Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “tactical planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Recent progress in utilization planning for Space Station Freedom

The progress made in utilization planning for the redesigned Space Station Freedom (SSF) concept is described. Consideration is given to the SSF user capabilities, the strategic planning process, the strategic planning organizations, and the Consolidated Operations and Utilization Plan (COUP, which will be released in January 1993) as well as to the COUP development process and implementation. The process by which the COUP will be produced was exercised in the international Multilateral Strategic and Tactical Integration Process (MUSTIP) simulation. The paper describes the MUSTIP simulation and its activities along with MUSTIP findings and recommendations.

Bartoe, John-David F.↗

Errors in Aviation Decision Making: Bad Decisions or Bad Luck?

Despite efforts to design systems and procedures to support 'correct' and safe operations in aviation, errors in human judgment still occur and contribute to accidents. In this paper we examine how an NDM (naturalistic decision making) approach might help us to understand the role of decision processes in negative outcomes. Our strategy was to examine a collection of identified decision errors through the lens of an aviation decision process model and to search for common patterns. The second, and more difficult, task was to determine what might account for those patterns. The corpus we analyzed consisted of tactical decision errors identified by the NTSB (National Transportation Safety Board) from a set of accidents in which crew behavior contributed to the accident. A common pattern emerged: about three quarters of the errors represented plan-continuation errors, that is, a decision to continue with the original plan despite cues that suggested changing the course of action. Features in the context that might contribute to these errors were identified: (a) ambiguous dynamic conditions and (b) organizational and socially-induced goal conflicts. We hypothesize that 'errors' are mediated by underestimation of risk and failure to analyze the potential consequences of continuing with the initial plan. Stressors may further contribute to these effects. Suggestions for improving performance in these error-inducing contexts are discussed.

Orasanu, Judith↗

Airborne Trajectory Management for Urban Air Mobility

Urban Air Mobility (UAM) has captured the imagination of the public and the aviation industry for someday soon moving people and goods through and around metropolitan areas using Unmanned Aircraft Systems (UAS) that are electrically powered, environmentally friendly, and autonomously operated. Significant investment and rapid development of vehicles for this activity is taking place, with package delivery services already beginning in some areas. However, the ability to manage thousands of these vehicles safely in a congested urban area presents a challenge unprecedented in air traffic management. Initial studies of this problem led by NASA under the UAS Traffic Management (UTM) initiative have primarily focused on geo-fencing and centralized reservation of airspace for individual flights. This paper proposes an extension of UTM using a de-centralized approach employing airborne surveillance, self-separation, and a minimized “design separation” approach to permit the optimization and safety of each flight in very high traffic densities and close proximities. The concept employs Airborne Trajectory Management (ABTM) principles and a novel new concept for variable separation criteria to manage the angular velocity of a passing vehicle, thus eliminating the "startle factor" and perceived hazard of very close operations. ABTM also accomplishes most of the services required for safe planning and execution of normal flights and recovery from abnormal or emergency operations while accommodating conventional piloted flights using the current air traffic control paradigm. The environment for UAM operations is described along with the proposed means for autonomous, tactical separation of the vehicles. Sample geometries of traffic conflicts and resolutions are shown and the airspace definitions, rules for flight within them, and additions and exemptions to the rules for these flights are listed and explained.

Cotton, William↗

Mars Ascent Vehicle (MAV) Solid Motor Technology Plans

Recent trades have taken place on solid propulsion options to support a potential Mars Sample Retrieval Campaign. Mass and dimensional requirements for a Mars Ascent Vehicle (MAV) are being assessed. One MAV vehicle concept would utilize a solid propulsion system. Key challenges to designing a solid propulsion system for MAV include low temperatures beyond common tactical and space requirements, performance, planetary protection, mass limits, and thrust vector control system. Two solutions are addressed, a modified commercial commercially available system, and an optimum new concept.

Prince, Andrew↗

Planetary mission planning for the next decade

This paper reflects NASA's philosophy in the further exploration of the solar system. The philosophy entails the continuing reconnaissance of unexplored bodies in the solar system, while at the same time performing in-depth science investigations with respect to those bodies where the major science issues can be annunciated. The tactic in implementing this strategy will of necessity vary from year to year as a consequence of the varying budget restraints imposed on planetary exploration. However, the strategy will yield the greatest increment of knowledge in a given time frame.

Herman, D. H.↗

Abstracts of the Annual Meeting of Planetary Geologic Mappers, Flagstaff, AZ, 2010

Topics covered include: Detailed Analysis of the Intra-Ejecta Dark Plains of Caloris Basin, Mercury; The Formation and Evolution of Tessera and Insights into the Beginning of Recorded History on Venus: Geology of the Fortuna Tessera Quadrangle (V-2); Geologic Map of the Snegurochka Planitia Quadrangle (V-1): Implications for the Volcanic History of the North Polar Region of Venus; Geological Map of the Fredegonade (V-57) Quadrangle, Venus: Status Report; Geologic Mapping of V-19; Geology of the Lachesis Tessera Quadrangle (V-18), Venus; Comparison of Mapping Tessera Terrain in the Phoebe Regio (V-41) and Tellus Tessera (V-10) Quadrangles; Geologic Mapping of the Devana Chasma (V-29) Quadrangle, Venus; Geologic Mapping of the Aristarchus Plateau Region on the Moon; Geologic Mapping of the Lunar South Pole Quadrangle (LQ-30); The Pilot Lunar Geologic Mapping Project: Summary Results and Recommendations from the Copernicus Quadrangle; Geologic Mapping of the Nili Fossae Region of Mars: MTM Quadrangles 20287, 20282, 25287, 25282, 30287, and 30282; Geologic Mapping of the Mawrth Vallis Region, Mars: MTM Quadrangles 25022, 25017, 25012, 20022, 20017, and 20012; Evidence for an Ancient Buried Landscape on the NW Rim of Hellas Basin, Mars; New Geologic Map of the Argyre Region of Mars: Deciphering the Geologic History Through Mars Global Surveyor, Mars Odyssey, and Mars Express Data; Geologic Mapping in the Hesperia Planum Region of Mars; Geologic Mapping of the Meridiani Region of Mars; Geologic Mapping in Southern Margaritifer Terra; Geology of -30247, -35247, and -40247 Quadrangles, Southern Hesperia Planum, Mars; The Interaction of Impact Melt, Impact-Derived Sediment, and Volatiles at Crater Tooting, Mars; Geologic Map of the Olympia Cavi Region of Mars (MTM 85200): A Summary of Tactical Approaches; Geology of the Terra Cimmeria-Utopia Planitia Highland Lowland Transitional Zone: Final Technical Approach and Scientific Results; Geology of Libya Montes and the Interbasin Plains of Northern Tyrrhena Terra, Mars: First Year Results and Second Year Work Plan; Mars Global Geologic Mapping Progress and Suggested Geographic-Based Hierarchal Systems for Unit Grouping and Naming; Progress in the Scandia Region Geologic Map of Mars; Geomorphic Mapping of MTMS -20022 and -20017; Geologic Mapping of the Medusae Fossae Formation, Mars, and the Northern Lowland Plains, Venus; Volcanism on Io: Results from Global Geologic Mapping; Employing Geodatabases for Planetary Mapping Conduct - Requirements, Concepts and Solutions; and Planetary Geologic Mapping Handbook - 2010.

Bleamaster, Leslie F., III↗

Scheduling and Separating Departures Crossing Arrival Flows in Shared Airspace

Flight efficiency and reduction of flight delays are among the primary goals of NextGen. In this paper, we propose a concept of shared airspace where departures fly across arrival flows, provided gaps are available in these flows. We have explored solutions to separate departures temporally from arrival traffic and pre-arranged procedures to support controllers' decisions. We conducted a Human-in-the-Loop simulation and assessed the efficiency and safety of 96 departures from the San Jose airport (SJC) climbing across the arrival airspace of the Oakland and San Francisco arrival flows. In our simulation, the SJC tower had a tool to schedule departures to fly across predicted gaps in the arrival flow. When departures were mistimed and separation could not be ensured, a safe but less efficient route was provided to the departures to fly under the arrival flows. A coordination using a point-out procedure allowed the arrival controller to control the SJC departures right after takeoff. We manipulated the accuracy of departure time (accurate vs. inaccurate) as well as which sector took control of the departures after takeoff (departure vs. arrival sector) in a 2x2 full factorial plan. Results show that coordination time decreased and climb efficiency increased when the arrival sector controlled the aircraft right after takeoff. Also, climb efficiency increased when the departure times were more accurate. Coordination was shown to be a critical component of tactical operations in shared airspace. Although workload, coordination, and safety were judged by controllers as acceptable in the simulation, it appears that in the field, controllers would need improved tools and coordination procedures to support this procedure.

shared airspace↗

Advanced Stirling Convertor (ASC) Technology Maturation

The Advanced Stirling Convertor (ASC) development effort was initiated by NASA Glenn Research Center (GRC) with contractor Sunpower Inc. to develop high efficiency thermal-to-electric power conversion technology for NASA Radioisotope Power Systems. Early successful performance demonstrations led to the expansion of the project as well as adoption of the technology by the Department of Energy (DOE) and system integration contractor Lockheed Martin Space Systems Company as part of the Advanced Stirling Radioisotope Generator (ASRG) flight project. The ASRG integrates a pair of ASCs to convert the heat from a pair of General Purpose Heat Source (GPHS) modules into electrical power. The expanded NASA ASC effort included development of several generations of ASC prototypes or Engineering Units to help prepare the ASC technology and Sunpower for flight implementation. Sunpower later had two parallel contracts allowing the last of the NASA Engineering Units called ASC-E3 to serve as pathfinders for the ASC-F flight convertors being built for DOE. The ASC-E3 convertors utilized the ASC-F flight specifications and were built using the ASC-F design and process documentation. Shortly after the first ASC-F Pair achieved initial operation, due to budget constraints, the DOE ASRG flight development contract was terminated. NASA continues to invest in the development of Stirling RPS technology including continued production of the ASC-E3 convertors, seven of which have been delivered with one additional unit in production. Starting in FY2015, Stirling Convertor Technology Maturation has been reorganized as an element of the RPS Stirling Cycle Technology Development (SCTD) Project and long-term plans for continued Stirling technology advancement are in reformulation. This paper provides a status on the ASC project, an overview of advancements made in the design and production of the ASC at Sunpower, and a summary of acceptance tests, reliability tests, and tactical tests at NASA GRC that demonstrate the capabilities of the ASC.

radioisotope↗

Advanced Stirling Convertor (ASC) Technology Maturation

The Advanced Stirling Convertor (ASC) development effort was initiated by NASA Glenn Research Center with contractor Sunpower, Inc., to develop high-efficiency thermal-to-electric power conversion technology for NASA Radioisotope Power Systems (RPSs). Early successful performance demonstrations led to the expansion of the project as well as adoption of the technology by the Department of Energy (DOE) and system integration contractor Lockheed Martin Space Systems Company as part of the Advanced Stirling Radioisotope Generator (ASRG) flight project. The ASRG integrates a pair of ASCs to convert the heat from a pair of General Purpose Heat Source (GPHS) modules into electrical power. The expanded NASA ASC effort included development of several generations of ASC prototypes or engineering units to help prepare the ASC technology and Sunpower for flight implementation. Sunpower later had two parallel contracts allowing the last of the NASA engineering units called ASC-E3 to serve as pathfinders for the ASC-F flight convertors being built for DOE. The ASC-E3 convertors utilized the ASC-F flight specifications and were built using the ASC-F design and process documentation. Shortly after the first ASC-F pair achieved initial operation, due to budget constraints, the DOE ASRG flight development contract was terminated. NASA continues to invest in the development of Stirling RPS technology including continued production of the ASC-E3 convertors, seven of which have been delivered with one additional unit in production. Starting in fiscal year 2015, Stirling Convertor Technology Maturation has been reorganized as an element of the RPS Stirling Cycle Technology Development (SCTD) Project and long-term plans for continued Stirling technology advancement are in reformulation. This paper provides a status on the ASC project, an overview of advancements made in the design and production of the ASC at Sunpower, and a summary of acceptance tests, reliability tests, and tactical tests at NASA Glenn that demonstrate the capabilities of the ASC.

Stirling cycle↗

Integration of Automated Systems Test Campaign NC-IAS

NASA’s 2022 strategic plan included the goal to catalyze economic growth and drive innovation in the aviation industry, and to address challenges in air transportation and airspace management within the National Airspace System (NAS). The Aeronautics Research Mission Directorate (ARMD) specifically was tasked with leading aviation innovation to enable safe and sustainable air transportation through revolutionary vehicle advances and efficient flight operations. As a part of meeting these objectives and advancing air mobility concepts, NASA initiated the National Campaign (NC) in the Advanced Air Mobility (AAM) Project within the Airspace Operations and Safety Program (AOSP). The NC was designed to support operational demonstrations with industry as well as the research and development needed to support NASA-led research flight demonstrations. Within NC, the Integration of Automated Systems (IAS), an NC activity, tested and evaluated flight deck automation and airspace operations management functions needed to enable Urban Air Mobility (UAM) operations. This was accomplished through a partnership with Sikorsky Aircraft (specifically Sikorsky Innovations), a Lockheed Martin company, and DARPA (Defense Advanced Research Projects Agency), by leveraging two automation-enabled helicopters equipped with unique capabilities that enabled NASA to develop and test two-ship conflict encounters to demonstrate flight path management and hazard avoidance technologies. The enabler in this testing was NASA-developed “Middleware” (MW) software (also known as Expandable Variable Autonomy Architecture, or EVAA), which among other things allowed multiple algorithms to be incorporated into one software build that was hosted on the dissimilar-type Sikorsky helicopters. The IAS test campaign period of performance was from March 2022 through October 2023 and was structured as a phased, or spiral, approach that ultimately led to the first-ever demonstration of two-ship UAM/AAM operations designed to safely choreograph specific conflict encounters and mission scenarios to test the research algorithms for strategic and tactical aircraft deconfliction. Lessons learned are included in the body of the report. Data collected will be used to inform FAA and industry standards groups on the increasingly automated systems needed for future AAM operations. The test encounters developed for these flight tests were proven to be highly predictable, repeatable, and safely exercised flight path planning and Detect and Avoid (DAA) algorithms. These same test encounters should be leveraged by future flight test campaigns to verify that operational safety is not compromised as the AAM architecture matures. Next steps include repeating similar encounters using unmanned aircraft carrying DAA sensors in the National Airspace.

AAM↗

Real-time artificial intelligence issues in the development of the adaptive tactical navigator

Adaptive Tactical Navigation (ATN) is a laboratory prototype of a knowledge based system to provide navigation system management and decision aiding in the next generation of tactical aircraft. ATN's purpose is to manage a set of multimode navigation equipment, dynamically selecting the best equipment to use in accordance with mission goals and phase, threat environment, equipment malfunction status, and battle damage. ATN encompasses functions as diverse as sensor data interpretation, diagnosis, and planning. Real time issues that were identified in ATN and the approaches used to address them are addressed. Functional requirements and a global architecture for the ATN system are described. Decision making with time constraints are discussed. Two subproblems are identified; making decisions with incomplete information and with limited resources. Approaches used in ATN to address real time performance are described and simulation results are discussed.

Green, Peter E.↗

Tactical Scientific Decision-Making during Crewed Astrobiology Mars Missions

The limitations placed upon human explorers on the surface of Mars will necessitate a methodology for scientific exploration that is different from standard approaches to terrestrial fieldwork and prior crewed exploration of the Moon. In particular, the data transmission limitations and communication latency between Earth and Mars create a unique situation for surface crew in contact with a terrestrial science team. The BASALT research program simulated a series of extravehicular activities (EVAs) in Mars analog terrains under various Mars-relevant bandwidth and latency conditions to investigate how best to approach this problem. Here we discuss tactical decision-making under these conditions, that is, how the crew on Mars interacts with a team of scientists and support personnel on Earth to collect samples of maximum scientific interest. We describe the strategies, protocols, and tools tested in BASALT EVAs and give recommendations on how best to conduct human exploration of Mars with support from Earth-based scientists. We find that even with scientists supporting them, the crew performing the exploration must be trained in the appropriate scientific disciplines in order to provide the terrestrial scientists with enough information to make decisions, but that with appropriate planning and structure, and tools such as a ‘‘dynamic leaderboard,’’ terrestrial scientists can add scientific value to an EVA, even under Mars communication latency

Decision-making↗

Development and Testing of the Orion CEV Parachute Assembly System (CPAS)

The Crew Exploration Vehicle (CEV) is an element of the Constellation Program that includes launch vehicles, spacecraft, and ground systems needed to embark on a robust space exploration program. As an anchoring capability of the Constellation Program, the CEV shall be human-rated and will carry human crews and cargo from Earth into space and back again. Coupled with transfer stages, landing vehicles, and surface exploration systems, the CEV will serve as an essential component of the architecture that supports human voyages to the Moon and beyond. In addition, the CEV will be modified, as required, to support International Space Station (ISS) mission requirements for crewed and pressurized cargo configurations. Headed by Johnson Space Center (JSC), NASA selected Jacobs Engineering as the support contractor to manage the overall CEV Parachute Assembly System (CPAS) program development. Airborne Systems was chosen to develop the parachute system components. General Dynamics Ordnance and Tactical Systems (GD-OTS) was subcontracted to Airborne Systems to provide the mortar systems. Thus the CPAS development team of JSC, Jacobs, Airborne Systems and GD-OTS was formed. The CPAS team has completed the first phase, or Generation I, of the design, fabrication, and test plan. This paper presents an overview of the CPAS program including system requirements and the development of the second phase, known as the Engineering Development Unit (EDU) architecture. We also present top level results of the tests completed to date. A significant number of ground and flight tests have been completed since the last CPAS presentation at the 2007 AIAA ADS Conference.

Lichodziejewski, David↗

Advanced information processing system: The Army Fault-Tolerant Architecture detailed design overview

The Army Avionics Research and Development Activity (AVRADA) is pursuing programs that would enable effective and efficient management of large amounts of situational data that occurs during tactical rotorcraft missions. The Computer Aided Low Altitude Night Helicopter Flight Program has identified automated Terrain Following/Terrain Avoidance, Nap of the Earth (TF/TA, NOE) operation as key enabling technology for advanced tactical rotorcraft to enhance mission survivability and mission effectiveness. The processing of critical information at low altitudes with short reaction times is life-critical and mission-critical necessitating an ultra-reliable/high throughput computing platform for dependable service for flight control, fusion of sensor data, route planning, near-field/far-field navigation, and obstacle avoidance operations. To address these needs the Army Fault Tolerant Architecture (AFTA) is being designed and developed. This computer system is based upon the Fault Tolerant Parallel Processor (FTPP) developed by Charles Stark Draper Labs (CSDL). AFTA is hard real-time, Byzantine, fault-tolerant parallel processor which is programmed in the ADA language. This document describes the results of the Detailed Design (Phase 2 and 3 of a 3-year project) of the AFTA development. This document contains detailed descriptions of the program objectives, the TF/TA NOE application requirements, architecture, hardware design, operating systems design, systems performance measurements and analytical models.

Harper, Richard E.↗

CABINS: Case-based interactive scheduler

In this paper we discuss the need for interactive factory schedule repair and improvement, and we identify case-based reasoning (CBR) as an appropriate methodology. Case-based reasoning is the problem solving paradigm that relies on a memory for past problem solving experiences (cases) to guide current problem solving. Cases similar to the current case are retrieved from the case memory, and similarities and differences of the current case to past cases are identified. Then a best case is selected, and its repair plan is adapted to fit the current problem description. If a repair solution fails, an explanation for the failure is stored along with the case in memory, so that the user can avoid repeating similar failures in the future. So far we have identified a number of repair strategies and tactics for factory scheduling and have implemented a part of our approach in a prototype system, called CABINS. As a future work, we are going to scale up CABINS to evaluate its usefulness in a real manufacturing environment.

Miyashita, Kazuo↗

Comparing and Reconciling Traditional Field and Photogeologic Mapping Techniques: Lessons from the San Francisco Volcanic Field, Arizona

Cartographic products and - specifically - geologic maps provide critical assistance for establishing physical and temporal frameworks of planetary surfaces. The technical methods that result in the creation of geologic maps vary depending on how observations are made as well as the overall intent of the final products [1-3]. These methods tend to follow a common linear work flow, including the identification and delineation of spatially and temporally discrete materials (units), the documentation of their primary (emplacement) and secondary (erosional) characteristics, analysis of the relative and absolute age relationships between these materials, and the collation of observations and interpretations into an objective map product. The "objectivity" of a map is critical cross comparison with overlapping maps and topical studies as well as its relevance to scientific posterity. However, the "accuracy" and "correctness" of a geologic map is very subject to debate. This can be evidenced by comparison of existing geologic maps at various scales, particularly those compiled through field- and remote-based mapped efforts. Our study focuses on comparing the fidelity of (1) "Apollo-style" geologic investigations, where typically non-geologist crew members follow static traverse routes established through pre-mission planning, and (2) "traditional" field-based investigations, where geologists are given free rein to observe without preplanned routes. This abstract summarizes the regional geology wherein our study was conducted, presents the geologic map created from traditional field mapping techniques, and offers basic insights into how geologic maps created from different tactics can be reconciled in support of exploratory missions. Additional abstracts [4-6] from this study discuss various exploration and science results of these efforts.

Skinner, J. A., Jr.↗

A Concept for Robust, High Density Terminal Air Traffic Operations

This paper describes a concept for future high-density, terminal air traffic operations that has been developed by interpreting the Joint Planning and Development Office s vision for the Next Generation (NextGen) Air Transportation System and coupling it with emergent NASA and other technologies and procedures during the NextGen timeframe. The concept described in this paper includes five core capabilities: 1) Extended Terminal Area Routing, 2) Precision Scheduling Along Routes, 3) Merging and Spacing, 4) Tactical Separation, and 5) Off-Nominal Recovery. Gradual changes are introduced to the National Airspace System (NAS) by phased enhancements to the core capabilities in the form of increased levels of automation and decision support as well as targeted task delegation. NASA will be evaluating these conceptual technological enhancements in a series of human-in-the-loop simulations and will accelerate development of the most promising capabilities in cooperation with the FAA through the Efficient Flows Into Congested Airspace Research Transition Team.

Isaacson, Douglas R.↗

Sensing and Virtual Worlds - A Survey of Research Opportunities

Virtual Worlds (VWs) have been used effectively in live and constructive military training. An area that remains fertile ground for exploration and a new vision involves integrating various traditional and now non-traditional sensors into virtual worlds. In this paper, we will assert that the benefits of this integration are several. First, we maintain that virtual worlds offer improved sensor deployment planning through improved visualization and stimulation of the model, using geo-specific terrain and structure. Secondly, we assert that VWs enhance the mission rehearsal process, and that using a mix of live avatars, non-player characters, and live sensor feeds (e.g. real time meteorology) can help visualization of the area of operations. Finally, tactical operations are improved via better collaboration and integration of real world sensing capabilities, and in most situations, 30 VWs improve the state of the art over current "dots on a map" 20 geospatial visualization. However, several capability gaps preclude a fuller realization of this vision. In this paper, we identify many of these gaps and suggest research directions

Moore, Dana↗