Software allows users to control and configure the Intermediate Frequency Switch Matrix (IFSM) on board the ACTS to yield a desired path through the spacecraft payload. Besides IFSM control, the C&PM Software System is also responsible for instrument control during HBR-LET experiments, uplink power control of the HBR-LET to demonstrate power augmentation during signal fade events, and data display. The Communication Protocol Software User's Guide, Version 1.0 (NASA CR-189162) outlines the commands and procedures to install and operate the Communication Protocol Software. Configuration files used to control the IFSM, operator commands, and error recovery procedures are discussed. The Communication Protocol Software Maintenance Manual, Version 1.0 (NASA CR-189163, to be published) is a programmer's guide to the Communication Protocol Software. This manual details the current implementation of the software from a technical perspective. Included is an overview of the Communication Protocol Software, computer algorithms, format representations, and computer hardware configuration. The Communication Protocol Software Test Plan (NASA CR-189164, to be published) provides a step-by-step procedure to verify the operation of the software. Included in the Test Plan is command transmission, telemetry reception, error detection, and error recovery procedures.

Reinhart, Richard C.↗

Assessing the Key Requirements for 450 GW of Renewable Capacity in India by 2030

In this policy brief, we assess the prerequisites for India to achieve 450 GW of solar and wind cumulative installed capacity by 2030. We examine requirements such as availability of land, new transmission buildout, financing and pace of deployment, as well as the impact on grid reliability and cost of generation. We also examine the impact of policies promoting domestic manufacturing. Deploying 307 GW of solar and 142 GW of wind capacity would use only about 1.25% of land that is categorized as barren or waste, which is equivalent to about 0.22% of the total land area in India. Because of the good solar resource across large swaths of India, the solar energy buildout—and thus the land use—potentially can be spread out. India would need about 280 GW of new interstate transmission capacity by 2030, a little over double the transmission expansion that has already been planned through 2025. However, most of the new transmission buildout is driven by the near doubling of electricity demand between 2020 and 2030. The total investment needed (in generation and storage resources) to realize this target is around USD 26.5 billion annually, which is 20% lower than the annual investment in India’s power sector across all generation resources between 2015 and 2019. We estimate that using domestically manufactured panels instead of imported panels may increase solar PPA prices by about 10%–15% in the medium term, but solar power would still be a cost-effective way to meet growing demand instead of building new fossil fuel-based power plants, because the price of electricity from solar plants has fallen below the variable cost of most existing coal units. To reach this target, India would need to build about 35–40 GW of solar and wind capacity every year in this decade. India’s power sector achieved a pace of capacity addition of 22 GW per year in the previous decade (including thermal and renewable). Policy and regulatory measures would be needed to increase the pace of deployment.

14 SOLAR ENERGY↗

Advanced Transmission Technologies –GETs and HPCs Session 3: HPCs and Building Actions Plans to Digital Assurance Risks

The third session of the Idaho National Laboratory’s (INL) Technical Assistance for Digital Assurance (TADA) program, held on November 11, 2025, centered on High Performance Conductors (HPCs) and the formulation of action plans to address digital assurance risks associated with Grid-Enhancing Technologies (GETs). This session convened experts from utilities, vendors, and government agencies to examine the technical, operational, and cybersecurity aspects of HPC deployment. Discussions highlighted the benefits of HPCs, such as their ability to rapidly increase transmission capacity using existing corridors, improve grid resilience, reduce system losses, and align with FERC Orders 2023 and 1920. Participants evaluated supply chain and digital assurance risks, including reliance on imported materials, limited domestic manufacturing capacity, workforce shortages, and traceability issues. The session also emphasized the importance of digital trust, integration-layer cybersecurity, and unified risk frameworks, introducing tools like intrusion detection systems, encryption, zero trust networking, and firmware integrity. Recaps of earlier workshops on Dynamic Line Ratings (DLRs), Advanced Power Flow Control (APFC), and Transmission Topology Optimization (TTO) underscored institutional barriers and integration challenges. Action plans were proposed to mitigate issues such as inconsistent cybersecurity practices, SBOM usage, supply chain visibility, operator trust, and misaligned incentives. Additionally, INL presented its supply chain risk management tools and Cyber-Informed Engineering (CIE) principles to support secure procurement and system design. The session concluded with a commitment to share key takeaways, incorporate cohort feedback into future policy development, and continue collaborative engagement through upcoming pilot activities. Session 3 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Technical Assistance for Nikolski and St. George, Alaska

Two remote Aleutian-Pribilof communities in Alaska, Nikolski and St. George, worked with the Energy Technology Innovation Partnership Project (ETIPP) to reduce diesel reliance and strengthen reliability by developing a community energy plan.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technical Assistance for Igiugig, Alaska

Igiugig, Alaska received technical assistance through the Energy Technology Innovation Partnership Project (ETIPP) to implement high-priority strategies detailed in their 2022 Community Energy Plan.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Minnesota Solar Pathways: Illuminating Pathways to 10% Solar (Final Technical Report)

The Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, was a three-year project designed to explore least-risk, best-value strategies for meeting the State of Minnesota’s solar goals. As part of this aim, the Pathways Team modeled renewable generation costs, examined ways to streamline interconnection, and evaluated technologies that can increase solar hosting capacity on the distribution grid. Midway through the project period, the Pathways Team expanded the scope of study using the same modeling framework from the Minnesota Solar Potential Analysis to estimate and compare generation costs for high renewables penetration scenarios across the Midcontinent Independent System Operator (MISO) region. The analysis concludes that it can be cheaper to overbuild solar + wind and curtail surplus than to store all generation. In addition, the analysis of individual MISO subregions compared with the whole region highlights the opportunities of enabling market potential compared with impact of ongoing transmission constraints. Beyond the analysis of future scenarios, the partnerships initiated and supported through this project underscored the ongoing need for work with stakeholders to address key issues, particularly around siting, and leverage symbiotic strategies to meet state goals.

14 SOLAR ENERGY↗

Playa de Ponce's Advancements in Energy Affordability and Reliability

Un Nuevo Amanecer Inc. (UNA), a community-based nonprofit organization, partnered with the U.S. Department of Energy's Energy Technology Innovation Partnership Project (ETIPP) to develop a Strategic Energy Plan (SEP) for the community of Playa de Ponce on the southern coast of Puerto Rico. The SEP provides a community-driven roadmap to improve local energy systems by identifying shared priorities, strategies, and actions that support a more reliable, affordable, and resilient energy future. Over a seven-month period, researchers from the National Laboratory of the Rockies (NLR) worked with UNA, the Puerto Rico Hispanic Federation, community leaders, and residents to gather input through engagement workshops held in March and June 2025. These discussions helped define the community's energy vision and identify key challenges, including high electricity costs, unreliable service during extreme weather events, and risks to public health and safety - particularly for the community's aging population. This fact sheet summarizes the key elements of the Strategic Energy Plan, including four priority strategies organized around three focus areas identified by the community: energy reliability, safety and security, and stakeholder participation, education, and capacity building. Together, these strategies outline actionable pathways to strengthen Playa de Ponce's energy resilience and support long-term community goals. The plan serves as a shared reference for community members, local organizations, and government partners working to advance energy solutions in Playa de Ponce and complements broader municipal and island-wide planning efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗