Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “science orbit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Orbit Determination for Mars Global Surveyor During Mapping

The Mars Global Surveyor (MGS) spacecraft reached a low-altitude circular orbit on February 4, 1999, after the termination of the second phase of aerobraking. The MGS spacecraft carries the Mars Orbiter Laser Altimeter (MOLA) whose primary goal is to derive a global, geodetically referenced 0.2 deg x 0.2 deg topographic grid of Mars with a vertical accuracy of better than 30 meters. During the interim science orbits in the' Hiatus mission phase (October - November 1997), and the Science Phasing Orbits (March - April, 1998, and June - July 1998) 208 passes of altimeter data were collected by the MOLA instrument. On March 1, 1999 the first ten orbits of MOLA altimeter data from the near-circular orbit were successfully returned from MGS by the Deep Space Network (DSN). Data will be collected from MOLA throughout the Mapping phase of the MCS mission, or for at least one Mars year (687 days). Whereas the interim orbits of Hiatus and SPO were highly eccentric, and altimeter data were only collected near periapsis when the spacecraft was below 785 km, the Mapping orbit of MGS is near circular, and altimeter data will be collected continuously at a rate of 10 Hz. The proper analysis of the altimeter data requires that the orbit of the MGS spacecraft be known to an accuracy comparable to that of the quality of the altimeter data. The altimeter has an ultimate precision of 30 cm on mostly flat surfaces, so ideally the orbits of the MGS spacecraft should be known to this level. This is a stringent requirement, and more realistic goals of orbit error for MGS are ten to thirty meters. In this paper we will discuss the force and measurement modelling required to achieve this objective. Issues in force modelling include the proper modelling of the gravity field of Mars, and the modelling of non-conservatives forces, including the development of a 'macro-model', in a similar fashion to TOPEX/POSEIDON and TDRSS. During Cruise and Aerobraking, the high gain antenna (HGA) was stowed on the +X face of the spacecraft. On March 29, 1999 the HGA will be deployed on a meter long boom which will remain Earth-pointing while the instrument panel (including the MOLA instrument) remains pointed at nadir. The tracking data must be corrected for the regular motion of the high gain antenna with respect to the center of mass, and the success of the MGS determination during Mapping will depend on correctly accounting for this offset in the measurement model.

Lemoine, F. G.↗

Aerobracking the ExoMars TGO: the JPL Navigation Experience

In October 2016, ESA’s Trace Gas Orbiter entered into orbit around Mars. The transfer from its initial 24-hour elliptical orbit into the final 2-hour science orbit was helped by means of 952 aerobraking passes between March 2017 and February 2018. For this first aerobraking operation by European Space Operations Centre (ESOC), a dedicated partnership was organized between ESOC and NASA’s Jet Propulsion Laboratory (JPL) to allow for JPL navigation team’s support during the TGO aerobraking operations. The Mission Design and Navigation section at JPL supported the mission by providing consulting in aerobraking navigation operations and independent orbit determination solutions during TGO’s aerobraking. This paper discusses the JPL Navigation team’s experience, challenges faced, and lessons learned during TGO’s aerobraking at Mars. Topics include the collaboration between the two navigation teams, configuration of orbit determination for aero drag passes, arrangement of automated orbit determination, and reporting processes.

Young, Brian↗

GLOW_SunFacing and SBG_Comms Analogous Examples

A Venus orbit insertion sequence to meet various science objectives and end with a stable science orbit. An Earth data downlink opportunities to polar ground stations. Neither are mission specific.

Trajectory↗

Mars Reconnaissance Orbiter Maneuver Plan Following Mars 2020 Landing

The Mars Reconnaissance Orbiter spacecraft continues to perform valuable science observations at Mars, provide telecommunication relay for surface assets, and characterize landing sites for future missions. The spacecraft provided the primary relay support for the Mars 2020 mission during entry, descent, and landing on February 18, 2021. This paper discusses the propulsive maneuver plan following the Mars 2020 landing to return the spacecraft to its primary science orbit by November 2021 and maintain it through 2029. Alternate maneuver plans considered for supporting Mars 2020 surface operations and the entry, descent, and landing of the ExoMars 2022 mission are also described.

Menon, Premkumar R.↗

Small Aerostationary Telecommunications Orbiter Concept for Mars in the 2020s

Current Mars science orbiters carry UHF proximity payloads to provide limited access and data services to landers and rovers on Mars surface. In the era of human spaceflight to Mars, very high rate and reliable relay services will be needed to serve a large number of supporting vehicles, habitats, and orbiters, as well as astronaut EVAs. These will likely be provided by a robust network of orbiting assets in very high orbits, such as areostationary orbits. In the decade leading to that era, telecommunications orbits can be operated at areostationary orbit that can support a significant population of robotic precursor missions and build the network capabilities needed for the human spaceflight era. Telecommunications orbiters of modest size and cost, delivered by Solar Electric Propulsion to areostationary orbit, can provide continuous access at very high data rates to users on the surface and in Mars orbit.In the era of human spaceflight to Mars very high rate andreliable relay services will be needed to serve a largenumber of supporting vehicles, habitats, and orbiters, aswell as astronaut EVAs. These could be provided by arobust network of orbiting assets in very high orbits. In thedecade leading to that era, telecommunications orbiterscould be operated at areostationary orbit that could support asignificant population of robotic precursor missions andbuild the network capabilities needed for the humanspaceflight era. These orbiters could demonstrate thecapabilities and services needed for the future but withoutthe high bandwidth and high reliability requirements neededfor human spaceflight.Telecommunications orbiters of modest size and cost,delivered by Solar Electric Propulsion to areostationaryorbit, could provide continuous access at very high datarates to users on the surface and in Mars orbit. Twoexamples highlighting the wide variety of orbiter deliveryand configuration options were shown that could providehigh-performance service to users.

Lock, Robert E.↗

Enhancing the Payload Development Process for Lunar Gateway and Lunar Surface Science & Exploration: Space Biology Beyond Low-Earth-Orbit Instrumentation and Science Series (BLISS) Science Working Group 2023-2024 Annual Report

Space biology BLEO research is inherently driven by the differences between the LEO and BLEO environments, which can be broadly characterized by the five-hazard “RIDGE” paradigm (Radiation, Isolation, Distance, Gravity, Environment, e.g., similar to Figure 2 in (1)). Thus, the envisioned goals over the next decade will include using the cislunar and lunar surface environments to (A) characterize deep-space environments including biological effects of radiation and other stressors, (B) gain experience from isolation of very small groups in very small enclosures, (C) learn to compensate for distance from Earth via in situ resource utilization (ISRU) and bioregenerative life support, (D) gain assurance that all aspects of deep-space exploration can proceed in altered or artificial gravity environments, (E) develop essential adaptation scenarios for the built (e.g., low pressure) and external (e.g., temperature extremes, dust) environments.

Biology↗

Mars Odyssey Science: The First Year and Beyond

The 2001 Mars Odyssey orbital science mission officially began in late February, 2002. The spacecraft carries three science instrument packages: the Gamma Ray Spectrometer suite (GRS), the Thermal Emission Imaging System (THEMIS), and the Martian Radiation Environment Experiment (MARIE). The GRS suite of three instruments includes the Gamma Sensor Subsystem (GSS), the Neutron Spectrometer (NS) and the High Energy Neutron Detector (HEND). THEMIS consists of two cameras sharing a single set of telescopic optics: a 5-band visible imager and a 10-band thermal infrared imager. Spacecraft and instrument performance have been nominal to this point in the science mission.

Plaut, J. J.↗

X-34 Vehicle Aerodynamic Characteristics

The X-34, being designed and built by the Orbital Sciences Corporation, is an unmanned sub-orbital vehicle designed to be used as a flying test bed to demonstrate key vehicle and operational technologies applicable to future reusable launch vehicles. The X-34 will be air-launched from an L-1011 carrier aircraft at approximately Mach 0.7 and 38,000 feet altitude, where an onboard engine will accelerate the vehicle to speeds above Mach 7 and altitudes to 250,000 feet. An unpowered entry will follow, including an autonomous landing. The X-34 will demonstrate the ability to fly through inclement weather, land horizontally at a designated site, and have a rapid turn-around capability. A series of wind tunnel tests on scaled models was conducted in four facilities at the NASA Langley Research Center to determine the aerodynamic characteristics of the X-34. Analysis of these test results revealed that longitudinal trim could be achieved throughout the design trajectory. The maximum elevon deflection required to trim was only half of that available, leaving a margin for gust alleviation and aerodynamic coefficient uncertainty. Directional control can be achieved aerodynamically except at combined high Mach numbers and high angles of attack, where reaction control jets must be used. The X-34 landing speed, between 184 and 206 knots, is within the capabilities of the gear and tires, and the vehicle has sufficient rudder authority to control the required 30-knot crosswind.

Brauckmann, Gregory J.↗

The Cassini/Huyegens Mission to Saturn and Titan

This paper summarizes the principal accomplishments of the Cassini/Huygens mission over the past year, which include a complete reload of the flight software on the spacecraft, including that of most of the orbiter science instruments, the final definition of the exact orbital tour to be flown at Saturn, and considerable progress in designing the sequence of science observations to be made in the tour.

Cassini Huygens Saturn Titan↗

Trajectory design for the Mars Reconnaissance Orbiter Mission

This paper describes the analysis and design evolution of the Mars Reconnaissance Orbiter trajectory from launch to end-of-mission. The mission uses a combination of propulsive maneuvers and aerobraking techniques to deliver the orbiter to a low-altitude frozen orbit at Mars. The launch/arrival space for the 2005 Earth-Mars opportunity will be described as well as the particular launch strategy chosen for this mission. Details of the aerobraking profile will be provided. Finally, the Primary Science Orbit will be examined, and the trade-offs between science objectives and orbiter capability will be presented.

Mars↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

Ground Data System (GDS)↗

Designing capture trajectories to unstable periodic orbits around Europa

The hostile environment of third body perturbations restricts a mission designer's ability to find well-behaved reproducible capture trajectories when dealing with limited control authority as is typical with low-thrust missions. The approach outlined in this paper confronts this shortcoming by utilizing dynamical systems theory and an extensive preexisting database of Restricted Three Body Problem (RTBP) periodic orbits. The stable manifolds of unstable periodic orbits are utilized to attract a spacecraft towards Europa. By selecting an appropriate periodic orbit, a mission designer can control important characteristics of the captured state including stability, minimum altitudes, characteristic inclinations, and characteristic radii among others. Several free parameters are optimized in the non-trivial mapping from the RTBP to a more realistic model. Although the ephemeris capture orbit is ballistic by design, low-thrust is used to target the state that leads to the capture orbit, control the spacecraft after arriving on the unstable quasi-periodic orbit, and begin the spiral down towards the science orbit. The approach allows a mission designer to directly target fuel efficient captures at Europa in an ephemeris model. Furthermore, it provides structure and controllability to the design of capture trajectories that reside in a chaotic environment.

low-thrust↗

Preliminary Operational Results of the TDRSS Onboard Navigation System (TONS) for the Terra Mission

The Earth Observing System Terra spacecraft was launched on December 18, 1999, to provide data for the characterization of the terrestrial and oceanic surfaces, clouds, radiation, aerosols, and radiative balance. The Tracking and Data Relay Satellite System (TDRSS) Onboard Navigation System (ONS) (TONS) flying on Terra provides the spacecraft with an operational real-time navigation solution. TONS is a passive system that makes judicious use of Terra's communication and computer subsystems. An objective of the ONS developed by NASA's Goddard Space Flight Center (GSFC) Guidance, Navigation and Control Center is to provide autonomous navigation with minimal power, weight, and volume impact on the user spacecraft. TONS relies on extracting tracking measurements onboard from a TDRSS forward-link communication signal and processing these measurements in an onboard extended Kalman filter to estimate Terra's current state. Terra is the first NASA low Earth orbiting mission to fly autonomous navigation which produces accurate results. The science orbital accuracy requirements for Terra are 150 meters (m) (3sigma) per axis with a goal of 5m (1 sigma) RSS which TONS is expected to meet. The TONS solutions are telemetered in real-time to the mission scientists along with their science data for immediate processing. Once set in the operational mode, TONS eliminates the need for ground orbit determination and allows for a smooth flow from the spacecraft telemetry to planning products for the mission team. This paper will present the preliminary results of the operational TONS solution available from Terra.

Gramling, Cheryl↗

Cassini Titan Science Integration: Getting a 'Jumpstart' on the Process

The Cassini spacecraft has been in orbit for five years, returning a wealth of scientific data from Titan and the Saturn system. The mission is a cooperative undertaking between NASA, ESA and the Italian Space Agency and the project is currently planning for a second extension of the mission. The Cassini Solstice Mission (CSM) will extend the mission's lifetime until Saturn's northern summer solstice in 2017. The Titan Orbiter Science Team (TOST) has the task of integrating the science observations for all 126 targeted Titan flybys (44 in the Prime Mission, 26 in the first extension (Equinox Mission), and 56 in the second extension (Solstice Mission)) contained in the chosen trajectory. Cassini science instruments are body-fixed with limited ability to articulate; thus, the spacecraft pointing during the flybys must be allocated among the instruments to accomplish the mission's science goals. The science that can be accomplished on each Titan flyby also critically depends on the closest approach altitude, which is in turn determined by the attitude, but changing the altitude impacts the overall trajectory for the Solstice Mission. During the Prime and Extended missions, TOST has learned that the best way to achieve Cassini's Titan science goals is via a 'jumpstart' process prior to final delivery of the trajectory. The jumpstart is driven by the desire to balance Titan science across the entire set of flybys during the CSM, and to influence any changes (tweaks) to the flyby altitudes. By the end of the jumpstart, TOST produces Master Timelines for each flyby, identifying each flyby's prime science observations and allocating control of the spacecraft attitude to specific instrument teams. In addition, developing timelines early, while the science and operations teams are still fully funded, decreases the future workload in integration and implementation.

Steadman, Kimberly B.↗

Dawn Statistical Maneuver Design for Vesta Operations

In July of 2011 the Dawn spacecraft is scheduled to begin orbital operations at Vesta, a large main-belt asteroid. Dawn is a NASA Discovery mission that uses solar-electric low-thrust ion propulsion for both interplanetary cruise and orbital operations. Navigating between the Dawn project's four targeted science orbits at Vesta requires a plan that accounts for uncertainties not only in thrust execution, orbit determination, and other spacecraft forces, but also large uncertainties in characteristics of Vesta - such as the asteroid's gravity field and pole orientation. Accommodating these uncertainties requires strategic use of low-thrust maneuvers reserved for statistical trajectory corrections. This paper describes the placement and evaluation of low-thrust statistical maneuvers during two key phases of the Vesta mission along with a discussion of the tools, constraints, and methods used to plan those maneuvers.

Solar Electric Propulsion↗

Telecommunication System Design for Interplanetary CubeSat Missions: LunaH-Map

The Lunar Hydrogen Mapper (Luna H-Map) will be one of 13 CubeSats to launch on the first integrated flight of NASA’s Space Launch System and Orion spacecraft in 2018. The goal of the LunaH-Map mission is to map the hydrogen content of the entire South Pole of the moon, including permanently shadowed regions at high resolution. The spacecraft is a 6 U CubeSat and the main instrument is a neutron spectrometer which will be used to perform the measurements required to accomplish the primary science objective. Once LunaH-Map reaches the Moon, the spacecraft will perform a 60 - day science mission, consisting of 141 science orbits during which the measurements will be taken. In the design of the LunaH-Map spacecraft, one of the main challenges is the elecommunication system as the spacecraft needs the ability to relay data during the long cruise phase and during the science phase. In addition, the telecommunication system needs to support the main navigation functions required to reach the Moon and to insert in the highly elliptical orbit required for the science phase. This paper covers the main aspects of the telecommunication design for the mission including: link and coverage analysis, waveform selection and spectral constraints, hardware selection and ground station coordination.

Babuscia, Alessandra↗