Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Preliminary Plan to Inform Testing of a Heat Exchanger Test Article

This report presents a preliminary plan to guide the qualification testing of advanced heat exchanger (HX) components for nuclear-to-industrial heat transfer applications. The objective is to establish a defensible, physics-based methodology that integrates computational modeling, targeted experimentation, and in-service inspection considerations to demonstrate component performance and reliability under representative reactor conditions. The analysis identifies Sodium-cooled Fast Reactor (SFR) and High-Temperature Gas-cooled Reactor (HTGR) systems as reference configurations in terms of temperature, pressure, and chemical environment. Within these operating envelopes, dominant degradation mechanisms— including creep–fatigue interaction, flow-induced vibration, corrosion, and diffusion-bond deterioration—were evaluated to define test requirements. A comprehensive computationalexperimental framework is proposed to support life prediction and qualification activities. The framework couples high-fidelity structural-mechanics, thermal-hydraulic, and fluid-structure interaction models with accelerated degradation testing to produce a traceable linkage between microstructural evolution, mechanical performance, and remaining useful life (RUL). The approach adheres to established Verification, Validation, and Uncertainty Quantification (VVUQ) standards (ASME V&V 10/20; NUREG-2152) and incorporates a digital-twin architecture for continuous model refinement through data assimilation. The plan further outlines testing methodologies, including pre-test analyses, test-loop design parameters, and sensor placement strategies that maximize information yield while maintaining mechanistic fidelity. Complementary sections describe in-service inspection (ISI), on-line monitoring (OLM), and structural-health-monitoring (SHM) techniques applicable to compact HX geometries typical of advanced reactors. Collectively, these activities establish the technical foundation for demonstrating 40-60-year equivalent service life of advanced heat exchangers in support of the U.S. Department of Energy’s Advanced Reactor and Integrated Energy Systems programs. The forthcoming phase will execute the defined pre-test analyses, initiate hardware fabrication, and implement the integrated testing campaign to validate the proposed qualification methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

EXAMINING THE ACCURACY OF ASTROPHYSICAL DISK SIMULATIONS WITH A GENERALIZED HYDRODYNAMICAL TEST PROBLEM

We discuss a generalization of the classic Keplerian disk test problem allowing for both pressure and rotational support, as a method of testing astrophysical codes incorporating both gravitation and hydrodynamics. We argue for the inclusion of pressure in rotating disk simulations on the grounds that realistic, astrophysical disks exhibit non-negligible pressure support. We then apply this test problem to examine the performance of various smoothed particle hydrodynamics (SPH) methods incorporating a number of improvements proposed over the years to address problems noted in modeling the classical gravitation-only Keplerian disk. We also apply this test to a newly developed extension of SPH based on reproducing kernels called CRKSPH. Counterintuitively, we find that pressure support worsens the performance of traditional SPH on this problem, causing unphysical collapse away from the steady-state disk solution even more rapidly than the purely gravitational problem, whereas CRKSPH greatly reduces this error.

79 ASTRONOMY AND ASTROPHYSICS↗

Cosmic Voids in the SDSS DR12 BOSS Galaxy Sample: the Alcock–Paczyński test

We apply the Alcock–Paczyński (AP) test to stacked voids identified using the final data release (DR12) of the Baryon Oscillation Spectroscopic Survey (BOSS). We also use 1000 mock galaxy catalogs that match the geometry, density, and clustering properties of the BOSS sample in order to characterize the statistical uncertainties of our measurements and take into account systematic errors such as redshift space distortions. For both BOSS data and mock catalogs, we use the ZOBOV algorithm to identify voids, we stack together all voids with effective radii of 30--100 h{sup −1} Mpc in the redshift range of 0.43–0.7, and we accurately measure the shape of the stacked voids. Our tests with the mock catalogs show that we measure the stacked void ellipticity with a statistical precision of 2.6%. The stacked voids in redshift space are slightly squashed along the line of sight, consistent with previous studies. We repeat this measurement of stacked void shape in the BOSS data, assuming several values of Ω{sub m} within the flat ΛCDM model, and we compare this to the mock catalogs in redshift space to perform the AP test. We obtain a constraint of Ω{sub m}=0.38{sub −0.15}{sup +0.18} at the 68% confidence level from the AP test. We discuss the sources of statistical and systematic noise that affect the constraining power of this method. In particular, we find that the measured ellipticity of stacked voids changes more weakly with cosmology than the standard AP prediction, leading to significantly weaker constraints. We discuss how constraints will improve in future surveys with larger volumes and densities.

79 ASTRONOMY AND ASTROPHYSICS↗

Testing of a 40-kWth Counterflow Particle-Supercritical Carbon Dioxide Narrow-Channel, Fluidized Bed Heat Exchanger

Particle-based primary heat exchangers (HXs) must deliver sCO2 fluid temperatures above 700°C to couple particle-based concentrating solar receivers and thermal energy storage (TES) sub-systems with efficient sCO2 power cycles. Particle-sCO2 HX designs have struggled to meet DOE cost targets (≤ $150/kWth) due to the amount of expensive nickel alloys necessary for manufacturing full-scale, particle-sCO2 HXs. Our team has demonstrated that mild bubbling fluidization of falling particles in a counterflow narrow-channel fluidized bed can reduce required HX surface area and thus, costs by increasing particle-wall heat transfer coefficients hT,w > 800 W m-2 K-1. This paper reports on the fabrication and testing of a stainless steel, particle-sCO2 HX with 12 fluidized-bed channels approximately 10.5 mm deep spaced between diffusion-bonded, micro-channel sCO2 plates. The HX with a core length of ≈0.56 m is fed with CARBOBEAD HSP particles through a short, fluidized freeboard zone just above the core. Testing to date in the National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories has shown that parallel bed fluidization maintains uniform particle inventory across the instrumented channels. Heat transfer thermal duty between the particle and sCO2 flows exceeds 30 kWth with sCO2 inlet temperatures of 200ºC and particle inlet temperatures up to 440ºC and mass flow rates of 0.2 kg s-1 fluidized by counterflowing gas flow rates of 0.005 kg s-1. Tests at higher particle and sCO2 inlet temperatures (600ºC and 400ºC respectively) are targeted to achieve > 40 kWth with model-predicted overall heat transfer coefficients U > 400 W m-2 K-1.

14 SOLAR ENERGY↗

Test Plan for the 1600°C Heating Test of AGR-3/4 Compact 3-2

Post irradiation examination (PIE) and heating tests of tristructural isotropic (TRISO)-coated fuel particles, fuel compacts, and graphite from the Advanced Gas Reactor (AGR) irradiation experiment AGR 3/4 is in progress. The AGR-3/4 test train consisted of twelve separate capsules irradiated in the northeast flux trap of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from December 14, 2011, to April 12, 2014 (Collin 2015). This test plan describes the heating test of AGR-3/4 Compact 3-2. The heating test will involve heating the compact in the Fuel Accident Condition Simulator (FACS) furnace to a peak temperature of 1600°C while collecting fission products released from the compact for subsequent analysis. One of several features of AGR-3/4 that set it apart from AGR-1 and AGR-2 is the incorporation of 20 designed-to-fail (DTF) particles in each compact. The fuel kernels in the DTF particles were coated only with a thin (20 µm thick) pyrocarbon layer having high anisotropy such that the coating should most-likely fail during the irradiation, resulting in up to 20 exposed kernels per compact. One of the main goals of this test is to assess the retention of fission products in the exposed kernels and the surrounding graphitic matrix material comprising the compact. Future heating tests will expose AGR-3/4 compacts at different temperatures in the FACS furnace (Demkowicz 2017). Additionally, the ability may be developed to heat re-irradiated AGR-3/4 compacts to allow a determination of the retention of short-lived fission products I-131 and Xe-133.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal Performance of Spandrel Assemblies in Glazed Wall Systems: Laboratory Test Design – Challenges and Test Results

Accurate thermal performance calculation procedures for opaque spandrel areas in curtain wall and window wall systems are essential for rating systems when comparing spandrel systems. However, there is a lack of consensus in thermal modeling needed for accurately characterizing heat transfer through spandrel assemblies due to the complex arrangement of materials and structural components. Several studies indicate that conventional 2D thermal simulations may overestimate R-values by 30% compared to physical testing and 3D simulations. Detailed simulations and well-curated laboratory test data are necessary to build confidence in simulation models, which will later be used to develop correlations to improve widely used conventional 2D thermal simulations. This study aims to experimentally test heat transfer through various spandrel assemblies to validate 3D simulation models. Also, the challenges of conducting a thorough testing design along with the solutions would be documented. The team developed a design for testing spandrel assemblies, making appropriate modifications to the existing heat, air, and moisture (HAM) chamber to accommodate the testing needs. Two moveable baffles were designed and fabricated to guide airflow direction parallel to the test article surface. The data acquisition capabilities in the chamber were upgraded to add more than two hundred sensors to the climate and indoor side of the chamber. The goal is to provide a quality dataset for validating complex 3D modeling simulations, which will be used to develop improved thermal simulation techniques that more accurately represent the thermal behavior of spandrel assemblies and their integration within the building envelope. This paper will summarize the results for the boundary conditions of the testing and the temperature variation across different locations of the spandrel assemblies.

Kunwar, Niraj [ORNL] (ORCID:0000000263457652)↗

Final Report for the Contractor Readiness Assessment of the Transient Reactor Test Facility Resumption of Transient Testing Activity at the Idaho National Laboratory

The purpose of this review was to verify readiness for the TREAT restart of transient testing activity at the INL and inform the startup authorization authority decision-making for startup authorization by providing a deliberate and managed determination of the state of readiness preparation and determination of whether operations can be performed safely. Verification of readiness included assuring that equipment operability, procedure viability, and personnel knowledge, skills, and performance are adequate for operations. Because the TREAT (including restart of transient testing activity) is a hazard category-2 nuclear facility and because reactor operation and transient testing activities were suspended for programmatic and funding reasons in excess of a year, DOE O 425.1D required that both a contractor and DOE RA be satisfactorily completed prior to startup of the TREAT and restart of transient testing activity. To this end, DOE directed that a CRA and federal RA be conducted. The CRA IP defined the depth of the CRA through the objectives and CRADs, delineated in Appendix A of the IP; established roles and responsibilities for CRA team activities; and established processes, practices, and protocols for preparation, conduct, documentation, and reporting of the CRA. The approaches and methodologies identified in the IP were used to verify that the BEA management team has established SSCs, developed personnel capabilities and competencies, and implemented safety features, programs, and procedures in a manner that provides reasonable assurance for adequate protection of workers, the public, and the environment in preparation for and execution of the TREAT restart of transient testing activity. This CRA was intended to confirm that (1) the facility is in a state of readiness to safely conduct operations in accordance with the safety basis; and (2) the management control programs are in place to ensure safe operations can be sustained. This equated to mature implementation of the integrated safety management (ISM) in conjunction with implementation of the individual facility authorization basis. This CRA was structured to verify the readiness to conduct restart of transient testing activity safely, and that facility programs were in place to support the restart of transient testing activity.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of a Fast Spectrum Test Loop at the Advanced Test Reactor

The United States currently has no infrastructure to provide a fast neutron flux for research purposes. With the increased interest in Sodium Fast Reactor (SFR) technology, this type of infrastructure is necessary for further development of key components such as Versatile Test Reactor. The purpose of this research is to characterize the thermal hydraulics of a test loop capable of providing SFR like operating conditions. This includes showcasing feasibility in mechanical design, reaching a high fast to thermal neutron flux ratio ideally near 15, an inlet temperature of 600 K, a temperature increase of 50 K from inlet to outlet, and test chamber radial temperature profiles similar to SFR fuel rods. Existing infrastructure must be used to provide the neutron flux for the test loop, and it was decided that the Advanced Test Reactor (ATR) was the optimal choice due to its availability and previous work conducted similar to this project. To achieve the goals of this project, several mechanical designs were put forward with the most feasible design being chosen. The neutronics and thermal hydraulics analysis were conducted in tandem, with an iterative process used to maximize efficiency of both systems. Analysis of the neutronics system was done using Attila and MCNP while the thermal hydraulic analysis was done using RELAP5. This document outlines the thermal hydraulic analysis, though it includes the results from the mechanical design and neutronics analysis. The loop design includes a primary system with molten sodium, a set of “booster fuel plates” to increase the fast flux within the test section, a water system to cool the booster fuel plates, a helium system to separate the sodium and water systems, and a thermal neutron shield to decrease the thermal flux. Each of these systems is modeled in the neutronics and thermal hydraulic analyses. The RELAP5 model showcased the feasibility of the design proposed by this report. For all designs tested, the desired 50 K temperature increase from inlet to outlet was reached. The fuel rod radial temperature profile was lower than was expected, likely due to a lower rod thermal power than expected. A parametric study was also conducted to characterize the system with three fuel pins. This study showed the effect of thermal power, fluid pressure, fluid velocity, and inlet temperature on the system. ©Copyright by Anton Higgins December 11, 2019 All Rights Reserved

99 GENERAL AND MISCELLANEOUS↗

Evaluation of Additively Manufactured Monolithic SiC and SiC-Matrix Ceramic Matrix Composites for Concentrating Solar Receiver Applications - Fabrication and Testing of Receiver Design Feature Specimens in a Simulating Lab Test via Laser Heating

Increasing operating temperatures of solar receivers is paramount to the efficiency of concentrated solar thermal (CST) and solar power (CSP) systems. Owing to its high temperature stability combined with excellent thermal and optical properties, SiC has been the material of choice for application in high-temperature solar receivers. We report the results of our study of the effective heat transfer characteristics of several candidate SiC structure motifs, or feature geometries, which are fabricated via additive manufacturing. The SiC structure motifs studied include different permutations of three-dimensional periodic lattices and defined shapes. A solar-thermal simulating laboratory test setup is constructed using a 4kW CO2 laser system with beam shaping optics to apply concurrent radiative heating power on one face of 2”-diameter cylindrical feature specimens, representing the structure motifs of interest for receiver element design, while flowing through the sample as heat transfer fluid. Using the test setup, simulative test conditions representative of a concentrated solar flux of up to ~2000 suns could be achieved in the lab tests under varying air flow through the test structure. A simple 1D numerical analysis scheme is developed to extract an effective or compound heat transfer coefficient representative of the test structure under steady-state heat flow conditions. The test results and their use to guide the selection and optimization of SiC material and structure motifs for the receiver element design fabrication are discussed.

14 SOLAR ENERGY↗

Test Plan for Reirradiation and 1600°C Heating Test of AGR-3/4 Compact 3-1

Post irradiation examination (PIE) and heating tests of tristructural isotropic (TRISO)-coated fuel particles, fuel compacts, and graphite from Advanced Gas Reactor (AGR) irradiation experiment AGR 3/4 are in progress. The AGR-3/4 test train consisted of twelve separate capsules irradiated in the northeast flux trap of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from December 14, 2011, to April 12, 2014 (Collin 2015b). This test plan describes the reirradiation and subsequent heating test of AGR-3/4 Compact 3-1. One of the main goals of this test is to assess the retention of short-lived fission products I-131 (t1/2 = 8.02 d) and Xe-133 (t1/2 = 5.2 d) in fuel kernels. To generate short-lived fission products, the compact will first be reirradiated in the Neutron Radiography Reactor (NRAD). Following reirradiation, the compact will be removed from NRAD, gamma scanned on the Precision Gamma Scanner (PGS), and then loaded into the Fuel Accident Condition Simulator (FACS) furnace for heating at 1600°C. Fission gases and condensable fission products released from the compact will be collected in the Fission Gas Monitoring System (FGMS) and the FACS condensation plates, respectively. The planned uses of AGR-3/4 compacts (including heating testing and destructive analysis) are discussed in the AGR-3/4 PIE plan (Demkowicz 2017).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

42 ENGINEERING↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of SNF, most of which are located at the INL site. “Road-ready dry storage” is a management concept where SNF is packaged into dry, sealed canisters, which are then placed in on-site storage in anticipation of later removal. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE SNF for road-ready dry storage. In support of establishing a large-scale road-ready dry storage program at the INL site, the demonstration will package a select amount of DOE-managed SNF into DOE Standard Canisters. The closure process for the DOE Standard Canisters will include fuel and basket loading, welding, inspection, leak testing, and if needed, repair. As a follow-up to previous discussion on the design of the DOE Closure Leak Test Assembly, this report describes recent fabrication and testing efforts performed at INL. DOE Standard Canisters are sealed by two sequential gas tungsten arc welds. Both are performed by remotely operated and semi-autonomous welding systems. The first weld is a circumferential pipe weld that completes assembly of the canister body and lid assembly. The second and final closure weld connects the vent plug to the vent port with an identical butt joint to the circumferential pipe weld. After the second weld is performed on the vent port, these welds are helium leak tested using an inside-out technique. In addition to the commercially available vacuum and leak detector systems, the DOE Standard Canister Closure Leak Test Assembly was designed for both remote and manual operation. This report describes fabrication and performance testing associated with the inside-out technique. INL staff designed and tested systems to accomplish these tasks. Hardware fabrication occurred at INL facilities. Forthcoming work includes design optimization, integration to existing systems, and implementation to packaging demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly – 24139

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of the surveillance test article for an advanced reactor surveillance test program

Operational environments in generation IV reactors involve corrosive and irradiative conditions at elevated temperatures. Typical reactor operations consist of transients which impose cyclic loads on reactor components. These cyclic loads, combined with corrosive and irradiative environments, result in synergistic degradation of component materials. However, limited data exists on the coupled damage effects on materials for reactor environments. While the surrogate material surveillance concept has been used in light water reactors to assess irradiation damage, existing material surveillance technologies are not suitable for in-situ monitoring of coupled material degradation. The materials surveillance program focuses on material degradation management and the estimation of remaining life of reactor components through surveillance test articles. This paper presents the design and analysis methodology of a bi-metal surveillance test article, which uses difference in thermal expansion coefficient between two metals to induce in-situ cyclic loads. This report presents the work conducted in FY 25, to test the surveillance test article in air and salt environments. These test specimens were evaluated after thermal cycle exposure and remaining life is measured through creep test.

36 - MATERIALS SCIENCE↗

Development of a Miniature Small Punch Creep Test for Post Surveillance Test Specimens

Summary: This poster outlines a new small punch creep test (SPCT) for examining the mechanical properties of post surveillance test specimens. A surveillance test article was previously designed to study the effects of Molten-Salt conditions on the structural materials in the reactor. To better understand the post-test mechanical properties of the specimen, a miniature SPCT is proposed. The principle, testing standards and challenges of the method is introduced in the poster. An initial design of the testing apparatus is shown, and an experiment plan is outlined.

36 MATERIALS SCIENCE↗

First elevated-temperature performance testing of coated particle fuel compacts from the AGR-1 irradiation experiment

In the AGR-1 irradiation experiment, 72 coated-particle fuel compacts were taken to a peak burnup of 19.5% fissions per initial metal atom with no in-pile failures. This paper discusses the first post-irradiation test of these mixed uranium oxide/uranium carbide fuel compacts at elevated temperature to examine the fuel performance under a simulated depressurized conduction cooldown event. A compact was heated for 400 h at 1600 degrees C. Release of 85Kr was monitored throughout the furnace test as an indicator of coating failure, while other fission product releases from the compact were periodically measured by capturing them on exchangeable, water-cooled deposition cups. No coating failure was detected during the furnace test, and this result was verified by subsequent electrolytic deconsolidation and acid leaching of the compact, which showed that all SiC layers were still intact. However, the deposition cups recovered significant quantities of silver, europium, and strontium. Based on comparison of calculated compact inventories at the end of irradiation versus analysis of these fission products released to the deposition cups and furnace internals, the minimum estimated fractional losses from the compact during the furnace test were 1.9 x 10-2 for silver, 1.4 x 10-3 for europium, and 1.1 x 10-5 for strontium. Other post-irradiation examination of AGR-1 compacts indicates that similar fractions of europium and silver may have already been released by the intact coated particles during irradiation, and it is therefore likely that the detected fission products released from the compact in this 1600 degrees C furnace test were from residual fission products in the matrix. Gamma analysis of coated particles deconsolidated from the compact after the heating test revealed that silver content within each particle varied considerably; a result that is probably not related to the furnace test, because it has also been observed in other as-irradiated AGR-1 compacts. X-ray imaging of selected particles was performed to examine the internal microstructure. This examination revealed variable irradiation performance of the coating layers, but sufficient statistical sampling is not yet available to identify any possible correlation to variation in individual particle fission product retention.

99 GENERAL AND MISCELLANEOUS↗

Biochemical methane potential (BMP) tests: Reducing test time by early parameter estimation

Highlights: • Early parameters prediction of BMP model is achieved by using sensitivity functions. • Minimum testing time for early parameter estimation is related to kinetic constant. • Balanced regression improves the accuracy of estimated parameters. - Abstract: Biochemical methane potential (BMP) test is a key analytical technique to assess the implementation and optimisation of anaerobic biotechnologies. However, this technique is characterised by long testing times (from 20 to >100 days), which is not suitable for waste utilities, consulting companies or plants operators whose decision-making processes cannot be held for such a long time. This study develops a statistically robust mathematical strategy using sensitivity functions for early prediction of BMP first-order model parameters, i.e. methane yield (B{sub 0}) and kinetic constant rate (k). The minimum testing time for early parameter estimation showed a potential correlation with the k value, where (i) slowly biodegradable substrates (k ≤ 0.1 d{sup −1}) have a minimum testing times of ≥15 days, (ii) moderately biodegradable substrates (0.1 −1 ) have a minimum testing times between 8 and 15 days, and (iii) rapidly biodegradable substrates (k ≥ 0.2 d{sup −1}) have testing times lower than 7 days.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design, testing and emplacement of sand-bentonite for the construction of a gas-permeable seal test (gast)

The main aim of a gas-permeable seal is to increase the gas transport capacity of the backfilled underground structures without compromising the radionuclide retention capacity of the engineered barrier system or the host rock. Such a seal, proposed by NAGRA as part of the 'Engineered Gas Transport System' in a L/ILW repository, considers specially designed backfill and sealing materials such as sand/bentonite (S/B) mixtures with a bentonite content of 20- 30%. NAGRA's RD and D plan foresees demonstrating the construction and performance of repository seals and improving the understanding and the database for reliably predicting water and gas transport through these systems. The fluid flow and gas transport properties of these backfills have been determined at the laboratory scale and through modelling the maximum gas pressures in the near field of a repository system and the gas flow rates have been evaluated. Within this context, the Gas-permeable Seal Test (GAST) was constructed at Grimsel Test Site (GTS) to validate the effective functioning of gas-permeable seals at realistic scale. The intrinsic permeability of such seals should be in the order of 10-18 m2. Because the construction of S/B seals is not common practice for construction companies, a stepwise approach was followed to evaluate different construction and quality assurance methods. As a first step, an investigation campaign with simple tests in the laboratory and in the field followed by 1:1 scale pre-tests at GTS was performed. Through this gradual increase of the degree of complexity, practical experience was gained and confidence in the methods and procedures to be used was built, which allowed reliably producing and working with S/B mixtures at a realistic scale. During the whole pre-testing phase, a quality assurance (QA) programme for S/B mixtures was developed and different methods were assessed. They helped to evaluate and choose appropriate emplacement techniques and methodologies to achieve the target S/B dry density of 1.70 g/cm{sup 3}, which results in the desired intrinsic permeability throughout the experiment. The final QA methodology was targeted at engineering measures to decide if the work can proceed, and at producing high resolution material properties database for future water and gas transport modelling activities. The different applied QA techniques included standard core cutter tests, the application of neutron-gamma (Troxler) probes and two mass balance methods (2D and 3D). The methods, looking at different representative scales, have provided only slightly different results and showed that the average density of the emplaced S/B plug was between 1.65 and 1.73 g/cm{sup 3}. Spatial variability of dry densities was observed at decimeter scale. Overall, the pre-testing and QA programme performed for the GAST project demonstrated how the given design criteria and requirements can be met by appropriately planning and designing the material emplacement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗