Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “spring 2009”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Water-table and discharge changes associated with the 2016–2017 seismic sequence in central Italy: hydrogeological data and a conceptual model for fractured carbonate aquifers

A seismic sequence in central Italy from August 2016 to January 2017 affected groundwater dynamics in fractured carbonate aquifers. Changes in spring discharge, water-table position, and streamflow were recorded for several months following nine Mw 5.0–6.5 seismic events. Data from 22 measurement sites, located within 100 km of the epicentral zones, were analyzed. The intensity of the induced changes were correlated with seismic magnitude and distance to epicenters. The additional post-seismic discharge from rivers and springs was found to be higher than 9 m{sup 3}/s, totaling more than 0.1 km{sup 3} of groundwater release over 6 months. This huge and unexpected contribution increased streamflow in narrow mountainous valleys to previously unmeasured peak values. Analogously to the L’Aquila 2009 post-earthquake phenomenon, these hydrogeological changes might reflect an increase of bulk hydraulic conductivity at the aquifer scale, which would increase hydraulic heads in the discharge zones and lower them in some recharge areas. The observed changes may also be partly due to other mechanisms, such as shaking and/or squeezing effects related to intense subsidence in the core of the affected area, where effects had maximum extent, or breaching of hydraulic barriers.

58 GEOSCIENCES↗

CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).

13 HYDRO ENERGY↗

Completion Report for Well ER-20-7: Corrective Action Units 101 and 102: Central and Western Pahute Mesa

Well ER-20-7 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. The well was drilled in June 2009 as part of the Pahute Mesa Phase II drilling program. The primary purpose of the well was to further investigate migration of radionuclides from the nearby, up-gradient TYBO and BENHAM underground nuclear tests, which originally was discovered at Well Cluster ER-20-5. This well also provided detailed hydrogeologic information in the Tertiary volcanic section that will reduce uncertainties within the Pahute Mesa-Oasis Valley hydrostratigraphic framework model. The main 44.45-centimeter hole was drilled to a depth of 681.8 meters and cased with 33.97-centimeter casing to 671.7 meters. The hole diameter was then decreased to 31.12 centimeters, and the well was drilled to total depth of 894.9 meters. The completion string, set to the depth of 890.0 meters, consists of 14.13-centimeter stainless-steel casing hanging from 19.37-centimeter carbon-steel casing. The 14.13-centimeter stainless-steel casing has one continuous slotted interval open to the Topopah Spring aquifer. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 meters, sidewall core samples from 20 depth intervals, various geophysical logs, water quality (primarily tritium) measurements, and water level measurements. The well penetrated 894.9 meters of Tertiary volcanic rock, including two saturated welded-tuff aquifers. A fluid level measurement was obtained during open-hole geophysical well logging for the upper, Tiva Canyon, aquifer at the depth of 615.7 meters on June 19, 2009. The fluid level measured in the open hole on June 27, 2009,after the total depth was reached and the upper aquifer was cased off, was also at the depth of 615.7 meters. Preliminary field measurements indicated 1.5 to 4.5 million picocuries per liter of tritium in the Tiva Canyon aquifer and 20 to 61 million picocuries per liter in the underlying Topopah Spring aquifer.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of NASA SPoRT's Pseudo-Geostationary Lightning Mapper Products in the 2011 Spring Program

NASA's Short-term Prediction Research and Transition (SPoRT) program is a contributing partner with the GOES-R Proving Ground (PG) preparing forecasters to understand and utilize the unique products that will be available in the GOES-R era. This presentation emphasizes SPoRT s actions to prepare the end user community for the Geostationary Lightning Mapper (GLM). This preparation is a collaborative effort with SPoRT's National Weather Service partners, the National Severe Storms Laboratory (NSSL), and the Hazardous Weather Testbed s Spring Program. SPoRT continues to use its effective paradigm of matching capabilities to forecast problems through collaborations with our end users and working with the developers at NSSL to create effective evaluations and visualizations. Furthermore, SPoRT continues to develop software plug-ins so that these products will be available to forecasters in their own decision support system, AWIPS and eventually AWIPS II. In 2009, the SPoRT program developed the original pseudo geostationary lightning mapper (PGLM) flash extent product to demonstrate what forecasters may see with GLM. The PGLM replaced the previous GLM product and serves as a stepping-stone until the AWG s official GLM proxy is ready. The PGLM algorithm is simple and can be applied to any ground-based total lightning network. For 2011, the PGLM used observations from four ground-based networks (North Alabama, Kennedy Space Center, Oklahoma, and Washington D.C.). While the PGLM is not a true proxy product, it is intended as a tool to train forecasters about total lightning as well as foster discussions on product visualizations and incorporating GLM-resolution data into forecast operations. The PGLM has been used in 2010 and 2011 and is likely to remain the primary lightning training tool for the GOES-R program for the near future. This presentation will emphasize the feedback received during the 2011 Spring Program. This will discuss several topics. Based on feedback from the 2010 Spring Program, SPoRT created two variant PGLM products, which NSSL produced locally and provided in real-time within AWIPS for 2011. The first is the flash initiation density (FID) product, which creates a gridded display showing the number of flashes that originated in each 8 8 km grid box. The second product is the maximum flash density (MFD). This shows the highest PGLM value for each grid point over a specific period of time, ranging from 30 to 120 minutes. In addition to the evaluation of these two new products, the evaluation of the PGLM itself will be covered. The presentation will conclude with forecaster feedback for additional improvements requested for future evaluations, such as within the 2012 Spring Program.

Stano, Geoffrey T.↗

"Research to Improve the Efficacy of Captive Broodstock Programs and Advance Hatchery Reform Throughout the Columbia River Basin." [from the Abstract], 2007-2008 Annual Progress Report.

This project was developed to conduct research to improve the efficacy of captive broodstock programs and advance hatchery reform throughout the Columbia river basin. The project has three objectives: (1) maintain adaptive life history characteristics in Chinook salmon, (2) improve imprinting in juvenile sockeye salmon, and (3) match wild phenotypes in Chinook and sockeye salmon reared in hatcheries. A summary of the results are as follows: Objective 1: Adult and jack Chinook salmon males were stocked into four replicate spawning channels at a constant density (N = 16 per breeding group), but different ratios, and were left to spawn naturally with a fixed number of females (N = 6 per breeding group). Adult males obtained primary access to females and were first to enter the nest at the time of spawning. Jack male spawning occurred primarily by establishing satellite positions downstream of the courting pair, and 'sneaking' into the nest at the time of spawning. Male dominance hierarchies were fairly stable and strongly correlated with the order of nest entry at the time of spawning. Spawning participation by jack and adult males is consistent with a negative frequency dependent selection model, which means that selection during spawning favors the rarer life history form. Results of DNA parentage assignments will be analyzed to estimate adult-to-fry fitness of each male. Objective 2: To determine the critical period(s) for imprinting for sockeye salmon, juvenile salmon were exposed to known odorants at key developmental stages. Molecular assessments of imprinting-induced changes in odorant receptor gene expression indicated that regulation of odorant expression is influenced by developmental status and odor exposure history. The results suggest that sockeye salmon are capable of imprinting to homing cues during the developmental periods that correspond to several of current release strategies employed as part of the Captive Broodstock program (specifically, planting eyed eggs, fall and smolt releases into the lake) appear to be appropriate for successful homing of sockeye in Redfish Lake. Also, our findings indicated that sockeye salmon were capable of olfactory imprinting at multiple life stages and over varying exposure durations. Fish exposed to odors just prior to smolting showed the strongest attraction to the imprinting odor arginine and this period corresponds to the period of highest plasma thyroxine levels and increased BAAR receptor mRNA in juveniles. Objective 3: Spring Chinook salmon were exposed to three different photoperiods and three feed rations at the button-up stage of development. Both photoperiod at emergence and ration post-ponding affected the number of males maturing at age one. Nearly 70% of the males in the early emergence and satiation fed group matured after the first year of rearing, while none of the fish reared on late emergence photoperiod (equivalent to emergence on May 1) matured during this time irrespective of ration treatment. Within the early emergence groups, reducing growth using ration (low or high) appeared to reduce the number of males maturing at age one from 70% to 40-50%. Maturation rates of fish that emerged in a photoperiod equivalent to mid-February (middle emergence) ranged from 10-25%. Together these data indicate that the seasonal timing of fry emergence and growth after ponding can alter life history patterns in spring Chinook salmon. The results imply that hatchery rearing practices that alter seasonal timing of fry emergence can have drastic effects on life history patterns in juvenile Chinook salmon. All three objectives are on-going and will result in recommendations (at the end of the FY 2009 performance period) to advance hatchery reforms in conventional and captive broodstock programs.

13 HYDRO ENERGY↗

Research, Development and Demonstration of Peak Load Reduction on Distribution Feeders Using Distributed Energy Resources for the City of Fort Collins

This project titled “Research, Development and Demonstration of Peak Load Reduction on Distribution Feeders Using Distributed Energy Resources for the City of Fort Collins” evolved in response to the Department of Energy’s (DOE) Funding Opportunity Announcement (FOA) Number DE-PS26-07NT43119. Also referred to as the Fort Collins Renewable and Distributed System Integration (RDSI) Project, the effort was undertaken by a diverse group of local government, higher education and business organizations; and was driven by three overarching goals: I. Fulfill the requirements of the DOE FOA’s Area of Interest 2: Renewable and Distributed System Integration; most notably, to demonstrate the ability to reduce electric system distribution feeder peak load by 15% or more through the coordinated use of Distributed Energy Resources (DER). II. Advance the expertise, technologies and infrastructure necessary to support the long term vision of the Fort Collins Zero Energy District (FortZED) and move towards creating a zero energy district in the Fort Collins “Old Town” area. III. Further the goals of the City of Fort Collins Energy Policy, including the development of a Smart Grid-enabled distribution system in Fort Collins, expanded use of renewable energy, increased energy conservation, and peak load reduction. Through the collaborative efforts of the partner organizations, the Fort Collins RDSI project was successful in achieving all three of these goals. This report is organized into two distinct sections corresponding to the two phases of the project: • Part 1: Feeder Peak Load Reduction and the FortZED Initiative. • Part 2: Forming and Operating Utility Microgrids and Managing Load and Production Variability The original project scope addressed the Part 1 feeder peak load reduction. That work took place from 2009 through 2011 and was largely complete when the project scope was amended to include a demonstration of microgrid operations. While leveraging the assets, partner relationships, and lessons learned from Part 1, Part 2 was managed and executed as a distinct and substantially independent sub-project during the spring and summer of 2013. Both Parts 1 and 2 of the overall RDSI project can be viewed as cohesive stand-alone bodies of work and are presented as such within this report. In addition to the narratives, this document includes two Appendices that were compiled to supplement information about the various aspects of activities performed during Parts 1 and 2 of the project. Moreover, these Appendices are organized (as outlined below) so as to directly relate to the narratives in Part 1 and 2 of this report. • Appendix - Part 1: describes the roles of each project participant in regards to the feeder peak load reduction effort, and • Appendix - Part 2: deals with the microgrid research/demonstration.

14 SOLAR ENERGY↗

Completion Report for Well ER-EC-11 Corrective Action Units 101 and 102: Central and Western Pahute Mesa

Well ER-EC-11 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, in support of the Nevada Environmental Restoration Project at the Nevada National Security Site (formerly Nevada Test Site), Nye County, Nevada. The well was drilled in September and October 2009 as part of the Pahute Mesa Phase II drilling program. A main objective was to investigate radionuclide migration down-gradient from Well Cluster ER-20-5 and Well ER-20-7 and across the northern Timber Mountain moat structural zone into the area referred to as the Bench, between Pahute Mesa and the Timber Mountain caldera complex. A secondary purpose of the well was to provide detailed hydrogeologic information for the shallow- to intermediate-depth Tertiary volcanic section in the Bench area. This well also provided detailed hydrogeologic information in the Tertiary volcanic section to reduce uncertainties within the Pahute Mesa-Oasis Valley hydrostratigraphic framework model (Bechtel Nevada, 2002). The main 52.1-centimeter hole was drilled to a depth of 507.5 meters and then opened to a diameter of 66.0 centimeters. It was cased with 50.8-centimeter casing to 504.9 meters. The hole diameter was then decreased to 47.0 centimeters, and drilling continued to a total depth of 979.3 meters. It was then cased with 34.0-centimeter casing set at 965.5 meters. The hole diameter was then decreased to 31.1 centimeters and the borehole was drilled to a total depth of 1,264.3 meters. The completion casing string, set to the depth of 1,262.5 meters, consists of 19.4-centimeter stainless-steel casing hanging from 19.4-centimeter carbon-steel casing. The stainless-steel casing has two slotted intervals open to the Tiva Canyon and Topopah Spring aquifers. Four piezometer strings were installed in Well ER-EC-11. A string of carbon-steel 6.0-centimeter tubing with one slotted interval was inserted outside the 50.8-centimeter casing, within the 66.0-centimeter borehole for access to the Timber Mountain aquifer, and landed at 475.3 meters. A second string of 6.0-centimeter tubing with one slotted interval was inserted outside the 34.0-centimeter casing, within the 47.0-centimeter borehole for access to the Benham aquifer, and landed at 911.7 meters. A third piezometer string consists of 7.3-centimeter stainless-steel tubing that hangs from 6.0-centimeter carbon-steel tubing via a crossover sub. This string was landed at 1,029.5 meters to monitor the Tiva Canyon aquifer. The deepest string of 7.3-centimeter tubing was landed at 1,247.8 meters to monitor the Topopah Spring aquifer. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 meters, 67 percussion gun and rotary sidewall core samples, various geophysical logs, fluid samples (for groundwater chemistry analysis and tritium measurements), and water-level measurements. The well penetrated 1,264.3 meters of Tertiary volcanic rock, including three saturated welded-tuff aquifers and one saturated lava-flow aquifer. A water level was measured in the Timber Mountain aquifer at 449.6 meters, during open-hole geophysical logging on September 20, 2009. The fluid level measured after the total depth was reached and the upper aquifer was cased off was 450.0 meters when measured in the open borehole on October 17, 2009. Measurements on samples taken from the undeveloped well indicated that tritium levels averaging approximately 12,430 picocuries per liter (less than Safe Drinking Water Act levels) were encountered within the Benham aquifer. Tritium was below the minimum detectable activity concentration for samples collected from the Tiva Canyon aquifer and the Topopah Spring aquifer.

54 ENVIRONMENTAL SCIENCES↗

High-Efficiency, Ultra-High Pressure Electrolysis With Direct Linkage to PV Arrays - Phase II SBIR Final Report

In this Phase II SBIR, Avalence LLC met all proposed objectives. Because the original Phase III partner pulled out of the project, several alternative sites/partners were used to achieve the goals. The on-site operation and PV measurements were performed on a smaller unit at General Motors proving grounds in Milford, MI. The actual equipment targeted for AC Transit will be delivered to Robins Air Force Base in September of 2009 to support the fueling of a fuel cell powered fork lift and 'Bobcat'. In addition the Transit Agency Site Requirements and Constraints were performed for the Greater New Haven Transit District (GNHTD) for the Hamden, CT Public Works building that will be the site for a similar fueling station to be delivered in the Spring of 2010. The Detailed Design Package was also based on the Design for the GNHTD unit. The work on this project successfuly demonstrated the potential of Avalence's high pressure technology to address the need for renewably produced hydrogen fuel for transportation applications. Several follow-on projects in a numerber of related applications are now underway as a result of this SBIR project.

08 HYDROGEN↗

Superconductivity at Dawn of the Iron Age

Superconductivity is a stunning quantum phenomenon and among the deepest paradigms in all of physics. From fundamental theories of the universe to strange goings-on in exotic materials to medical imaging and cell phones, its conceptual and practical dimensions span a reach as wide as anything in science. Twenty-odd years ago, the discovery of copper oxides ushered in a new era of high-temperature superconductivity, and the joyous exuberance that followed - with physicists throwing everything from fancy gauge theories to synchrotron radiation into its kitchen sink - only recently began to show any signs of waning. In the spring of 2008, as if on cue, a new family of iron pnictide high-temperature superconductors burst on the scene, hinting at an alternative route to room-temperature superconductivity and all of its momentous consequences. Fueled by genuine excitement - and a bit of hype - the iron-based superconductivity turned into a science blockbuster of 2009. I will present a pedagogical review of this new field, contrast the physics of iron- and copper-based systems, and speculate on the microscopic origins of the two types of high-temperature superconductivity.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Aerosol Properties Over Tibetan Plateau From a Decade of AERONET Measurements: Baseline, Types, and Influencing Factors

In this study, a decade long measurement of aerosol optical properties at two AERONET stations (Nam Co during 2006–2016 and QOMS during 2009–2017) in the Tibetan Plateau (TP), a region sensitive to climate change and human perturbation, is presented. The baseline value of aerosol optical depth (AOD) was 0.029 and 0.027 at Nam Co and QOMS, respectively, which are comparable to or even lower than those at some Arctic and remote ocean locations. The seasonality of AOD values were the order of spring > summer > winter > autumn. Based on AOD and Ångström exponent (α), major aerosol types over the TP were further identified as continental background, biomass burning, and dust. Although continental background aerosol was the main feature in remote areas of TP, biomass burning plumes frequently occurred, especially during spring (March–April). In one of such biomass burning event in April 2014, MODIS observations demonstrated that intensive open fires occurred in South Asia, covering the foothills of Himalayas and Indo‐Gangetic Plain. The air mass back trajectories and CALIOP observations further revealed that biomass burning plume could be uplifted to higher altitudes and reach the Himalayas. Moreover, an occasional dust event detected in April 2008 over the TP demonstrated that the dust from Taklamakan Desert may impact the main body of TP episodically, although the local dust from the inside of TP cannot be excluded and warrants further study.

Manisha Pokharel↗

Land and Atmosphere Near-Real-Time Capability for Earth Observing System

The past decade has seen a rapid increase in availability and usage of near-real-time data from satellite sensors. The EOSDIS (Earth Observing System Data and Information System) was not originally designed to provide data with sufficiently low latency to satisfy the requirements for near-real-time users. The EOS (Earth Observing System) instruments aboard the Terra, Aqua and Aura satellites make global measurements daily, which are processed into higher-level 'standard' products within 8-40 hours of observation and then made available to users, primarily earth science researchers. However, applications users, operational agencies, and even researchers desire EOS products in near-real-time to support research and applications, including numerical weather and climate prediction and forecasting, monitoring of natural hazards, ecological/invasive species, agriculture, air quality, disaster relief and homeland security. These users often need data much sooner than routine science processing allows, usually within 3 hours, and are willing to trade science product quality for timely access. While Direct Broadcast provides more timely access to data, it does not provide global coverage. In 2002, a joint initiative between NASA (National Aeronautics and Space Administration), NOAA (National Oceanic and Atmospheric Administration), and the DOD (Department of Defense) was undertaken to provide data from EOS instruments in near-real-time. The NRTPE (Near Real Time Processing Effort) provided products within 3 hours of observation on a best-effort basis. As the popularity of these near-real-time products and applications grew, multiple near-real-time systems began to spring up such as the Rapid Response System. In recognizing the dependence of customers on this data and the need for highly reliable and timely data access, NASA's Earth Science Division sponsored the Earth Science Data and Information System Project (ESDIS)-led development of a new near-real-time system called LANCE (Land, Atmosphere Near-Real-Time Capability for EOS) in 2009. LANCE consists of special processing elements, co-located with selected EOSDIS data centers and processing facilities. A primary goal of LANCE is to bring multiple near-real-time systems under one umbrella, offering commonality in data access, quality control, and latency. LANCE now processes and distributes data from the Moderate Resolution Imaging Spectroradiometer (MODIS), Atmospheric Infrared Sounder (AIRS), Advanced Microwave Scanning Radiometer Earth Observing System (AMSR-E), Microwave Limb Sounder (MLS) and Ozone Monitoring Instrument (OMI) instruments within 3 hours of satellite observation. The Rapid Response System and the Fire Information for Resource Management System (FIRMS) capabilities will be incorporated into LANCE in 2011. LANCE maintains a central website to facilitate easy access to data and user services. LANCE products are extensively tested and compared with science products before being made available to users. Each element also plans to implement redundant network, power and server infrastructure to ensure high availability of data and services. Through the user registration system, users are informed of any data outages and when new products or services will be available for access. Building on a significant investment by NASA in developing science algorithms and products, LANCE creates products that have a demonstrated utility for applications requiring near-real-time data. From lower level data products such as calibrated geolocated radiances to higher-level products such as sea ice extent, snow cover, and cloud cover, users have integrated LANCE data into forecast models and decision support systems. The table above shows the current near-real-time product categories by instrument. The ESDIS Project continues to improve the LANCE system and use the experience gained through practice to seek adjustments to improve the quality and performance of the system. For example, anGC-compliant Web Map Service (WMS) will be added shortly that will allow users to download geo-referenced MODIS images for arbitrary bounding boxes. Further, an OGC-compliant Web Coverage Service (WCS) will be added later this year that will expedite user access to arbitrary data subsets or re-formatted products. AIRS images are now served through WMS and available in multiple formats (PNG, GeoTIFF, KMZ). NASA has established a LANCE User Working Group to steer the development of the system and create a forum for sharing ideas and experiences that are expected to further improve the LANCE capabilities. The LANCE system has proved a success by satisfying the growing needs of the applications and operational communities for land and atmosphere data in near-real-time. NASA's Earth Sciences Division was able to leverage existing science research capabilities to provide the near-real-time community with products and imagery that support monitoring of disasters in a timely manner.

Murphy, Kevin J.↗

Seasonal and multiannual roost use by Rafinesque's Big-eared Bats in the Coastal Plain of South Carolina.

Little is known about factors affecting year-round use of roosts by Rafinesque's big-eared bats (Corynorhinus rafinesquii) or the long-term fidelity of this species to anthropogenic or natural roosts. The objectives of this study were to test whether seasonal use of roosts by Rafinesque's big-eared bats varied with roost type and environmental conditions within and among seasons and to document multiannual use of natural and anthropogenic structures by this species. We inspected 4 bridges, 1 building, and 59 tree roosts possessing basal cavity openings; roosts were inspected at least once per week from May through October in every year from 2005 through 2008 and once a month from November through April in every year from 2005 through 2009. We found that use of anthropogenic roosts was significantly greater than the use of tree roosts in summer but that the use of structure types did not differ in other seasons. There was significant seasonal variation in use of anthropogenic and tree roosts. Anthropogenic roost use was higher in summer than in all other seasons. There was no significant difference in tree use among spring, summer, and fall, but use in winter was significantly lower in 2 years of the study. Overall use of anthropogenic and tree roosts was positively related to minimum temperature, but the relationship between use of roosts and minimum temperature varied among seasons. Bats showed multiannual fidelity ({ge} 4 years) to all anthropogenic roosts and to some tree roosts, but fidelity of bats to anthropogenic roosts was greater and more consistent than to tree roosts. Our data indicate that Rafinesque's big-eared bats responded differently to environmental conditions among seasons; thus, a variety of structure types and characteristics are necessary for conservation of these bats. We suggest long-term protection of roost structures of all types is necessary for conservation of Rafinesque's big-eared bats in the southeast Coastal Plain.

60 APPLIED LIFE SCIENCES↗

Spring Dust in Western North America and its Interannual Variability – Understanding the Role of Local and Transported Dust

Mineral dust over western North America is an important aerosol type contributing up to one half of surface aerosol concentrations in spring. In the present study, we use data from in-situ and remote-sensing observations and the NASA Unified WRF (NU-WRF) model to investigate the sources and interannual variations of the springtime fine-mode dust over western North America. The horizontal distribution, seasonality, and interannual variability of the springtime dust over the region are characterized with observations of fine dust concentrations at the Interagency Monitoring of Protected Visual Environments (IMPROVE) sites and dust optical depth (DOD) from the Aerosol Robotic Network (AERONET) measurements. We have conducted detailed modeling and analysis for April in selected years of 2005, 2008, and 2009, to understand the causes of interannual variabilities of the springtime dust with model experiments that separate the dust generated from local deserts with that transported across the Pacific Ocean. The results suggest that although several permanent deserts and semi-arid regions in the western North America are the major source of surface fine dust concentrations in the immediate vicinity, long-range transpacific transported dust is a dominant dust source in springtime, especially over the coastal regions and areas remote from the local deserts. Interannual variability of fine dust over western North America is explained with both local dust emission and long-range transported dust.

North America spring dust↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on Hanford’s 300 Area Uranium Plume

The Integrated Field-Scale Subsurface Research Challenge (IFRC) at the Hanford Site 300 Area uranium (U) plume addresses multi-scale mass transfer processes in a complex hydrogeologic setting where groundwater and riverwater interact. A series of forefront science questions on mass transfer are posed for research which relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements and approaches needed to characterize and model a mass-transfer dominated system. The project was initiated in February 2007, with CY 2007 and CY 2008 progress summarized in preceding reports. The site has 35 instrumented wells, and an extensive monitoring system. It includes a deep borehole for microbiologic and biogeochemical research that sampled the entire thickness of the unconfined 300 A aquifer. Significant, impactful progress has been made in CY 2009 with completion of extensive laboratory measurements on field sediments, field hydrologic and geophysical characterization, four field experiments, and modeling. The laboratory characterization results are being subjected to geostatistical analyses to develop spatial heterogeneity models of U concentration and chemical, physical, and hydrologic properties needed for reactive transport modeling. The field experiments focused on: (1) physical characterization of the groundwater flow field during a period of stable hydrologic conditions in early spring, (2) comprehensive groundwater monitoring during spring to characterize the release of U(VI) from the lower vadose zone to the aquifer during water table rise and fall, (3) dynamic geophysical monitoring of salt-plume migration during summer, and (4) a U reactive tracer experiment (desorption) during the fall. Geophysical characterization of the well field was completed using the down-well Electrical Resistance Tomography (ERT) array, with results subjected to robust, geostatistically constrained inversion analyses. These measurements along with hydrologic characterization have yielded 3D distributions of hydraulic properties that have been incorporated into an updated and increasingly robust hydrologic model. Based on significant findings from the microbiologic characterization of deep borehole sediments in CY 2008, down-hole biogeochemistry studies were initiated where colonization substrates and spatially discrete water and gas samplers were deployed to select wells. The increasingly comprehensive field experimental results, along with the field and laboratory characterization, are leading to a new conceptual model of U(VI) flow and transport in the IFRC footprint and the 300 Area in general, and insights on the microbiological community and associated biogeochemical processes. A significant issue related to vertical flow in the IFRC wells was identified and evaluated during the spring and fall field experimental campaigns. Both upward and downward flows were observed in response to dynamic Columbia River stage. The vertical flows are caused by the interaction of pressure gradients with our heterogeneous hydraulic conductivity field. These impacts are being evaluated with additional modeling and field activities to facilitate interpretation and mitigation. The project moves into CY 2010 with ambitious plans for a drilling additional wells for the IFRC well field, additional experiments, and modeling. This research is part of the ERSP Hanford IFRC at Pacific Northwest National Laboratory.

54 ENVIRONMENTAL SCIENCES↗

Probing Novel Properties of Nucleons and Nuclei via Parity Violating Electron Scattering

This thesis reports on two experiments conducted by the HAPPEx (Hall A Proton Parity Experiment) collaboration at the Thomas Jefferson National Accelerator Facility. For both, the weak neutral current interaction (WNC, mediated by the Z 0 boson) is used to probe novel properties of hadronic targets. The WNC interaction amplitude is extracted by measuring the parity-violating asymmetry in the elastic scattering of longitudinally polarized electrons o unpolarized target hadrons. HAPPEx-III, conducted in the Fall of 2009, used a liquid hydrogen target at a momentum transfer of Q 2 = 0.62 GeV 2 . The measured asymmetry was used to set new constraints on the contribution of strange quark form factors (G s E,M ) to the nucleon electromagnetic form factors. A value of A PV = -23.803±} 0.778 (stat)± 0.359 (syst) ppm resulted in G s E + 0.517G s M = 0.003± 0.010 (stat)± 0.004 (syst)± 0.009 (FF). PREx, conducted in the Spring of 2010, used a polarized electron beam on a 208Pb target at a momentum transfer of Q 2 = 0.009 GeV 2 . This parity-violating asymmetry can be used to obtain a clean measurement of the root-mean-square radius of the neutrons in the 208 Pb nucleus. The Z 0 boson couples mainly to neutrons; the neutron weak charge is much larger than that of the proton. The value of this asymmetry is at the sub-ppm level and has a projected experimental fractional precision of 3%. We will describe the accelerator setup used to set controls on helicity-correlated beam asymmetries and the analysis methods for finding the raw asymmetry for HAPPEx-III. We will also discuss in some detail the preparations to meet the experimental challenges associated with measuring such a small asymmetry with the degree of precision required for PREx.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

U.S. residential consumer product information: Validation of methods for post-stratification weighting of Amazon Mechanical Turk surveys

We present two post-stratification weighting methods to validate survey data collected using Amazon Mechanical Turk (AMT). Two surveys focused on appliance and consumer electronics devices were administered in the spring and summer of 2012 to each of approximately 3,000 U.S. households. Specifically, the surveys asked questions about residential refrigeration products, televisions (TVs) and set-top boxes (STBs). Filtered data were assigned weights using each of two weighting methods, termed “sequential” and “simultaneous,” by examining up to eight demographic variables (income, education, gender, race, Hispanic origin, number of occupants, ages of occupants, and geographic region) in comparison to reference U.S. demographic data from the 2009 Residential Energy Consumption Survey (RECS). Five key questions from the surveys (number of refrigerators, number of freezers, number of TVs, number of STBs and primary service provider) were evaluated with a set of statistical tests to determine whether either method improved the agreement of AMT with reference data, and if so, which method was better. The statistical tests used were: differences in proportions, distributions of proportions (using Pearson’s chi-squared test), and differences in average numbers of devices as functions of all demographic variables. The results indicated that both methods generally improved the agreement between AMT and reference data, sometimes greatly, but that the simultaneous method was usually superior to the sequential method. Some differences in sample populations were found between the AMT and reference data. Differences in the proportion of STBs reflected large changes in the STB market since the time our reference data was acquired in 2009. Differences in the proportions of some primary service providers suggested real sample bias, with the possible explanation that AMT user are more likely to subscribe to providers who also provide home internet service. Differences in other variables, while statistically significant in some cases, were nonetheless considered to be minor. Depending on the intended purpose of the data collected using AMT, these biases may or may not be important; to correct them, additional questions and/or further post-survey adjustments could be employed. In general, based on the analysis methods and the sample datasets used in this study, AMT surveys appeared to provide useful data on appliance and consumer electronics devices.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗