Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

MARA (Multimode Airborne Radar Altimeter) system documentation. Volume 1: MARA system requirements document

The Multimode Airborne Radar Altimeter (MARA), a flexible airborne radar remote sensing facility developed by NASA's Goddard Space Flight Center, is discussed. This volume describes the scientific justification for the development of the instrument and the translation of these scientific requirements into instrument design goals. Values for key instrument parameters are derived to accommodate these goals, and simulations and analytical models are used to estimate the developed system's performance.

Parsons, C. L.↗

Advanced systems requirements for ocean observations via microwave radiometers

A future microwave spectroradiometer operating in several frequency bands will have the capability to step or sweep frequencies on an adaptable or programmable basis. The on-board adaptable frequency shifting can make the systems immune from radio interference. Programmable frequency sweeping with on-board data inversion by high speed computers would provide for instantaneous synoptic measurements or sea surface temperature and salinity, water surface and volume pollution, ice thickness, ocean surface winds, snow depth, and soil moisture. Large structure satellites will allow an order of magnitude improvement in the present radiometric measurement spacial resolution.

Blume, H.-J. C.↗

System requirements of Starprobe thermal shield

The mission of the Starprobe Spacecraft is to do in situ exploration of the solar corona to four solar radii. A thermal shield is required to protect the spacecraft equipment from a 3000 sun incident solar energy level caused by this close approach to the sun. The thermal shield requirements discussed include configuration, material requirements, temperature level, penetrations, outgassing and mass loss, and contamination as referenced to spacecraft mission parameters. Further, the size of the spacecraft will be limited by the space transport system orbiter payload bay dimensions, thus defining the upper limit of the relative sizes and locations of the heat shield and spacecraft equipment.

Miyake, R. N.↗

A modular propulsion system required for Space Station assembly

The U.S. Space Station Freedom Manned Base will be assembled on-orbit over the course of several years and multiple Space Shuttle flights. This paper discusses the assembly sequence evolution and its effects on the propulsion system. Relevant descriptions and parameters are given for the gaseous propellant storage, thruster quantity and orientation, and resistojet module. Specific assembly sequences are described and their most important characteristics are compared.

Morano, Joseph S.↗

Space station resistojet system requirements and interface definition study

Preliminary resistojet design requirements were established based on initial technical requirements imposed by the results of NASA and Rocketdyne studies. The requirements are directed toward long life, simplicity, flexibility, and commonality with other space station components. The resistojet assembly is comprised of eight resistojets, fluid components downstream of the waste fluid storage system, a power controller, structure, and shielding. It consists of two identical subassemblies, one of which is redundant. Each subassembly consists of four 500-W resistojets, series redundant latch values, a power controller, a water vaporizer, two pressure regulators, filters, check valves, disconnects, fluid tubing, and electrical cables. All components are packaged at the end of the stinger aft of the JEM and Columbus modules. Different flow and power control methods were studied. A constant inlet pressure and a two-power setting controller were tentatively selected based on simplicity and reasonably high specific impulse for the range of waste gas compositions that are anticipated. The constant pressure is supplied by pressure regulators. The two set point power control includes individual power supplies to each resistojet heater and water vaporizer. An embedded data processor, a multiplexer-demultiplexer, and a network interface unit that are standard space station components are included in the power controller. The total dry weight of the resistojet assembly is approximately 172 lb. The total cost for design, development, test, evaluation, qualification, and flight hardware is estimated to be $16 million.

Heckert, Bruce J.↗

Guidelines for Implementing Advanced Distribution Management Systems: Requirements for DMS Integration with DERMS and Microgrids

This guideline focuses on the integration of DMS with DERMS and microgrids connected to the distribution grid by defining generic and fundamental design and implementation principles and strategies. It starts by addressing the current status, objectives, and core functionalities of each system, and then discusses the new challenges and the common principles of DMS design and implementation for integration with DERMS and microgrids to realize enhanced grid operation reliability and quality power delivery to consumers while also achieving the maximum energy economics from the DER and microgrid connections.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bantam System Technology Project Ground System Requirements Document

The Low Cost Booster Project (LCBP), also known as Bantam, is an element of the Advanced Space Transportation Program focused on Low Cost Booster Technologies. During FY 99 flight demonstrations are planned to demonstrate the feasibility of producing a booster capable of inserting a 150 kg payload into low earth orbit. The ground support system is an element of the full launch system. The ground support system provides for integration of the payload with the launch vehicle, preparation of the vehicle for launch (including maintenance, integration and test of the vehicle flight software), monitor and control of the launch sequence, range safety during launch, and collection of telemetry during the flight up to payload release. The ground support system is intended to make the maximum possible use of Government Off-the-Shelf (GOTS) or Commercial Off-the-Shelf (COTS) hardware and software to obtain the best value in terms of development operations support and ultimate life cycle cost for the launch system.

Moon, J. M.↗

Rf System Requirements for JLab’s MEIC Collider Ring

The Medium-energy Electron Ion Collider (MEIC), proposed by Jefferson Lab, consists of a series of accelerators. At the top energy are the electron and ion collider rings. For the ion ring, it accelerates five long ion bunches to colliding energy and rebunches ions into a train of very short bunches before colliding. A set of low frequency RF system is needed for the long ion bunch energy ramping. Another set of high frequency RF cavities is needed to rebunch ions. For the electron ring, superconducting RF (SRF) cavities are needed to compensate the synchrotron radiation energy loss. The impedance of the SRF cavities must be low enough to keep the high current electron beam stable. The preliminary design requirements of these RF cavities are presented.

43 PARTICLE ACCELERATORS↗

A study of system requirements for Phobos/Deimos missions. Volume 4: Phase 3 results, combined missions to Mars and its satellites

Combined missions to Mars and Phobos/Deimos were considered in relation to large scientific returns at a low total cost. A matrix of all feasible major combined mission concepts was compiled. The most promising approach was selected from which a nominal mission profile was developed. A systems analysis was performed to trade off performance, configuration, and cost characteristics of candidate mission concepts. Configuration and subsystem optimization analysis were then conducted from which a baseline and an alternate program were selected. Program schedules and cost estimates were prepared for the recommended and alternate program.

Source record↗

Space systems requirements definition

The compilation of Scientific Data Requirements (SDRs) were based on discussions with a representative cross section of the scientific community and a selected survey of the extensive literature dealing with the measurement of CO2-induced climatic changes. This approach resulted in a baseline set of SDRs to determine what could be accomplished with space-based sensors. Twenty-three SDRs emerged as the basis for the investigation of space systems.

Source record↗

Radiometer system requirements for microwave remote sensing from satellites

An area of increasing interest is the establishment of a significant research program in microwave remote sensing from satellites, particularly geosynchronous satellites. Due to the relatively small resolution cell sizes, a severe requirement is placed on beam efficiency specifications for the radiometer antenna. Geostationary satellite microwave radiometers could continuously monitor several important geophysical parameters over the world's oceans. These parameters include the columnar content of atmospheric liquid water (both cloud and rain) and water vapor, air temperature profiles, and possibly sea surface temperature. Two principle features of performance are of concern. The first is the ability of the radiometer system to resolve absolute temperatures with a very small absolute error, a capability that depends on radiometer system stability, on frequency bandwidth, and on footprint dwell time. The second is the ability of the radiometer to resolve changes in temperature from one resolution cell to the next when these temperatures are subject to wide variation over the overall field-of-view of the instrument. Both of these features are involved in the use of the radiometer data to construct high-resolution temperature maps with high absolute accuracy.

Juang, Jeng-Nan↗

Solar Storm GIC Forecasting: Solar Shield Extension Development of the End-User Forecasting System Requirements

A NASA Goddard Space Flight Center Heliophysics Science Division-led team that includes NOAA Space Weather Prediction Center, the Catholic University of America, Electric Power Research Institute (EPRI), and Electric Research and Management, Inc., recently partnered with the Department of Homeland Security (DHS) Science and Technology Directorate (S&T) to better understand the impact of Geomagnetically Induced Currents (GIC) on the electric power industry. This effort builds on a previous NASA-sponsored Applied Sciences Program for predicting GIC, known as Solar Shield. The focus of the new DHS S&T funded effort is to revise and extend the existing Solar Shield system to enhance its forecasting capability and provide tailored, timely, actionable information for electric utility decision makers. To enhance the forecasting capabilities of the new Solar Shield, a key undertaking is to extend the prediction system coverage across Contiguous United States (CONUS), as the previous version was only applicable to high latitudes. The team also leverages the latest enhancements in space weather modeling capacity residing at Community Coordinated Modeling Center to increase the Technological Readiness Level, or Applications Readiness Level of the system http://www.nasa.gov/sites/default/files/files/ExpandedARLDefinitions4813.pdf.

space weather↗

Fusion Propulson System Requirements for an Interstellar Probe

An examination of the engine constraints for a fusion-propelled vehicle indicates that minimum flight times for a probe to a 5 light-year star will be approximately 50 years. The principal restraint on the vehicle is the radiator weight and size necessary to dissipate the heat which enters the chamber walls from the fusion plasma. However, it is interesting, at least theoretically, that the confining magnetic field strength is of reasonable magnitude, 2 to 3 x 10(exp5) gauss, and the confinement time is approximately 0.1 sec.

FUSION↗

ADVANCE System Requirements

In this document, we focus mainly on testing libraries written in the legacy ENDF format. As we move to new nuclear data format, we anticipate will need to revisit this document.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Additional Protocol (AP) Protocol Reporter version 3.0 (PR3) System Requirements Specification (SRS)

The Protocol Reporter (PR) was developed by the International Atomic Energy Agency (IAEA) to assist Member States in the creation and preparation of declarations pursuant to articles 2 and 3 of the model Additional Protocol (AP, INFCIRC/540, corrected), and was designed to be a complete tool for compiling, arranging, editing, managing, and submitting State declarations in support of the AP.

Cain, Ronald A.↗

System Requirements for the Implementation of a Fused Silica Debris Shield

The National Ignition Facility (NIF) is the world’s largest and most energetic laser. It consists of 192 individual laser beams that, when first fired from the master oscillator room, are no more energetic than a typical laser pointer. After the initial firing, the lasers are sent through a preamplifier where the energy is increased by a factor of 10 billion. The laser light is amplified even further in the NIF laser bays by “stretching”each individual laser to a cross sectional area of approximately one square foot and passing them through the NIF power amplifiers, then multiple times through the NIF main amplifiers inside the NIF Laser bays. The laser beams make one final pass through the through the power amplifiers before they are reflected out of the laser bays.

42 ENGINEERING↗