Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transmission deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Game Theory Approaches for System-level Incentive Design

This report presents a generalized Stackelberg game framework for designing and evaluating financial incentives that enhance power system resilience through strategic deployment of distributed energy resources(DERs) under various contingencies. The proposed approach addresses the challenge of coordinating individual community investment decisions to meet system-wide resilience objectives. The framework is demonstrated in a three-community test system subjected to two transmission contingency scenarios: inter-community line failure (Case 1) and complete main grid disconnection (Case 2). In both cases, three incentive levels are compared: a Base case with no financial incentives, and low and high incentive cases. In Case 1, the Base case (no incentives) results in a total installed DER capacity of 217.2 MW, with no load shedding due to alternative routing, but community costs remain high. Increasing incentives raises DER deployment to 286.9 MW, lowers aggregate community costs by $22M annually, and completely avoids the need for costly new transmission line construction. In Case 2, the Base case results in 24.3 MWh of unserved load; introducing incentives eliminates all load shedding and ensures up to 89 MWh of battery storage is available for emergency reserve. These results demonstrate that targeted incentives can dramatically improve grid resilience and cost-effectiveness. The framework thus offers policymakers and system planners a robust tool to quantify and compare the effectiveness of incentive programs for multi-community transmission networks behavior, system resilience, and economic efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Antigua and Barbuda Distributed Energy Resources Deployment Guidelines

This document is designed to provide comprehensive considerations, best practices and guidance for deployment of Distributed Energy Resources (DERs) in Antigua and Barbuda. The document provides lists of various technology selection guidance including technical specifications, requirements and applicable key standards and code associated with key DERs and balance of plant equipment. The document also presents the key microgrid design considerations to integrate the DERs to achieve the economic, decarbonization and resiliency goals. Taking into account sensitive grid for such islands, for grid readiness and screening the potential DER interconnection, general approach is highlighted along with the potential technical interconnection requirements. Furthermore, this document shows the key stakeholders involved in such DER integration and/or microgrid project and how key responsible project team can be qualified. Finally, this document refers to key information about warranties and consumer rights and maintenance of the systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Picosecond Synchronization System for Quantum Networks

The operation of long-distance quantum networks requires photons to be synchronized and must account for length variations of quantum channels. We demonstrate a 200 MHz clock-rate fiber optic-based telecommunication C-band quantum network using off-the-shelf components combined with custom-made electronics. The network is backed by a scalable and fully automated synchronization system with ps-scale timing resolution. Synchronization of the photons is achieved by distributing O-band-wavelength laser pulses between network nodes. Specifically, we distribute photon pairs between three nodes, and measure a reduction of coincidence-to-accidental ratio from 77 to only 42 when the synchronization system is enabled, which permits high-fidelity qubit transmission. Our demonstration sheds light on the role of noise in quantum communication and represents a key step in realizing deployed co-existing classical-quantum networks.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Distributed Energy, Utility Scale: 30 Proven Strategies to Increase VPP Enrollment [Slides]

After decades of low or declining growth in electricity demand, the U.S. now faces a significant near-term need for new generation capacity and transmission and distribution infrastructure. Virtual Power Plants (VPPs) can meet a large portion of the gap between electricity supply and growing demand, but only if deployed at an increased scale. This study provides 30 proven strategies for scaling VPPs through increased enrollment based on in-depth interviews with utilities and VPP solutions providers that have achieved considerable scale or rapid growth in program deployment. The study includes specific actions for regulators, utilities, and VPP solutions providers to increase VPP enrollment and deliver important customer and utility benefits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Renewable Energy Potential Model: Hawaii Geothermal Supply Curves

This dataset extends the development of the Renewable Energy Potential (reV) model to include geothermal energy, with a specific focus on Hawaii. Provided here are the results of two scenarios that were modeled for geothermal energy in Hawaii: binary enhanced geothermal systems (EGS) at a depth of 2.5 km and hydrothermal binary systems at a depth of 1.5 km. The resource data for both scenarios were derived from Lautze and Haskins (2024) using an exponential method. The PFA probability of heat map was used as a look up table for which temperature gradient to use (Lautze and Haskins, 2024). The dataset provides geospatial and techno-economic details for evaluating geothermal energy potential. It includes spatial coordinates, estimated capacity factors, developable area, resource potential, and annual energy production metrics. Economic details such as levelized cost of electricity (LCOE), site development costs, transmission costs, and fixed-charge rates are also included. The reV model, originally developed for wind and solar energy, incorporates these variables to evaluate deployment constraints related to land use, environmental and cultural factors, and grid integration.

15 GEOTHERMAL ENERGY↗

The Case for Custom TMY's: Examples Using the NSRDB

A typical meteorological year (TMY) data set essentially represents an hourly compilation of median months constructed using multi-year datasets. Although TMY data sets are generated from irradiance data in the horizontal plane, they are used in photovoltaic (PV) modeling for systems inclined to various angles. This paper demonstrates that a POA TMY (plane of array TMY) generated by selecting median months from a multi-year POA irradiance timeseries dataset produces significantly different results than a POA TMY generated by transposing a TMY dataset constructed from horizontal data. In some months the differences can be more than 3%. These results point to the need for generating TMY's using POA irradiance timeseries representing the orientation at which PV panels will be deployed.

14 SOLAR ENERGY↗

Long-Duration Energy Storage: Resiliency for Military Installations

This report provides a quantitative techno-economic analysis of a long-duration energy storage (LDES) technology, when coupled to on-base solar photovoltaics (PV), to meet the U.S. Department of Defense's (DoD's) 14-day requirement to sustain critical electric loads during a power outage and significantly reduce an installation's carbon footprint. The LDES modeled is Antora Energy's battery energy storage system (BESS). It is currently at a technology readiness level (TRL) of 7 and not ready for full-scale deployment. To support decisions on the value of near-term demonstrations, this analysis looked at the potential value of Antora Energy's BESS if deployed in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessing the Viability of Geothermal Microgrid Deployment: A Geospatial Analysis Across the United States

Geothermal microgrids hold a potential of supplying clean and dependable power to communities throughout the United States (US), all while sidestepping the expenses associated with connecting to strained or isolated power grids. Nonetheless, their implementation is still in its early stages in the country. The objective of this analysis is to leverage available data to pinpoint regions across the US that exhibit favorable conditions for the development of geothermal microgrids. Drawing from a variety of sources, including estimates of geothermal resources, the costs associated with geothermal energy generation and electricity transmission, existing microgrid locations, and subsidy programs, we aim to identify promising areas for further exploration. By mapping out the contiguous US, Alaska, and Hawaii, we delineate regions with high relative favorability for geothermal microgrid deployment. Our findings reveal the presence of highly favorable regions across the Western states of the contiguous US, as well as isolated areas in Alaska and Hawaii. Furthermore, we delve into a discussion on state policies and incentive programs, considering their role in fostering favorable conditions or posing barriers to geothermal microgrid development.

Alaska↗

Quantifying Thermal Output of Energetic Materials (LDRD Final Report)

We present the results of an LDRD project, funded by the Nuclear Deterrence IA, to develop capabilities for quantitative assessment of pyrotechnic thermal output. The thermal battery igniter is used as an exemplar system. Experimental methodologies for thermal output evaluation are demonstrated here, which can help designers and engineers better specify pyrotechnic components , provide thermal output guidelines for new formulations, and generate new metrics for assessing component performance and margin given a known failure condition. A heat-transfer analysis confirms that the dominant mode of energy transfer from the pyrotechnic output plume to the heat pellet is conduction via deposition of hot titanium particles. A simple lumped-parameter model of titanium particle heat transfer and a detailed multi-phase model of deposition heat transfer are discussed. Pyrotechnic function, as defined by "go/no-go" standoff testing of a heat pellet, is correlated with experimentally measured igniter plume temperature, titanium metal particle temperature, and energy deposition. Three high-speed thermal diagnostics were developed for this task. A three-color imaging pyrometer, acquiring 100k images per second on three color channels, is deployed for measurement of titanium particle temperatures. Complimentary measurements of the overall igniter plume emission ("color") temperature were conducted using a transmission-grating spectrograph in line-imaging mode. Heat flux and energy deposition to a cold wall at the heat-pellet location were estimated using an eroding thermocouple probe, with a frequency response of ~5 kHz. Ultimate "go/no-go" function in the igniter/heat-pellet system was correlated with quantitative thermal metrics, in particular surface energy deposition and plume color temperature. Titanium metal-particle and plume color temperatures both experience an upper bound approximated by the 3245-K boiling point of TiO 2 . Average metal-particle temperatures remained nearly constant for all standoff distances at T = 2850 K, ± 300 K, while plume color temperature and heat flux decay with standoff—suggesting that heat-pellet failure results from a drop in metal-particle flux and not particle temperature. At 50% likelihood of heat-pellet failure, peak time-resolved plume color temperatures drop well below TiO 2 boiling to ~2000 - 2200 K, near the TiO 2 melting point. Estimates of peak heat flux decline from up to 1 GW/m 2 for near-field standoffs to below 320 MW/m 2 at 50% failure likelihood.

36 MATERIALS SCIENCE↗

Leipzig University W-Band Cloud Radar, Gothic (Colorado), SAIL Campaign Second Winter (15.11.2022 - 05.06.2023)

The instrument is a polarimetric W-Band simultaneous transmission simultaneous reception (STSR) Doppler Cloud Radar manufactured by Radiometer Physics GmbH (RPG, instrument type RPG-FMCW-94-DP). It was deployed about 500m away from the ARM M1 facility in Gothic (CO) near the Ore House between Nov 15, 2022 and Jun 5, 2023 at an altitude of 2913 m. The Doppler cloud radar was mounted on a prototype of a cold temperature scanner manufactured by RPG. The dataset contains common radar variables like equivalent radar reflectivity factor, mean Doppler velocity, Doppler spectrum width as well as common polarimetric radar variables like differential phase shift (PhiDP), specific differential phase shift (KDP), correlation coefficient (RHV) and differential reflectivity (ZDR). Between Nov 15, 2022, and Feb 7, 2023 the radar was operated at 40° constant elevation and 151° azimuth (towards the KAZR at the AMF1). Between Feb 7 and Mar 15, 2023 the following scan cycle was repeated in 15min intervals: zenith pointing measurements, RHI scans from 0° to 90° and 90° to 0° elevation at 151° azimuth, constant elevation measurements at 40° elevation and 151° azimuth and PPI scans at 85° elevation for wind retrievals (one PPI per hour). Between Mar 15 18:18 UTC and Apr 8, 2023 11:04 UTC, the scanner was stuck at 72° elevation, which resulted in corrupted files for this period. For that period, the files containing data are uploaded but should be treated with care. Between Apr 8 and Apr 14, 2023 the scanning pattern described above was performed again. Afterwards, except for May 17 and May 18, 2023 where scanning patterns as described above were performed, measurements continued at 40° elevation and 151° azimuth until May 22, 2023 09:00 UTC. The scanning pattern was then started again, but without hourly PPI measurements until May 31, 2023. Between May 31 and Jun 5, 2023 solely zenith-pointing observations were performed. The data provided here are the RPG Level 1 (L1) files, Doppler spectra Level 0 (L0) files are available upon request.

54 ENVIRONMENTAL SCIENCES↗

Precursor Analysis Report: Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016

The Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016 Precursor Analysis Report leverages publicly available information about the December 2016 cyber attack against the Ukrainian Ukrenergo electric transmission utility and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. Industroyer is a modular malware framework designed to deploy several Industrial Control System (ICS) protocol-specific attack payloads to disrupt electricity distribution. Adversaries deployed Industroyer within the target network on a Microsoft Windows endpoint capable of directly manipulating or communicating with ICS. Industroyer abuses the functionality of a targeted ICS’s legitimate control system to achieve its intended impact. Adversaries likely first gained access to Ukrenergo enterprise networks in early 2016 after a successful spearphishing campaign against organizations in the electric power sector. Adversaries then began capturing credentials beginning on 1 December 2016. This allowed access to the ICS environment at the Pivnichna electric transmission substation outside Kyiv through a device dual-homed on the Information Technology (IT) and ICS networks. Adversaries conducted discovery, targeting, and access to this device using information and previously captured credentials from compromised enterprise IT machines. Finally, the adversaries deployed and launched the Industroyer malware just before midnight on 17 December. By midnight, Ukrenergo had lost control of a targeted substation, resulting in electric power outages for over an hour in the city of Kyiv and the Kyiv region. Researchers and analysts identified 31 unique techniques (used in a sequence of 33 steps) utilized during the attack with a total of 846 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Twenty-nine of the identified techniques used during the Industroyer cyber attack were precursors to the triggering event. Analysis identified 548 observables associated with these precursor techniques, 353 of which were assessed to have an increased likelihood of being perceived in the 300 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Development of an integrated platform for hardware-in-the-loop evaluation of microgrids prior to site commissioning

This paper presents an integrated hardware-in-the-loop (HIL) platform for testing the operation and control of a real-world microgrid system prior to site commissioning. The proposed testing approach shows the value of setting up an integrated HIL platform to test multiple hardware devices (including the system-level controller, device controllers, and field devices). A test bed developed for the Borrego Springs community microgrid is used as an example to demonstrate the feasibility of the integrated platform. Comprehensive tests are carried out using the Borrego Springs test bed to validate the platform, meet the test objectives, and gain valuable insight prior to site commissioning. The selected test scenarios, initial conditions, events, test metrics, etc., are similar to those defined in IEEE P2030.8. The test objectives are to evaluate the microgrid controller and the operation of the microgrid. The HIL platform presented in this paper shows good value for microgrid testing in terms of its flexibility and scalability for testing various microgrids; its accuracy in its representation of the field; the comprehensiveness of the testing capability; and the efficiency of testing, which can reduce risks prior to field deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of Renewable Energy Data for Facilitating the Clean Energy Transition in Vietnam

Vietnam is transforming its power system with an increasing share of variable renewable energy (VRE) in the generation mix and plans to achieve 27% VRE by capacity in 2030 and 42% by capacity in 2045, as indicated by the draft Eighth Power Development Plan for 2020–-2045 (PDP8). Further increase in VRE penetration is possible with data-driven analysis where availability of data, specifically VRE data, becomes critical. NREL has worked with various stakeholders in Vietnam to create high-resolution multi-year VRE data publicly available to all. This paper reviews this new VRE data for Vietnam and how different stakeholders can use this data to inform VRE deployment decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

I-80 Mid-America Clean Fuels Corridor: Deployment Plan Report

The I-80 Mid-America Clean Fuels Corridor, which spans I-80 from Fort Lee, New Jersey, to Council Bluffs, Iowa, was designated an Alternative Fuels Corridor (AFC) in Round 1 of the Alternative Fuels Corridor program administered by the U.S. Department of Transportation’s (DOT’s) Federal Highway Administration (FHWA). Originally called the “I-80 Mid-America Alternative Fuels Corridor,” it is now named the “I-80 Mid-America Clean Fuels Corridor.” As of Round 6 AFC designation, parts of the corridor have sufficient direct current fast charging (DCFC) stations to be designated Electric Vehicle (EV)-Ready and sufficient compressed natural gas (CNG) fueling stations to be designated CNG-Ready. However, much of the corridor’s approximately 1,240 miles (mi) are not yet EV- or CNG-Ready. This includes about 1,130 mi that are designated EV-Pending and 700 mi that are designated CNG-Pending. This report presents a plan to develop EV charging and CNG fueling infrastructure sufficient to convert the entire length of the corridor to EV-Ready and CNG-Ready. Specific sites are not identified for future infrastructure. Rather, priority exits are identified, and information, analysis, and additional steps are recommended to support further refinement of these locations, as well as additional outreach and deployment efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Voltage Regulation Performance Evaluation of Distributed Energy Resource Management via Advanced Hardware-in-the-Loop Simulation

This paper evaluates the performance of coordinated control across advanced distribution management systems (ADMS), distributed energy resources (DERs), and distributed energy resource management systems (DERMS) using an advanced hardware-in-the-loop (HIL) platform. This platform provides a realistic laboratory testing environment, including accurate dynamic modeling of a real-world distribution system from a utility partner, real controllers (ADMS and DERMS), physical power hardware (DERs), and standard communications protocols. One grid service—voltage regulation—is evaluated to show the performance of the coordinated grid automation system. The testing results demonstrate that the coordinated DERMS and ADMS system can effectively regulate system voltages within target operation limits using DERs. The realistic laboratory HIL testing results give utilities confidence in adopting the grid automation systems to manage DERs to achieve system-level control and operation objectives (e.g., voltage regulation). This helps utilities mitigate potential risks (e.g., instability) prior to field deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sustainable Port Operations: Powered by NREL

Seaports are vital economic hubs that allow the United States to compete on a global scale. But the heavy vehicles and cargo equipment that enable their operations also emit harmful air pollutants and greenhouse gas emissions. For nearly two decades, National Renewable Energy Laboratory (NREL) researchers have worked toward comprehensive seaport decarbonization. They fuse world-class analysis with deep vehicle and transportation systems knowledge to guide strategic deployment of low- and zero-emissions vehicles, charging and refueling infrastructure, and grid improvements. Together, these capabilities can enable sustainable port operations. This fact sheet outlines major seaport and airport decarbonization capabilities across the laboratory, including: fleet research, energy data, and insights for decarbonization; comprehensive hydrogen infrastructure deployment; optimized charging through grid integration; strategic blueprinting for clean, optimized technology deployment; and integrating diversity, equity, inclusion, and accessibility considerations into decarbonization efforts.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Cybersecurity Considerations for Grid-Connected Batteries with Hardware Demonstrations

The share of renewable and distributed energy resources (DERs), like wind turbines, solar photovoltaics and grid-connected batteries, interconnected to the electric grid is rapidly increasing due to reduced costs, rising efficiency, and regulatory requirements aimed at incentivizing a lower-carbon electricity system. These distributed energy resources differ from traditional generation in many ways including the use of many smaller devices connected primarily (but not exclusively) to the distribution network, rather than few larger devices connected to the transmission network. DERs being installed today often include modern communication hardware like cellular modems and WiFi connectivity and, in addition, the inverters used to connect these resources to the grid are gaining increasingly complex capabilities, like providing voltage and frequency support or supporting microgrids. To perform these new functions safely, communications to the device and more complex controls are required. The distributed nature of DER devices combined with their network connectivity and complex controls interfaces present a larger potential attack surface for adversaries looking to create instability in power systems. To address this area of concern, the steps of a cyberattack on DERs have been studied, including the security of industrial protocols, the misuse of the DER interface, and the physical impacts. These different steps have not previously been tied together in practice and not specifically studied for grid-connected storage devices. In this work, we focus on grid-connected batteries. We explore the potential impacts of a cyberattack on a battery to power system stability, to the battery hardware, and on economics for various stakeholders. We then use real hardware to demonstrate end-to-end attack paths exist when security features are disabled or misconfigured. Our experimental focus is on control interface security and protocol security, with the initial assumption that an adversary has gained access to the network to which the device is connected. We provide real examples of the effectiveness of certain defenses. This work can be used to help utilities and other grid-connected battery owners and operators evaluate the severity of different threats and the effectiveness of defense strategies so they can effectively deploy and protect grid-connected storage devices.

25 ENERGY STORAGE↗

Power System Event Identification Based on Deep Neural Network With Information Loading

Online power system event identification and classification are crucial to enhancing the reliability of transmission systems. In this study, we develop a deep neural network (DNN) based approach to identify and classify power system events by leveraging real-world measurements from hundreds of phasor measurement units (PMUs) and labels from thousands of events. Two innovative designs are embedded into the baseline model built on convolutional neural networks (CNNs) to improve the event classification accuracy. First, we propose a graph signal processing based PMU sorting algorithm to improve the learning efficiency of CNNs. Second, we deploy information loading based regularization to strike the right balance between memorization and generalization for the DNN. Numerical results based on real-world dataset from the Eastern Interconnection of the U.S power transmission grid show that the combination of PMU based sorting and the information loading based regularization techniques help the proposed DNN approach achieve highly accurate event identification and classification results.

24 POWER TRANSMISSION AND DISTRIBUTION↗