Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “shared solar”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Development of a Practical Secondary Control for Hardware Microgrids

Practical, vendor-agnostic interoperability guidelines for the secondary control architecture of microgrids (MGs) with multiple grid-forming (GFM) inverter-based resources (IBRs) have not yet been developed. Therefore, this paper proposes a generic and vendor-agnostic secondary control architecture that operates with all GFM IBRs and synchronous generators. This secondary control does not require the use of additional measurement devices in the MG and utilizes the inherent communication systems of the GFM units, such as Modbus TCP/IP. The practical challenges of Modbus registers, such as packet loss and quantization error, and their detrimental impacts on secondary control actions are investigated. The proposed three-stage modification for any secondary control architecture to mitigate these impacts includes: 1) averaging the data read, 2) situational event-triggering of the controller, and 3) finite iteration of the controlling action. The proposed method is validated using a three-phase electric power, 480 V, 60 Hz, 500 kVA laboratory hardware microgrid with commercial two GFM IBRs and one diesel generator. The experimental results corroborates the fact the proposed modification in the secondary control architecture is advantageous for practical usage under erroneous measurements.

grid-forming inverter↗

Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement

With the increasing share of distributed energy resources on the electric grid, utility companies are facing significant decisions about infrastructure upgrades. An alternative to extensive and capital-intensive upgrades is to offer non-firm interconnection opportunities to distributed generators, via a coordinated operation of utility scale resources. This paper introduces a novel flexible interconnection option based on the last-in, first-out principles of access aimed at minimizing the unnecessary non-firm generation energy curtailment by balancing access rights and contribution to thermal overloads. Although we focus on solar photovoltaic (PV) plants in this work, the introduced flexible interconnection option applies to any distributed generation technology. The curtailment risk of individual non-firm PV units is evaluated across a range of PV penetration levels in a yearlong quasi-static time-series simulation on a real-world feeder. The results show the importance of the size of the curtailment zone in the curtailment risk distribution among flexible generation units as well as that of the “access right” defined by the order in which PV units connect to the grid. Case study results reveal that, with a proper selection of curtailment radius, utilities can reduce the total curtailment of flexible PV resources by up to more than 45%. Findings show that non-firm PV generators can effectively avoid all thermal limit-related upgrade costs.

14 SOLAR ENERGY↗

Optoelectronic property comparison for isostructural Cu 2 BaGeSe 4 and Cu 2 BaSnS 4 solar absorbers

To target mitigation of anti-site defect formation in Cu 2 ZnSnS 4–x Se x , a new class of chalcogenides, for which Ba or Sr (group 2) replace Zn (group 12), has recently been introduced for prospective solar absorber application. Cu 2 BaGeSe 4 (CBGSe) and Cu 2 BaSnS 4 (CBTS) are two such compounds, which share a common trigonal crystal structure (P3 1 space group) and similar quasi-direct band gap (~2 eV). While CBTS-based films have already been studied, there are no reports yet on films and solar cells based on related CBGSe. To identify key differences and similarities in the electronic properties between these two materials, electronic characteristics (e.g., carrier concentration, mobility, electron affinity, defect levels, recombination, and charge carrier kinetics) of vacuum-deposited CBGSe and CBTS films are compared using a variety of characterization methods. Hall effect measurements reveal that CBGSe films have relatively higher hole carrier concentration and lower mobility (3 × 10 15 cm –3 , 0.6 cm 2 V –1 s –1 ) compared to CBTS (5 × 10 12 cm –3 , 3.5 cm 2 V –1 s –1 ). Photoelectron spectroscopy yields low electron affinity values for both CBGSe (3.7 eV) and CBTS (3.3 eV), pointing to the necessity of pursuing low electron affinity buffer materials for both types of absorbers. At low temperatures, CBGSe films show free-exciton photoluminescence, as well as pronounced deep-level emission at ~1.4 eV, while CBTS films exhibit a strong bound-exciton signal with noticeably less intense deep-level emission than for CBGSe. Charge carrier kinetics, transport, and recombination properties of both types of films are also analyzed using optical-pump terahertz-probe spectroscopy and time-resolved microwave conductivity. The first CBGSe prototype solar cells (using chemical bath deposited CdS as a buffer layer) show a maximum of 1.5% efficiency with ~0.62 V open-circuit voltage. Furthermore, the measured properties point to possible limiting factors for CBGSe and related films for PV and optoelectronics and provide insights on possible approaches for improvement within this multinary chalcogenide family.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

14 SOLAR ENERGY↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Investigation into Sizing Photovoltaic with Energy Storage for Off-Grid Transactive Scenarios

In this study, a novel sizing methodology was developed for centralized and interconnected operating strategies of transactive microgrids and several variables were investigated including starting month, initial charge of battery, load variability, unit cost of solar panels and energy storage, number of systems, climate, and required reliability to determine their effect on total cost. The centralized strategy improved cost by seven to ten percent compared to the isolated strategy in every case. The interconnected strategy saved an incremental amount of money consistently compared to the isolated standard. The number of connected systems was not a strong effect. It was thought that increasing the number of systems would increase the benefit of energy sharing. Climate zones studied (“Cold”; “Hot-Dry/Mixed Dry”; “Mixed Humid”; and “Cold but with lower solar irradiation”) showed a large variation on cost with the Hot-Dry/Mixed Dry being the least expensive and Cold, with lower solar irradiation being the most expensive. Cost sensitivity analysis was performed showing that the unit cost of solar has a greater effect on the total cost. Required reliability of power, measured in outage hours, exhibited an inverse relation with cost.

14 SOLAR ENERGY↗

Co-Benefits of Mitigating Aerosol Pollution to Future Solar and Wind Energy in China Toward Carbon Neutrality

The climate commitment to achieving carbon neutrality before 2060 in China has been announced recently. In the context of pursuing carbon neutrality, sharing similar sources as greenhouse gases, aerosol particle and precursor emissions are projected to substantially decrease in China, which can potentially have a great impact on climate. Here, we investigate the effects of future aerosol reductions, because of achieving carbon neutrality, on solar and wind energy in China by using an earth system model. We show that significant reductions in aerosol emissions, particularly in eastern China, lead to increases in the surface downwelling shortwave radiation, surface air temperature and wind speed, which can further enhance the potential of solar and wind energy production. The findings underline that the pursuit of carbon neutrality can yield co-benefits of not only mitigating climate change and air pollution but also fortifying the stability of renewable energy sources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Rural Hybrid Generation & Microgrids: National Labs are Here to Help

Hear about the tools and technical assistance National Labs can offer to co-ops and other rural utilities seeking to build or enhance hybrid generation projects combining multiple technologies including wind, solar, battery storage, and others resources. These hybrids can deliver additional value by combining complimentary resources and by increasing reliability and resilience, including as part of a microgrid to serve a local load or community. Experienced cooperative and lab experts will share their perspectives on the opportunities there are to make use of their advanced modeling capabilities and expertise to scope, design, and implement these emerging hybrid solutions. Key takeaways for participants will include better understanding of the resilience benefits distributed hybrid systems provide, awareness of National Laboratory assistance programs and resources, tips for successful federal funding applications for these types of projects, and peer-to-peer learning through shared experiences and discussion.

14 SOLAR ENERGY↗

Modeling direct air carbon capture and storage in a 1.5 °C climate future using historical analogs

Limiting the rise in global temperature to 1.5 °C will rely, in part, on technologies to remove CO 2 from the atmosphere. However, many carbon dioxide removal (CDR) technologies are in the early stages of development, and there is limited data to inform predictions of their future adoption. Here, we present an approach to model adoption of early-stage technologies such as CDR and apply it to direct air carbon capture and storage (DACCS). Our approach combines empirical data on historical technology analogs and early adoption indicators to model a range of feasible growth pathways. We use these pathways as inputs to an integrated assessment model (the Global Change Analysis Model, GCAM) and evaluate their effects under an emissions policy to limit end-of-century temperature change to 1.5 °C. Adoption varies widely across analogs, which share different strategic similarities with DACCS. If DACCS growth mirrors high-growth analogs (e.g., solar photovoltaics), it can reach up to 4.9 GtCO 2 removal by midcentury, compared to as low as 0.2 GtCO 2 for low-growth analogs (e.g., natural gas pipelines). For these slower growing analogs, unabated fossil fuel generation in 2050 is reduced by 44% compared to high-growth analogs, with implications for energy investments and stranded assets. Residual emissions at the end of the century are also substantially lower (by up to 43% and 34% in transportation and industry) under lower DACCS scenarios. The large variation in growth rates observed for different analogs can also point to policy takeaways for enabling DACCS.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Renewable Energy Materials Properties Database: Summary

Renewable energy is providing a growing share of electricity generation in the United States, with generation from utility scale wind and solar increasing by 12% and 29%, respectively, in 2020 (EIA 2021). Installation of new renewable energy facilities requires material inputs that range from common construction materials to specialized, high-performance materials that may have limited availability. This report summarizes the Department of Energy (DOE) Wind Energy Technologies Office (WETO) and DOE Solar Energy Technologies Office (SETO) database of materials used in domestic wind and solar installations. The Energy Act of 2020 directs WETO and SETO to deliver a "comprehensive physical property database of materials for use in [wind and solar] energy technologies, which shall identify the type, quantity, country of origin, source, significant uses, projected availability, and physical properties of materials used in [wind and solar] energy technologies" by no later than September 1, 2022. This report is the summary and directions for use of the Renewable Energy Materials Property Database (REMPD), in response to that direction. The related full text of the Energy Act of 2020 is provided in Appendix A. The focus of the REMPD and this accompanying report is on quantifying the raw and processed materials used in renewable energy technologies. The database contains information on the amount of each material that goes into wind and solar power plants, descriptions of the relevant material properties, and the primary countries of origin for each material. Some materials go through several stages of processing and/or are incorporated into subcomponents that make up the completed energy generation facilities. This report does not analyze supply chains for the production of renewable energy plant components. The Department of Energy has carried out related analysis in response to Executive Order 14017, which directed production of "America's Supply Chains" reports for Wind and Solar. The supply chain reports can be found at https://www.energy.gov/sites/default/files/2022-02/Wind%20Supply%20Chain%20Report%20-%20Final%202.25.22.pdf (Wind) and https://www.energy.gov/sites/default/files/2022-02/Solar%20Energy%20Supply%20Chain%20Report%20-%20Final.pdf (Solar). Additional reports in this series that are relevant to wind, solar and hybrid plants include: Energy Storage at https://www.energy.gov/sites/default/files/2022-02/Energy%20Storage%20Supply%20Chain%20Report%20-%20final.pdf and Neodymium Magnets at https://www.energy.gov/sites/default/files/2022-02/Neodymium%20Magnets%20Supply%20Chain%20Report%20-%20Final.pdf.

14 SOLAR ENERGY↗

Solar Energy Integration in Buildings

Energy consumption in buildings has been steadily increasing and contributing up to 40% of the total energy use in developed countries [1]. In developing countries, the share of building energy consumption is smaller, but given population growth, urbanization, and rising demands for building services and comfort, the sharp rise of building energy use is probably inevitable. Thus, reducing building energy consumption plays a very important role in controlling global energy demand and mitigating climate change, so as to develop a sustainable environment. Solar energy, as the most important source of renewable energy, features the characteristics of clean, renewable, inexhaustible, and widely distributed energy, relative to other kinds of energy sources. Solar energy systems can now generate electricity at a cost equal to or lower than local grid-supplied electricity [2]. More importantly, solar energy can provide almost all forms of energy needed by buildings, through active or passive methods.

buildings↗

10th Jubilee Singlet Fission Workshop

Singlet fission and its potential utility in solar photoconversion is a rapidly expanding field of scientific research. The workshop funded by this award was for facilitating collaboration and for open sharing of recent experimental or theoretical results on topics relevant to singlet fission. It took place at Estes Park Colorado at the Dao House resort on June 17 -20, 2023.

14 SOLAR ENERGY↗

Energy Northwest - Horn Rapids Solar and Storage: An Assessment of Battery Technical Performance

Chartered in 1957 as a joint action agency of the state, Energy Northwest (ENW) is a consortium of 27 public utility districts and municipalities across Washington state. ENW takes advantage of economies of scale and shared services to help utilities run their operations more efficiently and at lower cost, to the benefit of more than 1.5 million customers. ENW develops, owns, and operates a diverse mix of electricity generating resources, including hydro, solar, and wind projects – and the Northwest’s only active nuclear energy facility. These projects provide enough reliable, affordable, and environmentally responsible energy to power more than a million homes each year, and that carbon-free electricity is provided at the cost of generation. The agency continually explores new generation projects to meet its members’ needs. In 2017, as part of the second round of funding from the Washington state Clean Energy Fund, the Washington State Department of Commerce granted up to $3 million in matching funds to develop an estimated $6.5 million project that deployed a 4-MW, 20-acre solar generating array of photovoltaic (PV) panels coupled with a 1 MW/5.5 MWh lithium-iron-phosphate battery energy storage system (BESS) in Richland, Washington. The combination of PV and BESS will provide a predictable, renewable generating source and will also serve as a training ground for solar and battery technicians throughout the nation. The City of Richland will purchase the power from the project and utilize the benefits of the energy storage. The project provides Washington state with its first opportunity to integrate a large-scale solar and storage facility into its clean mix of hydro, nuclear, and wind resources. This first-of-its-kind facility combines solar generation with battery storage and technician training. In 2019, Pacific Northwest National Laboratory (PNNL) worked with ENW to assess the integrated PV and BESS in representative use cases that could benefit the City of Richland. Between March and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (A) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline), and they are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (B) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with ENW. Five use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) transmission charge reduction, 4) Volt-VAR service, and 5) outage mitigation. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help ENW understand the performance of the Horn Rapids BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

Community-Scale Solar Deployment in the Northwest Arctic

NANA Regional Corporation (NRC, or NANA) was formed as an Alaska Native Corporation (ANC) pursuant to the Alaska Native Claims Settlement Act of 1971. Our lands cover 39,000 square miles of the Northwest Arctic region of Alaska. We partner closely with the Northwest Arctic Borough (NAB) and our 11 remote communities on numerous projects and activities, especially around clean energy initiatives that improve quality of life and help to reduce extremely high energy costs experienced by the communities in our region. Collectively, the regional partnership has developed numerous successful solar, wind, biomass, and energy storage, distribution upgrade, and efficiency projects. To further progress, we created the Northwest Arctic Energy Steering Committee to share and replicate these benefits across the region. NANA’s mission is to provide economic opportunities for our more than 13,500 Iñupiat shareholders and to protect and enhance NANA lands.

14 SOLAR ENERGY↗

The Evolving Role of Extreme Weather Events in the U.S. Power System with High Levels of Variable Renewable Energy

As weather-dependent renewable generation grows, it is important for power system planning to understand the broad trends and correlations between weather, renewable resources, and load. The traditional planning, performed by utilities and system operators, includes the study of system resource adequacy during peak load periods in the summer and winter to ensure the generation and transmission system is appropriate to meet load. But in a power grid with a high penetration of variable renewable energy (i.e., wind and solar), periods of high risk to system resource adequacy may no longer correspond only to hours of peak load. In particular, high shares of variable renewable energy, even when well-forecasted to inform system operations, can further complicate the stress extreme weather events already place on the grid. They also may lead to changes to the types of weather conditions that are most problematic to system operations and resource adequacy due to widespread and extended deficits of wind and solar generation. Accordingly, the focus of reliability assessments in long-term planning studies may need to evolve in the coming years to more fully incorporate weather events that lead to these deficits. This report seeks to identify these new weather events and understand the characteristics of the events that lead to system risk of future systems with higher penetrations variable renewable energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

National Solar Jobs Accelerator (Final Technical Report (FTR))

The aptitudes and experiences gained through military service—such as dynamic leadership, teamwork and critical thinking skills, technical specialization, and a mission-completion work ethic—make veterans exceptional candidates for a wide range of solar energy careers. The solar industry offers a highly collaborative and purpose-driven work environment that resonates with service members and veterans looking to rise to their next challenge, and solar employers are eager to tap into this valuable talent pool. From October 2019 - February 2023, The National Solar Jobs Accelerator (publicly the Solar Ready Vets Network TM (SRV Network; SRVN)) enhanced and streamlined options for military service members and veterans to pursue solar training, certification, and employment, while advancing solar employers’ efforts and capacity to invest in military talent as part of a long-term workforce development strategy. The SRVN was led by the Interstate Renewable Energy Council (IREC) in partnership with the Solar Energy Industries Association (SEIA), the US Chamber of Commerce Foundation’s Hiring Our Heroes program (HOH) and the North American Board of Certified Energy Practitioners (NABCEP). Through several direct-impact and indirect, high-impact capacity building initiatives aligned with six key objectives, the SRV Network strengthened solar career pathways, and promoted increased representation of military talent across all levels and sectors of the solar workforce. A work-based learning Corporate Fellowship model connected transitioning service members with on-the-job experience in leadership roles with solar employers nationwide. The project advanced broader veteran recruitment and talent development by expanding GI Bill eligibility and streamlining veterans’ pathways for solar training and credentialing, supported direct connections to jobs with top solar employers, and led coordination among key education and industry partners to advance registered apprenticeships aligned with solar career pathways. To ensure that the project best served the needs of all stakeholders, an Advisory Committee of military-connected solar professionals, solar employers, and training providers met biannually to guide project activities and sustainability plans. The project team engaged the broader “SRV Network” (comprised of over 2,000 veterans, employers and training organizations) through regular newsletters and targeted outreach to share resources, hiring fairs, webinars, and other opportunities for engagement. The work done under this award builds on the previous iterations of the Department of Energy’s Solar Ready Vets ® program. As the solar industry continues to grow rapidly over the next decade, the military community will continue to be a highly valuable source of talent. The relationships established and work accomplished through this project will have an enduring positive impact well beyond the funding period.

14 SOLAR ENERGY↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

balancing authority↗